LIONTOWN LIMITED Capital/Financing Update 2021

Jan 10, 2021

65274_rns_2021-01-10_6648848f-d281-4c78-9877-2eb1cecb95bf.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

11[th] January 2021

Key consultants appointed to assist in delivering DFS in Q4 2021

HIGHLIGHTS

  • Definitive Feasibility Study (DFS) follows on from highly encouraging studies completed in Q4 2020 (see ASX releases dated 9[th] and 22[nd] October 2020) which support a stand-alone 2Mtpa mining operation with a 40-year mine life.

  • Key consultants including Lycopodium Minerals Pty Ltd, Snowden Mining Industry Consultants Pty Ltd, Knight Piésold Pty Ltd, MBS Environmental and ALS Metallurgy Pty Ltd appointed to ensure a high-quality DFS.

  • Water exploration drilling has identified a number of prospective follow-up targets for full bore development and testing.

  • Comminution Study completed which has identified the potential for further process circuit optimisation.

  • Geotechnical/in-fill drilling confirms the potential to upgrade Inferred parts of the Mineral Resource Estimate (MRE), with several high-grade intersections received, including:

KVGT0013

9.9m @ 1.9% Li2O from 135.9m , including: o 5.1m @ 2.9% Li2O from 135.9m, and 30.8m @ 1.6% Li2O from 260.6m , including: o 3m @ 3.0% Li2O from 261m, and o 4.9m @ 2.5% Li2O from 278.1m

KVDD0076

9.2m @ 1.6% Li2O from 189.2m , including: o 2m @ 2.2% Li2O from 191m, and 13.4m @ 1.7% Li2O from 269.6m , including: o 8m @ 2.0% Li2O from 274m

KVDD0077

14m @ 1.8% Li2O from 186m , including: o 4m @ 2.5% Li2O from 195m, and 39.7m @ 1.6% Li2O from 280.4m , including: o 5m @ 2.4% Li2O from 285m, and o 3.3m @ 2.2% Li2O from 299.1m

(True widths – 70-85% of down-hole widths. See Appendix 1 for further details including tantalum assays )

==> picture [596 x 59] intentionally omitted <==

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Liontown Resources Limited (ASX: LTR, “Liontown” or “Company”) is pleased to advise that it has moved to the next key pre-development stage at its 100%-owned Kathleen Valley Lithium-Tantalum Project in Western Australia with work now well underway on a Definitive Feasibility Study (DFS).

The DFS, which is scheduled for completion in Q4 2021, follows on from the highly encouraging studies completed in Q4 2020 that included:

  • A Pre-Feasibility Study (PFS) into establishing a 2Mtpa mining operation to produce an average 350,000tpa of spodumene concentrate (SC6) for 40 years; and

  • A subsequent Scoping Study into the potential to undertake downstream processing on-site to produce Lithium Hydroxide or Lithium Sulphate.

Liontown has appointed several highly credentialled consulting groups to assist with the DFS including Lycopodium Minerals Pty Ltd (Process Engineering), Snowden Mining Industry Consultants Pty Ltd (Mine Engineering), Knight Piésold Pty Ltd (Tailings and Hydrogeological Engineering), MBS Environmental (Environmental and Permitting) and ALS Metallurgy Pty Ltd (Metallurgical Test Work).

The Company has also undertaken additional geotechnical and water exploration drilling to acquire data identified by the 2020 PFS which is required to complete the DFS.

The geotechnical drilling comprised six diamond core holes totalling 1,312m ( Appendix 1 ) and was designed to provide rock quality data for the proposed underground portals and the north-western part of the deposit. Data from the holes indicate good ground conditions suitable for underground mining and are consistent with previous drilling.

Two of the geotechnical holes, KVDD0076 and KVDD0077, drilled into an Inferred part of the Mineral Resource ( see Figure 1 ), intersected significant widths of high-grade lithium mineralisation (see Highlights), confirming the continuity of the system. The assay data from KVDD0076 and KVDD0077 will be used to upgrade parts of the Mineral Resource Estimate to the Indicated category, which will subsequently be available for conversion to Ore Reserves as part of the DFS.

The water drilling comprised 10 Reverse Circulation (RC) holes totalling 1,018m with the holes targeting structures defined by aeromagnetic and ground EM data. A number of holes intersected water and further drilling to fully develop 2-3 bores and measure flow rates and draw-down is scheduled for late Q1 2021.

Further metallurgical test work on approximately 3 tonnes of material will also commence during the current Quarter to provide DFS-level data for recovery, variability, grind size optimisation and comminution.

A Process Comminution Study has also been completed which has confirmed the viability of further process optimisation leading to possible capital savings and improved operability through the removal of one stage of crushing and increased grinding mill size. This change will be incorporated into the DFS.

Further market updates will be provided as the DFS progresses.

Kathleen Valley Overview

The 100%-owned Kathleen Valley Lithium-Tantalum Project is located in the North Eastern Goldfields of Western Australia, approximately 400km north of Kalgoorlie ( Figure 2 ) close to well-established transport and energy infrastructure. Liontown acquired the Project in 2017 and has since drilled 461 RC and diamond core holes for a total of 89,066m.

Data from the drilling has been used to prepare a MRE of 156Mt @ 1.4% Li2O and 130ppm Ta2O5 , making Kathleen Valley one of the larger, spodumene-related hard rock lithium resources in the world.

LIONTOWN RESOURCES LIMITED | PAGE 2

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

The MRE formed the basis of a PFS completed in October 2020 with the key metrics from the study tabled below:

Description PFS
NPV8%(real) LOM (Post Tax) A$1.12B
IRR (%) LOM (Post Tax) 37%
Payback (years) 3
OPEX US$/t Li2O (dmt) Years 1-10 (exc. royalties)(2)(3) US$283/dmt
LOM Free Cashflow (post tax) A$4.8B
Annual Production 6% Li2O (dmt) 350ktpa
Annual Production 30% Ta2O5 (dmt) 430 tpa
Capital Cost A$M (inc. $67M pre-production costs) A$325M
Ore Reserve 71Mt@ 1.40% Li2O & 130ppm Ta2O5
Production Inventory(1) 79Mt@ 1.40% Li2O & 130ppm Ta2O5
Mine Life (at 2 Mtpa) ~40 years

Cautionary statement: 1The production targets and forecast financial information referred to in the PFS comprise Proven Ore Reserves (19.7%), Probable Ore Reserves (69.8%) and Inferred Mineral Resources (10.5%). The Inferred material included in the inventory is 8.28Mt @ 1.36% Li2O & 120 ppm Ta2O5. The Inferred material has been scheduled such that less than 1Mt is mined in the first ten years, with 6.44Mt at the end of the underground mine life and 0.84Mt after year 25 for the open pit. The Inferred material does not have a material effect on the technical and economic viability of the project. There is a low level of geological confidence associated with inferred Mineral Resources and there is no certainty that further exploration work will result in the determination of indicated Mineral Resources or that the production target itself will be realised.

2 Cash operating costs include all mining, processing, transport, freight to port, port costs and site administration/ overhead costs. Excludes sustaining capital.

3 As royalties are predominantly sales-price dependent they have not been included in cash costs. At PFS average Li2O pricing to 2040 of US$739/t royalties equates to $62/t of 6% Li2O for the 1[st] 10-year case presented above.

Given the highly encouraging results from the PFS, Liontown has commenced a DFS which is scheduled for completion in Q4 2021.

The Company has also undertaken a Scoping Study which supports the establishment of a downstream processing facility on-site to produce lithium hydroxide or lithium sulphate using 6% Li2O spodumene concentrate (SC6) from Kathleen Valley. Further test work is planned to provide the additional data required to determine whether Liontown should pursue this option further.

LIONTOWN RESOURCES LIMITED | PAGE 3

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

This announcement has been authorised for release by the Board.

==> picture [102 x 44] intentionally omitted <==

DAVID RICHARDS Managing Director

For More Information:

For More Information: Investor Relations: David Richards Nicholas Read Managing Director Read Corporate T: +61 8 9322 7431 T: +61 8 9388 1474 [email protected] [email protected]

Competent Person Statement

The Information in this report that relates to Exploration Results is based on and fairly represents information and supporting documentation prepared by Mr David Richards, who is a Competent Person and a member of the Australasian Institute of Geoscientists (AIG). Mr Richards is a full-time employee of the company. Mr Richards has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activities being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Richards consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The Information in this Presentation that relates to Mineral Resources for the Kathleen Valley Project is extracted from the ASX announcement “Kathleen Valley confirmed as a world-class lithium deposit as Mineral Resource increases to 156Mt @ 1.4% Li2O” released on the 11th May 2020 which is available on www.ltresources.com.au.

The Information in this Presentation that relates to Ore Reserves, Production Target and Pre-Feasibility Study (PFS) for the Kathleen Valley Project is extracted from the ASX announcement “Updated Kathleen Valley Pre-Feasibility Study delivers substantial increase in NPV to A$1.1 billion and mine life to ~40 years” released on 9[th] October 2020 which is available on www.ltresources.com.au

The Information in this Presentation that relates to the Downstream Scoping Study (DSS) is extracted from the ASX announcement “Downstream Scoping Study: Kathleen Valley Lithium-Tantalum Project” released on 22 October 2020 which is available on www.ltresources.com.au

The company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.

Forward Looking Statement

This announcement contains forward-looking statements which involve a number of risks and uncertainties. These forward-looking statements are expressed in good faith and believed to have a reasonable basis. These statements reflect current expectations, intentions or strategies regarding the future and assumptions based on currently available information. Should one or more of the risks or uncertainties materialise, or should underlying assumptions prove incorrect, actual results may vary from the expectations, intentions and strategies described in this announcement. No obligation is assumed to update forward looking statements if these beliefs, opinions and estimates should change or to reflect other future developments.

LIONTOWN RESOURCES LIMITED | PAGE 4

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

==> picture [454 x 415] intentionally omitted <==

Figure 1: Kathleen Valley – Plan showing proposed underground stopes and latest drill results.

LIONTOWN RESOURCES LIMITED | PAGE 5

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

==> picture [462 x 547] intentionally omitted <==

Figure 2: Kathleen Valley – Regional loaction and geology plan.

LIONTOWN RESOURCES LIMITED | PAGE 6

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Appendix 1 – Kathleen Valley –Drill hole statistics (Q4 2020)

==> picture [462 x 540] intentionally omitted <==

----- Start of picture text -----

Significant Li2O (>0.4%) and Ta2O5 (>50ppm) results
Hole_ID East North RL Dip Azimuth Depth (m)
From(m) To(m) nterval(m) Li2O (%) Ta2O5 (ppm)
189.2 198.4 9.2 1.6 14
incl. 2m @ 2.2% Li2O and 14ppm Ta2O5 from 191m
and 2m @ 1.8% Li2O and 25ppm Ta2O5 from 194m
and 1.53m @ 2.3% Li2O and 7ppm Ta2O5 from 196.5m
236 239.4 3.4 0.6 105
258 266.1 8.1 1.8 173
KVDD0076 257885 6959310 506 -75 183 334.1 incl. 5m @ 2.0% Li2O and 190ppm Ta2O5 from 258m
269.6 283 13.4 1.7 203
incl. 1.83m @ 2.2% Li2O and 58ppm Ta2O5 from 269.6m
and 8m @ 2.0% Li2O and 252ppm Ta2O5 from 274m
291.3 297.2 5.9 1.7 176
incl. 4.72m @ 1.9% Li2O and 171ppm Ta2O5 from 291.3m
302.3 303.2 0.9 1 247
21 24 3 1.7 178
incl. 1m @ 2.4% Li2O and 122ppm Ta2O5 from 22m
181 182.75 1.75 1.2 411
186 200 14 1.8 48
incl. 3.9m @ 2.2% Li2O and 19ppm Ta2O5 from 187.1m
and 4m @ 2.5% Li2O and 44ppm Ta2O5 from 195m
249.2 254 4.8 1.2 98
KVDD0077 258042 6959310 506 -56 203 350.5 incl. 1m @ 2.5% Li2O and 111ppm Ta2O5 from 253m
255.5 257.45 1.95 0.8 237
280.4 320.1 39.7 1.6 180
incl. 5m @ 2.4% Li2O and 177ppm Ta2O5 from 285m
and 1m @ 2.1% Li2O and 202ppm Ta2O5 from 293m
and 3.3m @ 2.2% Li2O and 272ppm Ta2O5 from 299.1m
and 0.9m @ 3.3% Li2O and 204ppm Ta2O5 from 304.1m
and 9.1m @ 1.8% Li2O and 196ppm Ta2O5 from 311m
135.9 145.8 9.9 1.9 94
incl. 5.1m @ 2.9% Li2O and 70ppm Ta2O5 from 135.9m
222.7 226.7 4 1.4 183
incl. 1m @ 2.5% Li2O and 160ppm Ta2O5 from 223m
233.3 234.7 1.4 1.1 105
KVGT013 258100 6959450 507 -61 176 360.1 251 256 5 1.5 193
incl. 2m @ 2.5% Li2O and 229ppm Ta2O5 from 253m
260.2 291 30.8 1.6 189
incl. 3m @ 3.0% Li2O and 110ppm Ta2O5 from 261m
and 5.3m @ 1.9% Li2O and 234ppm Ta2O5 from 269.7m
and 4.9m @ 2.5% Li2O and 176ppm Ta2O5 from 278.1m
KVGT014 257610 6958320 504 -70 360 51.9
KVGT015 257610 6958400 504 -65 358 115.1 Geotechnical holes only - not assayed
KVGT016 258755 6958170 525 -55 58 100.1
----- End of picture text -----

True widths estimated as follows:

Holes drilled towards NE (~045) and intersecting Kathleen's Corner lodes - true widths 85-100% of downhole width Holes drilled towards NE (~045) and intersecting Mt Mann lodes - true widths 65-100% of downhole width Holes drilled towards SW (~225) and intersecting Kathleen's Corner lodes - true widths 65-75% of downhole width Holes drilled towards SW (~225) and intersecting Mt Mann lodes - true widths 30-50% of downhole width Holes drilled on NW/SE lines - true widths 60-100% of downhole widths

LIONTOWN RESOURCES LIMITED | PAGE 7

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Appendix 2 – Kathleen Valley – JORC Code 2012 Table 1 Criteria

The table below summarises the assessment and reporting criteria used for the Kathleen’s Corner, Mt Mann deposits and Kathleen Valley Lithium Project Mineral Resource estimate and reflects the guidelines in Table 1 of The Australasian Code for the Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code, 2012).

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.

Sub-surface samples have been collected by reverse
circulation (RC) and diamond core drilling techniques (see
below).

Drillholes are oriented perpendicular to the interpreted
strike of the mineralised trend except where limited access
necessitates otherwise.
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g
charge for fire assay’). In other cases
more explanation may be required, such
as where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information.

RC samples are collected by the metre from the drill rig
cyclone as two 1 m cone split samples in calico bags and a
bulk sample in plastic mining bags.

The 1 m samples from the cyclone are retained for check
analysis. Only samples of pegmatite and adjacent wall rock
(~4 m) are collected for assay.

Diamond core has been sampled in intervals of ~1 m (up to
2.0 m within the main project area) where possible,
otherwise intervals less than 1 m have been selected based
on geological boundaries. Geological boundaries have not
been crossed by sample intervals.
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details (eg
core diameter, triple or standard tube,
depth of diamond tails, face-sampling bit
or other type, whether core is oriented
and if so, by what method, etc).

Drilling techniques used at Kathleen Valley comprise:
o Reverse Circulation (RC/5.5”) with a face sampling
hammer
o NQ2, HQ and PQ Diamond Core, standard tube to a
depth of ~650 m.
o Diamond core holes drilled directly from surface or from
bottom of RC pre-collars. Core orientation was provided
byan ACT REFLEX(ACT II RD)tool.
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed.

Sample recoveries are estimated for RC by correlating
sample heights in the plastic bag to estimate a recovery for
each metre.

For diamond core the recovery is measured and recorded for
everymetre.
Measures taken to maximise sample
recovery and ensure representative
nature of the samples.

RC drill collars are sealed to prevent sample loss and holes
are normally drilled dry to prevent poor recoveries and
contamination caused by water ingress. Wet intervals are
noted in case of unusual results.

For diamond core loss, core blocks have been inserted in
sections where core loss has occurred. This has then been
written on the block and recorded during the logging process
and with detailedphotographyof dryand wet core.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to

It has been demonstrated that no relationship exists
between sample recovery and grade. No grade bias was
observed with sample size variation.

LIONTOWN RESOURCES LIMITED | PAGE 8

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary
preferential loss/gain of fine/coarse
material.
Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource estimation,
mining studies and metallurgical studies.

All RC drillholes are logged on 1 m intervals and the following
observations recorded:
o
Recovery, quality (i.e. degree of contamination), wet/dry,
hardness, colour, grainsize, texture, mineralogy, lithology,
structure type and intensity, pegmatite and vein type and
%, lithium mineralogy and %, alteration assemblage, UV
fluorescence.

Diamond core is logged in its entirety as per detailed
geological description listed above. Geotechnical logging has
been completed for the entire hole.
Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.

Logging is quantitative, based on visual field estimates.

Diamond core is photographed post metre marking, for the
entire length of the hole,two trays at a time,wet and dry.
The total length and percentage of the
relevant intersections logged.

Drillholes are logged in their entirety.
Sub-sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.

The core has been cut in half and then quartered for sample
purposes. Half core used for metallurgical studies with the
remaining quarter stored as a library sample.

Density measurements have been taken on all quarter core
samples usingthe Archimedes method.
If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
_or dry. _

RC samples are collected as rotary split samples. Samples
are typically dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.

Sample preparation follows industry best practice standards
and is conducted by internationally recognised laboratories;
i.e.
o Oven drying, jaw crushing and pulverising so that 80%
passes -75 microns.
Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.

Duplicates and blanks submitted approximately every 1 in 20
samples.

Standards are submitted every 20 samples or at least once
per hole.

Cross laboratory checks and blind checks have been used at
a rate of 5%.
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.

Measures taken include:
o
regular cleaning of cyclones and sampling equipment to
prevent contamination
o
industry standard insertion of standards, blanks and
duplicate samples.

Analysis of duplicates (field, laboratory and umpire) was
completed and no issues identified with sampling
representatively.

Analysis of results from blanks and standards indicates no
issues with contamination (or sample mix-ups) and a high
level of accuracy.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.

Sample size is considered appropriate and is in-line with
industry standards.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness
of the assaying and laboratory procedures
used and whether the technique is
considered partial or total.

Initial assaying (2017) completed by ALS Perth. Subsequent
assaying (2018 onwards) completed by Nagrom laboratories
Perth.

Both laboratories use industry standard procedures for rare
metals such as Li and Ta. Analytical techniques are total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.

None used.

LIONTOWN RESOURCES LIMITED | PAGE 9

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.

Duplicates and blanks submitted approximately every 20
samples.

Standards are submitted every 20 samples or at least once
per hole.

Cross laboratory checks and blind checks have been used at
a rate of 5%.

Analysis of reference blanks, standards and duplicate
samples show the data to be of acceptable accuracy and
precision for the Mineral Resource estimation and
classification applied.
Verification of
sampling and
assaying
The verification of significant
intersections by either independent or
alternative company personnel.

Internal review by alternate company personnel.
The use of twinned holes.
11 diamond holes have been drilled as twins or in close
proximity to existing RC drillholes. Results compare well with
the original RC drillholes.
Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.

Drilling and logging data are entered directly into Microsoft
Excel spreadsheets onsite while drilling is ongoing. Data is
then entered into Access Database and validated before
being processed by industry standard software packages
such as MapInfo and Micromine.

Representative chip samples are collected for later
reference.
Discuss any adjustment to assay data.
Li% is converted to Li2O% by multiplying by 2.15, Ta ppm is
converted to Ta2O5 ppm bymultiplyingby1.22.
Location of
data points
Accuracy and quality of surveys used to
locate drillholes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.

All drill collars and geochemical samples are initially located
using a handheld GPS.

Drill collars are subsequently surveyed accurately by a
licensed surveyor using DGPS techniques. Eastings and
northings are measured to within +/-2 cm while elevations
are measured to within +/-10 cm.

All RC drillholes have been surveyed by a multi-shot digital
downhole camera provided by the drilling contractor.

All diamond drillholes have been surveyed with a REFLEX EZI-
SHOT(1001)magnetic single shot camera.
Specification of the grid system used.
GDA 94 Zone 51.
Quality and adequacy of topographic
control.

Initial collar elevations are based on regional topographic
dataset.

Drillhole collars are surveyed post drilling with DGPS (see
above).

Further topographic data (20 cm contours) has been
provided for the Project bya LIDAR flown byFugro.
Data spacing
and
distribution
Data spacing for reporting of Exploration
Results.

Drillhole spacing varies due to initial drill programs largely
designed to test the down-dip potential of mineralised
outcrops. The drill section spacing is 40 m to 100 m and on-
section spacingisgenerally30 m to 60 m.
Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.

The data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the
Mineral Resource estimation and classification applied.
Whether sample compositing has been
applied.

None undertaken.
Orientation of
data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.

Drilling is typically oriented perpendicular to the interpreted
strike of mineralisation.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to

Drilling orientation intersects the mineralisation at
appropriate angles so as to be mostly unbiased and suitable

LIONTOWN RESOURCES LIMITED | PAGE 10

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary
have introduced a sampling bias, this
should be assessed and reported if
material.
for resource estimation of the major pegmatite bodies.
Sample
security
The measures taken to ensure sample
security.

Sample security is not considered to be a significant risk
given the location of the deposit and bulk-nature of
mineralisation.

Nevertheless, the use of recognised transport providers,
sample dispatch procedures directly from the field to the
laboratory, and the large number of samples are considered
sufficient to ensure appropriate sample security.

Company geologist supervises all sampling and subsequent
storage in field. The same geologist arranges delivery of
samples to Nagrom laboratories in Perth via courier.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.

Independent, expert competent person reviews have been
completed by Ms. Wild of Wildfire Resources Pty Ltd and
Mrs. Standing of Optiro Limited on the resource drilling,
sampling protocols and data.

This included a laboratory visit to Nagrom by Ms. Wild.

Results indicate sampling and QAQC procedures are in-line
with industrystandards.
Section 2 Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.

The Kathleen Valley Project is located ~670 km NE of Perth
and ~45 km NNW of Leinster in Western Australia. The
Project comprises four granted mining leases - MLs 36/264,
265, 459, 460, one Exploration License (EL) - E36/879 and one
mining lease application (MLA) – M36/696.

The granted mining leases (MLs) and rights to pegmatite
hosted rare-metal mineralisation were acquired from
Ramelius Resources Limited via a Sales Agreement completed
in 2016. The MLs have been transferred to LRL (Aust) Pty Ltd,
a wholly owned subsidiary of Liontown Resources Limited
(Liontown).

Ramelius acquired 100% of the Kathleen Valley Project MLs in
June 2014 from Xstrata Nickel Operations Pty Ltd (Xstrata).
Xstrata retains rights to any nickel discovered over the land
package via an Offtake and Clawback Agreement.

The Gold Rights were acquired from Ramelius via a Sales
Agreement completed in June 2019.

LRL (Aust) Pty Ltd has assumed the following Agreement:
o
Bullion and Non-Bullion Royalty Agreement of a 2%
Gross Production Royalty affecting M36/264-265 and
459-460.

The EL and MLA are in the name of Liontown Resources
Limited with no third-party obligations apart from statutory
requirements.

The tenements are covered by the Tjiwarl Determined Native
Title Claim (WC11/7). Liontown has signed a number of
agreements with the Tjiwarl which provide protocols for field
activities by the Company.

LRL (Aust) Pty Ltd has received Section 18 consent to drill on
MLs 36/264,265,459,460.
The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.

All tenements are in good standing.

LIONTOWN RESOURCES LIMITED | PAGE 11

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary
Exploration
done by other
parties
Acknowledgment and appraisal of
exploration by other parties.

Multiple phases of exploration have previously been
completed for gold and nickel. This has not been reviewed in
detail due to Liontown’s focus on rare metal pegmatites.

There has been limited sporadic prospecting for Li, Ta and Sn,
principally by Jubilee Mines (subsequently taken over by
Xstrata). Work comprised geological mapping, broad spaced
soil sample lines and rock chip sampling of the pegmatites.
Details of the methods and procedures used have not been
documented.

There has been no previous drill testing of the Li and Ta
prospective pegmatites prior to Liontown acquiring the
Project.
Geology Deposit type, geological setting and style
of mineralisation.

The Project is located on the western edge of the Norseman-
Wiluna Belt within the Archaean Yilgarn Craton.

The Kathleen Valley Project contains a series of quartz-
feldspar-muscovite-spodumene pegmatites hosted in mafic
rocks related to the Kathleen Valley Gabbro or the Mt Goode
Basalts.

Thepegmatites are LCT type lithium bearing-pegmatites.
Drillhole
Information
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material
drillholes:
easting and northing of the drillhole
collar
elevation or RL (elevation above sea
level in metres) of the drillhole
collar
dip and azimuth of the hole
down hole length and interception
depth
hole length.

When reporting Exploration Results, see figures and
appendices in accompanying report

When reporting Mineral Resource Estimate, diagrams in the
announcement show the location of and distribution of drill
holes in relation to the resource.
Data
aggregation
methods
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high grades)
and cut-off grades are usually Material
and should be stated.

Li2O intercepts calculated using 0.4% cut off with a maximum
2m internal dilution typically applied except where drill hole
logging (e.g. continuous pegmatite) and assays indicate
wider dilution is warranted as overall grade is high enough to
allow mining to take entire geological unit.

Higher grade intervals calculated using 1.5% Li2O cut off. No
upper cuts applied.

Ta2O5values only quoted when lithium intersections
reported.

Metal equivalents have been used on the following basis:-

Li (equiv %) = Tant grade % * ($/t Tantalum/ $/tonne
Lithium) (% Tantalum recovery / % Lithium recovery_)
Inputs

Outputs
Tantalite
(Ta2O5) $/lb
69.9 (B2)
US$
Spodumene
$/tonne
739 (B3)
US$
Tantalite
recovery
50% (B4)
Per LTR
testwork
Ta2O5 LI2O Equiv=
0.107 (F4)
Spodumene
Recovery
76% (B5)
Per LTR
testwork
Ta2O5 Grade
30% (B6)
Equiv Li2Ograde =
1.5
Li2O Grade
6% (B7)
(Li2O% +Ta2O5)
Grade Ta2O5
in resource
130ppm (B9)
(per resource)
Grade Li2O in
resource
1.35% (B10)
(per resource)
As an equation:-

_F4=B9
((B2)/(B3/B7))(B4/B5)2204*0.0001


Equiv Li2O grade(Li2O% + Ta2O5%) = F4/(100+B10)

LIONTOWN RESOURCES LIMITED | PAGE 12

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary
Relationship
between
mineralisation
widths and
intercept
lengths
If the geometry of the mineralisation with
respect to the drillhole angle is known, its
nature should be reported.
If it is not known and only the down hole
lengths are reported, there should be a
clear statement to this effect (e.g. ‘down
hole length, true width not known’).

Drillholes intersected mineralisation at near perpendicular to
the dip orientation of the host lithologies and mineralisation.

Estimates of true widths provided at end of Appendices
attached to ASX announcements which list drill hole statistics
Diagrams Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view
of drillhole collar locations and
appropriate sectional views.

Relevant diagrams have been included within the
announcement.
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting of
Exploration Results.

All recent exploration results reported and tabulated.
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including
(but not limited to): geological
observations; geophysical survey results;
geochemical survey results; bulk samples
– size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.

Where relevant, this information has been included or
referred to elsewhere in this Table.
Further work The nature and scale of planned further
work (e.g. tests for lateral extensions or
depth extensions or large-scale step-out
drilling).

2020/ 21 Definitive Feasibility Study (DFS).

Section 3 Estimation and Reporting of Mineral Resources

Criteria JORC Code explanation Commentary
Database
integrity
Measures taken to ensure that data has
not been corrupted by, for example,
transcription or keying errors, between its
initial collection and its use for Mineral
Resource estimation purposes.

Drillhole data was extracted directly from the Company’s
drillhole database, which includes internal data validation
protocols.

Data was further validated by Optiro upon receipt, and prior
to use in the estimation.
Data validation procedures used.
Validation of the data was confirmed using mining software
(Datamine) validation protocols, and visually in plan and
section views.
Site visits Comment on any site visits undertaken by
the Competent Persons and the outcome
of those visits.

Liontown personnel Mr. Richards and Mr. Day have visited
the site on numerous occasions to supervise the drilling
programs.

Ms. Wild (Principal Geologist and Director of Wildfire
Resources Pty Ltd) and Mrs. Standing (Optiro Pty Ltd) have
visited the site on separate occasions during resource
definition drilling programs to review sampling procedures.

Ms. Wild reported that, in general, site practices were quite
good, core quality was excellent and RC sample quality was
moderate.

Mrs. Standing has confirmed site practices are appropriate
and satisfactory for the preparation of a Mineral Resource
Estimate.
Confidence in (or conversely, the
uncertainty of the geological
interpretation of the mineral deposit.

The confidence in the geological interpretation is reflected
by the assigned resource classification.

LIONTOWN RESOURCES LIMITED | PAGE 13

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary
Geological
interpretation
Nature of the data used and of any
assumptions made.

Both assay and geological data were used for the
mineralisation interpretation.

The lithium mineralisation is defined by a nominal 0.4% Li2O
cut-off grade.

Continuitybetween drillholes and sections isgood.
The effect, if any, of alternative
interpretations on Mineral Resource
estimation.

No alternative interpretations were considered.

Any alternative interpretations are unlikely to significantly
affect the Mineral Resource estimate.
The use of geology in guiding and
controlling Mineral Resource estimation.

Geological logging (including spodumene crystal orientation
from the diamond core) has been used for interpretation of
thepegmatites.
The factors affecting continuity both of
grade and geology.

The mineralisation is contained within pegmatite veins that
are readily distinguished from the surrounding rocks.

Sectional interpretation and wireframing indicates good
continuity of the interpreted pegmatite veins both on-
section and between sections.

The confidence in the grade and geological continuity is
reflected bythe assigned resource classification.
Dimensions The extent and variability of the Mineral
Resource expressed as length (along strike
or otherwise), plan width, and depth
below surface to the upper and lower
limits of the Mineral Resource.

Twenty lithium mineralised pegmatites have been identified
at the Kathleen Valley Project which extend from surface to a
depth of 640 m.

At Mt Mann, two steeply-dipping (-70° west) pegmatites
have been drilled over a strike length of 1,200 m and to a
vertical depth of around 300m to 400 m. The two
pegmatites are up to 35 m thick and have average
thicknesses of 9 m and 11 m.

At Kathleen’s Corner, 18 sub-horizontal pegmatites have
been drilled over an area of 1,800 m by 1,300 m. These
pegmatites outcrop in the northeast and are up to 40 m thick
with an average thickness of 8 m. The pegmatites coalesce
and merge with the Mt Mann pegmatites at approximately
300 m to 400 m below surface to form a single, thick (35 m
to 75 m) mineralised body that extends for a further 600 m
to 700 m down-dip.
Estimation
and modelling
techniques
The nature and appropriateness of the
estimation technique(s) applied and key
assumptions, including treatment of
extreme grade values, domaining,
interpolation parameters and maximum
distance of extrapolation from data
points. If a computer assisted estimation
method was chosen include a description
of computer software and parameters
used.

Data analysis and estimation was undertaken using Snowden
Supervisor and Datamine software.

Lithium oxide (Li2O) % and tantalum pentoxide (Ta2O5) ppm
block grades were estimated using ordinary kriging (OK).
Optiro considers OK to be an appropriate estimation
technique for this type of mineralisation.

Caesium (Cs), potassium (K), niobium (Nb), rubidium (Rb),
phosphorus (P) and tin (Sn) block grades were estimated
using ordinary kriging (OK). These additional variables were
included for analysis of the mineralisation and fractionation
trends of the pegmatite, from the K/Cs, K/Rb and Nb/Ta
ratios.

The nominal spacing of the drillholes is 50 m by 50 m. The
along section spacing ranges from 30 m to 100 m and on-
section spacing ranges from generally 30 m to 60 m.

Almost 90% of the assay data within the lithium mineralised
pegmatites is from samples of 1 m intervals, 1.5% is from
sample of >1 m (to a maximum of 2 m) and almost 9% is
from intervals of less than 1 m. The data was composited to
1 m downhole intervals for analysis and grade estimation.

Variogram analysis was undertaken to determine the kriging
estimation parameters used for OK estimation of Li2O and
Ta2O5.

Li2O mineralisation continuity was interpreted from
variogram analyses to have an alongstrike range of 145 m to

LIONTOWN RESOURCES LIMITED | PAGE 14

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary
230 m and a down-dip (or across strike) range of 110 m to
230 m.

Ta2O5mineralisation continuity was interpreted from
variogram analyses to have an along strike range of 58 m to
150 m and a down-dip (or across strike) range of 47 m to 170
m.

A maximum extrapolation distance of 50 m was applied
along strike and down dip extrapolation was generally 30 m.

Kriging neighbourhood analysis was performed in order to
determine the block size, sample numbers and discretisation
levels.

Three estimation passes were used for Li2O and Ta2O5; the
first search was based upon the variogram ranges; the
second search was two times the initial search and the third
search was up to four times the second search and the
second and third searches had reduced sample numbers
required for estimation.

Within the lithium mineralised pegmatites almost 84% of the
total Li2O block grades were estimated in the first search
pass, 14% within the second search pass and 2% estimated in
the third search pass.

Within the pegmatites 75% of the Ta2O5block grades were
estimated in the first pass, 24% in the second pass and 1% in
the third pass.

The estimated block model grades were visually validated
against the input drillhole data and comparisons were
carried out against the declustered drillhole data and by
northing,eastingand elevation slice.
Description of how the geological
interpretation was used to control the
resource estimates.

Geological interpretations were completed on sections
which were wireframed to create a 3D interpretation of the
mineralised pegmatites.

The interpretation of mineralisation was based on geological
logging and Li2O content. A nominal grade of 0.4% Li2O was
used to define the mineralisation within the interpreted
pegmatites.

The mineralised domain is considered geologically robust in
the context of the resource classification applied to the
estimate.
Discussion of basis for using or not using
grade cutting or capping.

Li2O and Ta2O5have low coefficients of variation (CV). Some
higher-grade outliers were noted and the Ta2O5grades were
capped (top-cut).

Cs, K, Rb, P and Sn have low coefficients of variation and Nb
has a moderate coefficient of variation (1.4). A small
number of high-grade outliers are present in the Cs, Nb, Rb,
P and Sn data and grades were capped.

The top-cut level was determined using a combination of
top-cut analysis tools, including grade histograms, log
probability plots and the CV.
The availability of check estimates,
previous estimates and/or mine
production records and whether the
Mineral Resource estimate takes
appropriate account of such data.

The Mineral Resource was first estimated for the Kathleen’s
Valley Lithium Project in August 2018. The Mineral
Resource, comprising 21 Mt at an average grade of 1.4% Li2O
and 170 ppm Ta2O5, was reported above a cut-off grade of
0.5% Li2O

Additional drilling was undertaken during 2019 and the
resource was in July 2019. The July 2019 Mineral Resource,
comprising 74.9 Mt at an average grade of 1.3% Li2O and 140
ppm Ta2O5,was reported above a Li2O cut-off grade of 0.5%
for open pit potential (above 200 mRL) and 0.7% for
undergroundpotential(below 200 mRL).

LIONTOWN RESOURCES LIMITED | PAGE 15

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary

Additional drilling was undertaken in 2019 and 2020 and the
resource was in February 2020. The February 2020 Mineral
Resource, comprising 139 Mt at an average grade of 1.33%
Li2O and 140 ppm Ta2O5, was reported above a cut-off grade
of 0.55% Li2O.

Since the February 2020 Mineral Resource was estimated
data from an additional 16 RC holes (for a total of 6,616 m)
and 28 DD holes (for a total of 9,682 m) have been
incorporated into the resource database.

The resource tonnage has increased from 139 Mt in February
2020 to 156 Mt in May 2020, while the average grade has
increased from 1.33% Li2O to 1.35% Li2O. The Ta2O5grade
has decreased from 140 ppm to 130 ppm.

Noproduction has occurred.
The assumptions made regarding
recovery of by-products.

An Investigation of tantalum recovery by magnetic separation
and gravity upgrade to produce a tantalum by-product was
undertaken in 2020. Using stage recoveries, the overall Ta2O5
reporting to concentrate has been estimated as 56% to a
grade of 15.3% based on test work. A mineralogical review
indicates potential to produce a 30% Ta2O5concentrate at an
offsite upgrade facility.

Further work on tantalum recovery is anticipated as part of
theplanned DFS.
Estimation of deleterious elements or
other non-grade variables of economic
significance (e.g. sulphur for acid mine
drainage characterisation).

Deleterious elements were not included in the Mineral
Resource estimate.

Liontown does not routinely assay drill samples for iron, the
main deleterious element, due to:
o
contamination from drill bits and rods during drilling
operations; and
o
contamination during sample preparation from crushing
and milling equipment.
o
Assaying of blank, silica only material inserted as part of
QAQC protocols indicates that contamination from
sample preparation adds 0.1% to 1% Fe2O3to the
sample.
o
Analysis of data indicates the iron content in the
pegmatites averages <0.5%.

Sulphur assays have been determined for more than 27,000
host rock samples – results indicate that acid mine drainage
will not be a significant environmental factor.
In the case of block model interpolation,
the block size in relation to the average
sample spacing and the search employed.

Grade estimation was into parent blocks of 10 mE by 10 mN
by 3.0 mRL.

Orelogy Consulting Pty Ltd (who are undertaking mining
studies for Liontown) advised that mining is likely to be
undertaken using a block size of 10 mE by 10 mN on 3 m
benches

This block dimension was confirmed by kriging
neighbourhood analysis and reflects the variability of the
deposit as defined by the current drill spacing and
mineralisation continuity determined from variogram
analysis.

Sub-cells to a minimum dimension of 2.5 mE by 2.5 mN by
0.5 mRL were used to represent volume.
Any assumptions behind modelling of
selective mining units.

Selective mining units were not modelled.
Any assumptions about correlation
between variables.

Li2O and Ta2O5are not correlated. Both Li2O and Ta2O5were
estimated independently.

Correlation coefficients for Cs, K, Nb, Rb, P and Sn within the
pegmatites indicate that they are not correlated, except for K
and Rb which have a highpositive correlation(0.87). All

LIONTOWN RESOURCES LIMITED | PAGE 16

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary
variables were analysed and estimated independently.
The process of validation, the checking
process used, the comparison of model
data to drillhole data, and use of
reconciliation data if available.

No production has taken place and thus no reconciliation
data is available.
Moisture Whether the tonnages are estimated on a
dry basis or with natural moisture, and
the method of determination of the
moisture content.

Tonnages have been estimated on a dry basis.
Cut-off
parameters
The basis of the adopted cut-off grade(s)
or quality parameters applied.

A cut-off grade of 0.55% Li2O has been selected to represent
the portion of the resource that may be considered for
eventual economic extraction by a combination of open pit
and underground mining methods.

This cut-off grade has been selected by Liontown Resources
in consultation with Optiro based on current experience and
in-line with cut-off grades applied for reporting of Mineral
Resources of lithium hosted in spodumene bearing
pegmatites elsewhere in Australia.
Mining factors
or
assumptions
Assumptions made regarding possible
mining methods, minimum mining
dimensions and internal (or, if applicable,
external) mining dilution. It is always
necessary as part of the process of
determining reasonable prospects for
eventual economic extraction to consider
potential mining methods, but the
assumptions made regarding mining
methods and parameters when
estimating Mineral Resources may not
always be rigorous.

The mineralisation at Kathleen Valley extends from surface
and would be suitable for open pit mining. High grade
mineralisation is present at depth and would be suitable for
underground mining.

The Kathleen Valley Lithium Project is located in a well-
established mining region in close proximity to existing
transport, energy and camp infrastructure.

On the basis of these assumptions, it is considered that there
are no mining factors which are likely to affect the
assumption that the deposit has reasonable prospects for
eventual economic extraction.
Metallurgical
factors or
assumptions
The basis for assumptions or predictions
regarding metallurgical amenability. It is
always necessary as part of the process of
determining reasonable prospects for
eventual economic extraction to consider
potential metallurgical methods, but the
assumptions regarding metallurgical
treatment processes and parameters
made when reporting Mineral Resources
may not always be rigorous.
2019 Pre-feasibility study

A Pre-feasibility level test work program was conducted at
ALS in Perth to provide sufficient test data to develop the
process design criteria for the Project. A total of 81 samples
from across the three main areas (Mt Mann, Kathleen Corner
and Kathleen Valley North) were selected for the Pre-
feasibility study. A master composite was created for testing
from these samples which are representative of the whole
deposit and include a range of grades and depths. No
variability test work has been undertaken at this time.

Key aspects of the metallurgical test work included the
following:
o head assay
o SMC testing on five comminution samples
o size by size assay
o crushing and wet screening at three sizes
o heavy liquid separation (HLS) at three crush and screen
sizes
o Dense media separation (DMS) of a bulk sample
o bond ball work index on DMS middling’s
o magnetic separation to remove ferrous materials
o rougher flotation to examine collector choice, residence
time, desliming and conditioning
o cleaner flotation to examine residence time and number
of stages
o thickening of flotation and slime tailings (in progress)
o filtration of concentrate
o rheology of tailings.

Key results from the test work indicated that:
o Samples were moderately competent with comminution
results similar to other pegmatites.
o Size bysize and wet screeningdata indicated that there

LIONTOWN RESOURCES LIMITED | PAGE 17

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary
was a trade off in crush size and screen size with
liberation. A finer crush size increased liberation in the
HLS stage but increased fines production. A crush size of
6 mm was selected.
o DMS testing showed a saleable concentrate with a grade
of more than 6% Li2O could be produced together with a
low-grade coarse tail.
o Grind optimisation of the flotation feed indicated a
primary grind of 125 microns gave the best recovery and
was selected for subsequent test work.
o Rougher flotation test work indicated that a modified
oleic acid collector gave the best flotation performance.
o Batch cleaner flotation results indicated a concentrate
with a grade of more than 6% Li2O could be produced
together.
o Concentrate filtration test work, currently being finalised,
has indicated that vacuum filtration will be adequate for
dewatering.
o Rheology test work indicated the tailings had low
viscosity at the proposed tailings density.

The metallurgical process consisted of three-stage
comminution including high-pressure grinding rolls (HPGR),
Dense Medium Separation (DMS) followed by flotation.

The feed composite used in the PFS test work consisted of
diamond drill core and was compiled based on the mine plan
for the study. The feed composite was deliberately
diluted/blended with 10% iron-rich gabbro which hosts the
mineralised pegmatites.

The PFS test work did not include any iron removal ahead of
DMS separation and only low intensity magnetic separation
or iron removal ahead of flotation. A combined concentrate
with a grade of 6.1% Li2O containing 1.42% Fe2O3 was
produced from the PFS composite sample.
2020 Metallurgical Testwork
The 2019 testwork program was focused on developing
preliminary design data for a flowsheet incorporating Dense
Media Separation (DMS) of a coarse feed followed by flotation of
the DMS middling’s and fines. Several areas were further
investigated post the PFS program in 2020 and included:

The impact of change in lithium head grade on overall
recovery.

Further investigation of Whole Ore Float (WOF)

Investigation of tantalum recovery by magnetic separation
and gravity upgrade to produce a tantalum by-product.
The 2020 program investigated these areas as part of the 2020
pre-feasibility study.
The source of the grade variation samples were the intercepts
remaining from the original drill program in 2019. The drill hole
intercepts were sorted by lithium grade (based on geological
assays) and grouped into the following grade targets: 1.0%, 1.1%
1.2%, 1.3%, 1.4%, 1.7% 2.0%.
WOF was tested on all the grade samples. The same flotation
regime was used as tested in the PFS at a grind size P80 of 125
µm.
The DMS-Flotation route was tested for all the grade samples
under the same conditions as for the 2019 PFS.

LIONTOWN RESOURCES LIMITED | PAGE 18

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary
Outcomes:-

Higher grade material for both processing options has a
higher recovery which supports the strategy of targeting high
grade zones using underground mining and optimised open-
pit shells;

WOF has the potential to produce a higher grade SC6.0 and
improved performance with a greater degree of control;
Following the outcomes of the testwork a decision was made to
base the 2020 PFS on a WOF flowsheet per ASX release dated
9th June 2020
An Investigation of tantalum recovery by magnetic separation
and gravity upgrade to produce a tantalum by-product was
undertaken. A sample of PFS composite was used for the
testwork as it provided a control against other treatment routes
already tested.
The sample was ground to a P80 passing size of 125 µm like all
the flotation feed samples. The ground sample was then treated
through a laboratory WHIMS separator followed by gravity
separation. Following the gravity concentration of the primary
magnetic separation magnetics, the remaining tails was
subjected to sequential magnetic separation.
Outcomes:-

Using stage recoveries, the overall Ta2O5reporting to
concentrate has been estimated as 56% to a grade of 15.3%
based on test work. A mineralogical review indicates
potential to produce a 25-30% Ta2O5 concentrate at an
offsite upgrade facility; and

Magnetic and gravity separation used to recover tantalum
also reduces iron levels in the potential flotation feed by up
to 55%.
As both the WOF and Ta2O5flowsheets have considerable scope
for further optimisation, this will form part of the DFS upgrade
test work program to be completed in 2021.
Testwork remains ongoing as part of the DFS
Environmental
factors or
assumptions
Assumptions made regarding possible
waste and process residue disposal
options. It is always necessary as part of
the process of determining reasonable
prospects for eventual economic
extraction to consider the potential
environmental impacts of the mining and
processing operation.

Baseline flora and fauna studies have been completed and it
is considered unlikely, given current knowledge that impacts
on conservation significant flora, fauna and ecological
communities will result from development of the Project.

Further baseline studies are scheduled during the DFS
Bulk density Whether assumed or determined. If
assumed, the basis for the assumptions. If
determined, the method used, whether
wet or dry, the frequency of the
measurements, the nature, size and
representativeness of the samples.
Discuss assumptions for bulk density
estimates used in the evaluation process
of the different materials.

Bulk density was measured for 3,873 core samples (including
3,083 samples of pegmatite) from diamond holes using
Archimedes measurements.

The density data overall ranges from 1.74 to 4.38 t/m3and
the density data within the pegmatites has a range of 1.74 to
4.14 t/m3. Outliers have been screened out of average SG
applied to resource model by Optiro.

A bulk density of 2.71 t/m3was applied to the pegmatite
with spodumene mineralisation within the oxidised horizons
and a value of 2.74 t/m3was applied to the freshpegmatite

LIONTOWN RESOURCES LIMITED | PAGE 19

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary
with spodumene mineralisation for tonnage estimation.

A lower density, of 2.51 t/m3, was applied for areas of fresh
pegmatite that was interpreted to contain petalite
mineralisation.

For the pegmatite material that is external to the lithium
mineralisation, a density of 2.64 t/m3was applied within the
oxidised horizons and 2.66 t/m3was applied to the fresh
pegmatite.

Most (99.5%) of the mineralised pegmatite is within the
fresh material.
Classification The basis for the classification of the
Mineral Resources into varying confidence
categories.

Mineral Resources have been classified as Measured,
Indicated or Inferred.

In general, the pegmatites that have been tested by the 50 m
by 50 m spaced drillholes have high confidence in the
geological interpretation and, having higher estimation
quality, were classified as Measured.

Areas where the drill spacing is up to 60 m by 100 m that
have good confidence in the geological interpretation and
where the majority of block grades were estimated within
the first search (but where the estimation quality is lower
than the Measured areas) were classified as Indicated.

Areas where the drill spacing is up to 60 m by 100 m, that
have good confidence in the geological interpretation and
where the majority of block grades were estimated in the
second and third search passes or in areas of grade
extrapolation have been classified as Inferred.
Whether appropriate account has been
taken of all relevant factors (ie relative
confidence in tonnage/grade estimations,
reliability of input data, confidence in
continuity of geology and metal values,
quality, quantity and distribution of the
_data). _

The Mineral Resource has been classified on the basis of
confidence in geological and grade continuity and taking into
account the quality of the sampling and assay data, data
density and confidence in estimation of Li2O and Ta2O5
content (from the kriging metrics).
Whether the result appropriately reflects
the Competent Person’s view of the
deposit

The assigned classification of Measured, Indicated and
Inferred reflects the Competent Person’s assessment of the
accuracy and confidence levels in the Mineral Resource
estimate.
Audits or
reviews
The results of any audits or reviews of
Mineral Resource estimates.

The Mineral Resource has been reviewed internally as part of
normal validation processes by Optiro.

No external audit or review of the current Mineral Resource
has been conducted.
Discussion of
relative
accuracy/
confidence
Where appropriate a statement of the
relative accuracy and confidence level in
the Mineral Resource estimate using an
approach or procedure deemed
appropriate by the Competent Person.

The assigned classification of Measured, Indicated and
Inferred reflects the Competent Person’s assessment of the
accuracy and confidence levels in the Mineral Resource
estimate.
The statement should specify whether it
relates to global or local estimates, and, if
local, state the relevant tonnages, which
should be relevant to technical and
economic evaluation. Documentation
should include assumptions made and the
procedures used.

The confidence levels reflect potential production tonnages
on a quarterly basis, assuming open pit mining.
These statements of relative accuracy and
confidence of the estimate should be
compared with production data, where
available.

No production has occurred from the deposit.

LIONTOWN RESOURCES LIMITED | PAGE 20

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Section 4 -Estimation and Reporting of Ore

Criteria JORC Code explanation Commentary – Open PIt Commentary - Underground
Mineral
Resource
estimate for
conversion to
Ore Reserves

Description of the Mineral
Resource estimate used as a
basis for the conversion to
an Ore Reserve.

Clear statement as to
whether the Mineral
Resources are reported
additional to, or inclusive of,
the Ore Reserves.
The mineral Resource Estimate used as a basis for the
conversion to the Ore Reserve was provided on the 11th May
2020 with Christine Standing, employee of Optiro, as the
Competent Person.
The total Mineral Resource of 156Mt at 1.4% Li2O includes: -
• 20 Mt of Measured at 1.3% Li2O and 140ppm Ta2O5,
• 105 Mt of Indicated at 1.4% Li2O and 130ppm Ta2O5and;
• 32 Mt of Inferred at 1.3% Li2O and 110ppm Ta2O5.
The Mineral Resources are reported inclusive of the Ore
Reserve.
As for Open Pit.
Site visits
Comment on any site visits
undertaken by the
Competent Person and the
outcome of those visits.

If no site visits have been
undertaken indicate why
this is the case.
The Open Pit Competent Person, Mr Jake Fitzsimons, visited
the proposed Project site on 28th September 2019. The
following observations were made:

The site is accessed directly from the Goldfields Highway.

The site is dominated by Mt Mann which rises
approximately 50 m above the surrounding terrain, and
Jones Creek dry watercourse which passes through the
northern half of the mining area flowing from east to
west.

Existing access between the North and South deposits is
across Jones Creek via a 10 m wide concrete ford with
opportunity to widen to 12-15 m without disturbing any
trees.

Pegmatite outcrop exists across the site.

Drilling core examined on site was hard and very
competent in both the gabbro hanging wall rock and
pegmatite ore zones.
The underground Competent Person, Mr Ben Wilson has not
visited the site, based on the visit by Mr Jake Fitzsimons detailed
above who is a coworker at Orelogy. The data collected on the
site visit by Mr O’Bryan & Mr Fitzsimons has been shared with
Mr Wilson.
Peter O’Bryan of Peter O’Bryan and Associates, visited the site
on 28th September 2019.
Study status
The type and level of study
undertaken to enable
Mineral Resources to be
converted to Ore Reserves.

The Code requires that a
study to at least Pre-
Feasibility Study level has
been undertaken to convert
Mineral Resources to Ore
An initial pre-feasibility study was completed in 2019 and
was updated in 2020, based on the provision of an updated
Mineral Resource in May 2020. The 2020 PFS forms the basis
of most of the assumptions for reporting an Ore Reserve.
The 2020 PFS report was compiled by Lycopodium on behalf
of Liontown with input from: -

Optiro(geology)
The 2020 PFS forms the basis of the assumptions for reporting
an Ore Reserve.

LIONTOWN RESOURCES LIMITED | PAGE 21

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary – Open PIt Commentary - Underground
Reserves. Such studies will
have been carried out and
will have determined a mine
plan that is technically
achievable and
economically viable, and
that material Modifying
Factors have been
considered.

Orelogy Consulting (mine planning)

Lycopodium (metallurgical testwork, process design and
non-process infrastructure)

MBS Environmental (environmental)

Knight Piesold (tailings storage, hydrology and
hydrogeology)

Liontown (financial analysis)
Orelogy undertook the mining component of this PFS, and in
the course of the study, produced optimisations, designs,
schedules and a cost model.
Modifying factors considered in the open pit mine planning
process included mining dilution and ore loss, slope design
criteria and practical mining considerations.
The activities and findings of all other disciplines are
summarized in the 2020 PFS document, including details of
other modifying factors such as processing recoveries, costs,
revenue factors, environmental and heritage considerations,
etc.
Overall, the result of the open pit and underground mine
plans demonstrate that the Kathleen Valley Lithium Project is
technically achievable and economically viable at the
forecast spodumene price.
Modifying factors considered in the underground mine planning
process included mining method selection, minimum mining
width, mining dilution and ore loss, geotechnical stope stability
criteria, pillar and filling requirements, and practical mining
considerations, for example, materials handling, ventilation and
dewatering.
Cut-off
parameters

The basis of the cut-off
grade(s) or quality
parameters applied.
The Ore Reserves are reported at a 0.7 - 0.75% Li2O cut-off
grade depending on the timing with 0.75% used in the early
open pit mining phase and 0.7% used for the final open pit
phase. This cut-off is above the theoretical economic cut-off
of 0.35% Li2O and has been adopted as the grade tonnage
curve shows very little material below this grade.
The Ore Reserves are reported as material contained within
stope designs done at cut off grades of 1.2 & 1.5% Li2O cut-off
grade based on flat or vertical zones within the deposit.
This cut-off has been adopted in the context of the prevailing
market conditions and surrounding open pit Ore Reserve. The
cut-off is above the theoretical underground economic cut-off of
0.95% Li2O as the grade tonnage curve shows very little material
below this grade.
A development cut-off grade of 0.8% Li2O has been used. This
cut-offgrade represents thegrade at which additional haulage

LIONTOWN RESOURCES LIMITED | PAGE 22

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary – Open PIt Commentary - Underground
and treatment costs are exceeded by the value of the ore
recovered during processing.
Mining factors
or assumptions

The method and
assumptions used as
reported in the Pre-
Feasibility or Feasibility
Study to convert the Mineral
Resource to an Ore Reserve
(i.e. either by application of
appropriate factors by
optimisation or by
preliminary or detailed
design).

The choice, nature and
appropriateness of the
selected mining method(s)
and other mining
parameters including
associated design issues
such as pre-strip, access,
etc.

The assumptions made
regarding geotechnical
parameters (eg pit slopes,
stope sizes, etc), grade
control and pre-production
drilling.

The major assumptions
made and Mineral Resource
model used for pit and stope
optimisation (if
appropriate).

The mining dilution factors
used.

The mining recovery factors
used.

Any minimum mining widths
used.

The manner in which
Inferred Mineral Resources
are utilised in mining studies
and the sensitivity of the
outcome to their inclusion.
The open pit and underground Ore Reserves are
underpinned by a mine plans that deliver pegmatites for
processing on site to produce SC6.0 for export via the
Geraldton port.
The mine planning activities included open pit and
underground optimisation, final and interim stage designs,
mine scheduling and cost estimation.
The mine plans indicated that the combined Ore Reserve
derived from the Mineral Resource Estimate can easily meet
the processing feed requirements for the 2.0 Mtpa
production target with a mine life of approximately 40 years.
A conventional open pit mining method using excavators
and rigid dump trucks was selected as the preferred
mining method. Experienced mining contractors will
undertake all aspects of the mining operation.
Supervision, grade control and planning will be
undertaken by an Owner’s team. All material will be
blasted. Bulk waste will be blasted on 12 m benches and
the ore zones will be blasted on 6 m benches and mined in
two or three flitches for greater selectivity (depending on
the point in the mine schedule) with ore delivered to
blend fingers on the ROM pad.
Open pit geotechnical guidance was provided by Peter
O’Bryan and Assoc. with an allowance for ramps on the
footwall and geotechnical berms on the hanging walls.
Oxidation is shallow from 5-20 m in depth with slope angles
of ~50oon the hanging wall and ~37oon the footwall. Overall
slope angles in fresh material were ~57oon the hanging wall
and ~45oon the footwall. As the Kathleen Valley orebody
dips at substantially less than wall angle constraints, the pit
shells are optimally shallower than these angles to the south-
west.
As for Open Pit.
Detailed mine designs were undertaken in the Deswik.CAD
mining software package, incorporating all available
geotechnical and practical considerations.
The Kathleen Valley gabbros and spodumene-bearing
pegmatites are massive, and rock mass quality is consistently
very good, allowing the consideration of mass mining methods
in the steeper and wider orebodies. Underground operations
are expected to be carried out in essentially dry ground. The
deepest mining planned is at ~440m below surface.
The underground mining area consists of two main mining
areas, the Mt Mann steeply dipping ore domains, located
underneath and to the south-west of the open pit, and the
North-West Lodes, flat dipping overlaid lodes (“the Flats”),
located to the north-west of the open pit.
Due to the significant variation in dip and orebody width
across the mining areas, three different mining methods have
been selected. The steeply dipping Mt Mann orebodies will be
mined by transverse retreat open stoping, with Cemented
Paste Backfill (CPB). In the North-West Lodes area, where the
orebody width is greater than 10m, longitudinal retreat open
stoping with CPB will be employed. In narrower areas of the
North-West Lodes, Room and Pillar Mining, without filling, will
be employed.
Within these mining methods, several different variations will
be employed, in order to meet geotechnical stability
guidelines while maximising productivity. These variations are
summarised in the table below:

LIONTOWN RESOURCES LIMITED | PAGE 23

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary – Open PIt Commentary - Underground

The infrastructure
requirements of the selected
mining methods.
An allowance for Grade Control drilling was made based on a
dedicated RC drilling program at 24 m vertical intervals.
The May 2020 Datamine Mineral Resource model
(kv_or_apr2020.dm) was used as a basis for the conversion
to an Ore Reserve.
To establish mineable quantities, a number of open pit
optimisations were completed on the Resource model
after applying ore loss and dilution to the edges of the
mineralisation. The base case optimisations considered
Measured and Indicated materials only, excluded the
Jones Creek watercourse and applied pricing, recoveries
and other modifying factors. All other optimizations
include Measured, Indicated and Inferred after it was
shown that the Inferred material had no impact on shell
size.
The shell selection was based on the business objectives
of maximising the discounted cash flow whilst providing
sufficient mine life.
Options investigated evolved as both Underground and
open pit options were simultaneously progressed, with the
approach by_Orelogy_as follows:-

Development of an optimised open pit schedule at a
0.75% Li2O Cut-off grade for Stages 1 and 2 for the
early mining phase and 0.7% Li2O Cut-off grade for the
final three stages. The open pit schedule was
manipulated by delaying stages or stretching over
longer time periods.

Assessment of flat and vertical Underground ore
bodies separately at cut off grades of 0.95%, 1.2% and
1.5% Li2O respectively and sequenced Underground
ore in conjunction with the open pit schedule to
maximise project returns
Schedules from Underground and open pit were combined
toproduce an optimised overallproject mineplan
These mining methods are considered appropriate, as they
provide a good balance of economic recovery of the resource,
cost minimisation, and safety.
The Mt Mann mining sequence is bottom up within each
stoping panel, generally four stopes high. The overall
sequence is top down. Stopes will be mined in a primary-
secondary sequence. The lower 15m of the bottom stope of
each panel will be filled with a higher strength CPB (8% rather
than the standard 4%), to maintain geotechnical stability when
the lower panel is mined underneath. Stopes will be mined
from footwall to hangingwall, to avoid undercutting previously
filled CPB stopes. Where practicable, in the secondary stopes,
rock filling has been utilized to minimize waste haulage to
surface.
In the North-West Lodes, the mining sequence for the open
stopes is similarly bottom up, with CPB used to maintain
geotechnical stability. The Room and Pillar stopes will also be
mined bottom up, but will not be filled.
The use of fill in the open stopes avoids the need for pillars
between stopes to maintain stope stability. Given the width
of the orebody, appropriately sized pillars would significantly
reduce the extraction percentage, and hence the economic
viability of the orebodies. Stopes are sequenced to manage
the open voids underground and maintain geotechnical
stability.
Access to the mine, for personnel, equipment and ore
haulage, will be via a main surface portal to the south-west of
the pit, and an in-pit portal, as the pit progresses.

LIONTOWN RESOURCES LIMITED | PAGE 24

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary – Open PIt Commentary - Underground
For the open pit, the model was diluted in a two-step
process:

Regularisation to a SMU size of 5 m x 5 m x 2 m for the
material within the 0.6 revenue factor shell for phase 1
mining

Regularisation to a SMU size of 5m x 5m x 3m for the
material outside the 0.6 revenue factor shell for phase 2
mining.

Secondary edge dilution was applied to the edges of the
ore zones to account for the steeply dipping Mt Mann
mineralisation.
The resulting mining model reported:

2.6% dilution and 6% ore loss for the 2 m flitch height in
Stage 1 and Stage 2 at 0.75% Li2O cut-off grade.

3.2% dilution and 6% ore loss for the 3 m flitch height in
the other 3 stages at 0.7% cut-off grade.
No additional mining recovery factors were applied.
The final pit and stages were designed with 40 m minimum
mining width between cutbacks and 25 m at the base of the
pit.
Only Measured and Indicated material were used in
reporting of Ore Reserves. Inferred material was treated as
waste in the Stage 1 and 2 pits. The LOM schedule included a
total of 840kt of Inferred material with the later pit stages.
Open stope designs were based upon a design Hydraulic
Radius of 10.0m, derived using empirical methods by Peter
O’Bryan, of Peter O’Bryan and Associates. Sub-level intervals
and hence stope heights were selected to maintain stable
hydraulic radii, balanced with what would be achievable by
production drilling with an acceptable level of accuracy.
Room and pillar designs were also derived using empirical
methods by Peter O’Bryan, of Peter O’Bryan and Associates.
Two different pillar sizes were recommended based on
orebody width, as detailed in the previous table.
Mining dilution has been modelled with design dilution, CPB
dilution and development dilution.
Design dilution: During the generation of stope shapes, a
dilution skin of 0.5m was added to the footwall and hanging-
wall of all stopes. This was applied geometrically.
CPB dilution: Mining of secondary stopes underneath and
next to CPB will likely result in some dilution of ore. This has
been estimated at 0.3m from the walls of the stope and 0.5m
from the back. This volume of paste was added to the stope
tonnage on a per-stope basis at zero grade (pure dilution).
Development dilution: similarly, where part of an ore
development heading protrudes beyond the orebody contact,
the ore grade of the volume mine is lowered accordingly. No
additional tonnage allowance for overbreak has been made.
Indicative ring designs were undertaken for representative
stopes from each mine area, and the three dilution factors
estimated based on the geometry of the design.
The capacity of the paste plant is limited by the volume of
tailings produced by the processing plant. Mining has been
scheduled to ensure the maximum filling capacity of
584,000m3per year is not exceeded.
Mining recoveries of 95% were applied to all open stopes, and
90% for all room and pillar stopes, to account for ore within
the stope shape that could not be extracted. This occurs
primarily due to geometry issues of boggers navigating around

LIONTOWN RESOURCES LIMITED | PAGE 25

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary – Open PIt Commentary - Underground
External infrastructure requirements for the project are
minimised due to the project’s location in the Goldfields
area of Western Australia. The Goldfields highway and
132 kV TransAlta overhead electrical power line are located
within 1 km of the site. A borehole has been proposed for
water supply, and typical site facilities such as camp
accommodation and facilities, sewerage plant, processing
plant,maintenance facilities,and tailings storage will be
90-degree corners and being unable to fully reclaim all blasted
ground.
Due to the requirement to leave behind ore pillars in the
Room and Pillar stopes, mining recovery is further reduced
from operational mining recovery, to 84% for the 5m-7m wide
stopes, and 82% for the 7m-10m wide stopes.
Mining recoveries of 100% were applied to all development,
with the expectation that development headings could be
bogged clean.
The minimum mining width used depended on the mining
area and method. These widths are shown in the Mining
Method table above. However, the absolute minimum mining
width for the project is 5 m, which comprises a 4 m orebody
width and 0.5 m of dilution in both hanging-wall and footwall.
Inferred material was optimised, designed and scheduled.
Stopes have been classified on a dominant resource category
basis, where the dominant resource category for the stope is
reported as the resource category for the entire stope. Proven
and Probable Reserve categories have an average of 3%
Inferred material and 2% waste material that is included in the
stope shapes. This is judged reasonable dilution of the Ore
Reserve. Stopes that have a dominant resource category of
Inferred are not reported as part of the Ore Reserves, and
similarly have an average of 5% Indicated Resources and 5%
waste material contained within the Inferred stope shapes.
The base case schedule for the PFS includes Inferred material
as well and Measured and Indicated material. However, this
Inferred material has been scheduled as much as possible at
the end of the underground mine life, and as such does not
have a material effect on the technical and economic viability
of the project. The majority of the Inferred material has been
included in the base case schedule on the basis that it is
contiguous with the surrounding Indicated mineralisation, and
forms part of the overall extraction sequence for that area of
the deposit.
As for Open Pit.

LIONTOWN RESOURCES LIMITED | PAGE 26

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary – Open PIt Commentary - Underground
required. The underground access portal will be
constructed in a box-cut adjacent to the plant ROM pad.
Other surface facilities will include a paste fill plant,
power/water reticulation, ventilation fans to support
underground mining activities, a ROM pad, haul roads,
areas for Contractor built/supplied workshops and other
Contractor facilities. Lithium concentrate can be
transported via the Goldfields Highway to the Port of
Geraldton, for shipment overseas.
Metallurgical
factors or
assumptions

The metallurgical process
proposed and the
appropriateness of that
process to the style of
mineralisation.

Whether the metallurgical
process is well-tested
technology or novel in
nature.

The nature, amount and
representativeness of
metallurgical test work
undertaken, the nature of
the metallurgical domaining
applied and the
corresponding metallurgical
recovery factors applied.

Any assumptions or
allowances made for
deleterious elements.

The existence of any bulk
sample or pilot scale test
work and the degree to
which such samples are
considered representative of
the orebody as a whole. For
minerals that are defined by
a specification, has the ore
reserve estimation been
based on the appropriate
mineralogy to meet the
specifications?
Environmental
Two distinct phases of testwork were conducted for the
Kathleen Valley Project in both 2019 and 2020. The Initial work
resulted in the development of a DMS-Flotation flowsheet
which was revised in June 2020 to a Whole Ore Flotation
flowsheet.
In 2019 a total of 81 intercepts from across the three main
areas (Mount Mann, Kathleen Corner and North) were
selected for the pre-feasibility study. These samples include a
spatial spread, grade range and depth. A master composite
was created for testing.
A grade- recovery relationship was defined from testwork
utilizing a WOF flowsheet.
During 2020 further work was undertaken in order:

To develop and test a WOF flowsheet;

To establish grade-recovery curves for both DMS and
WOF flowsheets at a range of composite grades to enable
direct comparisons between each; and

Test and develop of preliminary flowsheets to support
the extraction of tantalum.
Following the outcomes of the testwork a decision was made
to base the 2020 PFS on a WOF flowsheet per ASX release
dated 9th June 2020
The process has been tested at pre-feasibility level in the
laboratoryand further work is ongoing.
As for Open Pit.

LIONTOWN RESOURCES LIMITED | PAGE 27

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary – Open PIt Commentary - Underground

The status of studies of
potential environmental
impacts
Refer to main body of announcement and JORC table
Section3.
Geochemical characterisation of waste rock has been
completed with representative samples (70 fresh rock, 24
oxide and transitional waste and 4 low grade ore samples)
assessed for potential for saline, neutral or acid and
metalliferous drainage (AMD) as well as other general
geochemical properties. Several minor pockets of potentially
acid forming (PAF) material was identified to be present in
the dolerite gabbro and contact zone waste rock materials of
the Mt Mann mine area.
Provided parcels of PAF material originating from the dolerite
gabbro and contact zone mine wastes are managed
appropriately, there is a low risk of fresh waste rock
adversely impacting groundwater and surface water quality
via seepage or run-off from rainfall.
Characterisation of tailings generated by metallurgical test
work has been completed. Samples were assessed for
potential of saline, neutral or acid and metalliferous drainage
(AMD) as well as other general geochemical and some
physical properties.Results indicate tailings are unlikely to
pose risk to the environment and as such do not require
specialized storage facilities
Infrastructure
The existence of appropriate
infrastructure: availability of
land for plant development,
power, water,
transportation (particularly
for bulk commodities),
labour, accommodation; or
the ease with which the
infrastructure can be
provided, or accessed.
The Project is well served by existing infrastructure with the
Goldfields Highway which runs adjacent to the Project. There
is a 132 kV powerline (5 km to the West) and the goldfields
gas pipeline (11 km to the East) to provide mains power or a
site-based power station.
The process plant and waste stockpiles can be constructed
on existing mining licenses.
Preliminary modelling and site-based pumping trials provides
confidence that sufficient available bore water ofgood
As for Open Pit.

LIONTOWN RESOURCES LIMITED | PAGE 28

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary – Open PIt Commentary - Underground
quality is available from within the Liontown tenements and
regional sources.
A desktop study confirms that the concentrate can be
trucked on sealed roads from site to the port of Geraldton
where an environmental license would be required to export
the SC6.0 – due to the benign nature of the product,
approval is unlikely to be withheld.
The study assumes a camp will be constructed on a
exploration license that is subject currently to conversion to
a mining license application.
The current tenements and labour supply is not considered
unusual due to its location within driving distance of
Kalgoorlie and the region is serviced by regular charter flights
to Mt Keith and Leinster from Perth.
Costs
The derivation of, or
assumptions made,
regarding projected capital
costs in the study.

The methodology used to
estimate operating costs.

Allowances made for the
content of deleterious
elements.

The source of exchange
rates used in the study.

Derivation of transportation
charges.

The basis for forecasting or
source of treatment and
refining charges, penalties
for failure to meet
specification, etc.

The allowances made for
royalties payable, both
Government and private
The capital cost estimate has been based on a mechanical
equipment list with budget pricing for major equipment
together with recent database rates for bulks such as
concrete and steel. Electrical and earthworks were estimated
separately.
Operating cost estimates were based on budget quotes for
consumables and a benchmarked salary schedule. Other
costs have been supplied by Liontown and from Lycopodium
database.
A sequential magnetic separation and gravity circuit has been
included in the process flowsheet to concentrate tantalum
and also remove iron which is considered deleterious in the
final concentrate.
Forecast exchange rates for USD: AUD were sourced from a
third party providing long term forecasts with a range of 0.65
to 0.80 (excluding outliers). Liontown has assumed 0.72 as its
life of mine exchange rate.
As for Open Pit.

LIONTOWN RESOURCES LIMITED | PAGE 29

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary – Open PIt Commentary - Underground
Haulage and ship loading costs were provided by an
established haulage company that currently provides
stevedoring services at the port of Geraldton. Port costs were
obtained from the Port of Geraldton. Estimated shipping
costs were used to determine CIF costs to potential off-
takers.
The following government royalties and private royalties
have been included in the financial analysis as detailed
below:

WA state Royalty - 5% gross sales

Third Party private royalties - 3% gross sales and
A$0.50/t ore mined and milled for material sourced
from within Mining leases M36/460 & M36/459
No third party royalties apply for ore sourced from
exploration license E36/879 (Mining license application
M36/696).
Revenue factors
The derivation of, or
assumptions made
regarding revenue factors
including head grade, metal
or commodity price(s)
exchange rates,
transportation and
treatment charges,
penalties, net smelter
returns, etc.

The derivation of
assumptions made of metal
or commodity price(s), for
the principal metals,
minerals and co-products.
Spodumene pricing was based on forecast estimates
provided by Roskill as discussed in the main body of this
announcement.
Roskill has provided annual forecast pricing through to
2040 on a real, US$/dmt CIF China basis for “Arm’s Length”.
Arm’s Length prices are where no related party relationship
exists between the mining company and the customer.
At this stage, future production from Kathleen Valley
remains 100% uncommitted in order to maintain maximum
flexibility
and
independence
over
funding
and
development options. For the purposes of the PFS, it has
been assumed that Liontown will sell 100% of its
production on arm’s length terms to unrelated parties on a
yearly basis.
The Roskill forecast pricing results in an average price of
US$769/dmt CIF China for the period 2025 - 2040 (noting
that while the PFS extends beyond Roskill’s 2040 forecasts,
As for Open Pit.

LIONTOWN RESOURCES LIMITED | PAGE 30

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary – Open PIt Commentary - Underground
Liontown has assumed it reasonable to use the 2040 price
of CIF US$825/t as the basis from 2041 - 2064).
Liontown has adjusted Roskill’s CIF China prices to an FOB
Geraldton price by deducting US$30 per tonne to reflect
the estimated costs of shipping to China from Australia as
the ultimate destination of SC6.0 produced from the
Kathleen Valley Project is not known at this stage.
Other revenue factors were:

An exchange rate of 0.72 USD/AUD

In country transport and port charges of A$65/wmt
conc.

Export shipping costs of A$41.67/wmt conc
(US$30/dmt)

State royalty of 5% and private royalties of 3% gross
sales and a A$0.50 per tonne mined and milled for
material sourced from within Mining leases M36/460 &
M36/459

No third party royalties apply for ore sourced from
exploration license E36/879 (Mining license application
M36/696)
Liontown has again utilised the services of Roskill for its price
forecast assumptions for tantalum concentrate (30 Non-Class
7 Specification) as applied in the PFS.
Roskill has provided a forecast price through to 2040 on a
real, US$/lb CIF China basis for “Arm’s Length” pricing.
Like SC6.0, at this stage future tantalum concentrate
production from Kathleen Valley remains 100% uncommitted
in order to maintain maximum flexibility over funding and
development options. For the purposes of the PFS, it has
been assumed that Liontown will sell 100% of its production
on arm’s length terms to unrelated parties on a yearly basis.
Roskill provided an average price of US$70/lb CIF China for
2025 to 2040. Liontown has adjusted Roskill’s CIF China
prices to an FOB Fremantleprice bydeductingUS$0.1per

LIONTOWN RESOURCES LIMITED | PAGE 31

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary – Open PIt Commentary - Underground
pound to reflect the estimated costs of shipping to China
from Australia as the ultimate destination of tantalum
concentrate produced from the Kathleen Valley Project is not
known at this stage. This results in an average price of
US$69.9/lb FOB Fremantle.
Noting that while the PFS extends beyond Roskill’s 2040
forecasts, Liontown has assumed it reasonable to use the
2040 price of CIF US$65/lb as the basis from 2041 to 2064.
Other Tantalum revenue factors were:

An exchange rate of 0.72 USD/AUD

In country transport charges of A$194/dmt conc.

Shipping costs of US$0.1/lb conc.

State royalty of 5% and private royalties of 3% gross
sales and a A$0.50 per tonne mined and milled for
material sourced from with Mining leases M36/460 &
M36/459.

No third-party royalties apply for ore sourced from
exploration license E36/879 (Mining license application
M36/696)
No penalties for contaminants were assumed or considered
applicable for either Spodumene or Tantalum products.
Market
assessment

The demand, supply and
stock situation for the
particular commodity,
consumption trends and
factors likely to affect
supply and demand into the
future.

A customer and competitor
analysis along with the
identification of likely
market windows for the
product.

Price and volume forecasts
and the basis for these
forecasts.

For industrial minerals the
customer specification,
Demand for lithium is forecast to increase significantly over
the next decade driven using lithium ion batteries in
automotive applications. Whilst there is a current oversupply
of SC6.0 largely because of new mine capacity in Australia, it
is expected that reduction in mine output from mines in
Australia in 2021-2023 may initiate a phase of rebalancing.
With continued strong demand and consumption growth, a
supply deficit is expected to occur in the mid-2020’s.
Tantalum is used in high performance capacitors, superalloys
and other applications consumed widely in aerospace, military
and consumer electronics.
As for Open Pit.

LIONTOWN RESOURCES LIMITED | PAGE 32

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary – Open PIt Commentary - Underground
testing and acceptance
requirements prior to a
supply contract.
Tantalum is a critical material for high performance
applications, but global production is relatively small and
limited to a few key regions and producers.
With ongoing electrification of homes and vehicles, tantalum
should play an increasingly important role from ensuring
safety in autonomous vehicles to maintaining performance in
the next generation of electrical devices and communications
technology. While capacitors will remain the largest
application (accounting for around 36% of the 2.4kt Ta of
estimated demand in 2019), the largest growth will come from
chemical applications and tantalum mill products.
Supply-side disruptions have traditionally had the biggest
impact on concentrate price trends in recent years, including
the introduction of the Dodd-Frank Act in 2010, the fire at
AMG’s Brazilian Mibra operation in 2017, and more recently,
variance in Australian by-product supply.
A customer and competitor analysis was not undertaken
however market windows for the product have been
considered with pricing forecasts also provided by Roskill.
Economic
The inputs to the economic
analysis to produce the net
present value (NPV) in the
study, the source and
confidence of these
economic inputs including
estimated inflation, discount
rate, etc.

NPV ranges and sensitivity
to variations in the
significant assumptions and
inputs
An 8% real discount rate (using industry standard
assumptions in calculating a WACC) has been utilised to
determine the NPV for the Kathleen Valley Project.
A range of sensitivities to significant assumptions and inputs
has been provided in the body of this announcement
including spodumene prices, exchange rates, metallurgical
recoveries, lithium grade, capex and opex.
As for Open Pit.
Social
The status of agreements
with key stakeholders and
matters leading to social
licence to operate.
The Tjiwarl People are Traditional Owners of the area that
actively overlays the Project. The Project area is largely
located on granted mining leases and Liontown has signed a
Heritage Agreement with the Tjiwarl People relating to
exploration activities.
As for Open Pit.

LIONTOWN RESOURCES LIMITED | PAGE 33

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary – Open PIt Commentary - Underground
Liontown has signed a Negotiation Protocol with the Tjiwarl
People in respect to completing a mining agreement for the
Project.
Discussions are currently ongoing in terms of negotiating a
project specific_Mining Cooperation Agreement_for the
Project with the Tjiwarl.
Other
To the extent relevant, the
impact of the following on
the project and/or on the
estimation and classification
of the Ore Reserves:

Any identified material
naturally occurring risks.

The status of material legal
agreements and marketing
arrangements.

The status of governmental
agreements and approvals
critical to the viability of the
project, such as mineral
tenement status, and
government and statutory
approvals. There must be
reasonable grounds to
expect that all necessary
Government approvals will
be received within the
timeframes anticipated in
the Pre-Feasibility or
Feasibility study. Highlight
and discuss the materiality
of any unresolved matter
that is dependent on a third
party on which extraction of
the reserve is contingent.
There are no obvious or likely naturally occurring risks that
have been identified or which may negatively impact the
Project or Project area.
Liontown is a 100% owner of the deposit and has not entered
into any arrangements regarding future off take
arrangements.
All statutory government agreements permits and approvals
commensurate to the status of the Project are current and in
good order.
A mining license application has been submitted on the
16/6/20 to convert part of exploration tenement E36/879
(mining lease application # M36/696) on which a portion of
the underground reserve and likely solar farm plus
accommodation camp will be sited.
Timeframes for Agreements relevant to the 2020 PFS were
handled appropriately and have not put the Project at risk.
Agreement timeframes in respect to the Project will be
handled with similar accord so as not to put the future
studies and Project development at risk also.
As for Open Pit.
Classification
The basis for the
classification of the Ore
Reserves into varying
confidence categories.

Whether the result
appropriately reflects the
Proved Ore Reserves were determined from Measured
Resource material and Probable Ore Reserves were
determined from Indicated Resource material as per the
guidelines.
Proved Ore Reserves were determined from Measured Resource
material and Probable Ore Reserves were determined from
Indicated Resource material as per the guidelines. Small
percentages of Inferred material (3% on average) and waste
material (2% on average) were included in dominantly classified

LIONTOWN RESOURCES LIMITED | PAGE 34

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary – Open PIt Commentary - Underground
Competent Person’s view of
the deposit.

The proportion of Probable
Ore Reserves that have been
derived from Measured
Mineral Resources (if any).
These results reflect the Competent Person/s view of the
deposit. Probable Ore was derived from Indicated material
only.
Proved and Probable stope shapes. Dominantly classified
Inferred stope shapes were not included in Ore Reserves.
These results reflect the Competent Person/s view of the
deposit.
Probable Ore was derived from Indicated material only, not
Measured material.
Audits or
reviews

The results of any audits or
reviews of Ore Reserve
estimates.
The Ore Reserve estimate has been peer reviewed internally
by Orelogy Consulting Pty Ltd.
As for Open Pit.
Discussion of
relative
accuracy/
confidence

Where appropriate a
statement of the relative
accuracy and confidence
level in the Ore Reserve
estimate using an approach
or procedure deemed
appropriate by the
Competent Person. For
example, the application of
statistical or geostatistical
procedures to quantify the
relative accuracy of the
reserve within stated
confidence limits, or, if such
an approach is not deemed
appropriate, a qualitative
discussion of the factors
which could affect the
relative accuracy and
confidence of the estimate.

The statement should
specify whether it relates to
global or local estimates,
and, if local, state the
relevant tonnages, which
should be relevant to
technical and economic
evaluation. Documentation
should include assumptions
made and the procedures
used.

Accuracy and confidence
discussions should extend to
The Mineral Resource, and hence the associated Ore
Reserve, relate to global estimates.
The Ore Reserve estimate is an outcome of the 2020 Mining
Pre-Feasibility Study with geological, mining, metallurgical,
processing, engineering, marketing and financial
considerations to allow for the cost of finance and tax.
Engineering and cost estimations have been completed to a
+/-25% level of accuracy, consistent with a study of this
nature.
Liontown’s financial model estimated a post-tax NPV8%of
approx.A$1.12B, and IRR of 37%,which demonstrates that
the Project is economic at forecast prices.
Sensitivity analysis undertaken during the open pit and
underground optimisation demonstrates that:

Overall open pit size is insensitive to costs or slope
changes and mildly sensitive to price and recovery.

Open pit ore tonnes recoverable are moderately
sensitive to dilution, ore loss and recovery and slightly
sensitive to costs or slope angles.

Discounted cash flow for the Project is highly sensitive
to parameters that directly affect revenue (i.e.
commodity prices, recovery and exchange rate) and far
less so to other parameters.
The low sensitivity to cost variations provide reasonable
confidence in the Ore Reserve estimate. However, there is no
As for Open Pit.
The Ore Reserve estimate is an outcome of the 2020 Mining Pre-
Feasibility Study with geological, mining, metallurgical,
processing, engineering, marketing and financial considerations
to allow for the cost of finance and tax. Engineering and cost
estimations have been completed to a +/-25% level of accuracy,
consistent with a study of this nature.
Liontown’s financial model estimated a post-tax NPV8%of
approx.A$1.12B, and IRR of 37%,which demonstrates that the
Project is economic at forecast prices.
Sensitivity analysis undertaken during the underground
optimisation demonstrates that the chosen inventory is:

is relatively insensitive to costs or dilution changes and
mildly sensitive to price and recovery.

Discounted cash flow for the Project is highly sensitive to
parameters that directly affect revenue (i.e. commodity
prices, recovery and exchange rate) and far less so to other
parameters.
The low sensitivity to cost variations provide reasonable
confidence in the Ore Reserve estimate. However, there is no
guarantee that the price assumption, while reasonable, will be
achieved.

LIONTOWN RESOURCES LIMITED | PAGE 35

ASX ANNOUNCEMENT

ASX: LTR

==> picture [179 x 39] intentionally omitted <==

Criteria JORC Code explanation Commentary – Open PIt Commentary - Underground
specific discussions of any
applied Modifying Factors
that may have a material
impact on Ore Reserve
viability, or for which there
are remaining areas of
uncertainty at the current
study stage.

It is recognised that this
may not be possible or
appropriate in all
circumstances. These
statements of relative
accuracy and confidence of
the estimate should be
compared with production
data, where available.
guarantee that the price assumption, while reasonable, will
be achieved.

LIONTOWN RESOURCES LIMITED | PAGE 36