Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

M3 MINING LIMITED Capital/Financing Update 2023

Nov 21, 2023

65282_rns_2023-11-21_e2031650-1d70-4ba3-a4ae-eb75af49bd6d.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX Announcement

==> picture [115 x 91] intentionally omitted <==

RC DRILLING PROGRAM COMMENCES AT EDJUDINA GOLD PROJECT

HIGHLIGHTS

  • A ~400m reverse circulation (RC) drilling program has commenced at M3 Mining’s El Capitan prospect at the Edjudina Gold Project

  • Program to target depth extensions of previously intersected gold mineralisation including 10m at 241.2 g/t Au from 27m in aircore drillhole EDJAC164[1]

  • Program consists of two RC holes drilled in varying orientations with results expected in Q1 2024

M3 Mining Limited (ASX:M3M) (M3 Mining or the Company) is pleased to announce the start of an RC drilling program at the El Capitan prospect at the Edjudina Gold Project ( Edjudina or the Project ) located 140km northeast of Kalgoorlie in Western Australia. (see Figure 1).

==> picture [399 x 299] intentionally omitted <==

Figure 1 – RC drilling at the El Capitan prospect at the Edjudina Gold Project

1 See M3M announcement 10/07/2023 “ Spectacular gold mineralisation confirmed at Edjudina ” for further details.

==> picture [54 x 49] intentionally omitted <==

Registered Address

Directors

Projects

www.m3mining.com.au

==> picture [134 x 38] intentionally omitted <==

EXECUTIVE DIRECTOR SIMON ELEY SAID:

“M3 Mining is excited to be commencing an RC drilling program at the El Capitan prospect so soon after the repeal of the 2021 Aboriginal Cultural Heritage Bill which has stalled all significant exploration works since 1 July 2023.

The targeted program will focus on intercepting ultra-high grade gold mineralisation beneath the previous success. By drilling two holes from varying orientations the Company will explore multiple possible geometries of the previously intercepted 2,304 g/t Au hit (27 – 28m in EDJAC164).

==> picture [454 x 499] intentionally omitted <==

Figure 2 – Planned RC Drilling at The El Capitan Prospect

==> picture [134 x 38] intentionally omitted <==

==> picture [459 x 654] intentionally omitted <==

Figure 3 – The Edjudina Gold Project

==> picture [134 x 38] intentionally omitted <==

Victoria Bore Project Update

The M3 team have recently finished a nine-day pXRF sampling trip to Victoria Bore in order to test the prospectivity of the previously announced base metal targets[2] (See Figure 4). Seven prospects were visited, 245 localities sampled and 418 pXRF scans across the project.

M3 have not yet commenced interpreting the results and will release an announcement to the market once this is completed.

==> picture [487 x 415] intentionally omitted <==

Figure 4 – pXRF sampling at The Victoria Bore Project

2 See M3M announcement 17/05/2023 “ Regional Targets uncovered at Victoria Bore ” for further details.

==> picture [134 x 38] intentionally omitted <==

-END-

This announcement has been authorised for issue by the Board of M3 Mining Limited in accordance with ASX Listing Rule 15.5.

For further information please contact:

Simon Eley Media Executive Director David Tasker M3 Mining Ltd Chapter One Advisors T +61 8 6243 6581 T +61 433 112 936 E [email protected] E [email protected]

About M3 Mining

M3 Mining Limited (ASX:M3M) is a Perth-based mineral exploration company focused on creating value for shareholders through exploration and development of a high-quality base metal and gold exploration portfolio. M3 Mining’s projects are strategically located in regions surrounded by majors and has experienced minimal modern, systematic exploration across both projects. The Company’s strategy is to apply a systematic approach to the assessment and prioritisation of its projects, all of which have the potential to produce material discoveries.