Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

MACRO METALS LIMITED Board/Management Information 2019

Jul 4, 2019

65283_rns_2019-07-04_cd794fc4-6732-4ff2-8453-d61f728c7516.pdf

Board/Management Information

Open in viewer

Opens in your device viewer

==> picture [596 x 143] intentionally omitted <==

----- Start of picture text -----

Nigerian Subsidiary
----- End of picture text -----

5 July 2019

KOGI MANAGEMENT CHANGES AND APPOINTMENT OF ADVISORS

The Directors of Kogi Iron Limited and its Nigerian subsidiary KCM Mining (ASX: KFE, ‘Kogi’, ‘the Company’) are making the following management changes.

Martin Wood has resigned as Managing Director effective 5[th] August, 2019. David Turvey, a non-executive director of the Company, will assume the role of Managing Director on a short-term basis while a search is conducted for a new CEO. David is very well experienced to take on this role, having been the former Managing Director of FerrAus Limited. Martin will remain as a financial consultant till 30[th ] September 2019.

To ensure continuity of project knowledge & respect of in-country relationships the Company is also pleased to announce the appointment of Dr Ian Burston, Mr Kevin Joseph and Mr Ian Whiteley as advisors to assist in progressing the Agbaja Cast Steel Project. All have extensive experience in Africa, and Nigeria in particular, and have had a long association with the Project from its inception. Dr Burston is also a director of KCM Mining.

The advisors will report to the KCM Mining board and the positions are unremunerated.

The Company has also set up a Finance Committee to be chaired by non-executive director Peter Huljich. The committee will be responsible for identifying and securing the funding required for the completion of the detailed engineering and technical program for the development of the Agbaja Project. The committee will also include Greg Boulton, a non- executive director of the Company.

The board of the Company thanks Martin for his service and commitment over his period as Managing Director.

Commenting on these appointments, Kogi’s Chairman, Don Carroll, said that ‘it is important that the Company draws on the full experience of its directors and advisors to secure the successful funding and subsequent development of the Agbaja Project.”

For more information, please contact:

Kogi Iron Limited Tel (office): +61 8 9200 3456 Email: [email protected]

KFE Capital Summary
Ordinary Shares:
661,644,742
Share price: $0.067
Market capitalisation:
$44m
Board of Directors
Mr Don Carroll –Non-Executive Chairman
Mr Martin Wood –Managing Director
Mr Greg Boulton AM –Non-Executive Director
Mr David Turvey –Non-Executive Director
Mr Peter Huljich –Non-Executive Director
Contact
Unit 23, 4 Ventnor Avenue,
West Perth WA 6005
Tel : +61 8 9200 3456
Email:[email protected]
W: www.kogiiron.com

==> picture [90 x 25] intentionally omitted <==

==> picture [35 x 35] intentionally omitted <==

About Kogi Iron (ASX: KFE)

Kogi Iron Limited is a Perth-based company with the objective of becoming an African iron ore and steel producer through the development of its 100% owned Agbaja iron ore and steel project located in Kogi State, Republic of Nigeria, West Africa (“Agbaja” or “Agbaja Project”).

Nigeria has substantial domestic demand for steel products, which is currently met largely through imports. The Agbaja project, located about 200km south of the Nigerian capital Abuja, opens the opportunity for domestic production of pig iron products.

The Company holds a land position which covers a large part of the Agbaja Plateau. The Agbaja Plateau hosts an extensive, shallow, flat-lying channel iron deposit with an Indicated and Inferred Mineral Resource of 586 million tonnes with an in-situ iron grade of 41.3% reported in accordance with the JORC Code (2012). This mineral resource covers approximately 20% of the prospective plateau area within ML24606 and ML24607.

Table 1 – Summary Grade Tonnage for Laterite (Zone A) and Oolitic (Zone B) Horizons (20% Fe lower cut off is applied) Refer ASX announcement 10 December 2013.

Classification Tonnes (Mt) Fe (%)
ZoneA(LateriteMineralisation)
Indicated 147.5 33.2
Inferred 33.9 31.7
Total Indicated + Inferred (Zone A) 181.4 32.9
ZoneB(OoliticMineralisation)
Indicated 318.7 45.2
Inferred 86.3 44.7
Total Indicated + Inferred (Zone B) 405.0 45.1
CombinedZoneAandZoneB
Total Indicated 466.2 41.4
Total Inferred 120.1 41.1
Total Indicated + Inferred 586.3 41.3

The Company confirms that it is not aware of any information or data that materially affects the information included in the original market announcements and, in the case of estimated Mineral Resources, which all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements.