JUNE 2012 QUARTERLY REPORT

23 JULY 2012

LEGEND MINING LIMITED

ASX Symbol: LEG ABN 22 060 966 145

HIGHLIGHTS

  • New track mounted rig commissioned, increased drilling productivity expected in future.

Level 2, 640 Murray Street West Perth Western Australia 6005

  • 21 holes of 29 hole programme at Plateau completed.

  • Significant magnetite intercepts encountered and assays from 7 holes awaited.

PO Box 626 West Perth Western Australia 6872

Phone: +61 8 9212 0600 Facsimile: +61 8 9212 0611 Email: [email protected]

  • Final assays from Melombo East Phase 1 drilling reported. Phase 2 programme to commence in September 2012.

  • Pilbara Project sale completed. Legend now holds 12.5% of Artemis.

  • Cash and liquids at end of quarter +$17M.

OVERVIEW

www.legendmining.com.au

CONTACT

The new track mounted rig (see photo page 5) arrived in Cameroon mid June and was immediately mobilised to the Plateau target area. A commissioning team from the South African supplier flew to Cameroon and the last three holes for the quarter were drilled with this rig. It is expected that due to the greater all round capacity of the rig that drilling productivity will increase and deeper drilling will be possible in areas of interest.

Mr Mark Wilson Managing Director

Three quarters of the designed programme at Plateau were completed during the quarter with seven holes sent for assay. These assays will be reported once received.

PROJECTS

Once the Plateau Phase 1 drilling programme is completed, the rig and crew will be mobilised to Melombo East to carry out Phase 2 drilling at that target. This 20 hole programme is designed to test the grade/thickness continuity identified in the earlier programme.

Cameroon: iron ore, gold

On the West Australian front, the loose ends of the Mt Gibson and Gidgee Project sales were tidied up and the sale of the Pilbara Project to Artemis Resources Ltd (ASX:ARV) was completed resulting in Legend becoming a 12.5% shareholder in Artemis.

JUNE 2012 QUARTERLY REPORT

Page 1

==> picture [477 x 74] intentionally omitted <==

1. CAMEROON PROJECT

The Cameroon Project comprises three granted exploration permits covering an area of approximately 2,970km[2] and is considered prospective for iron ore and gold, see Figure 1. Magnetite-gneiss ore has been identified as the primary source of iron ore at the project.

Posco MOU

Legend and POSCO Africa (Pty) Ltd (“POSCO”) signed a MOU on 15 February 2012 by which the parties have agreed to use best endeavours and co-operate to negotiate and agree an exploration joint venture in relation to Legend’s Ngovayang iron ore project in Cameroon. These negotiations are continuing with legal advisors from both parties involved in Joint Venture draft documentation.

Drilling Ongoing

Diamond drilling continued during the June quarter with a total of 21 holes (DH076-096) completed at the Plateau Prospect. Eighteen of these holes were completed with the man portable rigs, while holes DH094-096 were drilled with Legend’s new track mounted diamond drilling rig which arrived on site on 19 June. This rig has more power and greater depth penetration than the man portable rigs and will be a valuable asset in evaluting the iron potential at depth throughout the Project.

==> picture [438 x 246] intentionally omitted <==

Figure 1: Cameroon Project Location and Infrastructure

JUNE 2012 QUARTERLY REPORT

Page 2

==> picture [477 x 74] intentionally omitted <==

==> picture [412 x 587] intentionally omitted <==

FIGURE 2: Ngovayang Project - Target Areas over Aeromagnetic Image (Analytical Signal of Total Magnetic Intensity)

JUNE 2012 QUARTERLY REPORT

Page 3

==> picture [477 x 74] intentionally omitted <==

Melombo East

Assay results from the last seven drill holes from the Phase 1 diamond drilling programme at Melombo East, which comprised 34 holes (DH042-075) for a total of 2,349.25m, were received during the quarter. A summary of the results from the seven drillholes (DH054, 55, 58, 60, 61, 64, 66) are presented in Table 1 below. Full drillhole details and returned assay results for Melombo East are given in Figure 3 and Appendices 1 and 2.

Table 1: Melombo East – Diamond Drillhole Results Table 1: Melombo East – Diamond Drillhole Results Table 1: Melombo East – Diamond Drillhole Results Table 1: Melombo East – Diamond Drillhole Results Table 1: Melombo East – Diamond Drillhole Results Table 1: Melombo East – Diamond Drillhole Results
Hole From To Int Fe% **SiO2% ** **Al2O3% ** P% LOI%
DH054 1.2 32.2 31.0 25.80 44.19 10.24 0.070 4.23
Incl. 20.5 32.2 11.7 32.59 48.27 1.53 0.111 -0.01
DH054 46.1 100.5 EOH 54.4 23.92 50.17 6.41 0.062 0.01
Incl. 58.7 100.5 EOH 41.8 26.78 47.84 5.15 0.069 0.01
DH055 1.2 19.7 18.5 25.22 40.72 13.62 0.064 7.35
42.0 100.5 EOH 58.5 21.13 52.75 8.02 0.078 0.01
DH058 1.3 10.4 9.1 23.17 35.07 18.74 0.057 11.54
49.5 96.8 47.3 24.29 51.60 6.36 0.072 -0.01
DH060 42.9 104.9 EOH 62.0 28.71 48.41 4.29 0.084 0.01
DH061 1.3 56.9 55.6 28.96 45.33 6.52 0.078 2.32
DH064 27.0 100.5 EOH 73.5 23.69 48.40 6.70 0.083 0.06
DH066 1.2 77.1 EOH 75.9 33.68 39.70 3.96 0.087 0.77

Assay Method Fe, SiO2, Al2O3, P by fusion XRF – OMAC Laboratory, Ireland. LOI – Loss on Ignition at 1,000[0] C determined gravimetrically.

These results continue to demonstrate encouraging iron grades (+25% Fe) and thicknesses (+40m) of magnetite gneiss across the prospect. The fact that five of the seven drillholes ended in magnetite gneiss with associated iron grades between 21.1-33.7% Fe, adds to the potential of the prospect.

Importantly, drillholes DH046 and DH060, which are located 200m apart along a NW-SE trending section (perpendicular to the strike of the magnetite gneiss) display good correlation, see Figure 3. DH046 returned 80.5m @ 36.6% Fe from 20m to end of hole, while DH060 returned 62m @ 28.7% Fe from 42.9m to end of hole. This correlation over a minimum width of 200m is also supported by geological mapping and geophysical modelling.

JUNE 2012 QUARTERLY REPORT

Page 4

==> picture [477 x 74] intentionally omitted <==

==> picture [426 x 278] intentionally omitted <==

Figure 3: Melombo East Prospect - Drillhole Locations over Aeromagnetics

Phase 2 Drilling Programme

Based on a full geological, geochemical and geophysical review of the 34 hole drilling programme at Melombo East the following Phase 2 programme is proposed to commence in September 2012:

  • 40m step out holes N, S, E and W of drillholes DH044, DH046 and DH066 to test grade/thickness continuity.

  • Complete drill testing in the northeastern part of the prospect with the new track mounted rig, where previous holes were not completed due to poor ground conditions and man portable rig limitations.

==> picture [335 x 173] intentionally omitted <==

New track mounted rig in factory prior to departure to site

JUNE 2012 QUARTERLY REPORT

Page 5

==> picture [477 x 74] intentionally omitted <==

Plateau

A total of 21 diamond drillholes (DH076-096) for a total of 1,512.76m were completed during the quarter at the Plateau Prospect, see Table 2 and Figure 4 for drillhole details. The drilling was testing a 2.5km portion of a regional 10km linear aeromagnetic feature associated with outcropping magnetite gneiss displaying a NE-SW strike and 40[0] -60[0] NW dip.

Table 2: Plateau Prospect -Diamond Drilling Summary Plateau Prospect -Diamond Drilling Summary Plateau Prospect -Diamond Drilling Summary Plateau Prospect -Diamond Drilling Summary
Hole ID Easting Northing Dip/Azimuth Final Depth
DH0076 665287 353390 -90/000 100.44
DH0077 665370 353318 -90/000 100.15
DH0078 665616 353903 -90/000 73.39
DH0079 665681 353845 -90/000 86.10
DH0080 665742 353778 -90/000 68.90
DH0081 665830 353713 -90/000 30.21*
DH0082 665920 353641 -90/000 68.65
DH0083 665818 353713 -90/000 30.20*
DH0084 665606 353130 -90/000 32.89*
DH0085 666225 354175 -90/000 76.45
DH0086 665524 353190 -90/000 100.44
DH0087 666150 354248 -90/000 93.40
DH0088 665430 353251 -90/000 100.34
DH0089 665069 352791 -90/000 70.44
DH0090 666059 354302 -90/000 86.58
DH0091 665996 354363 -90/000 29.95*
DH0092 664993 352860 -90/000 90.76
DH0093 664913 352919 -90/000 28.61*
DH0094 666675 354561 -90/000 48.15*
DH0095 666601 354634 -90/000 95.28
DH0096 666525 354702 -90/000 101.43
Total 1,512.76

* Drillhole abandoned due to poor ground conditions and rig limitations.

Drillholes DH076-DH093 utilised an Ingetrol man portable diamond drilling rig – HQ and NQ core sizes. Drillholes DH094-DH096 utilised a new track mounted rig – HQ and NQ core sizes. Co-ordinates: Universal Transverse Mercator WGS84, Zone 32, Northern Hemisphere.

The drilling was conducted along five NW-SE trending traverses spaced 500-600m apart with holes every 100m along the traverses, see Figure 4. The drill pattern was designed to provide information regarding the continuity of the mapped magnetite gneiss unit, both along strike and down dip.

JUNE 2012 QUARTERLY REPORT

Page 6

==> picture [477 x 74] intentionally omitted <==

==> picture [450 x 340] intentionally omitted <==

Figure 4: Plateau Prospect - Drillhole Locations over Aeromagnetics

A generalised stratigraphic sequence has been observed on all five traverses and comprises (from top to bottom); magnetite gneiss, overlying garnet gneiss with magnetiite gneiss bands of varying thickness, and a footwall unit of silicified quartz-biotite gneiss. The drilling has also confirmed the moderate NW dip of the package and demonstrated relatively good correlation between holes on section.

Significant downhole thicknesses of magnetite bearing gneiss ranging from 54.2m to 100.4m were intersected in seven of the 21 holes, see Table 3. The second most southerly traverse showed the best continuity/correlation with the following magnetie gneiss thicknesses from consecutive drillholes; DH076 (81.6m), DH077 (84.2m), DH088 (100.4m), DH086 (54.2m) and DH084 (32.9m incomplete).

The central traverse also showed good continuity between drillholes including; DH079 (77.2m), DH080 (48.2m), DH083 (30.2m – incomplete) and DH081 (27.2m – incomplete).

Drillholes DH076-079, 088, 090 and 092 have been sampled in their entirity over nominal 4m composite intervals and submitted for the standard iron ore suite of elements. Results from assays will be released once they are received.

JUNE 2012 QUARTERLY REPORT

Page 7

==> picture [477 x 74] intentionally omitted <==

Table 3: Plateau - Table 3: Plateau - **Logged ** Magnetite Bearing Gneiss Intervals
Hole From
To
Int Description
DH076 0 81.6 81.6 Signif. intersection of magnetitegneiss
DH077 16 100.2 EOH 84.2 Signif. intersection of magnetitegneiss
DH078 12.1
32.6
68.9
20.6
51.4
73.4 EOH
8.5
18.8
4.5
Three intervals of magnetite gneiss
41% of hole contains magnetite gneiss
DH079 0 77.2 77.2 Signif. intersection of magnetitegneiss
DH080 0 48.2 48.2 Top50% of hole contains magnetite bearing gneiss
DH081 0 27.2 27.2 Hole not completed;85% magnetitegneiss
DH082 48.3 68.7 EOH 20.4 Bottom 20% contains magnetie bearing gneiss
DH083 0 30.2 30.2 Hole not completed – all magnetitegneiss
DH084 0 32.9 32.9 Hole not completed – all magnetitegneiss
DH085 0 49 49 Top50% of hole contains magnetite bearing gneiss
DH086 0 54.2 54.2 Top45% of hole contains magnetite bearing gneiss
DH087 18.5 58.9 40.4 40% of hole contains magnetite bearing gneiss
DH088 0 100.4 EOH 100.4 Signif. intersection of magnetitegneiss
DH089 0
29.2
13.7
57.7
13.7
28.5
Two intervals of qtz-magnetite gneiss
55% of hole contains magnetite bearing gneiss
DH090 0 78.8 78.8 Signif. intersection of magnetite bearing gneiss
DH091 - - - Hole not completed – no magnetitegneiss
DH092 0
70.5
60.5
90.8 EOH
60.5
20.3
Signif. intersection of magnetite bearing gneiss
Bands of qtz-magnetite gneiss
DH093 0 4.6 4.6 Hole not completed – 15% magnetitegneiss
DH094 23.8 31.6 7.8 Hole not completed – 20% magnetitegneiss
DH095 35.1 73.5 38.4 45% of hole contains magnetite bearing gneiss
DH096 45.1 65.3 20.2 20% of hole contains magnetite bearing gneiss

Note: Intersections are downhole widths and not necessarily true thicknesses.

Drillholes not completed due to poor ground conditions and rig limitations. Assessment of all results will determine if not completed holes are redrilled.

Eight holes from the Plateau Phase 1 drill programme are yet to be completed and will be followed-up by a full assessment of the geological information and drill results over the prospect. The track mounted rig will then move to Melombo East and commence the Phase 2 infill drilling programme.

Regional Geological Mapping

Following the discovery of extensive magnetite gneiss outcrop in the Plateau area, a programme of regional geological mapping was undertaken along strike to the southwest and northeast. Preliminary mapping is guided by the aeromagnetic data and has been completed over the Bidjouka, Bibondi South and Bidondi prospect areas, see Figure 2 for locations. Additional field reconnaissance has commenced over the Mimbala and Zok prospects, which are situated on the northwestern side of the Ngovayang massif paralleling the Bidjouka-Plateau-Bidondi trend.

JUNE 2012 QUARTERLY REPORT

Page 8

==> picture [477 x 74] intentionally omitted <==

2. MT GIBSON PROJECT

Legend and Extension Hill Pty Ltd finalised all outstanding matters relating to the storm damage incurred at the site in February 2012. The $250,000 withheld from Legend at settlement on 13 March was paid in May 2012.

A milestone payment of 10 million Legend shares was made to Oroya Mining Limited in May 2012, being a deferred contingent consideration arising from the September 2005 sale agreement between Legend and Oroya for the sale of the Mt Gibson Project assets.

3. PILBARA PROJECT

Legend confirmed the sale of Pilbara project to Artemis Resources Ltd (“Artemis”) (ASX:ARV) was completed on 26 June 2012. The sale consideration was 60 million fully paid ordinary Artemis shares (giving Legend approximately 12.5% of the issued capital of Artemis) and a cash payment of $200,000 for reimbursement of expenses. The Pilbara Project comprised tenements wholly owned by Legend and Legend’s wholly owned subsidiary Armada Mining Limited.

4. GIDGEE PROJECT

On 3 May 2007 Legend announced the sale of the Gidgee Gold Project which included contingent consideration of $5,000,000 payable by Apex Gold Pty Ltd to Legend once a production milestone of 250,000oz of gold production from the Gidgee Gold Project tenements was reached. The contingency was never satisfied.

As part of the sale of the Gidgee Gold Project by Apex to Panoramic Gold Pty Ltd which completed on 1 June 2012, Legend received $750,000 cash in lieu of the contingent consideration payment.

5. CORPORATE

Legend held its Annual General Meeting on 16 May 2012 with all resolutions passed unanimously on a show of hands. The results of the meeting were released to the ASX on the same day.

Competent Persons Statements

The information in this announcement that relates to Exploration Results has been compiled by Mr Derek Waterfield, a Member of the Australian Institute of Geoscientists and a consultant to Legend Mining Limited. Mr Waterfield has sufficient relevant experience in the styles of mineralisation and types of deposit under consideration, and in the activity he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (the JORC Code), and consents to the inclusion of the information in the form and context in which it appears.

JUNE 2012 QUARTERLY REPORT

Page 9

==> picture [477 x 74] intentionally omitted <==

APPENDIX 1: Full Details of Diamond Drilling Programme - Melombo East Prospect

Hole ID Easting Northing Dip/Azimuth Final Depth
DH042 686065 373167 -60/135 16.5*
DH043 686398 372915 -90/000 96.0
DH044 685676 372406 -90/000 150.0
DH045 686082 373171 -90/000 30.0*
DH046 685435 371695 -90/000 100.4
DH047 685664 371930 -90/000 84.0
DH048 685351 371421 -90/000 100.4
DH049 684773 370886 -90/000 100.6
DH050 684313 371615 -90/000 15.2*
DH051 684305 371618 -90/000 100.0
DH052 684660 371511 -90/000 89.1
DH053 685020 371068 -90/000 101.6
DH054 684578 372111 -90/000 100.5
DH055 684834 371194 -90/000 100.5
DH056 684470 370806 -90/000 100.5
DH057 684276 371538 -90/000 101.3
DH058 684683 371342 -90/000 102.0
DH059 684482 371424 -90/000 30.2*
DH060 685301 371914 -90/000 104.9
DH061 686455 373419 -90/000 77.3
DH062 686081 373115 -90/000 89.2
DH063 686664 373539 -90/000 30.2*
DH064 687128 373680 -90/000 100.5
DH065 687221 373550 -90/000 25.7*
DH066 686919 373420 -90/000 77.1*
DH067 686827 372640 -90/000 69.0
DH068 687082 372798 -90/000 22.7*
DH069 687140 372896 -90/000 30.2*
DH070 687188 373095 -90/000 20.4*
DH071 686620 372589 -90/000 30.2*
DH072 687288 373033 -90/000 30.2*
DH073 687454 373376 -90/000 30.0*
DH074 687095 373274 -90/000 65.4
DH075 687385 373012 -90/000 27.2*
Total 2,349

* Drillhole abandoned due to poor ground conditions and rig limitations. Drilling utilised an Ingetrol man portable diamond drilling rig – HQ and NQ core sizes. Co-ordinates: Universal Transverse Mercator WGS84, Zone 32, Northern Hemisphere.

JUNE 2012 QUARTERLY REPORT

Page 10

==> picture [477 x 74] intentionally omitted <==

APPENDIX 2: Complete Reported Diamond Drillhole Assays - Melombo East Prospect

Hole **From ** To Int Fe% SiO2% Al2O3% P% LOI%
DH044 33.8 150.0. EOH 116.2 26.2 48.9 5.4 0.092 0.04
Incl. 70.9 150.0 EOH 79.1 29.7 48.1 3.7 0.096 0.01
DH046 20.0 100.5 EOH 80.5 36.6 44.6 0.2 0.103 0.04
DH047 0 33.1 33.1 22.5 30.4 23.4 0.049 13.10
DH051 0 48.5 48.5 23.0 47.7 10.1 0.054 1.45
DH051 92.0 100.0 EOH 8.0 35.0 44.4 1.8 0.101 -1.37
DH053 0 101.7 101.7 11.9 46.8 16.0 0.052 2.15
Incl. 0 11.8 11.8 20.2 16.4 29.1 0.084 17.88
DH054 1.2 32.2 31.0 25.80 44.19 10.24 0.070 4.23
Incl. 20.5 32.2 11.7 32.59 48.27 1.53 0.111 -0.01
DH054 46.1 100.5 EOH 54.4 23.92 50.17 6.41 0.062 0.01
Incl. 58.7 100.5 EOH 41.8 26.78 47.84 5.15 0.069 0.01
DH055 1.2 19.7 18.5 25.22 40.72 13.62 0.064 7.35
42.0 100.5 EOH 58.5 21.13 52.75 8.02 0.078 0.01
DH058 1.3 10.4 9.1 23.17 35.07 18.74 0.057 11.54
49.5 96.8 47.3 24.29 51.60 6.36 0.072 -0.01
DH060 42.9 104.9 EOH 62.0 28.71 48.41 4.29 0.084 0.01
DH061 1.3 56.9 55.6 28.96 45.33 6.52 0.078 2.32
DH064 27.0 100.5 EOH 73.5 23.69 48.40 6.70 0.083 0.06
DH066 1.2 77.1 EOH 75.9 33.68 39.70 3.96 0.087 0.77

Assay Method Fe, SiO2, Al2O3, P by fusion XRF – OMAC Laboratory, Ireland. LOI – Loss on Ignition at 1,000[0] C determined gravimetrically.

JUNE 2012 QUARTERLY REPORT

Page 11