Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

LITHIUM ENERGY LIMITED Capital/Financing Update 2021

Sep 23, 2021

65224_rns_2021-09-23_991924b6-7c66-4d6d-9aa8-9900eebc25b5.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

Friday, 24 September 2021

ASX Code : LEL

==> picture [251 x 60] intentionally omitted <==

MARKET ANNOUNCEMENT

Lithium Energy Prepares to Mobilise to Site with Approvals Pending for Solaroz Exploration

KEY HIGHLIGHTS

==> picture [17 x 13] intentionally omitted <==

==> picture [17 x 13] intentionally omitted <==

==> picture [17 x 13] intentionally omitted <==

  • Approvals expected shortly for exploration to commence at Solaroz Lithium Project

  • Lithium Energy preparing to mobilise to site to undertake geophysics and drilling for lithium Exploration Target

  • Long term fundamentals for Lithium demand remain strong, supporting Solaroz exploration strategy

Lithium Energy Limited (ASX:LEL) ( Lithium Energy ) is pleased to that all outstanding technical information relating to the Solaroz Lithium Project ( Solaroz ) that was required to be submitted following the public consultation meetings held in late July 2021[1] has now been delivered to UGAMP[2] by Lithium Energy’s local representatives.

Lithium Energy expects that, given that there were no substantive community or landowner objections raised at the consultation meetings to the proposed exploration works, approval for Lithium Energy to commence exploration will be issued shortly. The Company is therefore preparing to mobilise to site, in anticipation of the approvals being received.

Solaroz is located within South America’s ‘Lithium Triangle’ in North-West Argentina in the Salar de Olaroz basin ( Olaroz Salar ) and is directly adjacent to or principally surrounded by two world class Lithium brine projects, being the current production assets of Orocobre Limited (ASX/TSX:ORE) and the advanced lithium brine development project held by Lithium Americas Corporation (TSX/NYSE:LAC) (refer Figure 1).

Once approvals are received, Lithium Energy will commence an intensive exploration program consisting of geophysical surveys and drilling to test its Solaroz Exploration Target of 1.5 to 8.7 million tonnes (Mt) of contained Lithium Carbonate Equivalent (LCE) (based on a range of lithium concentrations of between circa 500 mg/L Lithium (Li) and 700 mg/L Li ):

1 Refer LEL ASX Announcement dated 5 August 2021: Approval Process for Solaroz Exploration Nearing Completion 2 Unidad de Gestión Ambiental Provincial Minera (Environmental Management Unit)

==> picture [61 x 61] intentionally omitted <==

www.lithiumenergy.com.au

A.B.N. 94 647 135 108

LITHIUM ENERGY LIMITED

Level 2, 31 Ventnor Avenue, West Perth, Western Australia 6005 T | (08) 9214 9737 F | (08) 9214 9700

E | [email protected]

ASX : LEL

20210924 LEL ASX Lithium Energy Prepares to Mobilise to Site with Approvals Pending for Solaroz Exploration.docx

Brine
Area
(km2)
SOLAROZ EXPLORATION TARGET SOLAROZ EXPLORATION TARGET SOLAROZ EXPLORATION TARGET
Thickness of Deep
Sand Unit(m)
Lithium
(mg/L)
Average Specific
Yield(Sy) (%)
Brine Volume
(million m3)
Contained
Lithium(Mt)
Contained
LCE(Mt)
Upper Assumption Estimate
78 150 700 20 2334 1.6 8.70
Lower Assumption Estimate
78 75 500 10 584 0.3 1.5

For further information, refer to LEL ASX Announcement dated 8 June 2021: Substantial Lithium Exploration Target Identified at the Solaroz Project in Argentina

The Exploration Target’s potential quantity and grade is conceptual in nature, there has been insufficient exploration to estimate a Mineral Resource, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

==> picture [327 x 532] intentionally omitted <==

Figure 1: Solaroz Project Tenement Locations

  • 2 -

20210924 LEL ASX Lithium Energy Prepares to Mobilise to Site with Approvals Pending for Solaroz Exploration.docx

The Company notes that the long-term fundamentals for Lithium demand remain strong, driven primarily by continued growth in the electric vehicle and energy storage industries.

Lithium Energy now looks forward to the approval process being concluded such that its Solaroz exploration works in the Olaroz Salar can commence.

AUTHORISED FOR RELEASE - FOR FURTHER INFORMATION:

William Johnson Peter Smith Executive Chairman Executive Director T | (08) 9214 9737 T | (08) 9214 9737 E | [email protected] E | [email protected]

ABOUT LITHIUM ENERGY LIMITED (ASX:LEL)

Lithium Energy Limited is an ASX listed battery minerals company which is developing its flagship Solaroz Lithium Brine Project in Argentina and the Burke Graphite Project in Queensland. The Solaroz Lithium Project (LEL:90%) comprises 12,000 hectares of highly prospective lithium mineral tenements located strategically within the Salar de Olaroz Basin in South America’s “Lithium Triangle” in north-west Argentina. The Solaroz Lithium Project is directly adjacent to or principally surrounded by mineral tenements being developed into production by Orocobre Limited (ASX/TSX:ORE) and Lithium Americas Corporation (TSX/NYSE:LAC). The Burke Graphite Project (LEL:100%) contains a high grade graphite deposit and presents an opportunity to participate in the anticipated growth in demand for graphite and graphite related products. LEL was spun out of Strike Resources Limited (ASX:SRK) via a $9 million IPO; Strike remains a major (43%) shareholder of the Company.

JORC CODE COMPETENT PERSON’S STATEMENT

The information in this document that relates to Exploration Targets and Exploration Results in relation to the Solaroz Lithium Project is extracted from the following ASX market announcements made by Lithium Energy dated:

  • 8 June 2021 entitled "Substantial Lithium Exploration Target Identified at the Solaroz Project in Argentina"

  • 26 May 2021 entitled "Geophysical Data Supports Highly Encouraging Exploration Potential for Solaroz}”

The information in the original announcements is based on, and fairly represents, information and supporting documentation prepared and compiled by Mr Peter Smith (BSc (Geophysics) (Sydney) AIG ASEG). Mr Smith is a Member of the Australian Institute of Geoscientists ( AIG ) and a Director of the Company. Mr Smith has the requisite experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (the JORC Code ). The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements (referred to above). The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements (referred to above).

FORWARD LOOKING STATEMENTS

This document contains “forward-looking statements” and “forward-looking information”, including statements and forecasts which include without limitation, expectations regarding future performance, costs, production levels or rates, mineral reserves and resources, the financial position of the Company, industry growth and other trend projections. Often, but not always, forwardlooking information can be identified by the use of words such as “plans”, “expects”, “is expected”, “is expecting”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates”, or “believes”, or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may”, “could”, “would”, “might”, or “will” be taken, occur or be achieved. Such information is based on assumptions and judgements of management regarding future events and results. The purpose of forward-looking information is to provide the audience with information about management’s expectations and plans. Readers are cautioned that forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company and/or its subsidiaries to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include, among others, changes in market conditions, future prices of minerals/commodities, the actual results of current production, development and/or exploration activities, changes in project parameters as plans continue to be refined, variations in grade or recovery rates, plant and/or equipment failure and the possibility of cost overruns. Forward-looking information and statements are based on the reasonable assumptions, estimates, analysis and opinions of management made in light of its experience and its perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances at the date such statements are made, but which may prove to be incorrect. The Company believes that the assumptions and expectations reflected in such forward-looking statements and information are reasonable. Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. The Company does not undertake to update any forward-looking information or statements, except in accordance with applicable securities laws.

  • 3 -