AI assistant
LEGEND MINING LIMITED — AGM Information 2017
May 17, 2017
65223_rns_2017-05-17_7b4d21fd-27cb-4ead-b9a8-9853aa27ac30.pdf
AGM Information
Open in viewerOpens in your device viewer
ASX:LEG
==> picture [162 x 55] intentionally omitted <==
==> picture [546 x 343] intentionally omitted <==
LEGEND MINING LIMITED
ANNUAL GENERAL MEETING – 18 MAY 2017
ACTIVITIES REPORT – MARK WILSON, MANAGING DIRECTOR
DISCLOSURE
==> picture [166 x 55] intentionally omitted <==
This is not a disclosure document. Any material used in this presentation is a summary of selected data, and any investor in Legend Mining Limited should refer to all Legend Mining Limited ASX releases and statutory reports before considering to invest in the company.
Any forward looking information in this presentation has been prepared on the basis of a number of assumptions that not to be advisors make or may prove correct. Neither Legend Mining Limited, nor its officers, employees and give any representation, warranty or guarantee in relation to this presentation.
Legend Mining Limited reserves the right to update, amend or supplement the Information in this presentation at any time in its absolute discretion without incurring any obligation to do so.
The information in this presentation that relates to exploration results is based on information compiled by Mr Derek Waterfield who is a member of the Australian Institute of Geoscientists and is a full time employee of Legend Mining Limited.
Mr Derek Waterfield has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (the JORC Code).
Mr Derek Waterfield consents to the inclusion in this presentation of the matters that relate to exploration results in the form and context in which it appears.
2
PROJECT LOCATION
Located in northern Fraser Range District 120km NE of Nova 100km S of Tropicana Comprises nine granted exploration licences and three applications covering 2,792km[2] Infrastructure access
Project potential for
-
Nova style Nickel-Copper
-
Tropicana style Gold
==> picture [352 x 447] intentionally omitted <==
3
INNOVATIVE EM
4
==> picture [165 x 55] intentionally omitted <==
-
500m line space - 300m x 300m square ‘loops’
-
High power ~200amp
-
Unique transmitter – wave type
-
Reading technique – out of loop ‘slingram’
High Power EM transmitter
Cable size
Innovative EM System
ROCKFORD PROJECT
AIRCORE DRILLING
==> picture [165 x 55] intentionally omitted <==
GEOLOGY KNOWLEDGE
-
Depth of Cover
-
Regolith type
-
Rock type at Bottom of Hole
-
Assays
-
Petrology
Samples ready for Assaying
Aircore Drillrig
ROCKFORD PROJECT
5
MOVING LOOP EM – SURVEY LOCATIONS
==> picture [447 x 325] intentionally omitted <==
==> picture [165 x 55] intentionally omitted <==
First surveys Sept 15 Ongoing Qualifies for R&D tax rebate ($1.037M 2016) Area selection from gravity and mag interpretation Only 5.1% of total project area covered
Area N Location
“First Pass Exploration Technique”
ROCKFORD PROJECT
6
MOVING AND FIXED LOOP - AREA N
==> picture [165 x 55] intentionally omitted <==
==> picture [338 x 205] intentionally omitted <==
==> picture [338 x 194] intentionally omitted <==
Area N Conductors on Aeromagnetics (top) and Gravity (bottom)
Dec 2015 – Moving Loop identified conductors
May 2017 – Fixed Loop better defines conductors
o N1 – 850 x 300m ~ 500m deep ~ 9000S
o N2 – 700 x 600m ~350m deep ~ 450S
N1 conductor lies on SE margin of gravity and aeromagnetic features
“Fixed Loop enables more accurate modelling”
ROCKFORD PROJECT
7
AIRCORE - AREA N
==> picture [165 x 55] intentionally omitted <==
==> picture [425 x 278] intentionally omitted <==
Lithology
-
Assays
-
Petrology
-
Updip projection of N1 conductor and gravity high
Aircore Drill Section at Area N
“Anomalous Assays in Regolith and Positive Petrology Report”
Aircore Drillhole RKAC068 (61m) at Area N
8
ROCKFORD PROJECT
FUTURE PROGRAMMES
==> picture [165 x 55] intentionally omitted <==
-
RC/Diamond Drilling N1 and N2 and other TBA
-
Ongoing Moving and Fixed Loop Surveys
-
Ongoing Aircore Drilling Programmes
==> picture [222 x 148] intentionally omitted <==
==> picture [225 x 151] intentionally omitted <==
L E G E N D M I N I N G L I M I T E D
A S X : L E G
9
==> picture [162 x 54] intentionally omitted <==
==> picture [405 x 277] intentionally omitted <==
THANK YOU
L E G E N D M I N I N G L I M I T E D
A S X : L E G