AI assistant
LIVIUM LTD — Interim / Quarterly Report 2017
Mar 8, 2017
65239_rns_2017-03-08_ae788767-78f9-4d6e-b82f-75894cd2cdce.pdf
Interim / Quarterly Report
Open in viewerOpens in your device viewer
LITHIUM AUSTRALIA NL
ABN 29 126 129 413
FINANCIAL REPORT
FOR THE HALF-YEAR ENDED 31 DECEMBER 2016
CONTENTS PAGE
CORPORATE DIRECTORY .......................................................................................................................................... 1 DIRECTORS’ REPORT ................................................................................................................................................. 2 AUDITORS’ INDEPENDENCE DECLARATION .............................................................................................................. 7 CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME ............... 8 CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION ....................................................................... 9 CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY ...................................................................... 10 CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS ................................................................................. 11 NOTES TO THE FINANCIAL STATEMENTS ................................................................................................................ 12 DIRECTORS’ DECLARATION .................................................................................................................................... 21 INDEPENDENT AUDITOR’S REVIEW REPORT .......................................................................................................... 22
CORPORATE DIRECTORY
DIRECTORS
George Bauk (Non-executive Chairman) Adrian Griffin (Managing Director) Bryan Dixon (Non-executive Director)
COMPANY SECRETARY
Barry Woodhouse
AUDITORS
Bentleys London House Level 3 216 St Georges Terrace PERTH WA 6000
SHARE REGISTRY
Advanced Share Registry Services 110 Stirling Highway NEDLANDS WA 6009
Telephone: +618 9389 8033 Facsimile: +618 9389 7871
REGISTERED OFFICE & PRINCIPAL PLACE OF BUSINESS
Level 1, 675 Murray Street WEST PERTH WA 6005
Phone: +618 6145 0288 Facsimile: +618 9475 0847 Email: [email protected] Website: www. lithium-au.com
STOCK EXCHANGE LISTING
The Company is listed on the Australian Securities Exchange Limited. Home Exchange: Perth ASX Codes: LIT and LITCE
Page 1
DIRECTORS’ REPORT
The Directors present their report on Lithium Australia NL and its controlled entities (“Consolidated Entity”) for the half-year ended 31 December 2016 .
BOARD OF DIRECTORS
The names and details of the Consolidated Entity directors in office during the financial period and until the date of this report are as follows. Directors were in office for this entire period unless otherwise stated.
George Bauk Non-executive Chairman Adrian Griffin Managing Director Bryan Dixon Non-executive Director
COMPANY SECRETARY
Barry Woodhouse
REVIEW OF OPERATIONS
Recognising and Addressing an Unparalleled Opportunity
Early in the 2014-15 financial year, Lithium Australia noticed an important change in lithium supply – a broadening supply gap and a potential shortage of available lithium. The dynamics of the current situation are complex, with supply controlled by only a handful of producers. Recognising an unparalleled opportunity to create an independent supply stream, Lithium Australia sought to develop lithium processing technologies that have the potential to be more cost-effective than the traditional, energy-intensive processes. If successful, these technologies will prove truly disruptive to the lithium industry.
Lithium Australia recognises that changes in mining and processing methods generate abundant reject lithium mineral streams such as lithium micas and contaminated spodumene, and that these, if processed using the Company’s 100% owned Sileach™ process, could bolster lithium chemical supply. Applying Lithium Australia's disruptive technology to mine waste and other less commonly processed minerals, such as lepidolite (a common lithium mica), could be a solution for the supply constrained battery market. Independent laboratory tests have confirmed the efficacy of the Sileach™ process, which allows what was previously considered 'waste' to be reclassified as 'ore', thereby establishing lithium micas as a primary ore source.
The disruptive processes Lithium Australia are developing are hydrometallurgical and have a very low energy footprint, since unlike conventional methods no roasting is required. Significant by-product credits further enhance their economic benefits. Indeed, estimated operating costs suggest these processes may be competitive with the world’s most efficient producers, as long as the cost of providing feed to the lithium chemical plant is low. Thus, lithium minerals contained in processing waste streams present a lucrative target, and Lithium Australia has identified a number of projects where such waste is available.
Further, the abundance and availability of lithium micas and low-grade spodumene concentrates not historically assessed for resource potential has given Lithium Australia scope to establish a project portfolio significant in terms of the lithium industry's recent expansion. Lithium Australia is pursuing this by creating strategic relationships that provide it with potential access to mineralised material and by targeting areas of high prospectivity for spodumene, lithium micas and lithium clay.
Developing Opportunities
Lithium Australia has secured an exclusive licence to use Lepidico’s L-Max® process in Western Australia as well as to use L-Max® outside that state. However, L-Max® is specific to micas and cannot process the substantial spectrum of other lithium minerals, including spodumene.
Page 2
DIRECTORS’ REPORT (Continued)
During 2016, having furthered its relationship with Pilbara Minerals, Lithium Australia sought to explore the possibilities of extracting lithium from spodumene via hydrometallurgy. To that end, Lithium Australia developed the Sileach™ process, which is halogen-based and has demonstrated very rapid leach times.
Laboratory tests of Sileach™ proved positive and Lithium Australia has subsequently commenced pilot testing, the first step towards commercialising the process. With lithium production considered of strategic importance to Australia’s mineral industry now and well into the future, Lithium Australia's development programme has attracted government grants at both state and federal levels.
Samples of lithium mica from Lepidolite Hill and spodumene from Pilbara Mineral’s Pilgangoora project (both in Western Australia) have undergone continuous pilot testing. Depending on the outcomes of these pilot plant trials and subject to the outcome of engineering studies, Lithium Australia may commit to the construction and operation of a larger-scale pilot plant for long-term continuous testing and financial evaluation.
Lithium Australia has also developed an alkaline-based lithium extraction method – LieNa™, a patent application for which was lodged in August 2016. Armed with this suite of processing technologies, the Company can match a particular resource to the most appropriate processing technology.
Lithium Australia’s Exploration Projects
Lithium Australia was a “first-mover” in seeing the potential of underexplored and under-realised lithium geological resources and provinces. In pursuing its strategy to create a union between lithium resources and lithium extraction and processing technology, Lithium Australia has used it first-mover advantage to secure strategic positions within prospective lithium provinces both in Australia and overseas. Outlined below are lithium projects currently being developed by Lithium Australia.
==> picture [455 x 291] intentionally omitted <==
Page 3
DIRECTORS’ REPORT (Continued)
-
Ravensthorpe Lithium Project, Western Australia (Lithium Australia 100%) - this project consists of one exploration licence covering a 20 kilometre-long structural corridor that contains Mt Cattlin lithium and tantalum mining operations of Galaxy Resources Limited. The project lies 420 kilometres southeast of Perth.
-
Greenbushes, Western Australia (Lithium Australia 100%) - comprising four exploration licences, an additional five exploration licence applications and seven prospecting licence applications, the project is 200 kilometres south of Perth, adjacent to the world’s largest lithium mine, which currently produces about 40% of global lithium supply.
-
The Goldfields Lithium Alliance (includes the Coolgardie Rare Metals Venture), Western Australia - Lithium Australia and Cazaly Resources Limited have combined their present and future lithium mineral interests (which lie within a 100-kilometre radius of Kalgoorlie, Western Australia), for an initial period of 5 years from 2016, thereby forming the Goldfields Lithium Alliance. This will significantly enhance the technical and land management resources available for advancing lithium projects within the Goldfields region. The existing projects include the Coolgardie Rare Metals Venture and the Widgiemooltha purchase.
-
Seabrook Rare Metals Venture, Western Australia (Lithium Australia 80%, Tungsten Mining NL (ASX: TGN) 20%) - this consists of six exploration licences, located 385 kilometres east-northeast of Perth. Tungsten mineralisation is associated with extensive skarn mineralisation which exhibits strong alkali metal halos, similar to those around lithium pegmatites identified further south.
-
Gascoyne, Western Australia (Lithium Australia 100%) - the project consists of four exploration licences/applications. Other projects in the Gascoyne include Cobalark and Yinnitherra. The occurrences within Lithium Australia’s ground have not been previously assessed for lithium despite exhibiting exceptionally favourable geological characteristics.
-
Memorandum of Understanding with Venus Metals Corporation Ltd in regard to lithium exploration at VMC’s Pilgangoora Project , Western Australia - Lithium Australia and Venus Metals Corporation have entered into an agreement to jointly explore certain exploration licences (and current applications). Lithium Australia will undertake exploration activities primarily with respect to evaluating the lithium mica potential of the area controlled by Venus Metals Corporation - using, among other things, advanced proprietary exploration techniques developed by Lithium Australia and the LIBZ® technology provided by SciAps (USA). Using the latter, real-time lithium assays can be undertaken in the field. The area the subject of the joint venture contains abundant pegmatites which will be evaluated both for their lithium potential and for the possibility of both parties benefitting from any lithium mica occurrences within the project area.
-
Cape York, Queensland (Lithium Australia 100%) - this project lies on the Cape York Peninsula in Queensland, some 1,700 kilometres northwest of Brisbane. EPM26252 was granted on 19 January 2017 and EPM26255 on 13 February 2017. This includes the projects entitled Amber and Cobree.
-
Bynoe, Northern Territory (Lithium Australia 100%) - Lithium Australia has established a foothold in the Bynoe Pegmatite Field, located 50 kilometres south-southwest of Darwin, capital of the Northern Territory, close to infrastructure. EL30897 lies within the Bynoe Pegmatite Field and is part of the wider 200 kilometre long Litchfield Pegmatite Belt which has been intruded by a suite of highly differentiated S-type granites, the probable source of the pegmatites and mineralisation.
-
Lake Johnston, Western Australia (Lithium Rights Agreement) - Lithium Australia holds the rights to lithium discovered on the area of two exploration licences held by Lefroy Exploration Limited (ASX: LEX) and in exchange LEX has taken gold and nickel rights over Lithium Australia’s E63/1777. The project area lies 440 kilometres east of Perth. Consideration for the sale of the gold and nickel rights in E63/1777 to LEX was 3,000,000 LEX shares, which shares are still held by Lithium Australia.
-
Donnelly River (Lithium Australia 100%) - comprising three exploration licences covering approximately 174 square kilometres of prospective graphite-bearing stratigraphy, this project is 240
Page 4
DIRECTORS’ REPORT (Continued)
kilometres south of Perth. Lithium Australia has been preparing to spin out its graphite projects to a current subsidiary BlackEarth Minerals NL (formerly Graphite Australia NL).
-
Kangaroo Island, South Australia (Lithium Australia 100%) - Lithium Australia has applied for ground prospective for lithium on Kangaroo Island.
-
Electra Joint Venture, Mexico (Lithium Australia 25%, Alix Resources Corporation 75%) - this is a farmin and joint venture in which Lithium Australia can earn up to 65% of the project from its partner Alix Resources Corporation. Lithium Australia is currently working towards lifting its 25% equity to 49%.
-
Tin International Joint Venture, Germany (Lithium Australia up to 50%) - Lithium Australia has entered into a Memorandum of Understanding with Tin International AG (a subsidiary of German listed Deutsche Rohstoff AG) to form a Joint Venture including the Sadisdorf deposit located in Saxony, Germany. Lithium Australia has the right to earn 15% of the incorporated joint venture company to be established by spending a total of EUR 750,000 on either exploration or payment of cash to Tin International AG by the end of 2017. By investing a further EUR 1.25 million over a 3 year period Lithium Australia has the right to further increase its interests in the joint venture company to 50%. Tin International will also receive a one off payment of EUR 50,000 in cash and LIT Shares to the value of EUR 200,000.
Technology Alliances
-
MetalsTech Limited (ASX: MTC) - MTC was formed to identify, fund, acquire, explore and develop high grade hard rock lithium projects in Quebec, Canada. Lithium Australia was a seed investor as part of the strategy to establish a partnership and collaboration agreement for Sileach™ and LieNa™ as well as the further development of lithium extraction technology specific to the spodumene at the MTC projects in Quebec. There is a technology licence agreement between the companies and Lithium Australia was issued a further 1 million shares when MTC listed on ASX on 24 February 2017.
-
Letter Agreement with Pilbara Minerals Limited in regard to the Sileach™ Joint Venture - Lithium Australia and Pilbara Minerals Limited have entered into an agreement to establish the Sileach™ Joint Venture on a 50:50 basis to produce lithium carbonate or lithium hydroxide from a Sileach™ processing plant fed by Pilbara Minerals spodumene concentrate.
A first pilot test has been completed and Lithium Australia is in the process of completing technical analysis of the data generated to deliver a scoping study at which point a decision will be made whether to proceed to a prefeasibility study for the construction of a large scale
Looking Ahead
LIT continues to pursue the production of battery-grade lithium carbonate from micas, and now spodumene, with cost competitive processing techniques. This gives it significant 'first mover' advantage, as does the exclusive nature of its wholly owned Sileach™ process and other extraction technology licences.
LIT will assess the Electra Project in Sonora Mexico in joint venture with Alix Resources Corporation (TSXV: AIX). LIT is reviewing other opportunities in Africa, Europe, the Americas and Australia.
RESULTS OF OPERATIONS
The operating loss after income tax of the Consolidated Entity for the half-year ended 31 December 2016 was $2,649,977 (31 December 2015: $1,759,795).
No dividend has been paid during or is recommended for the financial period ended 31 December 2016.
Page 5
DIRECTORS’ REPORT (Continued)
FINANCIAL POSITION
The Consolidated Entity’s working capital, being current assets less current liabilities was $6,231,265 at 31 December 2016 (30 June 2016: working capital of $8,890,671). There has been a marked improvement in the working capital position since LIT changed its strategy to pursue lithium opportunities. LIT continues to receive keen interest from partly-paid shareholders in relation to the conversion of the twenty-five cent partly paid shares that are currently paid to $0.0001.
In the Directors’ opinion, there are reasonable grounds to believe that the Consolidated Entity will be able to pay its debts as and when they become due and payable.
SUBSEQUENT EVENTS
On 20 January 2017, the Company issued 1,496,774 ordinary fully paid shares at various deemed issue prices per share as part of the Director and Senior Management Fee & Remuneration Sacrifice Share Plan.
On 6 February 2017, the Company advised its intention to make a conditional off-market scrip-bid for all the fully paid ordinary shares in fellow WA lithium explorer and developer, Lepidico Ltd (ASX: LPD).
On the 24 February 2017, MetalsTech Ltd listed on ASX. At listing, Lithium Australia held a total of 2 million shares in MTC. As a result of being a seed shareholder and through a collaboration agreement, the initial investment of $100,000 was valued at $540,000 as at close of trade on 24 February 2017. Further transaction details appear in Note 9 (a) of the financial report.
On 24 February 2017, Lithium Australia and Lepidico Ltd settled litigation by mutual agreement. All commercial details of the settlement remain confidential.
On 27 February 2017, the Company entered into a binding Memorandum of Understanding to form a Joint Venture with Tin International AG (subsidiary of German listed Deutsche Rohstoff).
On 2 March 2017, Lithium Australia lodged a Bidder’s Statement in relation to the offer to Lepidico Ltd (LPD) shareholders for the consideration of 1 LIT share for every 13.25 LPD shares.
Other than as listed above, there have not been any other material events subsequent to the end of the reporting date and the date of this report that have not been included in this financial report.
AUDITOR’S INDEPENDENCE DECLARATION
Section 307C of the Corporations Act 2001 requires our auditors, Bentleys, to provide the directors of the Consolidated Entity with an Independence Declaration in relation to the review of the interim financial report. This Independence Declaration is set out on page 8 and forms part of this directors’ report for the half-year ended 31 December 2016.
This report has been made in accordance with a resolution of the Board of Directors.
==> picture [99 x 45] intentionally omitted <==
Adrian Griffin Managing Director
Dated at Perth this 9[th] day of March 2017
Competent Person’s Statement
The information contained in the report relates to Exploration Results of projects owned by Lithium Australia NL and is based on information compiled or reviewed by Mr Adrian Griffin, an employee of the Company and a Member of the Australasian Institute of Mining and Metallurgy. Mr Griffin has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person, as defined in the 2012 Edition of the Joint Ore Reserves Committee (JORC) ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr. Griffin has given consent to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Page 6
To the Board of Directors
Auditor’s Independence Declaration under Section 307C of the Corporations Act 2001
As lead audit director for the review of the financial statements of Lithium Australia NL for the half year ended 31 December 2016, I declare that to the best of my knowledge and belief, there have been no contraventions of:
==> picture [6 x 10] intentionally omitted <==
- the auditor independence requirements of the Corporations Act 2001 in relation to the review; and
==> picture [6 x 10] intentionally omitted <==
- any applicable code of professional conduct in relation to the review.
Yours faithfully
==> picture [91 x 38] intentionally omitted <==
==> picture [132 x 30] intentionally omitted <==
==> picture [334 x 21] intentionally omitted <==
----- Start of picture text -----
BENTLEYS MARK DELAURENTIS CA
Chartered Accountants Director
----- End of picture text -----
Dated at Perth this 9[th] day of March 2017
CONDENSED CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME
For the Half-Year Ended 31 December 2016
| Note Continuing Operations Revenue Other revenue 5 Occupancy costs Professional fees Corporate fees Employee benefits expense Share based payment expense Administration costs Fair value of investments adjustment Realised gains/(losses) on financial assets Unrealised gains/(losses) on financial assets Exploration and evaluation costs written off Depreciation and amortisation Loss on disposal of subsidiary Loss before income tax Income tax expense Loss from continuing operations Other comprehensive income Items that may be reclassified subsequently to profit or loss: Net fair value loss on available for sale financial assets Foreign exchange translation of subsidiary disposed of, transferred to income statement Total comprehensive income for the period Loss for the year attributable to: Members of the controlling entity Non-controlling interest Total comprehensive income attributable to: Members of the controlling entity Non controlling interest Basic loss per share (cents per share) |
31 December 2016 31 December 2015 $ $ 22,064 4,690 879,161 25 (44,726) (35,000) (155,120) (44,935) (387,180) (120,168) (743,129) (369,728) (140,545) (792,243) (180,285) (48,712) (40,040) - 96,905 - (1,395,714) - (548,936) (256,084) (12,432) - - (97,640) |
|---|---|
| (2,649,977) (1,759,795) - - |
|
| (2,649,977) (1,759,795) |
|
| - - (321,319) - - 94,304 |
|
| (2,971,296) (1,665,491) |
|
| (2,550,967) (1,759,795) (99,010) - |
|
| (2,649,977) (1,759,795) |
|
| (2,872,286) (1,665,491) (99,010) - |
|
| (2,971,296) (1,665,491) |
|
| 1.06 1.33 |
The above statement of profit or loss and other comprehensive income should be read in conjunction with the accompanying notes.
Page 8
CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION As at 31 December 2016
| Note Current Assets Cash and cash equivalents Trade and other receivables Other assets Total Current Assets Non Current Assets Financial assets Exploration Expenditure 6 Intangibles 7 Property, plant and equipment Total Non Current Assets TOTAL ASSETS Current Liabilities Trade and other payables Total Current Liabilities TOTAL LIABILITIES NET ASSETS Equity Issued capital 8 Reserves Accumulated losses Controlling entity interest Non controlling interest TOTAL EQUITY |
31 December 2016 30 June 2016 $ $ 6,076,617 5,756,645 432,970 317,221 819,371 3,385,822 |
|---|---|
| 7,328,958 9,459,688 |
|
| 784,540 288,496 2,465,994 147,050 2,211,288 703,118 84,473 23,292 |
|
| 5,546,295 1,161,956 |
|
| 12,875,253 10,621,644 |
|
| 1,097,693 569,017 |
|
| 1,097,693 569,017 |
|
| 1,097,693 569,017 |
|
| 11,777,560 10,052,627 |
|
| 25,471,100 20,936,454 650,905 814,791 (14,249,585) (11,698,618) |
|
| 11,872,420 10,052,627 |
|
| (94,860) - |
|
| 11,777,560 10,052,627 |
THE ABOVE STATEMENT OF FINANCIAL POSITION SHOULD BE READ IN CONJUNCTION WITH THE ACCOMPANYING NOTES.
Page 9
CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY For the Half-Year Ended 31 December 2016
| Issued Capital |
Share Based Payment Reserve |
Share Based Payment Reserve |
Share Based Payment Reserve |
Foreign Currency Translation Reserve |
Investment Revaluation Reserve |
Accumulated Losses |
Non Controlling Interest |
Total | |
|---|---|---|---|---|---|---|---|---|---|
| $ | $ | $ | $ | $ | $ | $ | |||
| Balance at 1 July 2015 | 10,565,467 | 129,887 | (94,304) | - | (10,044,510) | - | 556,540 | ||
| Loss for the period | - | - | - | - | (1,759,795) | - | (1,759,795) | ||
| - | |||||||||
| Other comprehensive income | - | - | - | - |
- | - |
- | ||
| Exchange differences on | - | ||||||||
| translation of foreign | - | - | 94,304 | - | - |
94,304 | |||
| subsidiary | |||||||||
| Total comprehensive loss for the period |
- | - | 94,304 | - | (1,759,795) | - | (1,665,491) | ||
| Transaction with owner, | |||||||||
| directly recorded in equity: | |||||||||
| Issue of shares | 1,156,920 | - | - | - |
- | - |
1,156,931 | ||
| Capital raising costs | (11,621) | - | - | - | - |
(11,632) | |||
| Issue of performance rights | - | ||||||||
| and performance option | - | 792,243 | - | - | - |
792,243 | |||
| rights | |||||||||
| Options expired | - | (121,195) |
- | - | 121,195 | - | - | ||
| Balance at 31 December 2015 | 11,710,766 | 800,935 | - | - | (11,683,110) | - | 828,591 | ||
| Balance at 1 July 2016 | 20,936,454 | 691,225 | (2,414) | 125,980 | (11,698,618) | - | 10,052,627 | ||
| Loss for the period | - | - | - | - | (2,550,967) | (99,010) | (2,649,977) | ||
| Other comprehensive income | - | - | - | - |
- | - | - | ||
| Net fair value loss on available for sale financial assets |
- | - | - | (321,319) |
- | - |
(321,319) | ||
| Total comprehensive loss for the period |
- | - | - | (321,319) | (2,550,967) | (99,010) | (2,971,296) | ||
| Transaction with owner, directly | recorded in | equity: | |||||||
| Issue of shares | 4,449,799 | - | - | - |
- | - |
4,449,799 | ||
| Non-controlling interest | |||||||||
| arising on the incorporation of | - | - | - | - | - | 4,150 | 4,150 | ||
| subsidiary | |||||||||
| Capital raising costs | (20,153) | - | - | - |
- | - |
(20,153) | ||
| Transfer from share based payments reserve |
105,000 | (105,000) |
- | - | - | - | - | ||
| Issue of performance rights | |||||||||
| and performance option | - | 262,433 | - | - |
- | - |
262,433 | ||
| rights | |||||||||
| Options expired | - | - | - | - | - | - | - | ||
| Balance at 31 December 2016 | 25,471,100 | 848,658 | (2,414) | (195,339) | (14,249,585) | (94,860) | 11,777,560 |
The above statement of changes in equity should be read in conjunction with the accompanying notes.
Page 10
CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS For the Half-Year Ended 31 December 2016
| Cash Flows from Operating Activities Payments to suppliers and employees Payments for exploration and evaluation Interest received Net cash outflow from operating activities Cash Flows from Investing Activities Sale of financial assets Purchase of property, plant and equipment Payment for investment assets Payment for other financial assets Payments for intangible assets Net cash outflow from investing activities Cash Flows from Financing Activities Proceeds from issue of shares and options Payment for capital raising costs Net cash inflows from financing activities Net increase in cash held Cash and cash equivalents at the beginning of the period Cash and cash equivalents at the end of the period |
31 December 2016 31 December 2015 $ $ (1,259,324) (478,033) (598,633) (219,356) 22,064 4,690 |
|---|---|
| (1,835,893) (692,699) |
|
| - 250 (66,281) (8,123) (480) - (161,306) - (1,227,376) (151,511) |
|
| (1,455,443) (159,384) |
|
| 3,625,211 1,010,593 (13,903) (11,621) |
|
| 3,611,308 998,972 |
|
| 319,972 146,889 5,756,645 852,685 |
|
| 6,076,617 999,574 |
The above statement of cash flows should be read in conjunction with the accompanying notes.
Page 11
NOTES TO THE FINANCIAL STATEMENTS For The half-year ended 31 December 2016 (continued)
1. CORPORATE INFORMATION
The financial report of Lithium Australia NL and controlled entities (“the Consolidated Entity”) for the half-year ended 31 December 2016 was authorised for issue in accordance with a resolution of the directors on 9 March 2017. Lithium Australia NL is a no liability company incorporated in Australia and its shares are publicly traded on the Australian Securities Exchange. The nature of the operations and principal activities of the Consolidated Entity are described in the Directors’ report that is included in this report.
2. SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
Basis of accounting
The half-year financial report is a general-purpose financial statement, which has been prepared in accordance with the requirements of the Corporations Act 2001, applicable Accounting Standards including AASB 134 “Interim Financial Reporting” and other mandatory professional reporting requirements. Compliance with Australian Accounting Standards ensures that the financial statements and notes also comply with International Financial Reporting Standards.
The half-year financial report has been prepared on a historical cost basis, except where applicable for financial assets that have been measured at fair value. Cost is based on the fair value of the consideration given in exchange for assets. The company is domiciled in Australia and all amounts are presented in Australian dollars, unless otherwise noted. For the purpose of preparing the half-year financial report, the half-year has been treated as a discrete reporting period.
The half year financial report does not include all notes of the type normally included within the annual financial report and therefore cannot be expected to provide as full an understanding of the financial performance, financial position and financing and investing activities of the consolidated entity as the full financial report.
It is recommended that this financial report be read in conjunction with the annual financial report of Lithium Australia NL as at 30 June 2016 and any public announcements made by the Consolidated Entity during the half-year in accordance with continuous disclosure requirements arising under the Corporations Act 2001 and the ASX Listing Rules.
The half-year financial statements have been prepared in accordance with the accounting policies adopted in the consolidated entity’s last annual financial statements for the year ended 30 June 2016.
The Consolidated Entity has adopted all of the new and revised Standards and Interpretations issued by the Australian Accounting Standards Board (AASB) that are relevant to their operations and effective for the current half year.
3. SEGMENT INFORMATION
(a) Description of segments
For management purposes the consolidated entity has two segments which are exploration activities relating to minerals and research and development.
Refer to the relevant financial statements for details on assets, liabilities, revenues and expenses monitored by the Board.
(b) Segment information provided to the Board of Directors
The segment information provided to the Board of Directors for the reportable segments for the reporting period end 31 December 2016 is as follows:
Management has determined the operating segments based on the reports reviewed by the Board of Directors that are used to make strategic decisions.
The Consolidated entity has tenements in Western Australia. However, the Board, on a functional perspective, has identified that there are two reportable segments, being exploration of minerals and research and development.
Refer to the relevant financial statements for details on assets, liabilities, revenues and expenses monitored by the Board.
Page 12
NOTES TO THE FINANCIAL STATEMENTS For The half-year ended 31 December 2016 (continued)
4. OPERATING SEGMENTS
(i) Segment performance
| 31 December 2016 Revenue Expenses Total segment loss Reconciliation of segment result to Company net loss i) Unallocated items - Interest revenue - Other Net loss from continuing operations 31 December 2015 Revenue Expenses Total segment loss Reconciliation of segment result to Company net loss i) Unallocated items - Interest revenue - Other Net loss from continuing operations (ii) Segment Assets 31 December 2016 Segment Assets Unallocated assets: - Cash and cash equivalents - Trade and other receivables - Other Assets Total Company Assets 30 June 2016 Segment Assets Unallocated assets: - Cash and cash equivalents - Trade and other receivables - Other Assets Total Company Assets |
R&D Exploration Total $ $ $ - - - (2,100) (548,936) (551,036) (2,100) (548,936) (551,036) Total $ 22,064 (2,121,005) (2,649,977) R&D Exploration Total $ $ $ - - - (2,100) (256,084) (258,184) |
R&D Exploration Total $ $ $ - - - (2,100) (548,936) (551,036) (2,100) (548,936) (551,036) Total $ 22,064 (2,121,005) (2,649,977) R&D Exploration Total $ $ $ - - - (2,100) (256,084) (258,184) |
|
|---|---|---|---|
| (2,100) (256,084) (258,184) |
|||
| 4,690 (1,508,301) (1,759,795) Total $ 4,677,282 6,039,270 432,970 1,725,731 12,875,253 Total $ 850,168 5,756,645 317,221 3,697,610 10,621,644 |
|||
| R&D Exploration $ $ 2,211,288 2,465,994 R&D Exploration $ $ 703,118 147,050 |
Page 13
NOTES TO THE FINANCIAL STATEMENTS For The half-year ended 31 December 2016 (continued)
(ii) Segment Liabilities
| 31 December 2016 Segment Liabilities Unallocated Liabilities: - Trade and other payables Total Company Liabilities 30 June 2016 Segment Liabilities Unallocated Liabilities: - Trade and other payables Total Company Liabilities 5. OTHER REVENUE Sale of Gold and Nickel Exploration Rights at Mount Day with Research and Development Government Grant Total Other Revenue 6. CAPITALISED EXPLORATION EXPENDITURE Opening balance Lithophile Acquisition (i) Interest in Rights – Buckland (ii) Lithium Rights – Lake Johnston (iii) Electra Acquisition (iv) Greenbushes Acquisition (v) Closing balance |
R&D Exploration $ $ R&D Exploration $ $ zero cost base 31-Dec-16 $ 147,050 194,167 111,991 1,743,750 166,946 102,090 |
Total $ 1,097,693 1,097,693 Total $ 569,017 569,017 $ 720,000 159,161 879,161 30-Jun-16 $ 22,000 - - - 125,050 - |
|
|---|---|---|---|
| 2,465,994 | 147,050 |
(i) On 20 July 2016, the Company issued total 500,000 fully paid ordinary shares at $ 0.25 each and 500,000 partly paid shares at $0.001 as part consideration for the acquisition of Lithophile Pty Ltd.
(ii) On 16 October 2016, the Company issued total 400,000 fully paid ordinary shares at $0.25 each to Buckland Capital as consideration for the Widgiemooltha Project Lithium Rights.
(iii) On 16 October 2016, the Company issued total 9,000,000 fully paid ordinary shares at $0.185 each to Lefroy Exploration Ltd as consideration for the acquisition of the lithium rights at Lake Johnston.
(iv) On 11 November 2016, 500,000 fully paid shares and 500,000 partly paid shares were issued to Alix Resources Corp to raise the initial 25% interest to 49% as part of the farm-in terms for the Electra Joint Venture entered into 8 February 2016.
(v) On 11 November 2016, the Company issued total 283,039 fully paid ordinary shares at $0.1767 each and paid $50,000 cash as consideration for the Greenbushes consolidation.
Page 14
NOTES TO THE FINANCIAL STATEMENTS For The half-year ended 31 December 2016 (continued)
7. INTANGIBLE ASSETS
| TANGIBLE ASSETS | ||
|---|---|---|
| 31-Dec-16 | 30-Jun-16 | |
| $ | $ | |
| Opening balance | 703,118 | - |
| Expenditure during period(i) | 1,510,270 | 707,318 |
| Less: Amortisation of intangible asset | (2,100) | (4,200) |
| Closing balance | 2,211,288 | 703,118 |
| (i) During the period, the company spent $1,510,270 on development costs relating to the new lithium processing | ||
| technology. |
8. ISSUED CAPITAL
(a) Issued and paid up capital
| Share capital Ordinary Shares Fully paid of no par value (b) Movement in ordinary shares on issue Other equity securities Partly-paid contributing shares Total contributed equity |
31 December 2016 30 June 2016 Number $ Number $ 256,336,055 25,469,480 231,573,560 20,934,934 132,850,148 1,620 133,225,724 1,520 |
|---|---|
| 389,186,203 25,471,100 364,799,284 20,936,454 |
Reconciliation of the number of Ordinary Shares - fully paid
Movements in ordinary share capital of the Company during the period as follows:
| No. of shares | Value $ |
|
|---|---|---|
| Opening balance 1 July 2016 | 231,573,560 | 20,934,934 |
| Shares issued during the period: | ||
| 20 July 2016 (i) | 500,000 | 125,000 |
| 20 July 2016 (ii) | 40,662 | 10,641 |
| 20 July 2016 (iii) | 236,207 | - |
| 20 July 2016 (iv) | 472,650 | 118,115 |
| 27 July 2016 (v) | 278,306 | 69,549 |
| 09 August 2016 (vi) | 41,000 | 10,245 |
| 09 August 2016 (vii) | 26,676 | 243 |
| 31 August 2016 (viii) | 93,373 | 23,334 |
| 02 September 2016 (ix) | 804,005 | 184,733 |
| 16 October 2016 (x) | 9,000,000 | 1,665,000 |
| 16 October 2016 (xi) | 400,000 | 100,000 |
| 16 October 2016 (xii) | 1,025 | 256 |
| 10 November 2016 (xiii) | 500,000 | 87,500 |
| 11 November 2016 (xiv) | 283,039 | 50,000 |
| 18 November 2016 (xv) | 10,899,875 | 1,961,974 |
| 01 December 2016 (xvi) | 1,000,000 | 105,000 |
Page 15
NOTES TO THE FINANCIAL STATEMENTS For The half-year ended 31 December 2016 (continued)
| 8. ISSUED CAPITAL (CONTINUED) 01 December 2016 (xvii) Adjustment Less: Transaction costs Closing balance 31 December 2016 |
No. of shares Value $ 185,677 46,401 - (3,292) - (20,153) |
|---|---|
| 256,336,055 25,469,480 |
(i) On 20 July 2016, the Company issued total 500,000 fully paid ordinary shares at $ 0.25 each as part consideration for the acquisition of Lithophile Pty Ltd.
(ii) On 20 July 2016, the Company issued total 40,662 fully paid ordinary shares on conversion of LITAQ at a conversion price of $0.2499 to raise $10,641 before costs.
(iii) On 20 July 2016, the Company issued total 236,207 fully paid ordinary shares on conversion of LITAQ at a conversion price of $0.2499 to raise $58,549 before costs. Funds recognised in prior period.
(iv) On 20 July 2016, the Company issued total 472,650 fully paid ordinary shares on conversion of LITAQ at a conversion price of $0.2499 to raise $118,115 before costs.
(v) On 27 July 2016, the Company issued total 278,306 fully paid ordinary shares on conversion of LITAQ at a conversion price of $0.2499 to raise $69,549 before costs.
(vi) On 09 August 2016, the Company issued total 41,000 fully paid ordinary shares on conversion of LITAQ at a conversion price of $0.2499 to raise $10,245 before costs.
(vii) On 09 August 2016, the Company issued total 26,676 fully paid ordinary shares on conversion of LITCD at an average conversion price of $0.009 to raise $243 before costs.
(viii) On 31 August 2016, the Company issued total 93,373 fully paid ordinary shares on conversion of LITAQ at a conversion price of $0.2499 to raise $23,334 before costs.
(ix) On 02 September 2016, the Company issued total 804,005 fully paid ordinary shares at $ 0.2298 each under Director and Senior Management Fee & Remuneration Sacrifice Share Plan.
(x) On 16 October 2016, the Company issued total 9,000,000 fully paid ordinary shares at $0.185 each to Lefroy Exploration Ltd as consideration for the acquisition of the lithium rights at Lake Johnston.
(xi) On 16 October 2016, the Company issued total 400,000 fully paid ordinary shares at $0.25 each to Buckland Capital as consideration for the Widgiemooltha Project Lithium Rights.
(xii) On 16 October 2016, the Company issued total 1,025 fully paid ordinary shares on conversion of LITAQ at a conversion price of $0.2499 to raise $256 before costs.
(xiii) On 10 November 2016, the Company issued total 500,000 fully paid ordinary shares at $ 0.1750 each as part consideration for phase 2 of the Electra Joint Venture.
(xiv) On 11 November 2016, the Company issued total 283,039 fully paid ordinary shares at $0.1767 each as consideration for the Greenbushes consolidation.
(xv) On 18 November 2016, the Company issued total 10,899,875 fully paid ordinary shares at $0.18 each following completion of the Share Purchase Plan.
(xvi) On 01 December 2016, the Company issued 1,000,000 fully paid ordinary shares at $0.105 each pursuant to the the hurdle as approved by shareholders in the 2015 annual general meeting.
(xvii) On 01 December 2016, the Company issued total 185,677 fully paid ordinary shares on conversion of LITCE at a conversion price of $0.2499 to raise $46,401 before costs.
Page 16
NOTES TO THE FINANCIAL STATEMENTS For The half-year ended 31 December 2016 (continued)
8. ISSUED CAPITAL (CONTINUED)
Reconciliation of the number of contributing shares - partly paid
Movements in partly paid contributing shares of the Company during the period as follows:
| Opening balance 1 July 2016 09 August 2016 (i) Closing balance 31 December 2016 |
No. of shares Value $ 26,676 - (26,676) - |
|---|---|
| - - |
(i) On 09 August 2016, the Company converted 26,676 partly paid shares(LITCD) to LIT at an average of $0.009 to raise $243 before costs.
Reconciliation of the number of contributing shares - partly paid
Movements in partly paid contributing shares of the Company during the period as follows:
| Opening balance 1 July 2016 20 July 2016 (i) 20 July 2016 (ii) 20 July 2016 (iii) 27 July 2016 (iv) 09 August 2016 (v) 31 August 2016 (vi) 16 October 2016 (vii) 10 November 2016 (viii) 01 December 2016 (ix) Closing balance 31 December 2016 |
No. of shares Value $ 133,199,048 1,520 (276,869) - (472,650) - 500,000 50 (278,306) - (41,000) - (93,373) - (1,025) - 500,000 50 (185,677) - 132,850,148 1,620 |
|---|---|
There are 132,850,148 partly paid shares with outstanding calls of $0.2499 each. The dates for the future calls are not before 31 December 2016. The partly paid shares carry a right to a dividend on the same basis as holders of Ordinary Shares. Partly paid shares carry the right to vote in proportion which the amount paid (not credited) bears to the total amounts paid and payable (excluding amounts credited). The Company has the power to forfeit any shares where the call remains unpaid 14 days after the call was payable. The Company must then offer the shares forfeited for public auction within six weeks of the ball becoming payable.
(i) On 20 July 2016, the Company converted 276,869 partly paid shares(LITAQ) to LIT at an issue price of $0.2499 to raise $69,190 before costs.
(ii) On 20 July 2016, the Company converted 472,650 partly paid shares(LITAQ) to LIT at an issue price of $0.2499 to raise $118,115 before costs.
(iii) On 20 July 2016, the Company issued 500,000 partly paid shares at $0.001 each as part consideration for the acquisition of Lithophile Pty Ltd.
(iv) On 27 July 2016, the Company issued 278,306 partly paid shares(LITAQ) to LIT at an issue price of $0.2499 to raise $69,549 before costs.
(v) On 09 August 2016, the Company converted 41,000 partly paid shares(LITAQ) to LIT at an issue price of $0.2499 to raise $10,245 before costs.
(vi) On 31 August 2016, the Company converted 93,373 partly paid shares(LITCE) to LIT at an issue price of $0.2499 to raise $23,334 before costs.
(vii) On 16 October 2016, the Company converted 1,025 partly paid shares(LITCE) to LIT at an issue price of $0.2499 to raise $256 before costs.
Page 17
NOTES TO THE FINANCIAL STATEMENTS For The half-year ended 31 December 2016 (continued)
8. ISSUED CAPITAL (CONTINUED)
(viii) On 10 November 2016, the Company issued 500,000 partly paid shares at $0.001 each as part consideration for phase 2 of the Electra Joint Venture.
(ix) On 01 December 2016, the Company converted 185,677 partly paid shares (LITCE) to LIT at an issue price $0.2499 to raise $46,400 before costs.
- (c) Options as at 31 December 2016
Unlisted options on issue as at 31 December 2016 as follows:
| Options outstanding 1 July 2016 No options exercised or issued during the period Options outstanding as at 31 December 2016 |
Number Exercise Price Fair Value $ 21,391,666 - 21,391,666 |
|---|---|
- (d) Performance Rights
Unlisted performance rights on issue as at 31 December 2016 as follows:
| Performance Rights outstanding 1 July 2016 01 December 2016 Performance Rights Converted Issued 28 November 2016 Issued 28 November 2016 Issued 28 November 2016 Issued 28 December 2016 Issued 01 December 2016 Issued 01 December 2016 Issued 01 December 2016 Issued 01 December 2016 Issued 20 December 2016 Issued 20 December 2016 Issued 20 December 2016 Issued 20 December 2016 Performance Rights outstanding as at 31 December 2016 |
Number Hurdle Fair Value 11,340,000 (1,000,000) 12 months service ($105,000) 1,000,000 Successful PFS on SileachTMtechnology $170,000 2,000,000 Procurement of feed to support 17,000tpa Li Carbonate from SileachTM plant $170,000 3,000,000 Commitment decision to large-scale pilot facility $102,000 4,000,000 Financial investment decision for full scale commercial plant $34,000 500,000 Successful PFS on SileachTMtechnology $82,500 1,000,000 Procurement of feed to support 17,000tpa Li Carbonate from SileachTM plant $82,500 1,500,000 Commitment decision to large-scale pilot facility $49,500 2,000,000 Financial investment decision for full scale commercial plant $16,500 125,000 Successful PFS on SileachTMtechnology $16,875 250,000 Procurement of feed to support 17,000tpa Li Carbonate from SileachTM plant $16,875 375,000 Commitment decision to large-scale pilot facility $10,125 500,000 Financial investment decision for full scale commercial plant $3,375 26,590,000 |
|---|---|
Page 18
NOTES TO THE FINANCIAL STATEMENTS For The half-year ended 31 December 2016 (continued)
9. SUBSEQUENT EVENTS
-
(a) On 20 January 2017, the Company issued 1,496,774 ordinary fully paid shares at various deemed issue prices per share as part of the Director and Senior Management Fee & Remuneration Sacrifice Share Plan.
-
(b) On 6 February 2017, the Company advised its intention to make a conditional off-market scrip-bid for all the fully paid ordinary shares in fellow WA lithium explorer and developer, Lepidico Ltd (ASX: LPD).
-
(c) On 24 February 2017, MetalsTech Ltd listed on ASX. At listing, Lithium Australia held a total of 2 million shares in MTC. As a result of being a seed shareholder and through a collaboration agreement, the initial investment of $100,000 was valued at $540,000 as at close of trade on 24 February 2017.
-
(d) On 24 February 2017, Lithium Australia and Lepidico Ltd settled litigation by mutual agreement. All commercial details of the settlement remain confidential.
-
(e) On 27 February 2017, the Company entered into a binding Memorandum of Understanding to form a Joint Venture with Tin International AG (subsidiary of German listed Deutsche Rohstoff).
-
(f) On 2 March 2017, the Company released it Bidder’s Statement for the takeover of Lepidico Ltd(LPD). The Company is offering LPD shareholders 1 LIT Share for every 13.25 LPD shares held.
Other than as listed above, there have not been any other material events subsequent to the end of the reporting date and the date of this report that have not been included in this financial report.
10. CONTINGENT ASSETS
On the 11 October 2016, the Company entered into a binding letter agreement with MetalsTech. The Company will grant MetalsTech the licence to use Sileach[TM] , LieNA[TM] or other Lithium Australia owned processing technologies. The licence will grant MetalsTech the exclusive right to use the licensed technology for any project in the province of Quebec, Canada, owned by MetalsTech or for any ore originating from a project within Quebec.
Lithium Australia will be entitled to receive a royalty of 2% of gross revenue derived by MetalsTech from selling all products that were beneficiated using the technology. In addition to royalty payments, MetalsTech will be required to issue Lithium Australia up to 5,000,000 Shares in the Company and 3,000,000 Options, subject to performance millstones as follows:
-
(a) Completion Payment : MetalsTech will issue LIT 1,000,000 Shares upon:
-
the execution of the binding Letter Agreement; and - the completion of the listing of MetalsTech on the ASX
-
(b) Proof of Concept: MetalsTech will issue LIT 500,000 Shares upon LIT achieving representative >90% Li extraction from bench scale testing using spodumene sourced from a MetalsTech projects
-
(c) Quality Tests: MetalsTech will issue LIT 500,000 Shares upon LIT achieving representative >95% Li2CO3 purity ppt from leach liquors, using spodumene sourced from a MetalsTech project
-
(d) Pilot Tests: MetalsTech will issue LIT 1,000,000 Shares and 500,000 Options upon LIT achieving representative extraction >90% Li recovery and >85% from leach liquor, in a continuous plant operation, using spodumene sourced from a MetalsTech projects.
-
(e) Scoping Study: MetalsTech will issue LIT 1,000,000 Shares and 500,000 Options upon MetalsTech delivering of a scoping study on one of the MetalsTech projects demonstrating that using the Technology, MetalsTech can produce a lithium carbonate product or lithium hydroxide product on cost competitive terms.
-
(f) Definitive Feasibility Study: MetalsTech will issue LIT 1,000,000 Shares and 500,000 Options upon MetalsTech delivering of a definitive feasibility study on one of the MetalsTech projects demonstrating that using the Technology, MetalsTech can produce a lithium carbonate product or lithium hydroxide product on cost competitive terms.
-
(g) Offtake: MetalsTech will issue LIT 500,000 Options upon MetalsTech executing a binding offtake agreement(s) for the supply of >5,000 tpa of lithium carbonate and/or lithium hydroxide from a processing plant using the Technology.
-
(h) Commencement of Plant Construction: MetalsTech will issue LIT 500,000 Options upon MetalsTech commission construction of a full-scale processing plant using the Technology (excluding pilot plant construction).
-
(i) First Commercial Production: MetalsTech will issue LIT 500,000 Options upon MetalsTech achieving first commercial production and sales of lithium carbonate and/or lithium hydroxide from a full-scale processing plant using the Technology.
11. CONTINGENT LIABILITIES
The Consolidated Entity has the following contingent liabilities as at 31 December 2016 (30 June 2016: Nil). Acquisition of Lithophile Pty Ltd
On the 1st July 2016, Lithium Australia NL acquired 100% shareholding in Lithophile Pty Ltd for the consideration of $26,726 cash payment, 500,000 Shares, 500,000 Partly Paid Shares as well as Deferred Consideration Shares as listed below. The deferred consideration is not probable, and therefore the Group has not provided for such amounts in this financial report.
-
(a) First deferred consideration shares of 500,000 fully paid ordinary share and 500,000 partly paid shares (payable on completion of a prefeasibility study).
-
(b) Second deferred consideration shares of 1,500,000 fully paid ordinary share (payable on completion of study which indicated resources of no less than 1m tonne grading 1% lithium).
Page 19
NOTES TO THE FINANCIAL STATEMENTS For The half-year ended 31 December 2016 (continued)
12. COMMITMENTS
Lithium Australia NL and Tin International AG, (subsidiary of German listed Deutsche Rohstoff AG), have entered into a binding Memorandum of Understanding (MoU) to form a Joint Venture. The JV will include the Sadisdorf deposit, located in Saxony, Germany as key asset of the Joint Venture. LIT has the right to earn 15% of the to be established company by spending a total of EUR 750,000 on exploration of Sadisdorf until the end of 2017. Alternatively, the company can elect to pay the outstanding amount in cash to Tin International by year-end. By investment of a further EUR 1.25 million over a 3-year period Lithium Australia has the right to further increase its interest in the Joint Venture Company to 50%. After the completion of this “earn-in” period, the partners equally bear the project development costs or are diluted accordingly. Tin International will receive a one-off payment of EUR 200,000 in LIT shares and EUR 50,000 in cash.
13. FINANCIAL INSTRUMENTS
The Group’s financial instruments consist of trade and other receivable and trade and other payables. These financial instruments are measured at amortised cost, less any provision for non-recovery. The carrying amount of the financial assets and liabilities approximate their fair value.
Financial assets
The Group’s Held for trading financial assets are level-1 financial instruments and valued using the quoted bid prices from the Australian Securities Exchange as at the reporting date.
14. SUBSIDIARY ACQUIRED
| 31 December 2016 | Principle Activity | Date of Acquisition | Proportion of Share | Consideration |
|---|---|---|---|---|
| Acquired | Transferred | |||
| BlackEarth Minerals | Mineral Exploration | 14/08/2016 | 34.48%(a) | $1 |
| NL |
Due to the composition of Board of Directors, Lithium Australia controls the financial and operating policies of BlackEarth Minerals NL.
- (a) Lithium Australia NL holds 10,000,000 partly paid shares in BlackEarth Minerals NL and has the discretion to pay up on these shares at any time to convert them to ordinary shares in the Company. BlackEarth Mineral NL also has the power to forfeit any shares where the call remains unpaid 14 days after the call was payable. BlackEarth Mineral NL must then offer the shares forfeited for public auction within six weeks of the call becoming payable.
Page 20
DIRECTORS’ DECLARATION
The directors of Lithium Australia NL declare that:
-
The financial statements and notes are in accordance with the Corporations Act 2001 and:
-
(a) comply with Accounting Standards AASB 134: Interim Financial Reporting ; and
-
(b) give a true and fair view of the Consolidated Entity’s financial position as at 31 December 2016 and of its performance as represented by the results of its operations, changes in equity and its cash flows for the halfyear ended on that date; and
-
At the date of this statement there are reasonable grounds to believe that the Consolidated Entity will be able to pay its debts when they become due and payable.
This declaration is made in accordance with a resolution of the Board of Directors.
==> picture [99 x 45] intentionally omitted <==
Adrian Griffin Managing Director
Dated at Perth this 9th day of March 2017
Page 21
Independent Auditor’s Review Report
To the Members of Lithium Australia NL
We have reviewed the accompanying half-year financial report of Lithium Australia NL (“the Company”) and Controlled Entities (“the Consolidated Entity”) which comprises the condensed consolidated statement of financial position as at 31 December 2016, the condensed consolidated statement of profit or loss and other comprehensive income, condensed consolidated statement of changes in equity and condensed consolidated statement of cash flows for the half-year ended on that date, a statement of accounting policies, other selected explanatory notes and the directors’ declaration of the Consolidated Entity, comprising the Company and the entities it controlled during the half-year.
Directors Responsibility for the Half-Year Financial Report
The directors of the Company are responsible for the preparation of the half-year financial report that gives a true and fair view in accordance with Australian Accounting Standards and the Corporations Act 2001 and for such control as the directors determine is necessary to enable the preparation of the half-year financial report that gives a true and fair view and is free from material misstatement, whether due to fraud or error.
Auditor’s Responsibility
Our responsibility is to express a conclusion on the half-year financial report based on our review. We conducted our review in accordance with Auditing Standard on Review Engagements ASRE 2410 Review of a Financial Report Performed by the Independent Auditor of the Entity, in order to state whether, on the basis of the procedures described, we have become aware of any matter that makes us believe that the financial report is not in accordance with the Corporations Act 2001 including: giving a true and fair view of the Consolidated Entity’s financial position as at 31 December 2016 and its performance for the half-year ended on that date; and complying with Accounting Standard AASB 134 Interim Financial Reporting and the Corporations Regulations 2001. As the auditor of the Consolidated Entity, ASRE 2410 requires that we comply with the ethical requirements relevant to the audit of the annual financial report.
A review of a half-year financial report consists of making enquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review is substantially less in scope than an audit conducted in accordance with Australian Auditing Standards and consequently does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion.
Independent Auditor’s Review Report To the Members of Lithium Australia NL (Continued)
==> picture [73 x 36] intentionally omitted <==
Independence
In conducting our review, we have complied with the independence requirements of the Corporations Act 2001.
Conclusion
Based on our review, which is not an audit, we have not become aware of any matter that makes us believe that the half-year financial report of Lithium Australia NL and Controlled Entities is not in accordance with the Corporations Act 2001 including:
-
a. Giving a true and fair view of the Consolidated Entity’s financial position as at 31 December 2016 and of its performance for the half-year ended on that date; and
-
b. Complying with Accounting Standard AASB 134: Interim Financial Reporting and Corporations Regulations 2001.
==> picture [91 x 38] intentionally omitted <==
==> picture [132 x 31] intentionally omitted <==
BENTLEYS MARK DELAURENTIS CA Chartered Accountants Director
Dated at Perth this 9[th] day of March 2017