DURKIN COPPER/NICKEL PROJECT EXPLORATION UPDATE

  • Calcrete sample assay results for main Cu/Ni target area received with individual nickel results ranging up to 343 ppm, copper 129.8 ppm, cobalt 39.3 ppm and chromium 5224 ppm.

  • Ground gravity survey data acquisition nearing completion.

  • Airborne electromagnetic survey planned to commence within coming days.

  • Further infill surface sampling planned.

Durkin copper/nickel prospect – Pundinya project

(Marmota Energy Limited (ASX: MEU) 100%)

Calcrete sampling results

Marmota Energy (ASX:MEU) is pleased to announce that it has received calcrete sample assay results from sampling programs covering approximately 50% of the central target zone (Figure 1) at the Durkin copper/nickel prospect. Calcrete sampling is used to more accurately target priority drill zones through the detection of trace elements within a range of samples.

Results are from 197 samples submitted for assay covering the main target zone that extends for approximately 1.2 km, within a larger copper and nickel-in-calcrete anomaly previously defined that extends more than 5km (Figure 1). This is currently considered by the Company to be the highest priority zone for potential drill testing. Remaining assay results covering the northern half of this zone are expected to be received shortly.

The results continue to strongly support the potential for copper – nickel mineralisation at Durkin. The survey is designed to assist in identifying targets for drill testing within the large anomaly zone defined from previously acquired calcrete sampling.

==> picture [270 x 381] intentionally omitted <==

Figure 1: Area of received calcrete assay results shown above within black outlined box.

Assay results* from calcrete samples included anomalous grades for nickel of up to 343ppm with associated vectoring elements chromium and cobalt returning grades of up to 5224ppm and 39.3ppm respectively. The association of copper, nickel, cobalt and chromium is considered critical and a positive sign for the project as they are all very common in other Ni/Cu projects of this type. Coincident anomalous copper results with grades of up to 129.8ppm Cu were also returned from assay as well as anomalous silver ranging up to 0.78 g/t Ag.

Marmota Energy Limited | PO Box 247, Export Park SA 5950 | T +61 8375 4300 | F +61 8375 3999

1

www.marmotaenergy.com.au

Summary of values for key elements of nickel, cobalt, chromium and copper over the main Durkin target area for 197 calcrete samples are below:

Element
Samples
Min Max Mean
Cu ppm 197 2 129.8 26.49
Ni ppm 197 5 343 25.42
Co ppm 197 1.2 39.3 7.85
**Crppm ** 197 8 5224 164.88

Results from calcrete samples covering the northern half of the main target, along with rock chip samples from outcrop are pending.

  • All analyses were undertaken by Genalysis Laboratory Services. The samples are pulverised to 85% passing 75 microns. An aqua-regia partial digest was used with multi-element assays based on ICP-OES (inductively coupled plasma optical (atomic) emission spectrometry) and ICP-MS (inductively coupled plasma mass spectrometry) methodology as appropriate.

Gravity survey

High resolution ground gravity survey data over the project with a 500x500 metre fixed grid gravity station network is being acquired across the Durkin Cu/Ni prospect. The survey results will complement the multi component infill surface sampling which has focused on the large coincident copper and nickel-in-calcrete anomaly (Figure 2).

==> picture [267 x 367] intentionally omitted <==

==> picture [85 x 25] intentionally omitted <==

----- Start of picture text -----

Gravity station
----- End of picture text -----

==> picture [37 x 11] intentionally omitted <==

Figure 2: Planned gravity station locations over copper- in- calcrete image with regional geology - Durkin prospect.

The new survey will replace regional spaced historic gravity data acquired at an approximate 4 mile spacing during the 1970’s pre GPS. Acquisition is continuing on schedule with approximately 70% of the survey completed. It is estimated that the survey will be completed in coming days with final results expected to be delivered within a week of end of acquisition. The preliminary results over part of the area indicate that the

Marmota Energy Limited | PO Box 247, Export Park SA 5950 | T +61 8375 4300 | F +61 8375 3999 www.marmotaenergy.com.au

2

data will greatly improve the Company’s understanding of the geological framework of the area and be a great aid in targeting drilling.

Airborne Electromagnetic Survey

Fugro Geophysics have mobilised a crew to the Durkin project area to commence a high resolution airborne electromagnetic (AEM) survey. The survey is scheduled to commence this weekend and will cover the northern half of the Pundinya tenement which hosts the Durkin Cu/Ni prospect.

The survey will be flown with Fugro’s HELITEM System which is the world’s most powerful helicopter timedomain electromagnetic system. The high power of HELITEM, coupled with the low noise at the receiver due to its placement above and not in the centre of the transmitting loop, ensures the greatest depth of penetration possible for any electromagnetic system.

HELITEM is offered with a high sensitivity magnetometer to detect magnetic anomalies and map geologic units and structure. The survey is expected to define any conductive features which may be related to the potential copper and nickel or any other mineralisation.

The survey is also expected to provide vital information relating to the potential depth extent and shape of any conductive features mapped. The duration of the survey is planned to be 2 weeks.

Combining the gravity data with good quality conductivity data over the target area will significantly improve the potential for drilling success.

Figure 3: Fugro’s HELITEM system in flight.

The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr D J Calandro, who is a Member of the Australian Institute of Geoscientists. Mr Calandro is employed full time by the Company as Managing Director and, has sufficient experience in the style of mineralisation and type of deposit under consideration and qualifies as a Competent Person as defined in the 2004 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Calandro consents to the inclusion of the information in this report in the form and context in which it appears.

==> picture [100 x 32] intentionally omitted <==

Mr Dom Calandro MANAGING DIRECTOR 9 November 2012

Marmota Energy Limited | PO Box 247, Export Park SA 5950 | T +61 8375 4300 | F +61 8375 3999

3

www.marmotaenergy.com.au

Element count min max 75Perc 90Perc 95Perc 98Perc
Cu ppm 197 2 129.8 32 49.55 73.575 100
Co ppm 197 1.2 39.3 9.2 13.38 16.62 23.02
Cr ppm 197 8 5224 170 329.6 516 920.96
Ni ppm 197 5 343 23 40.96 79.16 100.48
Fe % 197 0.43 36.96 9.53 18.6 23.542 30.3136
Mn ppm 197 16 1138 125 191.4 237 317.44
Mo ppm 197 0.1 6.7 0.5 1.01 1.4 2.1
Pd ppm 197 10 32 17.5 21 23.5 27.8
Ti ppm 197 5 >1000 68 152.8 231.1 338.64
U ppm 197 0.05 3.5 0.61 0.864 1.492 2.1816
V ppm 197 8 1038 171 335.4 454.8 724.68
Ag g/t 197 0.05 0.78 0.1175 0.345 0.4125 0.591
Appendix 1: Calcrete sample assay statistics for key elements 1: Calcrete sample assay statistics for key elements 1: Calcrete sample assay statistics for key elements 1: Calcrete sample assay statistics for key elements 1: Calcrete sample assay statistics for key elements
Easting Northing Zone
Sample
Ag Co Cr Cu Fe Mn Mo Ni Pd Ti U V
Number ppm ppm
ppm
ppm % ppm
ppm
ppm ppm ppm ppm ppm
378700 6641700 53 203832 0.07 29.3 219 27 17.91 134 0.6 343 X 87 0.55 211
378700 6641800 53 203821 X 5.5 326 50 10.96 111 0.7 32 18 457 0.67 347
378600 6641800 53 203820 0.09 16.5 356 81 19.55 295 0.6 43 15 162 0.58 306
378500 6641800 53 203819 0.07 5.8 238 68 14.53 139 0.7 21 11 129 0.69 349
378400 6641800 53 203818 0.43 8.7 320 73 10.14 122 1.4 24 X 107 2.59 744
378200 6641900 53 203802 X 5.9 205 129 7.61 76 1.2 19 21 154 0.33 232
378700 6641900 53 203799 X 13.3 313 43 11.03 209 0.8 64 X 52 0.28 164
378700 6642000 53 203782 0.09 12.7 502 51 23.67 233 0.4 78 X 163 0.37 244
378700 6642100 53 203777 X 16.2 900 10 34.27 122 0.2 106 15 348 0.52 212
378100 6642200 53 203754 X 6.1 198 122 19.02 115 0.5 32 X 78 0.85 374
378300 6642200 53 203752 X 15.6 5224 33 13.25 160 0.2 272 X >1000 1.15 251
378700 6642200 53 203736 X 2.9 338 67 20.02 88 0.4 23 X 203 0.49 447
378900 6642200 53 203735 0.08 17.1 215 86 13.11 177 1 66 13 130 0.92 341
379000 6642200 53 203734 0.33 11.4 684 16 23.51 132 0.7 24 11 154 0.86 947
379000 6642300 53 203733 0.21 13.7 281 60 13.76 150 1.1 29 20 75 1.74 689
378800 6642300 53 203731 0.07 9.3 572 48 32.77 267 0.5 50 20 309 1.84 434
378600 6642300 53 203729 X 9.5 340 16 10.47 66 0.2 60 X 61 1.75 108
378500 6642300 53 203728 X 8.4 770 40 18.69 70 0.2 78 X 168 0.41 143
378100 6642300 53 203718 0.07 6.4 172 98 12.35 185 0.3 40 12 20 0.65 245
378000 6642400 53 203716 X 8.1 137 69 22.19 174 3.2 23 X 85 0.5 171
378100 6642400 53 203715 X 22.7 1162 41 22.39 236 0.3 88 X 259 0.85 427
378500 6642400 53 203711 X 9.2 378 54 13.79 56 0.7 29 11 56 0.9 406
378800 6642400 53 203708 X 26.7 156 53 9.14 215 0.3 34 X 66 0.79 295
378900 6642500 53 203706 0.08 12.2 132 32 2.88 143 0.2 100 X 7 0.38 131
378200 6642500 53 203692 X 5.1 144 79 18.39 155 4.7 16 14 118 0.67 188
378100 6642500 53 203691 X 3.9 170 118 36.96 154 6.7 8 32 152 0.75 226
379000 6642800 53 203633 X 15.5 572 17.5 11.57 310 0.4 94.9 X 126 0.48 102
379500 6642900 53 203628 0.06 9.5 701 16.6 19.47 211 1.9 12 X 11 2.23 1038
379200 6643200 53 203585 X 17.2 1613 7.9 19.22 403 0.6 93.1 11 258 1.46 200
379500 6643200 53 203584 X 5.9 129 13.3 3.06 95 0.4 61.7 X 16 0.42 43
379200 6643300 53 203555 0.06 39.3 2109 25.4 25.19 270 0.8 111.6 X 56 0.81 239
379000 6643400 53 203552 X 29.5 223 129.8 29.31 1138 0.6 83.8 X 91 1.21 278
379400 6643500 53 203517 X 21 405 75.3 18.54 688 1.3 33.4 X 142 1.65 764
378200 6643500 53 203510 0.78 7.1 102 16.5 3.67 73 0.2 29.4 X 18 0.4 65
378300 6643500 53 203511 X 19.9 188 38.2 8.68 191 1.6 89.8 14 15 1.14 339