Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

LEEUWIN METALS LTD Capital/Financing Update 2025

Jul 28, 2025

65245_rns_2025-07-28_df3c54e2-f6a9-4bb0-b2b0-de74ec654c5c.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX Announcement ASX: LM1 29 July 2025

==> picture [156 x 44] intentionally omitted <==

Strong results from latest drilling support strategy to define and grow resources at Marda

Assays up to 10g/t continue to expand known mineralisation; Maiden Mineral Resource targeted this quarter and drilling to commence within weeks to support further resource definition; New targets identified from recent field mapping

HIGHLIGHTS

  • Additional drilling at Marda Central hits significant gold mineralisation at the Python prospect, with multiple, thick, high-grade gold intersections

  • Significant assay results from Python include:

  • 5m @ 5.0g/t Au from 229m to end-of-hole (EOH), including 1m @ 10.0g/t Au from 231m (MGRC0018)

    • A diamond tail in MGRC0018 intercepted an additional 5m of sulphide-rich banded iron formation (BIF) and a heavily altered zone[1] .
  • 23m @ 1.29g/t Au from 207m, including 10m @ 2.3g/t Au from 207m and 16m @ 0.78g/t Au from 244m (MGRC0027)

  • 9m @ 1.15g/t Au from 193m (MGRC0023)

  • The results extend the known mineralisation below the existing open pit and demonstrate continuity below the pit, over a 200m by 200m area

  • Drill planning at Evanston is underway, with drilling expected to commence in mid-August, targeting shallow, high-grade mineralisation

  • Recent fieldwork has identified 11 new target areas across a 500m of surface expression, supported by historical workings. These areas remain significantly under-explored, with over 120 assays pending from recent rock chip sampling

  • Ongoing mapping continues to refine structural understanding, target ranking and drill program design. These are critical steps in advancing the broader Marda system toward resource definition

Leeuwin Metals Ltd ( Leeuwin or the Company ) ( ASX: LM1 ) is pleased to announce more high grade drilling results which demonstrate the immense growth potential at is Marda Gold Project in Western Australia. The latest drilling returned wide, high-grade intersections which confirm the potential for significant mineralised extensions within the granted mining lease.

In addition, recent field work at Marda Central has identified 11 new trends based on surface sampling and mapping of historical workings. These areas are significantly under explored and represent the potential for high grade mineralisation. Further field work is currently underway, with a focus on pit mapping and delineating and expanding historical working trends.

1 Cautionary Statement: Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations. Refer to Figure 3 for core imagery & Appendix B, Table 3 for geological description. Assays pending (estimated 4-6 weeks).

Leeuwin Metals Ltd

A Suite 2, 64-68 Hay Street, Subiaco, Western Australia 6008

ASX LM1 | ACN 656 057 215

T +61 8 6556 6427 E [email protected] W leeuwinmetals.com

==> picture [155 x 43] intentionally omitted <==

==> picture [130 x 78] intentionally omitted <==

Leeuwin Executive Chairman, Christopher Piggott, said:

“These results reinforce the scale and potential of the Marda system. A maiden Mineral Resource Estimate is targeted for this quarter based on previously announced drilling, with the assays reported today to support a subsequent update later this calendar year.

This is our second drilling campaign at Marda, and results continue to demonstrate strong down-dip continuity of mineralisation at Marda Central. Drilling beneath Python has identified new targets, with grades up to 10 g/t gold, highlighting the scale and potential tenor of the system.

Surface exploration has also expanded, with mapping and sampling identifying multiple historical workings that may represent a previously untested style of mineralisation. More than 120 rock chips have been collected across 11 target areas, with assays pending. Further mapping and sampling are underway to refine drill targets at Marda Central and Evanston, with further drilling planned for August.”

==> picture [475 x 375] intentionally omitted <==

Figure 1: Marda Central, Python Pit – cross section +/-10m thickness showing key intercepts from Leeuwin’s recent drill program. Historical drilling was previously reported in the Company’s ASX release dated 8 April 2025.

ASX LM1 | W leeuwinmetals.com

Leeuwin Metals Ltd

==> picture [155 x 43] intentionally omitted <==

==> picture [130 x 78] intentionally omitted <==

Marda Central Drill Results

Marda Central covers a 3km trend with four existing pits, with mineralisation hosted in banded iron formations (BIFs) and quartz veining with sulphide associations.

The recent drilling targeted down-dip and strike extensions of known mineralisation within the granted mining lease. Results confirm broad zones of shallow, high-grade gold and reinforce Marda Central as a priority area. Significant intercepts from the current program are summarised in Table 1 below, with full drill hole details provided in Appendix B, Table 2.

The significant intercept within MGRC0018, 5m @ 5g/t Au from 229m to end-of-hole (EOH). A diamond tail extension intersected an additional 5m zone of sulphides and alteration. Assay results from this are pending; however, visuals confirm an additional 0.5m of heavily altered quartzsulphide rich BIF zone with an additional 4.5m of heavily altered footwall. Refer to Figure 3 and Appendix B, Table 3 for core imagery and geological description. See Appendix A for the Cautionary Note on Visual Estimates.

Table 1 Significant Intercepts from Current Drilling at Marda Central

Hole ID Intercept
Prospect From
()
To
()
Width
()
Au
(/t)
GxM
m m m g
MGRC0017 Python 176 179 3 1.31 3.93 3m @ 1.31g/t Au from 176m to EOH
MGRC0018 Python 229 234 5 5 25 5m @ 5g/t Au from 229m to EOH incl. 1m @
10.03g/t Au from 231m
incl. 231 232 1 10.03 10.03
MGRC0021 Python 143 164 21 0.44 9.24 21m @ 0.44g/t Au from 143m
MGRC0023 Python 193 202 9 1.15 10.35 9m @ 1.15g/t Au from 193m
MGRC0026 Python 249 253 4 1.76 7.04 4m @ 1.76g/t Au from 249m
MGRC0027 Python 207 230 23 1.29 29.67 23m @ 1.29g/t Au from 207m incl. 10m @ 2.3g/t
Au from 207m; &
16m @ 0.78g/t Au from 244m incl. 4m @ 1.37g/t
Au from 245m
Incl. 207 217 10 2.3 23
& 244 260 16 0.78 12.48
incl. 245 249 4 1.37 5.48

ASX LM1 | W leeuwinmetals.com

Leeuwin Metals Ltd

3

==> picture [155 x 43] intentionally omitted <==

==> picture [130 x 78] intentionally omitted <==

==> picture [445 x 628] intentionally omitted <==

Figure 2: Plan view of Marda Central showing recent Leeuwin drill collars from the Phase 1 program, reported on 14 May 2025, and the current program (red) and historical drill collars (black) at Python. Historical collar data was sourced from the Company’s ASX release dated 8 April 2025. Map projection: MGA94 Zone 50.

ASX LM1 | W leeuwinmetals.com

Leeuwin Metals Ltd

4

==> picture [155 x 43] intentionally omitted <==

==> picture [130 x 78] intentionally omitted <==

==> picture [410 x 333] intentionally omitted <==

Figure 3: Diamond Tail of MGRC0018 from 234m. Mineralised BIF unit intercepted from 234 to 234.5m, with footwall alteration from 234.5 to 239m. See Appendix B - Table 3 for detailed descriptions and visual estimates. Assays Pending (estimated 4-6 weeks). Cautionary Statement: Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations.

Marda Central Mapping and Rock Chip sampling

Recent field mapping has identified 11 additional mineralised corridors across Marda Central. All of these host significant historical workings, with the majority being situated within the established mining licence yet unsubjected to modern exploration methods. At times surface expressions of workings can be observed over >500m of strike. From these locations, Leeuwin has collected over 120 samples currently in the lab for assay with these results expected in August.

These areas of workings follow north-south oriented, quartz vein dominant structures, which crosscut known East-West trending BIF-hosted mineralisation at Marda Central. As a result, modern exploration drilling has mostly been oriented parallel to these trends, leaving significant exploration potential. In light of recent field observations, detailed structural mapping of these areas is a high priority and currently underway.

ASX LM1 | W leeuwinmetals.com

Leeuwin Metals Ltd

5

==> picture [155 x 43] intentionally omitted <==

==> picture [130 x 78] intentionally omitted <==

==> picture [442 x 624] intentionally omitted <==

Figure 4: Location of additional mineralised corridors containing historical workings within Marda Central. Followup structural mapping will better inform the orientation and extent of the workings. Over 120 assays are currently pending for samples collected within these trends.

ASX LM1 | W leeuwinmetals.com

Leeuwin Metals Ltd

6

==> picture [155 x 43] intentionally omitted <==

==> picture [130 x 78] intentionally omitted <==

==> picture [343 x 345] intentionally omitted <==

Figure 5: Extensive historical workings interpreted to have targeted north–south trending quartz veins surrounding Marda Central. These veins were historically considered prospective for high-grade gold. The attitude and orientation of the workings suggest a potential additional mineralisation style that has not yet been subjected to systematic modern exploration within the tenure.

Next steps

Leeuwin’s strategic focus remains on building momentum across multiple gold targets within the broader Marda Gold Project. Following the success of the initial drilling programs, the Company will continue systematically testing extensions of mineralisation along key structural trends while advancing its broader pipeline of gold prospects. The next phase of activity is designed to build geological confidence, inform drill prioritisation, and unlock structural controls on mineralisation across key areas.

  • Drilling – Evanston: RC drilling is scheduled to commence in mid August, targeting downdip and strike extensions to historical shallow high-grade intercepts.

  • Structural Mapping: A field campaign to investigate the structural controls on gold mineralisation across existing pits and historical workings will commence immediately, the results from which will inform further drill targeting.

  • 3D geological modelling and resource evaluation: Ongoing of modelling at Marda North will support resource estimation to occur in 2H 2025.

  • Regional target assessment: Prospect review is underway at Golden Orb, Evanston, King Brown and other structurally prospective corridors across the project area to build a pipeline of follow-up targets.

ASX LM1 | W leeuwinmetals.com

Leeuwin Metals Ltd

7

==> picture [155 x 43] intentionally omitted <==

==> picture [130 x 78] intentionally omitted <==

Overview

The Marda Gold Project is an advanced exploration asset with significant near-term drilling potential. Leeuwin Metals aims to leverage its strategic location, granted mining lease and broader tenement position, which includes mining, exploration and prospecting licences. The project is positioned close to existing infrastructure, supporting efficient field operations and future development options.

==> picture [365 x 516] intentionally omitted <==

Figure 6: Marda Regional Location with greenstone. Map projection MGA94 z50.

ASX LM1 | W leeuwinmetals.com

Leeuwin Metals Ltd

8

==> picture [155 x 43] intentionally omitted <==

==> picture [130 x 78] intentionally omitted <==

Geology

The Marda Gold Project spans a 70km greenstone corridor from Evanston in the north to Golden Orb in the south. Gold was first discovered in 1901, with intermittent mining carried out since that time.

Mineralisation is hosted in the Youanmi Terrane within the Marda–Diemals Greenstone Belt and is typically associated with BIF units and quartz veining containing sulphides.

From 2019 to 2023, Ramelius Resources mined several shallow open pits, producing 2.3Mt at 1.9g/t Au for 143,000 ounces[2] .

The project benefits from an extensive exploration dataset, with over 350,000m of drilling completed to date, comprising 230,000m of RAB/AC, 117,000m of RC, and 5,000m of diamond drilling. This data-rich environment provides strong support for ongoing exploration targeting.

==> picture [296 x 418] intentionally omitted <==

Figure 7: Regional GSWA Geology for Marda. Map projection MGA94 z50.

2 For detailed information, please refer to Ramelius Resources' Annual Report released on 18 October 2024.

ASX LM1 | W leeuwinmetals.com

Leeuwin Metals Ltd

==> picture [155 x 43] intentionally omitted <==

==> picture [130 x 78] intentionally omitted <==

This ASX announcement has been approved for release by the Board of Leeuwin.

-ENDS-

KEY CONTACTS

Christopher Piggott

Executive Chairman

E [email protected] T +61 8 6556 6427

About Us

Leeuwin Metals Ltd (ASX: LM1) is an ASX-listed exploration company focused on discovering and developing high-value mineral resources across a diversified portfolio.

Led by a skilled team with expertise in project generation, discovery, development, operations, and transactions.

Marda Gold Project (Western Australia): Adds a significant precious metal asset to our portfolio, with a strong potential for growth. The project is strategically located near key infrastructure and processing facilities.

West Pilbara Iron Ore Project (Western Australia): Featuring high-grade iron ore (>50% Fe) over a 2.4-kilometre strike length, strategically located near Rio Tinto’s Mesa A mine.

Nickel, Copper, PGE, and Lithium Projects (Canada and Western Australia): Highly prospective exploration targets supporting the global demand for critical battery metals in North America, with strong exploration upside.

ASX LM1 | W leeuwinmetals.com

Leeuwin Metals Ltd

10

==> picture [155 x 43] intentionally omitted <==

==> picture [130 x 78] intentionally omitted <==

APPENDIX A: IMPORTANT NOTICES

Competent Person Statement

The information in this report that relates to Exploration Results is based on and fairly represents information compiled by Mr Christopher Piggott, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy and the Executive Chairman of the Company. Mr Piggott has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Piggott consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Prior disclosure

This announcement contains references to prior Exploration Results, all of which have been crossreferenced to previous market announcements made by the Company. The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcements.

Forward Looking Statements

Various statements in this announcement constitute statements relating to intentions, future acts and events. Such statements are generally classified as "forward looking statements" and involve known and unknown risks, uncertainties and other important factors that could cause those future acts, events and circumstances to differ materially from what is presented or implicitly portrayed herein. The Company gives no assurances that the anticipated results, performance or achievements expressed or implied in these forward-looking statements will be achieved.

Cautionary Note on Visual Estimates

This announcement contains references visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations. Assays are expected in 4 to 6 weeks.

ASX LM1 | W leeuwinmetals.com

Leeuwin Metals Ltd

11

==> picture [155 x 43] intentionally omitted <==

==> picture [130 x 78] intentionally omitted <==

APPENDIX B: JORC CODE, 2012 EDITION

Table 2: Drill summary from Marda Central at the Marda Project. Coordinates are in MGA94 z50 projection. Drill intercepts have been reported based on a >0.3g/t Au cut off grade with up to 8m of internal dilution. With intervals based on geological boundaries.

Hole ID Hole EOH Easting Northing RL From To Width Au
Prospect Azimuth Dip GxM
**Type ** Depth (m) (m) (m) (m) (m) (m) Grade
MGRC0016 Python RC 186 718776 6656743 449 160 -54 120 121 1 0.6 0.6
150 151 1 0.4 0.4
MGRC0017 Python RC 179 718804 6656756 448 170 -60 176 179 3 1.31 3.93
MGRC0018 Python RC 234 718815 6656793 439 200 -60 229 234 5 5 25
incl. 231 232 1 10.03 10.03
MGRC0019 Python RC 192 718922 6656777 446 200 -60 174 175 1 0.33 0.33
MGRC0020 Python RC 156 718703 6656708 450 200 -60 104 106 2 1.07 2.14
MGRC0021 Python RC 168 718713 6656742 448 200 -60 143 164 21 0.44 9.24
MGRC0022 Python RC 192 718732 6656780 447 200 -60 159 161 2 1.08 2.16
MGRC0023 Python RC 252 718739 6656822 446 200 -60 193 202 9 1.15 10.35
MGRC0024 Dugite RC 150 718176 6657127 440 200 -60 NSI
MGRC0025 Dugite RC 228 718212 6657134 440 140 -50 130 131 1 1.17 1.17
153 154 1 1.23 1.23
210 214 4 0.9 3.6
MGRC0026 Python RC 270 718753 6656854 445 200 -60 249 253 4 1.76 7.04
MGRC0027 Python RC 270 718836 6656826 446 200 -60 207 230 23 1.29 29.67
incl. 207 217 10 2.3 23
244 260 16 0.78 12.48
incl. 245 249 4 1.37 5.48
MGRC0028 Python RC 222 718937 6656816 445 200 -60 159 160 1 0.63 0.63

Table 3: Logging of visual intercepts for hole MGRC0018

Hole ID From
(m)
To
(m)
Logging
MGRC0018 234 234.5 Brecciated BIF with moderate sericite alteration. Brecciating quartz veins 20%
of volume, blebby and stringer pyrite 10% in veins and country rock.
Basalt with strong sericite-chlorite alteration. Two generations of quartz
veining up to 5% vol. Pyrite up to 5% in veinlets and blebs within country rock.
MGRC0018 234.5 239

ASX LM1 | W leeuwinmetals.com

Leeuwin Metals Ltd

12

==> picture [155 x 43] intentionally omitted <==

==> picture [130 x 78] intentionally omitted <==

Section 1: Sampling techniques and data

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g., cut
channels, random chips, or specific
specialised
industry
standard
measurement tools appropriate to the
minerals under investigation, such as
downhole gamma sondes, or handheld
XRF instruments, etc.). These examples
should not be taken as limiting the broad
meaning of sampling.
Sampling was completed via Reverse Circulation (RC). RC drill samples
were collected at 1m intervals in a cyclone at the side of the drilling rig and
a sub-sample collected via a riffle or cone splitter. The remaining portion
was laid out on the ground for logging. Occasional wet samples were not
split but collected in a plastic bag then spear sampled. Some samples were
collected as 1m, 2m or 4m composites.
Include reference to measures taken to
ensure sample representivity and the
appropriate
calibration
of
any
measurement tools or systems used.
All sampling by conventional gold industry drilling methods.
Aspects
of
the
determination
of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be
relatively
simple
(e.g.,
‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In
other cases, more explanation may be
required, such as where there is coarse
gold that has inherent sampling problems.
Unusual commodities or mineralisation
types (e.g., submarine nodules) may
warrant disclosure of detailed information.
Sampling Technique details for historic drilling are often partial or
unknown.
Early RC drilling may have been collected in bagged 1m samples and
manually riffle split.
Drilling
techniques
Drill type (e.g., core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc.) and details (e.g., core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc.).
Drilling for Leeuwin was completed via Reverse Circulation (RC).
Historically, numerous holes drilled by Gondwana (1990's) and Southern
Cross Gold (2011) as mostly reverse circulation (RC) drilling, plus
moderate diamond drill holes. RMS drilled additional RC infill holes
between 2019-2023 which confirmed earlier drillholes.
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed.
Recovery has been logged for more recent drilling (post 2019) and is
generally excellent (≈100%). Minor wet intervals occur and can affect RC
sample recovery. Chip sample recovery is generally not logged but noted
if wet sample or other issues (rare). Voids relating to historic UG workings
are logged as open or filled stope voids.
Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
Sample recovery at all deposits is generally excellent in weathered and
fresh rocks. Recent drilling has utilised RC rigs of sufficient size and air
capacity to maximise recovery and provide dry chip samples or using
significant diamond drilling, RC primary, duplicate and total sample was
weighed and graphed at the rig to check sample recovery and interval
accuracy.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential
loss/gain
of
fine/coarse
material.
No indication of sample bias is evident or has been established.
Logging Whether core and chip samples have been
geologically and geotechnically logged to
a level of detail to support appropriate
Mineral
Resource
estimation,
mining
studies and metallurgical studies.
Recent drilling (+2019) has been logged for lithology, oxidation, alteration,
veining, textures and sulphides and all core is photographed and
unsampled core retained. Chip-trays are retained for RC precollars and
holes. Older drilling generally has a minimum of lithology is logged for
+90% of holes, with varying degrees of other information.
Whether
logging
is
qualitative
or
quantitative in nature. Core (or costean,
channel, etc.) photography.
Drillhole logging of RC chips is qualitative on visual recordings of rock
forming minerals & estimates of mineral abundance.

ASX LM1 | W leeuwinmetals.com

Leeuwin Metals Ltd

13

==> picture [155 x 43] intentionally omitted <==

==> picture [130 x 78] intentionally omitted <==

Criteria JORC Code explanation Commentary
The total length and percentage of the
relevant intersections logged.
The entire length of drillholes are geologically logged
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and whether
quarter, half or all core taken.
Only RC drilling completed.
Except for the extension of MGRC0018 with a Diamond tail which was
drilled as NQ2 for 16m – assays are pending for diamond core.
If non-core, whether riffled, tube sampled,
rotary split, etc. and whether sampled wet
or dry.
Recent RC holes were sub-sampled by rig mounted cone or riffle splitter.
Majority of old drilling details unknown. Occasional wet samples spear
sampled from plastic bags.
For all sample types, the nature, quality,
and
appropriateness
of
the
sample
preparation technique.
The sampling protocol implemented is considered to be appropriate and
industry standard for dealing with RC drilling and rock chip samples.
Quality control procedures adopted for all
subsampling
stages
to
maximise
representivity of samples.
Recent RC samples have field duplicate samples taken at regular intervals
and compared. For older sampling reports exist referencing similar
methods, however detailed information is incomplete or lacking for the
majority of older data or exists in hardcopy formats which have not been
systematically investigated
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for instance
results for field duplicate/second-half
sampling.
All recent samples sub-sampled using accepted splitting techniques and
have been delivered to laboratory for total preparation by crushing and
pulverisation, before being sub-sampled for analysis.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
Sample sizes are generally appropriate for grain size and material types
being sampled.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
Leeuwin Metals utilises ALS with assays from this release utilising the
Photon Assay method to give total contained gold.
Recent assaying (+2019) has all been by commercial laboratories including
ALS, SGS, KalAssay and Genalysis, typically by 40-50g Fire Assay to give
total contained gold. Earlier assaying includes a number of techniques and
laboratories and details are often incomplete or unknown.
For geophysical tools, spectrometers,
handheld XRF instruments, etc., the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
No geophysical tools or portable XRF instruments were utilised.
Nature of quality control procedures
adopted
(e.g.,
standards,
blanks,
duplicates, external laboratory checks)
and whether acceptable levels of accuracy
(i.e., lack of bias) and precision have been
established.
Leeuwin Metals Ltd uses certified reference material for current results
with CRMs, blanks and duplicates used on general industry best practise.
The laboratory has its standard QA/QC protocols including laboratory
CRMs, blanks and duplicates to monitor laboratory performance. No
material issues on QA/QC of rock samples are noted.
Recent assaying (+2019) has had QAQC measures including certified
reference standards, field duplicates, blank samples and umpire laboratory
check samples carried out for all deposits and shows acceptable levels of
accuracy and precision. For older data reports and tables exist,
referencing similar QAQC methods, however detailed information is
incomplete or lacking for the majority of old data.
Verification
of sampling
and assaying
The
verification
of
significant
intersections by either independent or
alternative company personnel.
The Competent person has verified significant intersections of recent
drilling.
The use of twinned holes. Holes were not twinned.
Documentation of primary data, data entry
procedures,data verification,data storage
All recent data has been documented in digital format, verified and stored

ASX LM1 | W leeuwinmetals.com

Leeuwin Metals Ltd

14

==> picture [155 x 43] intentionally omitted <==

==> picture [130 x 78] intentionally omitted <==

Criteria JORC Code explanation Commentary
(physical and electronic) protocols. by the Company.
Discuss any adjustment to assay data. No adjustments were made to the assay data.
Location of
data points
Accuracy and quality of surveys used to
locate drillholes (collar and downhole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
Leeuwin Metals Ltd drill collars have locations surveyed using hand-held
GPS to an accuracy of ±5 m.
Recent (+2019) collars have been surveyed by DGPS instruments to sub-
metre accuracy. All recent holes were downhole surveyed using electronic
camera or gyroscopic survey tools. Old: Collar survey method is not
always recorded for all old holes. Downhole surveys not available for all
older drilling. If present, downhole survey method frequently unknown.
Specification of the grid system used. Any grid references are presented in MGD94 zone 50.
Quality and adequacy of topographic
control.
Topographic control is based on government topographic maps and GPS.
This method of topographic control is deemed adequate.
Data spacing
and
distribution
Data spacing for reporting of Exploration
Results.
Due to the stage of the Project the sample spacing is appropriate.
Whether the data spacing and distribution
is sufficient to establish the degree of
geological
and
grade
continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied
Drill hole spacing is considered sufficient to establish geological and grade
continuities for reporting exploration results.
Whether sample compositing has been
applied.
Compositing has been applied for reporting drill intercepts using
weighted average.
Orientation of
data in
relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
The core drilling and RC drilling is completed orthogonal to the interpreted
strike of the deposits. A number of scissor holes exist at most deposits.
Marda ore zones are generally steeply dipping to sub vertical.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
No bias considered present for all project areas. Minor potential for
orientation bias for some individual holes exists, but no bias is believed
evident at broader scales
Sample
security
The measures taken to ensure sample
security.
All recent (+2019) samples have been collected by Ramelius geological
staff. Samples are transported to the laboratory by commercial transport
companies. The laboratory receipts received samples against the sample
dispatch documents and issues a reconciliation report for every sample
batch.
All samples are secured within calico bags on site before being sent
directly to the laboratory for assay. Leeuwin Metals ltd sampling: Samples
were collected, sorted and placed in polywoven bags and transported to
Perth ALS Laboratory in a company vehicle. Laboratory assays are sent
directly to CORE Geoscience Pty Ltd, a private data services provider who
merges assays with sample points into a relational database.
Audits or
reviews
The results of any audits or reviews of
sampling techniques and data.
There have been no audits or reviews of sampling techniques and data.

ASX LM1 | W leeuwinmetals.com

Leeuwin Metals Ltd

15

==> picture [155 x 43] intentionally omitted <==

==> picture [130 x 78] intentionally omitted <==

Section 2: Reporting of exploration results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type,
reference
name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical
sites, wilderness or national park
and environmental settings.
The security of the tenure held at
the time of reporting along with
any
known
impediments
to
obtaining a licence to operate in
the area.
All project areas at Marda are located on 100% owned Leases unless otherwise
stated. Below is the full list of tenure:
M 77/1300 (Pending), E 77/1322-I, E 77/1741-I, E 77/1899-I, E 77/1921-I, E
77/2109-I, E 77/2124, E 77/2141-I, E 77/2165, E 77/2171, E 77/2202, E 77/2260,
E 77/2269-I, E 77/2272-I, E 77/2274-I, E 77/2275-I, E 77/2288-I, G 77/120, G
77/35, L 77/238, L 77/239, L 77/240, L 77/241, L 77/242, L 77/258, L 77/259, L
77/260, L 77/261, L 77/268, L 77/351, M 77/1259-I, M 77/1261-I, M 77/1271, M
77/1272, M 77/394-I, M 77/576, M 77/646-I, M 77/824, M 77/931-I, M 77/962-
I, P 77/4179, P 77/4180, P 77/4181, E 77/1721-I (Pending), E 77/1791 (Pending),
E 77/2105 (Pending), E 77/2654 (Pending) (together, the Project Tenements).
The Marda Gold Project is entirely within the Marlinyu Ghoorlie claim area. The
claim was filed with the Federal Court (WAD647/2017) on the 22 December
2017 and was entered on the register of the National Native Title Tribunal
(WC2017/007) on the 28 March 2019, the claim has been under review
through Federal Court proceedings, has not yet been finalised.
Please refer to ASX release dated December 20, 2024 for historical
information relating to the tenure.
The tenements are in good standing an no known impediments exist.
Exploration done
by other parties
Acknowledgment and appraisal of
exploration by other parties.
Marda area discovered in late 1800's. Minor historical workings mainly a Dolly
Pot deposit. Modern exploration by Chevron 1980's, Cyprus Gold 1990's,
Savage Resources late 1990's and Southern Cross Goldfields/Black Oak
Minerals from 2011-2014. Ramelius acquisition & drilling 2019 with production
between 2019 and 2023.
Evanston was first discovered and mined by prospectors in the 1930’s.
Modern exploration by occurred in the late 1980’s and 1990’s primarily by
Nobel Resources where RC and RAB drilling occurred. With small scale mining
occurring at Evanston between 1998-2000. No significant exploration has
occurred since.
Geology Deposit type, geological setting
and style of mineralisation.
Mineralisation is likely controlled by shear zones/fault zones passing through
competent BIF rock units, hosted with mafic/ultramafic stratigraphy. Gold is
associated with pyrite alteration in brecciated BIF, +/- quartz. Deep
weathering has likely generated supergene enhancement of gold at shallow to
moderate depths.
Drill hole
information
A summary of all information
material to the understanding of
the exploration results including a
tabulation
of
the
following
information
for
all
Material
drillholes:

easting and northing of
the drillhole collar

elevation
or
RL
(elevation
above
sea
level in metres) of the
drillhole collar

dip and azimuth of the
hole

downhole
length
and
interception depth hole
length.
Please refer to Appendix B - Table 2 of the release for co-ordinates relevant to
published drill results.
The co-ordinates of the rock chip samples will be provided once the relevant
assay information has been received.
The visually identified sulphide-bearing BIF and alteration zone intercepted in
MGRC0018 is detailed in Appendix B, Table 3, with supporting core imagery in
Figure 3.

ASX LM1 | W leeuwinmetals.com

Leeuwin Metals Ltd

16

==> picture [155 x 43] intentionally omitted <==

==> picture [130 x 78] intentionally omitted <==

Criteria JORC Code explanation Commentary
If the exclusion of this information
is justified on the basis that the
information is not Material and this
exclusion does not detract from
the understanding of the report,
the Competent Person should
clearly explain why this is the case.
Drill intercepts have been reported based on a >0.3g/t Au cut off grade. With
all drill results reported within the release in summary tables.
The reporting of the holes in this report are deemed to be reasonable by the
competent person.
Data
aggregation
methods
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g., cutting of high
grades) and cut-off grades are
usually Material and should be
stated.
Drill intercepts have been reported based on a >0.3g/t Au cut off grade with
up to 8m of internal dilution. With intervals based on geological boundaries.
This cut-off was selected based on the shallow depth and continuity of
mineralisation observed in the historical drilling, and is considered appropriate
for early-stage exploration targeting.
The reporting of the selected holes in this report are deemed to be reasonable
by the competent person.
Gram x Metre values have been provided.
Relationship
between
mineralisation
widths and
intercept
lengths
If
the
geometry
of
the
mineralisation with respect to the
drillhole angle is known, its nature
should be reported.
If it is not known and only the down
hole lengths are reported, there
should be a clear statement to this
effect (e.g., ‘downhole length, true
width not known’).
The majority of the drill holes are drilled as close to orthogonal to the plane of
the mineralised lodes as possible. A number of drill holes have intersected the
mineralisation at high angles.
Only down hole lengths are reported.
Diagrams Appropriate maps and sections
(with scales) and tabulations of
intercepts should be included for
any significant discovery being
reported These should include, but
not be limited to a plan view of
drillhole
collar
locations
and
appropriate sectional views.
Exploration plans and diagrams are included in the body of this release as
deemed appropriate by the Competent Person.
Balanced
reporting
Where comprehensive reporting of
all Exploration Results is not
practicable,
representative
reporting of both low and high
grades and/or widths should be
practiced
to
avoid
misleading
reportingof Exploration Results.
Reported based on a >0.3g/t Au cut off grade on results from the Marda
Central prospect area has been reported in this release today. The reporting
of the holes in this report are deemed to be reasonable by the competent
person.
Other
substantive
exploration data
Other
exploration
data,
if
meaningful and material, should be
reported including (but not limited
to):
geological
observations;
geophysical
survey
results;
geochemical survey results; bulk
samples – size and method of
treatment;
metallurgical
test
results; bulk density, groundwater,
geotechnical
and
rock
characteristics;
potential
deleterious
or
contaminating
substances.
All relevant and material exploration data for the target areas discussed, has
been reported or referenced.
Further work The nature and scale of planned
further work (e.g., tests for lateral
extensions or depth extensions or
large-scale step-out drilling).
Please refer to the body of this release, noting further exploration is warranted
across the project.
Diagrams clearly highlighting the
areas
of
possible
extensions,
including
the
main
geological
interpretations and future drilling
areas, provided this information is
not commerciallysensitive.

Where relevant this information has been provided. Please refer to the body
of this release.

ASX LM1 | W leeuwinmetals.com

Leeuwin Metals Ltd

17