MATSA RESOURCES LIMITED Capital/Financing Update 2019

Aug 20, 2019

65296_rns_2019-08-20_7d12ebe2-4efa-4cae-b1d0-b07144c1109a.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [595 x 56] intentionally omitted <==

----- Start of picture text -----

Matsa Resources Limited
----- End of picture text -----

==> picture [132 x 117] intentionally omitted <==

LIMITED ABN 48 106 732 487

ASX Announcement

21[st] August 2019

Mining Study for Fortitude Gold Mine Stage 2 Delivers Excellent Results

Highlights

  • Mining Study delivers highly positive results - indicates potential for immediate commencement of Fortitude Stage 2 mining operation

CORPORATE SUMMARY

Executive Chairman

Paul Poli

Director

  • Total cash surplus A$21.8M over 22 months

Frank Sibbel

  • Total production of 54,400 oz gold at 93% recovery

  • Capital outlay A$6.6M which includes pre-stripping

  • Operating cash cost of A$1,628/oz gold

Director & Company Secretary

Andrew Chapman

Shares on Issue

  • Assumed average gold price of A$2,150

176.93 million

  • Total material movement 5.85M bank cubic metres (bcm’s) at a waste to ore ratio of 14.4

  • All statutory and regulatory approvals are in place for the immediate commencement of mining

  • Total Indicated and Inferred Mineral Resources at Fortitude stand at 5,449,000 tonnes @ 2.0g/t Au (342,600 oz Au)

  • Maiden ore reserve declared of 1,029,000 tonnes at 1.8 g/t for 58,100 oz gold. Potential exists for a substantial increase of gold ore reserves in the near term

  • Discussions with respect to ore purchase arrangements with AngloGold Ashanti are in progress

Unlisted Options

~22 million @ $0.17 - $0.30

Top 20 shareholders

Hold 53.42%

Share Price on 20[th] August 2019

16 cents

Market Capitalisation

$28.31 million

  • Project financing discussions and options for gold hedging underway

Head Office: Suite 11, 139 Newcastle Street, Perth Western Australia 6000 Tel : +61 8 9230 3555 Fax: +61 8 9227 0370 Bangkok Office: Unit 1801, Pacific Place 2, 142 Sukhumvit Road, Klongtoey, Bangkok 10110 Tel : +66 0 2653 0258 Fax : +66 0 2653 0258 [email protected] www.matsa.com.au

Matsa Resources Limited

Matsa Resources Limited (“Matsa” or “the Company” ASX: MAT) is pleased to report highly positive results from its recently completed Mining Study for the proposed Stage 2 mining operations at the Company’s Fortitude gold deposit within the 100%-owned Lake Carey Gold Project in the Eastern Goldfields of Western Australia.

The study shows that the Stage 2 mining is attractive with a potential cash surplus of A$21.8M over a period of 22 months with a modest capital investment of only A$6.6M. A sensitivity analysis indicates that the project is robust with potential for improvement to the financial model as new optimisations come to hand. Finalisation of discussions with key parties and completion of the tender process may deliver further improvements.

Metallurgical test work indicates that Fortitude ore is amenable for treatment at any of the nearby processing facilities, and will deliver very good-to-excellent gold recoveries with no deleterious elements. Matsa is currently assessing processing options for the treatment of ore from Fortitude, and is in discussions with AngloGold Ashanti Australia Limited (AGAA), which is currently treating gold ore from Matsa’s nearby Red October underground gold mine under a five-year Ore Purchase Agreement between Matsa and AGAA.

Matsa Executive Chairman Mr Paul Poli said:

“Based on the positive outcomes of the Stage 2 Mining Study, we will now immediately move ahead with plans to tender for the mining contract, finalise ore purchase and treatment options and secure project financing to facilitate the commencement of the Stage 2 mining operations at Fortitude. In conjunction with our ongoing mining operations at the Red October underground gold mine, the proposed Stage 2 mining of Fortitude has the potential to deliver significant cash flows for the Company and value for our shareholders.”

Summary Details of the Stage 2 Mining Study are included in this announcement

Fortitude Stage 2 Mining Study Summary

Matsa has completed a study into a Stage 2 mining operation at the Fortitude gold deposit. The Stage 2 gold mining operation becomes cash flow positive after month 7 (Refer Figure 1), and has the following positive financial summary:

  • Capital outlay A$6.6M which includes A$5.1M for pre-stripping of overburden

  • Maximum cash outlay exposure A$9.1M

  • Cash surplus A$21.8M after 22 months

  • Assumed gold price of A$2,150

  • Production 1.029M t @ 1.8g/t ( 58,080 oz contained ) with 54,400 recovered ounces of gold

  • Total movement of 5.85M bcm’s

  • Waste to ore ratio 14.4

  • Operating cash cost per ounce A$1,628

Page 2

Matsa Resources Limited

Month surplus and cash flow

==> picture [455 x 278] intentionally omitted <==

----- Start of picture text -----

$7,000,000 $25,000,000
$6,000,000
$20,000,000
$5,000,000
$15,000,000
$4,000,000
$10,000,000
$3,000,000
$2,000,000 $5,000,000
$1,000,000
$0
$0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 -$5,000,000
-$1,000,000
-$10,000,000
-$2,000,000
-$3,000,000 -$15,000,000
MONTH
SURPLUS CASH FLOW
MONTH SURPLUS
CASH FLOW
----- End of picture text -----

Figure 1: Mining Study Projected Cash Flow ($AUD)

Importantly, all regulatory and statutory approvals are already in place which permits immediate commencement of mining activities. Tenders for the mining are to be called as well as finalisation of ore purchase/treatment options, which are well advanced.

Upon completion of drilling in 2016 and subsequent modelling and depletion of the resource due to the Stage 1 Trial Mining, the Indicated Mineral Resource at Fortitude is 2,945,000t @ 1.8g/t (170,400 oz). The total Indicated and Inferred Mineral Resource estimate for Fortitude now stands at 5,449,000 @ 2.0g/t (342,600 oz).

Cut-Off grade

The Mineral Resource has been reported at a cut-off grade of 1 g/t. This is reasonable considering the style of the deposit, the proximity to process facilities and to the selection of open cut mining equipment and methods used.

Fortitude Project Background

Matsa’s Fortitude deposit is located in the southern portion of the prolific Laverton Tectonic Zone (LTZ). The deposit is located just 25km south of AngloGold Ashanti Australia Ltd’s Sunrise Dam Gold Mine (10Moz), 60km south of Gold Fields Ltd’s Granny Smith Gold Mine (11.6Moz) and 12 km southeast of Matsa’s Red October Gold Mine (0.342Moz).

The Fortitude deposit was discovered in 1998 during regional exploration by Aurora Gold Ltd. The project was acquired by Midas Resources Ltd in 2002 who divested it to Fortitude Gold Pty Ltd in 2014.

Page 3

Matsa Resources Limited

The bulk of historic work was completed by Aurora and Midas who drilled 523 RC, AC and diamond drill holes into the deposit area. Also completed was a number of prefeasibility and feasibility studies into a heap-leach/dump leach operation and the viability of constructing a 600tpa CIL treatment plant.

Matsa purchased the Fortitude project from the receivers of Fortitude Gold Pty Ltd in 2016 ( refer to the ASX announcement of 21[st] July 2016 ). Matsa subsequently completed an audit of the Resource figures and the Mineral Resource estimate was confirmed as a JORC 2012 compliant Mineral Resource ( refer to the ASX announcement of 1[st] September 2016 ). Matsa subsequently commenced a diamond drilling program to provide drill core for metallurgical, geotechnical and resource definition purposes ( refer to the ASX announcements of 15[th] November 2016 and 14[th] December 2016 ).

Matsa has also previously completed the required heritage, hydrogeological, flora, fauna, community consultation and geotechnical studies which were included in the mining proposal at the trial mining stage which was approved by DMIR’s in 2017. Matsa successfully conducted the Stage 1 trial mine during the 2017/2018 years which was completed in May 2018 ( refer to the ASX announcement of 19[th] June 2018 ).

Study Scope

A mining study at Fortitude gold deposit commenced in July 2016 to evaluate the technical and financial viability of mining the Fortitude deposit. Trial mining was successfully undertaken in 2017/2018 with ore from the trial mine taken to AGAA’s Sunrise Dam Gold Mine processing plant and this current study evaluates the financial and technical viability of mining the remainder and larger part of the gold deposit (Stage 2) using a conventional open pit operation.

The Ore Reserve Estimate data, economic evaluation and Stage 2 Mining Study has been comprehensively reviewed by Matsa senior management.

The study is classified as a Scoping study with a confidence level of +/-20%.

Geology and Mineralisation

Gold mineralisation at Fortitude is associated with the Fortitude Shear Zone, a north-northwest striking shear which extends the length of the project. Ductile shearing and mineralisation is focussed within an intermediate volcanic unit adjacent to relatively undeformed mafic rocks.

Gold mineralisation forms continuous steeply dipping quartz lodes along the Fortitude Shear and is accompanied by pervasive wallrock siderite-sericite-silica alteration and vein quartz (locally +/carbonate) with pyrite +/- arsenopyrite in the deeper sulphide zones.

Vein intensity, siderite/sericite alteration and sulphide minerals are indicative of better Au grade.

Mineral Resource Update

Matsa has updated the Mineral Resource estimate to allow for depletion due to the Stage 1 trial mining.

Total Indicated and Inferred Mineral Resources for the Fortitude gold project now stands at 5,449,000 @ 2.0g/t for 342,600 oz (Refer Table 1).

Page 4

Matsa Resources Limited

Fortitude Deposit 2019 Mineral Resource Estimate (1 g/t Au cut off)

Fortitude Deposit 2019 Mineral Resource Estimate (1 g/t Au cut off) Fortitude Deposit 2019 Mineral Resource Estimate (1 g/t Au cut off) Fortitude Deposit 2019 Mineral Resource Estimate (1 g/t Au cut off) Fortitude Deposit 2019 Mineral Resource Estimate (1 g/t Au cut off) Fortitude Deposit 2019 Mineral Resource Estimate (1 g/t Au cut off) Fortitude Deposit 2019 Mineral Resource Estimate (1 g/t Au cut off) Fortitude Deposit 2019 Mineral Resource Estimate (1 g/t Au cut off) Fortitude Deposit 2019 Mineral Resource Estimate (1 g/t Au cut off)
Type Indicated Inferred Total Resource
Tonnes
kt
Au
g/t
Tonnes
kt
Au
g/t
Tonnes
kt
Au
g/t
Au
Oz
Oxide
Transition
Saprock
Fresh
222
377
227
2,119
1.9
1.8
1.9
1.8
51
125
1
2,326
2.1
2.0
2.1
2.1
273
502
228
4,445
1.9
1.8
1.9
2.0
16,900
29,700
14,100
282,000
Total 2,945 1.8 2,503 2.1 5,449 2.0 342,600

Table 1: Fortitude Gold Project Mineral Resource Estimate

  • Figures have been rounded in compliance with the JORC code. Rounding errors may cause the column not to add up precisely.

  • ** Mineral Resources are reported in situ (undiluted).

  • *** Mineral Resources are reported to a cut-off grade of 1g/t Au.

Sections 1, 2 and 3 JORC tables for the Mineral Resource estimate are presented in Appendix 1.

Competent Persons Statement

The information in this report that relates to Mineral Resources has been compiled by Matthew Cobb, who is a full-time employee of CSA Global Pty Ltd, and Richard Breyley who is a full time employee of Matsa Resources Limited. Dr Cobb is a Member of both the Australian Institute of Geoscientists and the Australian Institute of Mining and Metallurgy. Mr Breyley is a member of the Australian Institute of Mining and Metallurgy. Both Dr Cobb and Mr Breyley have sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activities which they are undertaking to qualify as a Competent Persons as defined in the JORC Code (2012). Dr Cobb and Mr Breyley consent to the disclosure of this information in this report in the form and context in which it appears.

Page 5

Matsa Resources Limited

Cautionary Statement

This belief is expressed in good faith and believed to have a reasonable basis.

The material in this announcement is intended to be a summary of current and proposed activities, selected geological data, as well as Mineral Resource estimates and Ore Reserves. This data is based on information available at the time.

It does not include all available information and should not be used in isolation as a basis to invest in the Company.

This announcement includes information and graphics relating to a conceptual mining study, completed Mineral Resource estimate and a scoping study and includes “forward looking statements” which include, without limitation, estimates of gold production based on mineral resources that are currently being evaluated.

While the Company has a reasonable basis on which to express these estimates, any forward looking statement is subject to risks, uncertainties, assumptions and other factors, which could cause actual results to differ materially from future results expressed, projected or implied by such forward-looking statements.

Risks include, without limitation, gold metal prices, foreign exchange rate movements, project funding capacity and estimates of future capital and operating costs.

The Company does not undertake to release publicly any revisions to forward looking statements included in this report to reflect events or results after the date of this presentation, except as may be required under applicable securities regulations.

Any potential investor should refer to publicly available reports on the ASX website and seek independent advice before considering investing in the Company.

Matsa completed a 21 diamond drillholes in 2016 for 2,257.7m. The results from the drilling were reported on 15[th] November 2016 and 14[th] December 2016. The purpose of the diamond drilling was to:

  • Infill and convert Inferred Mineral Resources in the potential mining area to Indicated Mineral Resources

  • Provide diamond drill core for metallurgical test work

  • Provide diamond drill core for bulk density determination

  • Geotechnical assessment

CSA Global consultants were contracted to carry out grade estimation for the Fortitude Mineral Resource estimate. The estimate was based on geological constraints and bulk densities provided by Matsa. Three domains were interpolated. Two primary lodes were domained striking 330[0] and 350[0] and steeply dipping towards the northeast. The supergene domain is more variable, striking between 330[0] and 360[0] and shallow dipping towards the northeast.

Top cuts applied for the estimate range from 20g/t Au to 40g/t Au. The chosen method of estimation was ordinary kriging (ok) using a two pass search strategy where the number of samples required being reduced for the second pass. Detailed commentary on all assumptions and methods used in the Mineral Resource estimate can be located in Appendix 1. In 2019, the resource was recalculated to account for the depletion of the Stage 1 trial mining.

Page 6

Matsa Resources Limited

Diamond Drill Core Sampling Techniques

The diamond core was marked up for orientation and then for assay sample selection. The core was marked up for sampling, to a maximum of 1m intervals as well as for shorter intervals which targeted visual geological boundaries. The core was then cut length wise to produce half core in a manner to protect the orientation markings. Sampling was completed from one half of the core.

The samples were placed into pre-numbered calico bags and sent off for assay.

Sample Analysis Method

The half core sent for assay sampling was crushed and riffle split and pulverised to produce a 30-50gm sample for fire assay.

Cut-Off grade

The Mineral Resource has been reported at a cut-off grade of 1 g/t. This is reasonable considering the style of the deposit, the proximity to process facilities and to the selection of open cut mining equipment and methods used.

Mine Design and Scheduling

The study demonstrates that under the current market conditions, Fortitude can be economically mined.

A geotechnical assessment was completed by Peter O’Bryan and Associates from which the wall design criteria were selected. Walls have been designed at 55[0] in the weathered zone with lower walls having berm widths from 5m to 8m with face angles 60[0] to 75[0] with berms every 10 vertical metres in the weathered zone and 20m in the fresh zones.

An optimisation study was completed by Orelogy using a gold price of A$1,700 per ounce and industry based costs. The optimisation studies were based on Probable Ore Reserves only. The results from this optimisation were used to design the pit. Ramps are designed at a gradient of 1 in 10 and are 24m width for dual lane in the upper portion of the pit at 1 in 10 gradient and 14m width at 1 in 9 for single lane in the lower portion of the pit.

Ore loss of 5% and dilution of 10% at zero grade was allowed for in the study.

Stage 2 Pit Reserves Oxide Transitional Fresh Total
Ore tonnes kt 141 277 611 1,029
Ore grade g/t 1.8 1.6 1.8 1.8
Waste bcm 5,447,000
Total bcm 5,853,000
Contained ounces 8,000 13,900 36,200 58,100

Table 2: Mine Production

Page 7

Matsa Resources Limited

The pit has been scheduled to be mined to completion within 22 months. Mining will be initially worked on double shift, and then from month 14 on single shift as the work area decreases towards the bottom of the pit. Production will be 54,400 ounces of recovered gold at an operating cost of A$1,628 per recovered oz of gold. The ore tonnes mined are hauled to an external treatment facility for processing. Ore haulage commences in month 2 and continues to month 22 when all ore stockpiles on site have been delivered to the processing facility.

==> picture [460 x 258] intentionally omitted <==

----- Start of picture text -----

Ore tonnes hauled
100,000
90,000
80,000
70,000
60,000
50,000
40,000
30,000
20,000
10,000
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Oxide Ore Trans Ore Fresh Ore
----- End of picture text -----

Figure 2: Ore Tonnes Mined per Pit per Month

Ore Reserves

The total Ore Reserve for the Fortitude Stage 2 mining study is 1,029,000t @ 1.8g/t (58,100 oz Au). The entire Ore Reserve is classified as Probable under the JORC 2012 code.

Ftitd Dit 2019 O Ftitd Dit 2019 O Ftitd Dit 2019 O St 2 Mii Oti 1 /t A tff St 2 Mii Oti 1 /t A tff St 2 Mii Oti 1 /t A tff St 2 Mii Oti 1 /t A tff St 2 Mii Oti 1 /t A tff
orue epos re eserve age nng peraon ( g u cu-o)
Type Proven Probable Total
Tonnes
Au
t
g/t
Tonnes
Au
t
g/t
Tonnes
Au
Au
t
g/t
Oz
Oxide
Transitional
Fresh
0 0 141,000 1.8 141,000 1.8 8,000
277,000 1.6 277,000 1.6 13,900
611,000 1.8 611,000 1.8 36,200
Total 0
0
1,029,000
1.8
1,029,000
1.8
58,100

Table 3: Ore Reserve Statement

Page 8

Matsa Resources Limited

  • Figures have been rounded in compliance with the JORC code. Rounding errors may cause the column not to add up precisely.

  • ** Ore Reserves are reported inclusive of marginally economic material and diluting material delivered for treatment (diluted).

  • *** Ore Reserves are reported to a cut-off grade of 1g/t Au.

Dilution parameters applied to the Mineral Resource estimate as modifying factors for Reserve calculation include a mining loss of 5% and dilution of 10% at zero grade. This is considered appropriate for the open pit operation.

The reported Ore Reserve estimations are considered representative on a global scale.

Competent Persons Statement

The information in this report that relates to Ore Reserves has been compiled by Franciscus Sibbel who is a non-executive director of Matsa Resources Limited. Mr Sibbel is a Fellow Member of the Australian Institute of Mining and Metallurgy. Mr Sibbel has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activities which they are undertaking to qualify as a Competent Persons as defined in the JORC Code (2012). Mr Sibbel consents to the disclosure of this information in this report in the form and context in which it appears.

Metallurgy

The test work programme scope included detailed head assays, basic comminution characterisation testing and gravity-cyanidation testing under conditions encompassing the potential treatment plants, including cyanidation testing under a range of applicable grind sizes. Test work was undertaken on composite samples derived from part diamond drill core intervals selected to spatially represent the ore types and from the experience of the trial mining. In general, the outcomes of the programme results received to date are very encouraging and include:

  • Detailed head assays demonstrated no significant levels of potentially deleterious elements and relatively low sulphide contents

  • Comminution characterisation test work demonstrated relatively soft to moderate competency, hardness and abrasiveness characteristics including Bond Ball Mill Work Index values ranging from 8.6 kWh/t to 14.6 kWh/t

  • Slurry rheology testing was undertaken on the oxide ore type samples and indicated that no viscosity issues are expected from these samples under the tested conditions

  • Gravity Au recovery at the tested 180 µm P80 grind size demonstrated good (27%) to high (57%) Au extraction to intensive cyanidation solution under the tested conditions

  • Cyanidation of the combined gravity tail samples exhibited very good (89.8%) to excellent (98.2%) Au recoveries (including gravity) at 36 hours and excellent Au extraction kinetics which allowed for similar 24 hour Au recoveries (including gravity) which ranged between very good (89.8%) and excellent (97.5%) values for all tested ore types

  • Moderate cyanide consumption and typical lime addition values were reported

The results demonstrate characteristics suitable for treatment via any of the potential nearby toll treatment operator’s processing facilities with moderate comminution demands, very good to

Page 9

Matsa Resources Limited

excellent gravity and cyanidation gold recoveries, moderate reagent requirements and no significant deleterious elements. Some grind size and leach residence time dependencies to gold recovery have been shown and the reported technical relationships can be assessed along with commercial related aspects to obtain maximised economic utilisation of the Fortitude gold deposit.

Processing

Matsa is currently evaluating its processing options for the treatment of ore and has had discussions as part of its ongoing relationship with AGAA. Treatment costs used in the mining study fall within the range currently being negotiated in commercial confidence and are in line with the Stage 1 trial mining and the Red Dog gold mine.

It is expected that a binding contract will be entered into before mining commences.

Infrastructure

The Fortitude gold deposit is located in close proximity to multiple fully established mining operations complete with processing facilities. There is an established haul road connecting Fortitude to the nearby operations.

The infrastructure required for the mining of the Stage 2 mining operation are:

  • Dewatering of the trial mining operation

  • Recommissioning of dewatering bores and the dewatering pipeline network and the sediment and discharge water management ponds

  • Minor refurbishment of existing haul roads

  • Set up an administration complex which will include the office, crib, ablution and 1[st] aid room

Approvals and Permitting

All approvals necessary for the Stage 2 mining project are in place:

  • 5C License to take water – Department of Water – Approved

  • 26D License to construct wells – Department of Water – Approved

  • Native Vegetation Clearing Permit – Department of Environmental Regulation – Approved

  • License to discharge water – Department of Environmental Regulation – Approved

  • Mining Proposal – Department of Mines and Petroleum – Approved

  • Works approval – Department of Environmental Regulation – Approved

Land Tenure and Social Heritage

The Mineral Resource and proposed mining area covers 3 granted mining leases which do not expire until 2029. Matsa Gold Pty Ltd (a wholly owned subsidiary of Matsa) is the 100% owner of the tenements which are located on the Mt Weld pastoral lease.

Harmony Australia Ltd holds a 1.5% net smelter royalty for production in excess of 250,000oz of gold. This royalty will not be triggered by this mining proposal. No other 3[rd] party royalties apply apart from the normal state government royalties.

There are no native title claims over the area. The archaeological and anthropological survey located one heritage site outside of the operational envelope and will be easily protected. The traditional owners have been extensively consulted and have given their approval for the mining project.

There are no impediments for the license to operate.

Page 10

Matsa Resources Limited

Capital Costs

The total estimated capital setup costs are A$6.6M which includes A$5.1M for pre-stripping overburden removal. The major capital items are pit dewatering system (A$100k), the site mobilisation and the administration office complex (A$600k). These capital cost items are based on quotes sourced through market suppliers and rates supplied by mining contractors on pre-tender submissions.

Mining Method

The mining method selected for this study is based on a conventional open pit operation involving approximately (120 tonne) backhoe excavators and (90 tonne) trucks. Allowance has been made for drilling and blasting of the material as needed. Ramps are designed at a gradient of 1 in 10 and are 24m wide for dual lane in the upper portion of the pit at 1 in 10 gradient and 14m width at 1 in 9 for single lane in the lower portion of the pit.

Waste Rock Characterisation

A waste rock characterisation study has been completed to determine the suitability of the waste rock to resist erosion, as well as confirming that the waste rock is classified as non-acid forming (NAF).

Operating Costs

Operating costs have been based on unit mining costs supplied by mining contractors from pre-tender submissions and from previous recent actual costs incurred during the Stage 1 trial mining and the Red Dog gold mine. Mining costs are yet to be finalised by contract.

An allowance as been made for in pit grade control and is applied on a cost per tonne of ore mined basis.

Negotiations are underway with nearby ore treatment facilities. Treatment costs used in the mining study fall within the range currently being negotiated in commercial confidence.

Ore haulage costs have been based on costs achieved in the Stage 1 trial mining and current quotes. All ore mined will be hauled from a local ROM to an external treatment facility using standard triple/quad road-trains along a Matsa privately held haul road.

The study was based on a FIFO workforce working on double shift for the initial 13 months and then single shift. The workforce will be accommodated at Matsa’s nearby Red October accommodation village and commuting on a shift basis between the village and the minesite.

Market Assessment

The study was completed using an average gold price of A$2,150 per oz, which is considered achievable for the project. There is a transparent quoted liquid market for the sale of gold in Australia.

Economic Factors

The total cost of the Stage 2 mining operation to Matsa is A$95.3M and consists of:

  • Start-up cost of A$6.6M including A$5.1M pre-stripping costs

  • Mining and haulage costs of A$43.1M

Page 11

Matsa Resources Limited

  • Processing costs of A$45.6M

The revenue factor is based on an ore sales agreement and on the delivery of 1,029,000 ore tonnes at 1.8g/t to an external ore treatment facility. This equates to an operating cost to Matsa of A$1,628/oz of gold for the life of the Stage 2 mining project.

Processing Method

The ore will be processed at one of three nearby ore treatment facilities. The selection of ore treatment facility is a commercially sensitive matter.

The current metallurgical test work indicates that the Fortitude ore is amenable for treatment at any of the nearby facilities and that there are no deleterious elements in the ore. Historical and current recovery data indicates that recovery for Fortitude oxide and Transitional material is 95% which was used in the study and for the fresh ore the metallurgy recovery of 93% has been used.

Cut-Off Grade

The Ore Reserve has been reported at a cut-off grade of 1g/t. This was calculated using a gold price of A$2,150 per oz, pre-selected mining equipment and projected treatment requirement of the nearby treatment facilities.

Financial Modelling

Financial modelling was undertaken using monthly schedules and cash flows. A flat gold price of A$2,150 per oz was used for the project. The operation has a maximum cash exposure of A$9.1M.

Month surplus and cash flow

==> picture [432 x 258] intentionally omitted <==

----- Start of picture text -----

$7,000,000 $25,000,000
$6,000,000
$20,000,000
$5,000,000
$15,000,000
$4,000,000
$10,000,000
$3,000,000
$2,000,000 $5,000,000
$1,000,000
$0
$0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 -$5,000,000
-$1,000,000
-$10,000,000
-$2,000,000
-$3,000,000 -$15,000,000
MONTH
SURPLUS CASH FLOW
CASH FLOW
MONTH SURPLUS
----- End of picture text -----

Figure 3: Mining Study Projected Cash Flow

Page 12

Matsa Resources Limited

Funding Requirements

Matsa is currently evaluating options to finance the project and commenced discussions with certain parties.

Opportunities

The Fortitude Stage 2 mine represents an opportunity for Matsa, to combine Fortitude with the mining operation at Red October underground gold mine to exploit its gold resources for the benefit of all shareholders.

Risks

A key number of risks that are normal for this type of operation have been identified, such as:

  • Reduction in the $A gold price will negatively impact on revenue

  • Confidence in the geological model

  • Finalisation of a toll treating/ore purchase agreement with a nearby mill under acceptable and reasonable terms

  • Achieving the assumed unit cost mining rates as used in the study

  • Geotechnical stability of the pit walls

For further information please contact:

Paul Poli Executive Chairman Phone +61 8 9230 3555 Fax +61 8 9227 0370 Email [email protected] Web www.matsa.com.au

Page 13

Matsa Resources Limited

Appendix 1 - Matsa Resources Limited – Fortitude Gold Deposit

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling techniques Nature and quality of sampling (eg. cut channels, random
chips,
or
specific
specialised
industry
standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.
The sampling methodology below is for Matsa drilling only.
DD holes – After the core was oriented, marked up and logged the geologist marked up the sample intervals which honored
geological contacts or a 1m sample interval if no geological contact was observed. Where the core was unconsolidated it was split
(halved) using a paint scraper along the orientation line with the left side of the core being sampled and the right side retained. In
competent core the core was quartered using an Almonte core saw with the lower left side of the core (looking down hole) being
sampled.
The sampling methodology below is known for Midas drilling only.
RC sampling procedures adopted by Midas varied pre- and post- 2005. Prior to 2005 (FTRC001 – FTRC153) 1m bulk samples were
collected from the cyclone using plastic bags. A 5m composite was then collected in a calico bag using a metal scoop. Upon
receiving assays, the plastic bags containing the bulk samples within the mineralised zones were routinely re-split using a Jones
riffle splitter to obtain a 2-3kg sample (1/8th split) for submission.
Post 2005 drilling (FTRC154 – FTRC266) the bulk sample was collected for 1m sample intervals in plastic bags, while sub- samples
were collected in calico bags at the time of drilling by splitting the bulk 1m sample through a Jones riffle splitter to get a 1/8th split.
Sampling of AC cores – Drill cuttings were collected every metre in a plastic bag. 4m composite samples were collected by using a
trowel or ridged plastic spear, and the approximate 2kg sample was and sent for analysis. Upon receipt of assays the bulk sample
within each plastic bag in the mineralised zone was then re-sampled using on 1m intervals by scooping the sample from the bag.
DD holes - Once the core was correctly matched, orientation marks were drawn onto the drill core and then propagated along the
entire length. The core was then marked for sampling by the geologist, to either 1m length or by geological definitions. The core
was cut lengthways in a manner to preserve the orientation line. Sampling of ½ core was then completed.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
For diamond drilling core was orientated marked up and logged prior to being marked up for sampling by the geologist. Any core
loss was logged for entering into the database. Core was either halved or quartered the entire sample portion being collected in a
calico bag for submission to the laboratory.
For RC drilling completed by Midas 1 metre bulk samples were split using a jones riffle splitter or a rig mounted splitter beneath the
cyclone. The resulting 2-3kg sample was collected in a calico bag for submission to the laboratory.
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively
simple (eg. ‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other cases more
explanation may be required, such as where there is coarse
The entire nominated sample was sent to the lab, crushed, riffle split to <3kg (if required) and pulverised to produce a 30-50g
charge for fire assay or aqua-regia Au determination.

Matsa Resources Limited

Criteria JORC Code explanation Commentary
gold that has inherent sampling problems. Unusual
commodities or mineralisation types (eg. submarine
nodules) may warrant disclosure of detailed information.
Drilling techniques Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic etc) and
details (e.g. core diameter, triple of standard tube, depth
of diamond tails, face-sampling bit or other type, whether
core is orientated and if so, by what method, etc).
A total of 25 diamond holes, 12R C/DD holes, 187 RC holes and 93 AC holes were used in the resource estimation.
RC holes were completed using a standard face sampling hammer.
The core diameter for diamond drilling completed by Matsa was HQ3 triple tube. Previous companies used a combination of HQ
and PQ core diameters. Core was oriented using a Reflex digital core orientation tool, orientation methods by previous companies
are unknown.
Drill sample recovery Method of recording and assessing core and chip sample
recoveries and results assessed.
Core recoveries were recorded on a per run basis and entered into the geotechnical database. Zones of “nil recovery” were logged
by the geologist and assigned a grade of <0.01ppm Au for resource calculation.
Recoveries from RC and diamond drilling completed by Midas and Aurora were not provided.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Diamond drilling completed by Matsa was carried out by HQ3 triple tube to maximise recovery.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.
No relationship between recovery and grade has been observed.
Logging Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
All core, RC and AC chips were logged by either Matsa, Aurora or Midas geologists.
Diamond drilling completed by Matsa was logged for RQD’s and 6 holes were logged in detail by a geotechnical consultant.
Geological and geotechnical logging was completed to an appropriate level of detail required for Mineral Resource estimation,
geotechnical studies, metallurgical studies and mining studies.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.
DD core has been wet and dry photographed after metre marking and orientation was completed.
Qualitative geological logging was completed using a standard set of codes. These codes are considered suitable for use in defining
and modellingof the depositgeology.
The total length and percentage of the relevant
intersections logged.
All drill holes utilised for the Mineral Resource Estimate have been logged.
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether quarter, half or
all core taken.
The subsampling technique below is for Matsa only.
Where the core was unconsolidated it was split (halved) using a paint scraper along the orientation line with the left side of the core
being sampled and the right side retained. In competent core the core was quartered using an Almonte core saw with the lower left
side of the core (looking down hole) being sampled.

Matsa Resources Limited

Criteria JORC Code explanation Commentary
For Midas, ½ core was sampled. No information exists for the core sub-sampling for Aurora.
If non-core, whether riffled, tube sampled, rotary split, etc
and whether sampled wet or dry.
For RC drilling, mineralised sample splits from the 1m samples are obtained by Jones riffle splitter or rig mounted splitter to obtain a
2 – 3kg sample for submission.
For AC drilling mineralised sample splits are obtained by metal scoop from the 1m sample bags. The size of the sample is not
recorded but is assumed to be similar to the RC sampling.
Wetness information has not been captured in the database.
For
all
sample
types,
the
nature,
quality
and
appropriateness of the sample preparation technique.
Samples taken by Matsa were submitted to ALS laboratories in Kalgoorlie. Samples were dried and crushed to a nominal 6-10mm
through a jaw crusher. Samples over 3kg were riffle split to below 3kg and pulverized. Pulverising reduced the particle size to 90%
passing 75µm. 300-400g were sub-sampled from the pulveriser bowl as an analytical pulp.
The majority of sampling completed by Midas was submitted to either Ultra Trace or Genalysis Laboratories in Perth. Both
laboratories abide by a generic sample preparation process where drill samples are initially dried in an oven at temperatures of
approximately 105
0C, before crushing using a jaw crusher to achieve a product of a maximum 3mm size. Samples exceeding 3kg
were split to obtain a volume that would fit in the LM5 pulveriser bowl with single pass. The crushed sample is then pulverised for a
specified time in order to achieve a nominal 80% to 95% passing 75 micron size.
A 250g sub-sample was then collected and placed in a pulp envelope for analysis.
The sample preparation techniques are accepted routine procedure for the style and nature of gold mineralisation at Fortitude.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.
QAQC procedures adopted by Matsa included the insertion of appropriate certified standards and course blanks into the sample
sequence preferentially in the ore zones as well as the use of laboratory repeats. 5% of samples were also submitted to an umpire
laboratory, 2.5% of these were randomly selected and 2.5% selected by the geologist.
Midas QAQC protocols involves submission of standards, blanks, and field duplicate samples. Laboratory repeat analyses have also
been supplied to Runge and a large number of pulp samples were also submitted to a secondary laboratory for independent checks.
In general all certified standards and blanks returned the expected results within an acceptable error. Laboratory repeats and
umpire laboratory results had reasonable repeatability with no obvious bias as would be expected from a gold deposit with a
moderate – low nugget affect.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.
Matsa did not undertake any second half sampling of drill core as the samples were required for metallurgical test work.
802 duplicate samples were taken by Midas. A scatter plot showed reasonable repeatability with some outliers as expected in lode
gold deposits. There was no inherent bias observed.
Whether sample sizes are appropriate to the grain size of
the material being sampled.
The split/cut sample size of 2-3kg to be pulverised with 200-300g sub samples are appropriate for the grain size of the material
being sampled.
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.
Matsa submitted all samples to ALS in Kalgoorlie for analysis by fire assay with a 30g charge.
Ultra Trace laboratories was the major provider of assay services to Midas. Assay methods were either Fire Assay or Aqua Regia,

Matsa Resources Limited

Criteria JORC Code explanation Commentary
with 40g charge used in both methods.
ALS laboratories were the principal provider of assay services during the Aurora phase of drilling, while Genalysis laboratories also
provided assay services. Analysis was conducted using either Fire Assay or Aqua Regia, with both methods using a 50g charge.
Genalysis also conducted both Fire Assay and Aqua Regia analysis, using a 25g charge for the Fire Assay, and a 10g charge for Aqua
Regia.
Fire assay and aqua-regia analysis methods for gold are appropriate gold analysis methods for ore deposits of this type. Both
methods can be considered near total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
Not Applicable.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (ie lack of bias)
and precision have been established.
QAQC procedures adopted by Matsa included the insertion of appropriate certified standards and course blanks into the sample
sequence preferentially in the ore zones as well as the use of laboratory repeats. 5% of samples were also submitted to an umpire
laboratory, 2.5% of these were randomly selected and 2.5% selected by the geologist.
Midas QAQC protocols involves submission of standards, blanks, and field duplicate samples. Laboratory repeat analyses have also
been supplied to Runge and a large number of pulp samples were also submitted to a secondary laboratory for independent checks.
In general all certified standards and blanks returned the expected results within an acceptable error. Laboratory repeats and
umpire laboratory results had reasonable repeatability with no obvious bias as would be expected from a gold deposit with a
moderate – low nugget affect.
Verification of
sampling and assaying
The verification of significant intersections by either
independent or alternative company personnel.
No verification of significant intersections was carried out by either independent or alternative company personnel.
The use of twinned holes. Six out of the 93AC holes in the resource area have been twinned by RC holes. Intercepts and grades from both hole types are
similar, with the AC havingslightlylower meangrade.
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.
Data entry, verification and storage procedures are not formally documented. All hard copy sample cut sheets and assay files are
retained for database validation.
Discuss any adjustment to assay data. Not applicable.
Location of data
points
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.
Matsa
All drill holes were surveyed using a Sokkia GSR2650 LB differential GPS which has an accuracy of +/-10cm both vertically and
horizontally. Down hole surveys were carried out by Gyro Australia Pty Ltd using an SDI high speed true north seeker keeping gyro.
Midas
All drill holes used in the resource estimate have been accurately surveyed by contract surveyors using an RTK GPS instrument.
Downhole surveys have been conducted by the drilling company at regular intervals using either a single shot or a gyro tool for RC
and DD holes. Downhole survey of AC holes was not done.

Matsa Resources Limited

Criteria JORC Code explanation Commentary
Specification of the grid system used. Midas and Aurora used the AMG84_51 grid system. Matsa used the MGA94_51 grid system.
Quality and adequacy of topographic control. A high accuracy (method unknown) topographic DTM supplied by Midas has been used.
Data spacing and
distribution
Data spacing for reporting of Exploration Results. Drill spacing of approximately 25m (along strike) by 25m (on section) was considered adequate to establish both geological and
grade continuity. Towards the edges of the deposit the drill spacing widens to either 50m (along strike) by 25m (on section) or 50m
(alongstrike)by50m(on section).
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Data spacing and distribution has been sufficient to permit delineation and to confirm grade continuity of the narrow lodes and
supergene domains.
Whether sample compositing has been applied. Samples were composited to 1m downhole lengths.
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which
this is known, considering the deposit type.
The orientation of bulk of the drilling is approximately perpendicular to the strike of the steeply dipping mineralisation and is
unlikely to have introduced any significant sampling bias.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
Not applicable.
Sample security The measures taken to ensure sample security. Samples were delivered directly to ALS laboratories in Kalgoorlie by Matsa personnel. The chain of custody was not broken by any
3
rd parties.
Audits or reviews The results of any audits or reviews of sampling techniques
and data.
No audits or reviews of sampling techniques were undertaken.

==> picture [604 x 133] intentionally omitted <==

Page 18

Matsa Resources Limited

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral tenement and
land tenure status
Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or national
park and environmental settings.
The Mineral Resource covers 2 granted mining leases M39/710 and M39/1065. Both tenements expire in 2029. Matsa Gold Pty
Ltd is the 100% owner of the tenements which are located on the Mt Weld pastoral lease.
Harmony Australia Ltd hold a 1.5% net smelter royalty for production over 250,000oz.
There is no native title claim over the area.
One mapped heritage site in the area will not impact on mine planning or production.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a licence
to operate in the area.
There are no known impediments to obtaining a license to operate in the area.
Exploration done by other
parties
Acknowledgment and appraisal of exploration by other
parties.
Exploration drilling was conducted by Aurora Gold Limited (Aurora) between October 1998 and February 2002.
Midas Resources Limited (Midas) acquired the project from Aurora in October 2002. Midas has drilled in excess of 380 drill holes
both in and around Fortitude to test for extensions to the Fortitude system.
Matsa acquired the project in 2016 and has drilled 21 diamond holes for 2,257.7m.
Geology Deposit type, geological setting and style of mineralisation. The Lake Carey Project of which the Fortitude deposit forms a part is situated on the Fortitude Shear, which along with the Bindah
Shear located just west, forms a narrow corridor of ESE trending greenstones which are bounded to the east and west by
granitoid terrane. As the Fortitude-Bindah system extends north the greenstone pile thickens and lies host to numerous large gold
mineralisation systems. To the south the Fortitude-Bindah system appears to attenuate and eventually terminate against
granitoids of the Eastern Gneiss Terrane.
The greenstone sequence located within the Fortitude tenement is comprised of highly foliated felsic to intermediate volcanic
rocks with relatively undeformed mafic volcanic units to the east and west in contact with granite. The whole greenstone package
varies in width from <2km at the southern end of the tenement to approximately 8km at the northern end. Major north to north-
northwest trending shear zones occur within the greenstones and the granite to the east, in particular along geological contacts.
The main structural features are the Fortitude Shear along the eastern intermediate-mafic contact and the more north- westerly
trending Bindah Shear, along the western intermediate-mafic contact
Gold mineralisation is typically associated with the Fortitude Shear Zone, a north-northeast striking dextral shear which extends
the length of the Lake Carey tenement. To the north, it horsetails into the Wilga fault system and in the south it continues into the
Kirgella Gneissic Dome. Gold mineralization is also associated with the Bindah Shear, particularly at the old Bindah Mine to the
southwest.
The Fortitude deposit is hosted within sheared felsic to intermediate volcanic rocks and minor ultra mafics, and is covered by up
to 10m of lacustrine clays and aeolian sands surrounding Lake Carey. Gold mineralisation occurs within a steeply dipping shear
system, and is associated with pervasive carbonate-sericite-silica alteration along with pyrite-arsenopyrite mineralisation.
Remobilisation of gold has also resulted in the formation of flat lying zones of supergene mineralisation within the regolith.
Weathering extends to a depth of 60-80m.

Matsa Resources Limited

Criteria JORC Code explanation Commentary
Drill hole Information A
summary
of
all
information
material
to
the
understanding of the exploration results including a
tabulation of the following information for all Material drill
holes:

easting and northing of the drill hole collar

elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar

dip and azimuth of the hole

down hole length and interception depth

hole length.
Not applicable, the company is not reporting exploration results.
If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion
does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the
case.
Not applicable, the company is reporting a Mineral Resource based on historic drilling information. A summary of the drilling
information has been provided in Section1.
Data aggregation methods In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(eg. cutting of high grades) and cut-off grades are usually
Material and should be stated.
Not applicable, the company is not reporting exploration results.
Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade results,
the procedure used for such aggregation should be stated
and some typical examples of such aggregations should be
shown in detail.
Not applicable, no intercepts have been reported.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Not applicable, no metal equivalent results have been used.
Relationship between
mineralisation widths and
intercept lengths
These relationships are particularly important in the
reporting of Exploration Results. If the geometry of the
mineralisation with respect to the drill hole angle is known,
its nature should be reported. If it is not known and only
the down hole lengths are reported, there should be a
clear
statement
to
this
effect
(eg ‘down hole length, true width not known’).
Mineralisation styles tend to change from narrow vertical lodes in the north, to shallow dipping supergene-hypogene
mineralisation in the south. The shear hosted lode mineralisation strikes at roughly between 330° and 350° and is vertical to very
steeply dipping to the east north-east. The supergene mineralisation is somewhat more variable with strike roughly between 330°
and north - south and the lenses are generally flat lying or shallow dipping to the east north-east.
The orientation of the drilling is approximately perpendicular to the strike and dip of the shear hosted mineralisation and is
unlikely to have introduced any significant sampling bias.
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should include,
but not be limited to a plan view of drill hole collar
locations and appropriate sectional views.
Not applicable.

Matsa Resources Limited

Criteria JORC Code explanation Commentary
Balanced reporting Where comprehensive reporting of all Exploration Results
is not practicable, representative reporting of both low and
high grades and/or widths should be practiced to avoid
misleading reporting of Exploration Results.
Not applicable.
Other substantive
exploration data
Other exploration data, if meaningful and material, should
be reported including (but not limited to): geological
observations; geophysical survey results; geochemical
survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics;
potential deleterious or contaminating substances.
Not applicable.
Further work The nature and scale of planned further work (eg tests for
lateral extensions or depth extensions or large-scale step-
out drilling).
The mineralisation at Fortitude is open and plunges towards the north. Further drilling is warranted to test for potential
underground resources.
Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.
Not applicable.

==> picture [604 x 133] intentionally omitted <==

Page 21

Matsa Resources Limited

Section 3 Estimation and Reporting of Mineral Resources (Criteria listed in the preceding section also apply to this section)

Criteria JORC Code explanation Commentary
Database integrity Measures taken to ensure that data has not been
corrupted by, for example, transcription or keying errors,
between its initial collection and its use for Mineral
Resource estimation purposes.
The database used to generate the Mineral Resource estimate was supplied to CSA Global by Matsa as a validated Surpac
database. Use in Surpac requires the passing of a set of routine validation steps checking for sample overlaps, sample
duplications, missing downhole and missing collar survey data.
Data validation procedures used. Historic data was validated during importation into the Matsa database and found to be clean.
Sections were plotted and validated against historic hard copy sections.
Planned drill holes were ground trothed against historic collars in the field.
Matsa is satisfied that the drill hole database has been thoroughly validated.
Site visits Comment on any site visits undertaken by the Competent
Person and the outcome of those visits.
CSA Global staff have not visited site.
Matsa staff have made numerous visits to site throughout the conduct of exploration campaigns during 2016 and closely
supervised the 2016 resource definition, metallurgical and geotechnical drilling programs.
If no site visits have been undertaken indicate why this is
the case.
Not Applicable.
Geological interpretation Confidence in (or conversely, the uncertainty of) the
geological interpretation of the mineral deposit.
The geological interpretation of the Fortitude deposit was completed by Matsa.
The model is well constrained by a long history of discovery and mining of similar deposits within the region. Structural and
geological data collected from diamond drill core adequately characterizes the mineralization style to permit a high degree of
confidence in the interpretation of the Fortitude deposit.
The Competent Persons are satisfied that the geological model is robust and correlates well to field observations and drill hole
data.
Nature of the data used and of any assumptions made. Detailed geological logging, including alteration and oxidation state data, along with logged intensity of shearing and quartz
vein content were used, in conjunction with chemical assays, in order to develop the geological interpretation.
The effect, if any, of alternative interpretations on
Mineral Resource estimation.
Narrow Archaean Lode Gold deposits with a supergene expression and a low grade halo are a common style of mineralization
encountered in the Eastern Goldfields of Western Australia. Their morphology and petrogenesis are well characterized, and do
not readily offer materially different interpretations. The Competent Persons do not consider that an alternative interpretation
of the Fortitude deposit is likely to yield material differences to the Mineral Resource estimate.

Matsa Resources Limited

Criteria JORC Code explanation Commentary
The use of geology in guiding and controlling Mineral
Resource estimation.
The Fortitude deposit is hosted by the Fortitude Shear, which represents the sheared contact between undifferentiated
intermediate rocks and greenschist facies mafic / ultramafic rocks. The modelling of geology, along with the presence and
intensity of quartz veining is a strong guide to the interpretation of the extents of mineralization.
The factors affecting continuity both of grade and
geology.
Continuity of grade along strike and at depth is controlled by the presence / absence of the host shear fabric, intensity of
quartz veining, and the degree of chemical alteration the host rocks have undergone. Each of these characteristics may be
traced between drill holes using visual characteristics.
Dimensions The extent and variability of the Mineral Resource
expressed as length (along strike or otherwise), plan
width, and depth below surface to the upper and lower
limits of the Mineral Resource.
The Fortitude Mineral Resource is contained within an area defined by a strike length of 1,490 m and 200 m across strike,
along an azimuth of 350. The deposit is bounded by the extents 456,807 mE to 457,570 mE and 6,756,451 mN to 6,757,880
mN. The deposit lies within 375 m of the surface, and is open at depth, and potentially to the north along strike.
Estimation and modelling
techniques
The nature and appropriateness of the estimation
technique(s) applied and key assumptions, including
treatment
of
extreme
grade
values,
domaining,
interpolation parameters and maximum distance of
extrapolation from data points. If a computer assisted
estimation method was chosen include a description of
computer software and parameters used.
The Mineral Resource has been completed using 3 individual statistical domains built using a nominal 0.2 g/t Au cutoff grade.
Samples were composited to 1 m intervals base on assessment of the raw input sample intervals. Hi grade cuts ranging from
20 to 40 g/t Au were applied to the mineralization domains following statistical analysis. Analysis was completed using
GeoAccess software.
Quantitative Kriging Neighbourhood Analysis was undertaken using Supervisor software, to assess the effect changing key
neighbourhood parameters had on the block grade estimates. Kriging Efficiency and Slope of Regression were assessed for a
variety of block sizes, minimum and maximum input samples, search dimensions and discretization grids.
A two pass search strategy was used where the minimum number of samples required for estimation was reduced in the
second pass. For blocks not informed after two passes, the Sichel mean grade for that particular statistical domain was
assigned.
Ordinary Kriging (OK) was the chosen method of interpolation for the grades of mineralized zones and the low grade halo.
All grade estimation was undertaken in Surpac 6.6.2 software.
The availability of check estimates, previous estimates
and/or mine production records and whether the Mineral
Resource estimate takes appropriate account of such
data.
A previously published Mineral Resource estimate was completed in 2012. Statement of this resource is publicly available and,
after consideration for updated drilling data and re-interpretation of mineralized lodes, grade and tonnage values for this
previous estimate compare reasonably to the current estimate.

Matsa Resources Limited

Criteria JORC Code explanation Commentary
The assumptions made regarding recovery of by-
products.
No by or co-products have been considered.
Estimation of deleterious elements or other non-grade
variables of economic significance (eg. sulphur for acid
mine drainage characterisation).
No deleterious elements were recorded within the available assay data, and none have been considered in this Mineral
Resource estimate.
In the case of block model interpolation, the block size in
relation to the average sample spacing and the search
employed.
Blocks of dimensions 5 x 20 x 5 m were used to subcell to a minimum size of 1.25 x 5 x 1.25 m. This block size was selected on
the basis of quantitative analysis using data from the most well informed primary mineralised domain. Dimensions represent
approximately half the drill hole spacing in the X and Y dimensions for well informed regions of the model.
Any assumptions behind modelling of selective mining
units.
No assumption of selective mining unit has been made as part of the Mineral Resource estimate.
Any assumptions about correlation between variables. The model considers only one variable; Au and so no correlations have been considered.
Description of how the geological interpretation was used
to control the resource estimates.
Mineralisation domain boundaries were treated as hard boundaries for the purposes of selection of input samples data. These
boundaries were created on the basis of logged geology, alteration and says values.
Discussion of basis for using or not using grade cutting or
capping.
High grade cuts were sued to limit undue influence of extreme outliers values in the dataset described above.
The process of validation, the checking process used, the
comparison of model data to drill hole data, and use of
reconciliation data if available.
The Mineral Resource estimate was validated visually via qualitative comparison on screen between estimated block grades in
drill hole assays in section, and also via swath plots generated in the X, Y and Z directions.
Moisture Whether the tonnages are estimated on a dry basis or
with natural moisture, and the method of determination
of the moisture content.
Tonnages have been determined on a dry in-situ basis. No moisture values were reviewed.
Cut-off parameters The basis of the adopted cut-off grade(s) or quality
parameters applied.
The Mineral Resource has been reported at a cutoff grade of 1 g/t Au. The Competent Persons consider this reasonable when
considering the style of deposit, its proximity to processing infrastructure and the assumption of open pit mining methods
being employed.
Mining factors or
assumptions
Assumptions made regarding possible mining methods,
minimum mining dimensions and internal (or, if
applicable, external) mining dilution. It is always
necessary as part of the process of determining
reasonable prospects for eventual economic extraction to
consider potential mining methods, but the assumptions
made regarding mining methods and parameters when
estimating Mineral Resources may not always be
Mining optimisation studies conducted on historic Mineral Resource estimates for the Fortitude deposit show that it is
amenable to open pit mining at grade similar to those reported within this MRE.
Open pit mining is considered the most appropriate method of extraction to consider in any future studies.
Both the Competent Persons believe that there is a likely prospect of economic extraction.
A minimum downhole intercept width of 2m has been applied. No other considerations were made. Detailed assumptions
regarding dilution and minimum mining widths should be included in any future optimisation and Mine Planning work
conducted by Matsa during any Ore reserve estimation.

Matsa Resources Limited

Criteria JORC Code explanation Commentary
rigorous. Where this is the case, this should be reported
with an explanation of the basis of the mining
assumptions made.
Metallurgical factors or
assumptions
The basis for assumptions or predictions regarding
metallurgical amenability. It is always necessary as part
of the process of determining reasonable prospects for
eventual economic extraction to consider potential
metallurgical methods, but the assumptions regarding
metallurgical treatment processes and parameters made
when reporting Mineral Resources may not always be
rigorous. Where this is the case, this should be reported
with an explanation of the basis of the metallurgical
assumptions made.
Historic and current metallurgical test work has been completed indicating good recoveries of greater than 92% through a
regular CIL processing plant.
Environmental factors or
assumptions
Assumptions made regarding possible waste and process
residue disposal options. It is always necessary as part of
the process of determining reasonable prospects for
eventual economic extraction to consider the potential
environmental impacts of the mining and processing
operation. While at this stage the determination of
potential environmental impacts, particularly for a
greenfields project, may not always be well advanced, the
status of early consideration of
these potential
environmental impacts should be reported. Where these
aspects have not been considered this should be reported
with an explanation of the environmental assumptions
made.
No considerations regarding waste and process residue disposal have been made as part of this MRE. Given the proximity of
the deposit to existing processing infrastructure, it is likely that such infrastructure will be used for processing and will include
residue disposal options.
Bulk density Whether assumed or determined. If assumed, the basis
for the assumptions. If determined, the method used,
whether wet or dry, the frequency of the measurements,
the nature, size and representativeness of the samples.
CSA Global used fixed density values, assigned on the basis of regolith classification of the material within the model. Fresh
material was given a value of 2.8, Slightly weathered material; 2.7, transitional oxide material 2.4, fully oxidized material and
transported (colluvial) material; 2.0.
128 bulk density measurements were undertaken representing all ore types.
Bulk density determination was carried out by ALS laboratories using the wax immersion method on dried core for oxidised
rocks to account for voids, vugs and porosity.
In transitional and fresh rocks bulk densities were analysed by both the water immersion method and the wax immersion
method(ALS). The wax immersion method wasgivenprioritywhen assigningthe bulk densityto the various rock types.

Matsa Resources Limited

Criteria JORC Code explanation Commentary
The bulk density for bulk material must have been
measured by methods that adequately account for void
spaces (vugs, porosity, etc), moisture and differences
between rock and alteration zones within the deposit.
The wax immersion method on dried core carried out by ALS laboratories adequately accounts for voids, vugs and porosity.
Discuss assumptions for bulk density estimates used in
the evaluation process of the different materials.
The average bulk density rounded to 1 decimal place was used for all material types except for oxide where a lower value was
chosen. This is to account for any possible bias in sample selection.
Classification The basis for the classification of the Mineral Resources
into varying confidence categories.
The Mineral Resource was classified as Indicated and Inferred, taking into account the geological understanding of the deposit,
the density and quality of input data (including drill hole spacing) and kriging estimation statistics.
Whether appropriate account has been taken of all
relevant factors (ie relative confidence in tonnage/grade
estimations, reliability of input data, confidence in
continuity of geology and metal values, quality, quantity
and distribution of the data).
Both the Competent Persons consider that the classification is appropriate when consideration is given to all of the above
factors.
Whether the result appropriately reflects the Competent
Person’s view of the deposit.
The classification appropriately reflects the view of both Competent Persons.
Audits or reviews The results of any audits or reviews of Mineral Resource
estimates.
Internal Audits were conducted by CSA Global which verified methodology and parameters used in the generation of the
Mineral Resource estimate.
Discussion of relative
accuracy/ confidence
Where appropriate a statement of the relative accuracy
and confidence level in the Mineral Resource estimate
using an approach or procedure deemed appropriate by
the Competent Person. For example, the application of
statistical or geostatistical procedures to quantify the
relative accuracy of the resource within stated confidence
limits, or, if such an approach is not deemed appropriate,
a qualitative discussion of the factors that could affect
the relative accuracy and confidence of the estimate.
The Mineral Resource accuracy is communicated through the classification assigned to the deposit. The Mineral Resource
estimate has been classified in accordance with the JORC Code, 2012 Edition using a qualitative approach. All factors that have
been considered have been adequately communicated in Section 1 and Section 3 of this Table.
The statement should specify whether it relates to global
or local estimates, and, if local, state the relevant
tonnages, which should be relevant to technical and
economic evaluation. Documentation should include
assumptions made and the procedures used.
The Mineral Resource statement relates to a global estimate of in-situ tonnes and grade.

Matsa Resources Limited

Criteria JORC Code explanation Commentary
These statements of relative accuracy and confidence of
the estimate should be compared with production data,
where available.
The deposit has not, and is not currently being mined.

Section 4 Estimation and Reporting of Ore Reserves (Criteria listed in the preceding section also apply to this section)

Criteria JORC Code explanation Commentary
Mineral Resource
estimate for conversion to
Ore Reserves
Description of the Mineral Resource estimate used as a
basis for the conversion to an Ore Reserve.
The Fortitude Mineral Resource estimate 2017 (fortitude)ok_final20170130.mdl) was prepared by CSA Global Consulting using
databases and geological interpretation supplied by Matsa.
Clear statement as to whether the Mineral Resources are
reported additional to, or inclusive of, the Ore Reserves.
Mineral Resources are inclusive of Ore Reserves.
Site visits Comment on any site visits undertaken by the Competent
Person and the outcome of those visits.
The competent person is a non-executive director and consultant for Matsa and has visited the site a number of times.
If no site visits have been undertaken indicate why this is
the case.
Not applicable.
Study status The type and level of study undertaken to enable Mineral
Resources to be converted to Ore Reserves.
The Stage 2 mining study is a pre-feasibility/scoping level study.
The Code requires that a study to at least Pre-Feasibility
Study level has been undertaken to convert Mineral
Resources to Ore Reserves. Such studies will have been
carried out and will have determined a mine plan that is
technically achievable and economically viable, and that
material Modifying Factors have been considered.
The Stage 2 mining study is a pre-feasibility study with a level of confidence of +/-20%. The mine is technically and economically
viable and Modifying Factors have been considered.
Cut-off parameters The basis of the cut-off grade(s) or quality parameters
applied.
A cut-off grade of 1g/t Au is based on an economic assessment and current market parameters.

Matsa Resources Limited

Criteria JORC Code explanation Commentary
Mining factors or
assumptions
The method and assumptions used as reported in the Pre-
Feasibility or Feasibility Study to convert the Mineral
Resource to an Ore Reserve (i.e. either by application of
appropriate factors by optimisation or by preliminary or
detailed design)
The reported “Stage 2 mining study” was a pre-feasibility study. Input factors into optimization have a level of confidence of +/-
20%. The economic outcome is based on detailed mine designs.
The choice, nature and appropriateness of the selected
mining method(s) and other mining parameters including
associated design issues such as pre-strip, access, etc.
The selected mining method of typical open pit truck and shovel is appropriate for this type and configuration of mineral deposit.
The
assumptions
made
regarding
geotechnical
parameters (eg pit slopes, stope sizes, etc), grade control
and pre-production drilling.
Pit slopes are based on a detailed geotechnical assessment by external consultants. Walls have been designed at 55
0in the
weathered zone with lower walls having berm widths from 5 to 8m with face angles 60 to 75 degrees with berms every 10 vertical
metres in the weathered zone and 20m in the fresh zones. No further pre-production drilling is required. Grade controls costs have
been applied on a per tonne of ore basis.
The major assumptions made and Mineral Resource
model
used
for
pit
and
stope
optimisation
(if
appropriate).
The Fortitude Mineral Resource estimate 2017 (fortitude_ok_final20170130.mdl) for pit optimization. Pit optimizations were
carried out with appropriate slope angles, dilution, recovery, mining costs and metallurgical factors.
The mining dilution factors used. 10% of waste at zero grade was added to the ore to account for dilution.
The mining recovery factors used. Recovery factor of 95% was used.
Any minimum mining widths used. A minimum mining width of 15m was used.
The manner in which Inferred Mineral Resources are
utilised in mining studies and the sensitivity of the
outcome to their inclusion.
Inferred Mineral Resources have not been used for the mining study.
The infrastructure requirements of the selected mining
methods.
Site establishment will require the dewatering of the trial mining pits, installation of administration complex and the refurbishment
of a haul road.
Metallurgical factors or
assumptions
The
metallurgical
process
proposed
and
the
appropriateness of that process to the style of
mineralisation.
Ore will be processes at nearby CIL processing facilities. This process is appropriate for this style of mineralisation.
Whether
the
metallurgical
process
is
well-tested
technology or novel in nature.
CIL technology is well tested and widely used.
The
nature,
amount
and
representativeness
of
metallurgical test work undertaken, the nature of the
metallurgical domaining applied and the corresponding
metallurgical recovery factors applied.
3 oxide, 1 transitional and 1 fresh composite was selected for metallurgical test work. The selection was made such that the
material was spatially representative of the entire deposit at a grade similar to the overall mined grade. The information gained in
the trial mining was also used.
Any assumptions or allowances made for deleterious
elements.
Not applicable. No deleterious elements were identified in the test work.

Matsa Resources Limited

Criteria JORC Code explanation Commentary
The existence of any bulk sample or pilot scale test work
and the degree to which such samples are considered
representative of the orebody as a whole.
Not applicable. No bulk sample or pilot scale test work was undertaken.
For minerals that are defined by a specification, has the
ore reserve estimation been based on the appropriate
mineralogy to meet the specifications?
The Ore Reserve estimate has been based on mineralogical and metallurgical factors designed to meet any ore purchase or toll
treating agreements with nearby 3rd party plants.
Environmental The status of studies of potential environmental impacts
of the mining and processing operation. Details of waste
rock characterisation and the consideration of potential
sites, status of design options considered and, where
applicable, the status of approvals for process residue
storage and waste dumps should be reported.
Matsa has completed detailed flora and fauna, waste rock characterization and hydrogeological studies. Waste rock will be stored
in nearby waste dumps constructed to form a stable landform. The project does not require the construction of a tailings storage
facility.
Waste rock characterization test work indicates the waste material mined is non acid forming (NAF).
There are no known environmental impediments to the commencement of mining.
Infrastructure The existence of appropriate infrastructure: availability of
land for plant development, power, water, transportation
(particularly
for
bulk
commodities),
labour,
accommodation;
or
the
ease
with
which
the
infrastructure can be provided, or accessed.
The project is located nearby significant mining infrastructure and processing plants. An existing haul road is owned by Matsa and
connects the project to nearby mines. The mine would be developed as a FIFO operation with the workforce residing at Matsa’s
Red October camp only 30 minute drive from site.
Costs The derivation of, or assumptions made, regarding
projected capital costs in the study.
The costs have been derived from direct quotes received from suppliers and pre-tender submissions by contractors.
The methodology used to estimate operating costs. Operating costs have been derived from unit rates received in pre-tender submissions by contractors.
Allowances made for the content of deleterious elements. Not applicable.
The source of exchange rates used in the study. Not applicable, all costs have been quoted in Australian dollars.
Derivation of transportation charges. Ore haulage costs have been derived from quotes provided by local contractors and experience from the trial mining project..
The basis for forecasting or source of treatment and
refining
charges,
penalties
for
failure
to
meet
specification, etc.
Matsa is currently in negotiation with a number of nearby processing plants for the treatment of ore and has a non-binding ore
purchase offer. Treatment costs used in the mining study fall within the range currently being negotiated in commercial
confidence.
The allowances made for royalties payable, both
Government and private.
WA government royalties are included. No other royalties apply for this project. The Harmony royalty will not be triggered by this
project.
Revenue factors The derivation of, or assumptions made regarding
revenue factors including head grade, metal or
Revenue factors are based on forecast production rates, head grades and predicted metallurgical recoveries from the mine
schedule. A flat gold price of A$2,150/ounce was used based on the current market price.

Matsa Resources Limited

Criteria JORC Code explanation Commentary
commodity price(s) exchange rates, transportation and
treatment charges, penalties, net smelter returns, etc.
The derivation of assumptions made of metal or
commodity price(s), for the principal metals, minerals and
co-products.
Market assessment The demand, supply and stock situation for the particular
commodity, consumption trends and factors likely to
affect supply and demand into the future.
Not applicable. No detailed market assessment was undertaken or is required for gold.
A customer and competitor analysis along with the
identification of likely market windows for the product.
Not applicable for gold sales.
Price and volume forecasts and the basis for these
forecasts.
Not applicable.
For industrial minerals the customer specification, testing
and acceptance requirements prior to a supply contract.
Not applicable.
Economic The inputs to the economic analysis to produce the net
present value (NPV) in the study, the source and
confidence of these economic inputs including estimated
inflation, discount rate, etc.
Not applicable, no NPV has been reported.
NPV ranges and sensitivity to variations in the significant
assumptions and inputs.
Not applicable, no NPV has been reported.
Social The status of agreements with key stakeholders and
matters leading to social license to operate.
Matsa has completed significant consultation with the traditional owners, local shires and station owners. There are no social
impediments to the commencement of mining.
Other To the extent relevant, the impact of the following on the
project and/or on the estimation and classification of the
Ore Reserves:
Any identified material naturally occurring risks. No material naturally occurring risks have been identified.
The status of material legal agreements and marketing
arrangements.
Matsa is currently in negotiation with a number of nearby processing plants for the treatment of ore.
Matsa is required to go to tender on the mining and ore haulage contracts.

Matsa Resources Limited

Criteria JORC Code explanation Commentary
The status of governmental agreements and approvals
critical to the viability of the project, such as mineral
tenement
status,
and
government
and
statutory
approvals. There must be reasonable grounds to expect
that all necessary Government approvals will be received
within the timeframes anticipated in the Pre-Feasibility or
Feasibility study. Highlight and discuss the materiality of
any unresolved matter that is dependent on a third party
on which extraction of the reserve is contingent.
All government approvals are in place.
Classification The basis for the classification of the Ore Reserves into
varying confidence categories.
Probable Ore Reserves are based on Indicated Mineral Resources subject to economic viability.
Whether the result appropriately reflects the Competent
Person’s view of the deposit.
The estimate appropriately reflects the view of the competent person who has signed a JORC consent form to that effect.
The proportion of Probable Ore Reserves that have been
derived from Measured Mineral Resources (if any).
No applicable, no Probable Ore Reserves have been derived from Measured Mineral Resources.
Audits or reviews The results of any audits or reviews of Ore Reserve
estimates.
The Ore Reserve estimate, data, economic evaluation and pre-feasibility study have been comprehensively reviewed by Matsa
senior management.
Discussion of relative
accuracy/ confidence
Where appropriate a statement of the relative accuracy
and confidence level in the Ore Reserve estimate using an
approach or procedure deemed appropriate by the
Competent Person. For example, the application of
statistical or geostatistical procedures to quantify the
relative accuracy of the reserve within stated confidence
limits, or, if such an approach is not deemed appropriate,
a qualitative discussion of the factors which could affect
the relative accuracy and confidence of the estimate.
The relative accuracy and confidence in the Ore Reserve estimate is consider high. Geostatistical and statistical procedures used in
the Resource were completed by qualified external consultants.
The statement should specify whether it relates to global
or local estimates, and, if local, state the relevant
tonnages, which should be relevant to technical and
economic evaluation. Documentation should include
assumptions made and the procedures used.
All currently reported Ore Reserve estimations are considered representative on a global scale.
Accuracy and confidence discussions should extend to
specific discussions of any applied Modifying Factors that
may have a material impact on Ore Reserve viability, or
for which there are remaining areas of uncertainty at the
current study stage.
Appropriate modifying factors for dilution and ore loss have been applied based on the experience of the competent person.

Matsa Resources Limited

Criteria JORC Code explanation Commentary
It is recognised that this may not be possible or
appropriate in all circumstances. These statements of
relative accuracy and confidence of the estimate should
be compared with production data, where available.
Not applicable. Previous production exploited oxide ore where future production will target sulphide ore, as such the modifying
factors are treated differently.

==> picture [604 x 133] intentionally omitted <==

Page 32