LCL RESOURCES LIMITED Interim / Quarterly Report 2012

Jul 31, 2012

65217_rns_2012-07-31_47331cfa-fec2-4183-ba8f-ac5dd8e96f9d.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

ASX ANNOUNCEMENT

31 July 2012

==> picture [217 x 36] intentionally omitted <==

QUARTERLY ACTIVITIES REPORT & APPENDIX 5B

3 MONTHS TO JUNE 2012

HIGHLIGHTS

Los Calatos

  • Drilling in the quarter confirmed the existence of high-grade geological domains that could provide ore feed in the initial years of an open pit operation, thereby materially improving the associated financial returns;

  • The current drilling program has been trimmed from 100,000m to 61,000m to focus on upgrading those higher grade resources which will potentially be included in an initial open pit. The reduction will save approximately US$12 million in the current year;

  • The Company’s focus has shifted to the assessment of conceptual mining scenarios prior to commencing a pre-feasibility study in early 2013.

Mollacas Project

  • A final Mineral Resource Estimate was completed for the Copper Leach Project (oxide and secondary sulphide zone) of 15.5 million tonnes containing 79,111 tonnes leachable copper and 61,650 tonnes soluble copper;

  • A combined primary and transitional sulphide resource of 18.8 million tonnes containing 52,638 tonnes copper and 112,745 ounces gold was estimated for the first time.

KEY RESULTS

Significant progress during the quarter at Los Calatos in Peru, and Mollacas in Chile, has taken Metminco Limited (“Metminco” or the “Company”) closer to mine development and, ultimately, copper production.

At Los Calatos, an interim Mineral Resource Estimate was announced in April 2012, and conceptual mining studies have started ahead of a pre-feasibility study to be commissioned in early 2013. Ongoing conceptual mining studies have demonstrated that the Company has considerable optionality in terms of a phased development of Los Calatos, enabling more favourable deployment of capital expenditure and resulting cash flows. This is viewed positively by management, and is particularly relevant in these challenging macro-economic times.

In July 2012, a Mineral Resource Estimate was finalised for the Mollacas Project of 34.3 million tonnes containing 131,749 tonnes of copper and 176,408 ounces of gold. This includes a maiden primary sulphide resource (mineralisation open at depth), as well as a significant gold resource.

Mr William Howe, Managing Director commented “The current phase of drilling at Los Calatos is nearing completion, and we have initiated conceptual mining studies ahead of a pre-feasibility study to be started in early 2013.

At Mollacas, the new resource demonstrates the quality of the project and provides Metminco with optionality in terms of its development.

Progress at both projects is a considerable achievement for Metminco.”

Metminco Limited ABN 43 119 759 349 Level 6, 122 Walker Street, North Sydney, NSW, 2060 ASX Code: MNC.AX; AIM Code: MNC.L Tel: +61 (0) 2 9460 1856; Fax: +61 (0) 2 9460 1857 www.metminco.com.au

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

REVIEW OF OPERATIONS

Los Calatos

At Los Calatos an interim mineral resource of 2.3 billion tonnes at 0.40% Cu and 210 ppm Mo (11.9 million tonnes CuEq[1] ), demonstrating the world-class nature of the copper-molybdenum deposit, was declared during the quarter (see Table 1).

A major infill drilling program continued during the quarter, focussed at better defining the higher grade zones developed within the overall deposit. This drilling has produced encouraging results, demonstrating that the deposit has the capacity to provide higher grade ore early in the life of any future mining operation, which is likely to have a material and positive impact on the project’s economics, particularly in terms of timing of capital expenditure and resulting cash flow.

The remaining drilling this year will focus on converting the high-grade portions of the mineral resource to an Indicated Mineral Resource category. Importantly, the current drilling program has been reduced from 100,000m to 61,000m, resulting in a saving of approximately US$12 million without compromising the quality of the dataset.

Mollacas

At Mollacas, the final drilling program culminated in a total mineral resource estimate for the project of 34.3 million tonnes containing 131,749 tonnes copper and 176,408 ounces gold (see Tables 7a and 7b). Of this, however, a mineral resource of 15.5 million tonnes containing 79,111 tonnes copper has been estimated for the oxide and secondary sulphide zone, which is amenable to leaching (“Copper Leach Project”) (see Tables 5a and 5b).

In addition, Metminco has now been able to declare a separate transitional and primary sulphide resource, as well as a gold resource, providing options for the development of the project. Earlier development scenarios have focussed solely on copper recoveries from the Copper Leach Project, and did not capture the potential value of the primary sulphide and gold resource.

The options available to the Company include the following:

  • a) Proceed with the commissioning of a Feasibility Study in support of the development of the Copper Leach Project. This would preclude the recovery of the copper in the primary sulphide zone, as well as the gold.

  • b) Conduct a trade-off study to evaluate the merits of a heap leach operation versus a conventional sulphide (flotation) plant, where the latter would facilitate the recovery of the copper and gold associated with the secondary, transitional and primary sulphide zones.

  • c) Monetise the project through a sale. This may be of interest to a party looking to develop and operate a copper leach project, or to a party who has a suitable metallurgical plant to process the primary and secondary sulphide resource.

In the interim, Metminco’s principal focus is to advance the development of the Copper Leach Project. Accordingly, metallurgical column leach test work continues on those ore types comprising the oxide and secondary sulphide zones in order to optimise the process design ahead of a planned Feasibility Study. The latter study has, however, been delayed to late September 2012 to provide the opportunity to evaluate the options alluded to in terms of a) to c) above, by way of comparative financial returns.

Other Projects

Diamond drilling at the Vallecillo Project was completed in January 2012, and all related assay results were received by the end of Q1 2012. The Company is presently refining the current geological model for the La Colorada deposit, which required additional sampling of the available

1 Refer to Glossary.

Page | 2

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

drill core. A 3-D geological model and updated drilling database will then be finalised and submitted to SRK Consulting (Chile) S.A. (“SRK”) for resource estimation purposes.

A reverse circulation (“RC”) drilling program comprising 12 drill holes has recently been completed in the northern sector of the Camaron Project (Genesis Licences). Although the drilling confirmed the presence of subsurface gold, copper and zinc mineralisation over narrow drill intercepts, the mineralisation style is unlikely to be amendable to bulk mining. As such, the exploration focus will shift to the southern sector of the project, where co-incidental copper and molybdenum anomalies will be drill tested in the medium term.

TECHNICAL SUMMARY

Los Calatos

Interim Mineral Resource Estimate

The interim Mineral Resource Estimate completed in April 2012 incorporates the drilling results from 113 drill holes totalling 90,403 metres, of which 31,550 metres of mineralised intercepts were used in estimating the mineral resource associated with the Los Calatos mineralised envelope.

The Mineral Resource Statement has been reported at a 0.2% Cu cut-off grade, and is categorised into Indicated and Inferred Mineral Resources in accordance with the JORC (2004) standards for Reporting Mineral Resources and Mineral Reserves (Table 1 below).

Table 1: Mineral Resource Statement for the Los Calatos Copper-Molybdenum Project, Arequipa, Peru, SRK Consulting (Chile) S.A., April 19, 2012.

Category Tonnage
(kilotonnes)
Cu
(%)
Mo
(%)
Measured - - -
Indicated 884,608 0.42 0.027
Total Measured and Indicated 884,608 0.42 0.027
Inferred 1,431,556 0.40 0.018
Total 2,316,164 0.40 0.021

Note: Mineral Resource reported at a 0.2% Cu cut-off.

Appendix 1 provides a grade-tonnage table which demonstrates the sensitivity of the mineral resource to various Cu cut-off grades.

Further, and based on Table 1, the contained metal by resource category is summarised in Table 2 below.

Table 2: Contained Metal Content by Resource Category.

Category Tonnage
(kilotonnes)
Cu
(million tonnes)
Mo
(kilotonnes)
Indicated 884,608 3.7 239
Inferred 1,431,556 5.7 258
Total 2,316,164 9.4 497

Note: Rounding-off of figures may result in minor computational discrepancies, where this happens, it is not deemed significant.

Page | 3

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

Recent drilling results

The drilling results returned to date for Phase 4 (CD-50 to CD-77) are summarised in Appendix 2.

As announced on 26 July 2012, and since the release of the Interim Mineral Resource Estimate for Los Calatos in April 2012, 17 drill holes (CD-61 to CD-77) have been completed. The drill holes, as described in Table 3 below, returned intercepts that met, or exceeded, expectations (Table 4 below and Appendix 3 [Figures 1 to 4]).

Table 3: Objectives of drill holes CD-61 to CD-77.

BHID Mineralised Zone Objective
CD-61 & CD-64 Breccia Definition drilling; northern margin
CD-66B, CD-67; CD-69, CD-71,
CD-72, CD-75B& CD-77
Porphyry & Diatreme Complex Infill drilling of potential Stage 1
Open Pit
CD-63, CD-65, CD-68, CD-70 &
CD-73
Porphyry and Diatreme Complex Confirm
depth
extension
of
mineralisation
CD-62 & CD-76 Diatreme Complex Confirm eastern continuity of high
gradezones
CD-74 Porphyry Confirm western extension

Note: BHID = Borehole identification number.

Table 4: Significant drill hole results (CD-61 to CD-77).

Depth Interval (m)
BHID Mineralised Intercept
From To
CD-61 933m at 0.51% Cu and 407ppm Mo
including
309m at 0.97% Cu and 1,052ppm Mo
767
878
1,700
1,187
CD-62 324m at 0.53% Cu and 51ppm Mo 652 976
CD-64 956m at 0.48% Cu and 408ppm Mo
including
63m at 1.07% Cu and 565ppm Mo
including
42m at 1.23% Cu and 2,224ppm Mo
464
494
914
1,420
557
956
CD-73 647m at 0.36% Cu and 92ppm Mo
including
79m at 0.53% Cu and 59ppm Mo
1,256
1,385
1,903
1,464
CD-75B 179m at 0.61% Cu and 79ppm Mo
including
67m at 1.07% Cu and 139ppm Mo
1,351
1,411
1,530
1,478
CD-76 58m at 0.45% Cu and 12ppm Mo
and
128m at 0.59% Cu and 43ppm Mo
539
685
597
813

The drilling results for the porphyry are generally consistent with the mineralisation model used for constraining the April 2012 Mineral Resource Estimate.

However, drill holes CD-61 and CD-64 returned higher grade intersections than were estimated in the block model for the high grade breccia zone located on the northern margin of the deposit, with CD-61 returning a grade of 0.97% Cu over 309 metres, and CD-64 returning grades of 1.07% and 1.23% Cu over 63 metres and 42 metres respectively.

Page | 4

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

Two drill holes (CD-62 and CD-76) were completed on the eastern edge of the mineralised envelope (diatreme complex), which returned grades of 0.53% Cu over 324 metres (CD-62), and 0.59% Cu over 128 metres (CD-76).

Categorisation of mineralisation types

The mineralisation types for Los Calatos can be grouped into three broad categories:

  • a) High-grade anhydrite breccia (Appendix 3; Figure 2): Mineralisation tends to be wellconstrained, occurs near surface, and continues to depths in excess of 1,700 metres. The breccia would constitute the primary focus of an initial, Stage 1, open pit.

  • b) High-grade diatreme complex (Appendix 3; Figure 3): Mineralisation tends to be wellconstrained, occurring within, and peripheral to the diatreme complex. As the associated mineralisation occurs at depths in excess of 500 metres, the identified mineralisation would be exploited as part of a larger open pit, and/or an underground bulk mining (viz. block caving) operation.

  • c) Low to medium grade porphyry (Appendix 3; Figure 4): Mineralisation tends to be more diffuse, occurs from near surface, and continues to depths in excess of 1,700 metres. The mineralised porphyry would be incorporated into a Stage 1 open pit, and any subsequent, larger, open pit.

Revised drilling program

Following the completion of the mineralisation model used to constrain the April 2012 Mineral Resource Estimate, the Phase 4 drilling program was revised to focus on high-grade zones identified within the Los Calatos mineralised envelope.

In general, the high-grade zones identified within the Los Calatos porphyry system are associated with a well-developed breccia system, and a younger diatreme complex.

Based on a preliminary Company assessment of the drilling, and the fact that the high-grade breccia zone occurs near surface, and persists at depth, the breccia zone will broadly be the focus of an initial, Stage 1, open pit.

The Phase 4 drilling program has therefore been reduced from 100,000 metres to 61,000 metres to focus on the high grade breccia zone, in addition to the high grade zones associated with the diatreme complex. The objective of the remaining drilling is threefold:

  • Definition of geological domains: Delineate the areal extent of the high grade zones that have been identified within the Los Calatos mineralised envelope, and confirm their geological attributes;

  • High-grade anhydrite breccia: Upgrade that part of the current Inferred Mineral Resource which will potentially be included in a Stage 1 open pit, to an Indicated Mineral Resource, ahead of the planned pre-feasibility study; and

  • Diatreme Complex: Develop a better understanding of the high-grade zones that occur within, and peripheral to, the diatreme complex, and their lateral and vertical continuity.

Proposed work program

The revised Phase 4 drilling program is scheduled for completion in early Q4 2012[2] , following which a further Mineral Resource Estimate will be finalised in accordance with the JORC Code

2 Errata: The ASX Release of 26 July 2012 incorrectly reported this as early Q3 2012.

Page | 5

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

(2004). This resource update will be followed by the commissioning of a pre-feasibility study in early 2013.

The Company is undertaking an internal mining study to identify the main requirements of the prefeasibility study. This will address aspects such as pit optimisation studies (and key input parameters), planned seawater pipeline from the coast, the design of a port/loading facility for concentrate, the quantification of the metallurgical testwork required to evaluate the use of sea water for flotation purposes (and refine recoveries) and access to the regional power grid.

As part of the mining study, several conceptual mining scenarios will be evaluated involving the phased development of Los Calatos, commencing with an initial, Stage 1, open pit. These studies will be finalised by the end of 2012, following the completion of an updated Mineral Resource Estimate.

Mollacas

Resource Modelling

With the completion of the final drilling program at the Mollacas Project in early 2012, a further Mineral Resource Estimate was completed by SRK Consulting (Chile) S.A. on 6 July 2012.

The mineral resource model incorporates the results from 119 drill holes (16,280 metres), of which 95 holes are diamond drill holes (12,784 metres) and 24 are reverse circulation holes (3,496 metres).

The Mineral Resource Estimate is reported at a 0.2% Cu cut-off grade, and has been classified in accordance with the JORC Code (2004) for reporting Mineral Resources and Mineral Reserves.

Mineral Resource Estimate

The Mineral Resource Estimate for the Mollacas Project is reported for the oxide and secondary sulphide zone (Tables 5a and 5b), the primary and transitional sulphide zone (Tables 6a and 6b), and for the project as a whole (Tables 7a and 7b). Sensitivities of the mineral resource to various Cu cut-off grades are summarised in Appendix 4.

Appendix 5 provides a cross-section through the Mollacas Block Model, showing the different mineralised zones, as well as the copper grades.

Prior resource estimates have not included the contained gold and the primary sulphide zone.

Oxide and Secondary Sulphide Zone (Copper Leach Project)

The Copper Leach Project was the subject of a Scoping Study conducted in 2008, that supported the robust economics of the project as an open pit, copper leach operation. Exploration work conducted since has improved the confidence levels in the Mineral Resource Estimate to the extent that the associated Inferred Mineral Resource has been fully converted to Measured and Indicated Mineral Resource categories.

The Measured and Indicated Mineral Resource for the oxide and secondary sulphide zone is 15.5 million tonnes containing 79,111 tonnes of leachable copper and 63,663 ounces gold, as categorised in Tables 5a and 5b below. Of the leachable copper, 61,650 tonnes is soluble (15.5 million tonnes at 0.40% Cu).

It must be noted in Tables 5a and 5b below that CuT represents total leachable copper, whereas Cu_Sol represents total soluble copper.

Page | 6

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

Table 5a: Mineral Resource Statement – Oxide and Secondary Sulphide Zone, Mollacas Project, SRK Consulting (Chile) S.A., July 06, 2012.

Category Tonnes CuT(%) Cu_Sol(%) Au(g/t)
Measured 11,168,047 0.55 0.44 0.124
Indicated 4,313,870 0.41 0.29 0.138
Total 15,481,917 0.51 0.40 0.128

Note: Reported at a 0.2% Cu cut-off grade.

Table 5b: Contained Metal Content by Resource Category – Oxide and Secondary Sulphide Zone.

Category Tonnes CuT(tonnes) Cu_Sol(tonnes) Au(oz)
Measured 11,168,047 61,424 49,140 44,523
Indicated 4,313,870 17,687 12,510 19,140
Total 15,481,917 79,111 61,650 63,663

Note: Rounding-off of figures may result in minor computational discrepancies, where this happens, it is not deemed significant.

Of significance is the fact that the Mineral Resource Estimate for the Copper Leach Project of 15.5 million tonnes is lower than that of November 2007 estimate of 17.0 million tonnes, due to the exclusion of the transitional sulphide zone, which accounts for 1.44 million tonnes.

Primary and Transitional Sulphide Zone

A Mineral Resource Estimate has not previously been reported for the primary sulphide zone. Further, the transitional sulphide zone has been combined with the newly defined primary sulphide resource due to the low solubility.

The primary and transitional sulphide zone comprises a Measured, Indicated and Inferred Mineral Resource of 18.8 million tonnes containing 52,638 tonnes copper and 112,745 ounces gold, as categorised in Tables 6a and 6b below.

Table 6a: Mineral Resource Statement – Transitional and Primary Sulphide Zone, Mollacas Project, SRK Consulting (Chile) S.A., July 06, 2012.

Category Tonnes CuT(%) Au(g/t)
Measured 8,206,798 0.30 0.216
Indicated 5,113,495 0.27 0.182
Measured & Indicated 13,320,293 0.29 0.203
Inferred 5,465,646 0.26 0.147
Total 18,785,939 0.28 0.187

Note: Reported at a 0.2% Cu cut-off grade.

Page | 7

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

Table 6b: Contained Metal Content by Resource Category – Transitional and Primary Sulphide Zone.

Category Tonnes CuT(tonnes) Au(oz)
Measured 8,206,798 24,620 56,993
Indicated 5,113,495 13,807 29,921
Measured & Indicated 13,320,293 38,427 86,914
Inferred 5,465,646 14,211 25,831
Total 18,785,939 52,638 112,745

Note: Rounding-off of figures may result in minor computational discrepancies, where this happens, it is not deemed significant.

Mollacas Project

The total mineral resource for the Mollacas Project (oxide, secondary sulphide, transitional sulphide and primary sulphide zones) is 34.3 million tonnes containing 131,749 tonnes copper and 176,408 ounces gold, as categorised in Tables 7a and 7b below.

On a copper equivalent basis, and using a long term Cu price of US$2.75/lb and Au price of US$1,500/oz, this translates to 175,400 CuE tonnes.

Table 7a: Mineral Resource Statement for the Mollacas Project, SRK Consulting (Chile) S.A., July 06, 2012.

Category Tonnes CuT(%) Au(g/t)
Measured 19,374,845 0.45 0.163
Indicated 9,427,365 0.34 0.162
Measured & Indicated 28,802,210 0.41 0.163
Inferred 5,465,646 0.26 0.147
Total 34,267,856 0.39 0.160

Note: Reported at a 0.2% Cu cut-off grade.

Table 7b: Contained Metal Content by Resource Category – Mollacas Project.

Category Tonnes CuT Tonnes Gold(oz)
Measured 19,374,845 86,044 101,516
Indicated 9,427,365 31,494 49,061
Measured & Indicated 28,802,210 117,538 150,577
Inferred 5,465,646 14,211 25,831
Total 34,267,856 131,749 176,408

Note: Rounding-off of figures may result in minor computational discrepancies, where this happens, it is not deemed significant.

Proposed work program

Confirmatory column leach testwork continues at Mollacas to establish a definitive process design for the Copper Leach Project in terms of the envisaged solvent extraction – electrowinning (SXEW) processing route.

Page | 8

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

This includes permeability testing on the ore types to be used for the column leach testwork, which will be completed in July 2012, and actual column tests which will commence in mid-August 2012.

The geotechnical study in support of the planned open pit (viz. pit profiles and slopes) is nearing completion, whereas the geotechnical design of the requisite leach pads has been completed.

With the definition of an additional primary sulphide and gold resource, alternative processing routes and related costs will be evaluated to establish comparative financial returns.

The terms of reference for the conduct of the planned Feasibility Study have been prepared, which will form the basis of a tender process by suitable consulting groups. The commencement of the Feasibility Study has recently been deferred to September 2012.

Vallecillo

The recent in-fill drill program completed at the La Colorada deposit in Q1 2012 has, in conjunction with the prior drill results, formed the basis of the current geological model (Appendix 6) for the deposit.

In reviewing the geological model, and the associated style of mineralisation, it became clear that further refinement to the model was required, which necessitated the sampling of previously unsampled zones, and additional geological analysis of the drill core.

Once the results of the additional sampling program have been received, and the geological model has been refined, a 3-D geological model will be finalised and submitted to SRK for resource estimation purposes. A further Mineral Resource Estimate is thus expected to be completed in late Q3 2012.

Once the updated mineral resource estimate is available, a pre-feasibility study will be commissioned.

Camaron

A reverse circulation (“RC”) drilling program comprising 12 drill holes (3,600 metres) has recently been completed in the northern sector of the Camaron Project (“Genesis Licences”).

The drilling program was designed to confirm the presence of subsurface mineralisation which resulted in the precious and base metal soil geochemical anomalies identified by the Company in a prior exploration program. In particular, the area covered by the Genesis Licences was assessed to provide the Company with sufficient information to make a decision with respect to the exercise of the current option that allows the Company to increase its interest in the Genesis Licences to 100% under the Genesis Joint Venture Agreement.

The RC drilling intersected numerous narrow zones (< 10 metres) comprising quartz veins and/or breccia’s within hydrothermally altered volcanic and/or intrusive rocks, characterised by the presence of anomalous precious and/or base metal mineralisation. Significant mineralised intercepts included a 4.6g/t gold value over a 2 metre sample width (289 to 291 metres) in hole GR-06; a 0.7g/t gold value over 4 metres (68 to 72 metres) in hole GR-05; and a 0.24% copper and 0.52% zinc value over 11 metres (61 to 72 metres) in hole GR-04.

Having assessed the results, the Company decided that, while the drilling has successfully intersected and tested the likely cause for the geochemical and alteration anomalies evident at surface, the mineralisation style is unlikely to be amenable to bulk mining. Accordingly the Company is unlikely to exercise its option under the Genesis Joint Venture Agreement.

However, the remaining project area in which Metminco holds a 100% interest will be retained, and the coincidental copper and molybdenum soil geochemical anomalies identified by previous exploration work, will be drill tested in the medium term.

Page | 9

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

La Piedra

Limited exploration work was conducted on the project during the quarter.

Work conducted earlier in the year by independent contract geologists included mapping, sampling and the compilation of geological and alteration maps. In addition, two traverses were sampled across the main alteration zone at different elevations in an effort to determine any vertical zonation, and these were submitted for ICP analysis.

While analytical results indicate that anomalous base and precious metal mineralisation occurs along a narrow linear belt of 1,000 metres by 300 metres, the associated geochemical elements indicate that the mineralisation is likely to be relatively distal to a medium to large scale porphyry complex. As such the identified style of mineralisation would not be amenable to bulk mining.

The results of the exploration work completed to-date, including the work conducted by independent geologists, will be assessed prior to initiating any further exploration work.

The Company has successfully negotiated a six-month extension to 30 December 2012 for the payment of the next option fee in order to complete the abovementioned assessment.

CORPORATE

Annual General Meeting of Shareholder

The Company’s Annual General Meeting of shareholders for the year ended 31 December 2011 was held at 54 McLaren Street, North Sydney NSW, 2060 on Thursday, 31 May 2012. All resolutions put before the Annual General Meeting were approved by shareholders, and the results can be found on the Company’s website.

Cash Position

As at 30 June 2012, Metminco had cash reserves of approximately A$32.3 million.

In June 2012, the Company undertook a detailed review of its work programs for 2012 taking into account information obtained from work undertaken during the first half of 2012 and the need to optimise cash outlays.

The Company has now implemented a revised work plan for 2012, which will achieve the Company’s objectives for 2012, but require a lower cash outlay than previously planned. Initiatives include a reduction of the Los Calatos Phase 4 drilling program from 100,000m to 61,000m, saving approximately US$12 million. This followed a decision to focus the remaining drilling on that portion of the current mineral resource which would potentially be exploited in the early years of a future open pit operation.

==> picture [89 x 56] intentionally omitted <==

William Howe Managing Director

Page | 10

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

For further information contact:

Metminco Limited Office: +61 (0) 2 9460 1856 William Howe – Managing Director Mobile: +56 9 9308 7900 Stephen Tainton – GM Investor Relations Mobile: +61 (0) 477 299 411

Canaccord (Australia) Warwick Grigor Office: +61 (0) 2 9263 2700 Canaccord Genuity (UK) Andrew Chubb Office: +44 (0) 20 7523 8000 Liberum (UK) Tim Graham Office: +44 (0) 20 3100 2225

Company Background

Metminco is a dual ASX and AIM listed company with a portfolio of copper, molybdenum and gold projects in Peru and Chile.

The Los Calatos Project, located in southern Peru, has a Mineral Resource of 2,316 million tonnes, comprising an Indicated Resource of 885 million tonnes at 0.42% Cu and 270 ppm Mo, and an Inferred Resource of 1,431 million tonnes at 0.40% Cu and 180 ppm Mo (at a 0.2% copper cut-off).

The Chilean assets include the Mollacas Project with a Mineral Resource of 34.3 million tonnes consisting of a Measured Resource of 19.4 million tonnes at 0.45% Cu and 0.16g/t Au, an Indicated Resource of 9.4 million tonnes at 0.34% Cu and 0.16g/t Au, and an Inferred Resource of 5.5 million tonnes at 0.26% Cu and 0.15g/t Au (at a 0.2% copper cut-off); and the Vallecillo gold/zinc project with a Mineral Resource of 10.1 million tonnes consisting of an Indicated Resource of 7.9 million tonnes at 1.14g/t Au; 11.4g/t Ag; 1.32% Zn; 0.29% Pb and an Inferred Resource of 2.2 million tonnes at 0.78g/t Au; 8.2g/t Ag; 0.58% Zn; 0.26% Pb (at a cut-off grade of 0.3g/t Au).

The Company also has a number of early stage exploration projects where initial exploration activities have identified anomalous copper, molybdenum and gold values.

Competent Persons Statement

The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Colin Sinclair, BSc, MSc, who is a Member of the Australasian Institute of Mining and Metallurgy and is a full-time employee of the Company as Executive General Manager.

Colin Sinclair has sufficient experience (over 30 years) which is relevant to the style of mineralisation, type of deposit under consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results’. Mr Sinclair, as Competent Person for this announcement, has consented to the inclusion of the information in the form and context in which it appears herein.

Page | 11

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

SRK Consulting (Chile) S.A.

Metminco supplied SRK with a geological model and the drill data. Copper and gold grades were estimated into a block model using ordinary kriging with GEMCOM software.

The information provided in this ASX Release as it relates to Exploration Results and Mineral Resources of the Mollacas Project is based on information compiled by George G. Even, Principal Geologist of SRK Consulting in Santiago, Chile. Mr Even, a Qualified Person for JORC compliant statements, reviewed the technical information presented in this document. Mr Ernesto Jaramillo, Principal Resource Geologist with SRK Santiago, performed the resource estimation. Mr Even has sufficient experience that is relevant to the style of mineralisation and type of mineral deposit under consideration, and to the activity which was undertaken, to make the statements found in this report in the form and context in which they appear.

Mr Even and Mr Jaramillo have consented to be named in this announcement, and have approved of the inclusion of the information attributed to them in the form and context in which it appears herein.

Forward Looking Statement

All statements other than statements of historical fact included in this announcement including, without limitation, statements regarding future plans and objectives of Metminco are forwardlooking statements. When used in this announcement, forward-looking statements can be identified by words such as ‘anticipate”, “believe”, “could”, “estimate”, “expect”, “future”, “intend”, “may”, “opportunity”, “plan”, “potential”, “project”, “seek”, “will” and other similar words that involve risks and uncertainties.

These statements are based on an assessment of present economic and operating conditions, and on a number of assumptions regarding future events and actions that, as at the date of this announcement, are expected to take place. Such forward-looking statements are not guarantees of future performance and involve known and unknown risks, uncertainties, assumptions and other important factors, many of which are beyond the control of the Company, its directors and management of Metminco that could cause Metminco’s actual results to differ materially from the results expressed or anticipated in these statements.

The Company cannot and does not give any assurance that the results, performance or achievements expressed or implied by the forward-looking statements contained in this announcement will actually occur and investors are cautioned not to place undue reliance on these forward-looking statements. Metminco does not undertake to update or revise forward-looking statements, or to publish prospective financial information in the future, regardless of whether new information, future events or any other factors affect the information contained in this announcement, except where required by applicable law and stock exchange listing requirements.

Page | 12

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

APPENDIX 1

Los Calatos Project: Grade – Tonnage Table

Sensitivity of the Mineral Resource to the copper cut-off grade.

Indicated Indicated Inferred Total
Cut-off Tonnage Tonnage Tonnage

(Kton)
Cu (%) Mo (%)
(Kton)
Cu (%) Mo (%)
(Kton)
Cu (%) Mo (%)
1.00
0.95
0.90
0.85
0.80
0.75
0.70
0.65
0.60
0.55
0.50
0.45
0.40
0.35
0.30
0.25
15,151
19,801
26,150
34,032
42,803
56,530
74,652
97,983
126,598
166,542
217,615
283,215
365,033
469,176
594,614
731,995
1.26
1.19
1.13
1.07
1.02
0.96
0.90
0.85
0.80
0.74
0.69
0.64
0.59
0.54
0.50
0.46
0.061
0.059
0.056
0.054
0.052
0.049
0.048
0.047
0.045
0.044
0.042
0.041
0.039
0.036
0.033
0.030
9,206
12,501
18,438
25,673
38,549
50,174
69,516
96,580
140,931
211,008
292,356
412,024
551,301
744,183
967,584
1,220,954
1.18
1.13
1.06
1.01
0.95
0.91
0.86
0.80
0.75
0.69
0.64
0.59
0.55
0.51
0.46
0.43
0.021
0.021
0.021
0.020
0.020
0.021
0.023
0.024
0.027
0.029
0.028
0.027
0.025
0.024
0.022
0.019
24,358
32,302
44,588
59,705
81,352
106,704
144,168
194,563
267,529
377,549
509,971
695,240
916,334
1,213,359
1,562,198
1,952,949
1.23
1.17
1.10
1.04
0.98
0.93
0.88
0.83
0.77
0.71
0.66
0.61
0.57
0.52
0.48
0.44
0.046
0.044
0.042
0.039
0.037
0.036
0.036
0.036
0.036
0.035
0.034
0.033
0.031
0.028
0.026
0.023
0.20 884,608 0.42 0.027 1,431,556 0.40 0.018 2,316,164 0.40 0.021
0.15
0.10
0.05
0.00
1,020,734
1,100,729
1,111,809
1,116,276
0.38
0.37
0.36
0.36
0.025
0.023
0.023
0.023
1,642,684
1,782,029
1,886,417
1,890,465
0.37
0.35
0.33
0.33
0.016
0.015
0.014
0.014
2,663,418
2,882,758
2,998,225
3,006,741
0.37
0.36
0.34
0.34
0.019
0.018
0.017
0.017

Page | 13

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

APPENDIX 2

Los Calatos Project: Summary of Phase 4 drill hole results.

Easting Northing RL Azimuth true Dip Hole depth Depth (m) Depth (m) Interval Cu Mo
Hole ID
(m) (m) (m) (degrees) (degrees) (m) From To (m) (%) (ppm)
CD-50 286415 8130424 2978 39 -63 993.3 183 855 672 0.28 217
CD-51 286941 8130464 2916 205 -60 918 383 587 204 0.32 295
CD-52 287111 8130240 2936 238 -69 674.5 318 415 97 0.42 9
CD-53 286312 8130086 3047 31 -64.5 1976.4 670 1089 419 0.42 223
includes 905 1039 134 0.69 293
1163 1323 160 0.15 21
1371 1634 263 0.39 161
1682 1780 98 0.16 80
CD-54 286502 8130076 3020 23 -70 1577.35 482 836 354 0.25 165
853 921 68 0.23 292
933 957 24 0.30 142
974 1013 39 0.36 129
1213 1279 66 0.26 7
1351 1390 39 0.12 11
1506 1572 66 0.21 78
CD-55 287415 8130772 2924 207 -59 1588.25 762 816 54 0.47 51
830 998 168 0.36 18
1125 1154 29 0.13 101
1240 1435 195 0.26 55
CD-56 287331 8130859 2951 216 -64.5 2003.9 980 1270 290 0.80 184
includes 990 1102 112 1.14 244
1289 1385 96 0.47 151
1401 1734 333 0.43 494
includes 1672 1732 60 0.75 627
1772 2004 232 0.55 146
includes 1809 1843 34 1.02 151
CD-57 286733 8131226 3041 201 -72 1894.8 711 826 115 0.44 634
850 870 20 0.37 440
879 1894 1015 0.51 233
includes 1197 1282 85 1.05 221
CD-58 286423 8131111 2983 206.5 -64 1263.2 870 1263 393 0.26 155

Page | 14

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

Easting Northing RL Azimuth true Dip Hole depth Depth (m) Interval Cu Mo
Hole ID
(m) (m) (m) (degrees) (degrees) (m) From To (m) (%) (ppm)
CD-59 286429 8130214 2997 31.5 -61 1277.9 413 601 188 0.20 116
700 1002 302 0.17 145
1014 1194 180 0.22 99
CD-60 287001 8130475 2921 221.5 -65.5 997.35 70 103 33 0.17 4
542 819 277 0.24 146
912 955 43 0.13 12
CD-61 286842 8131190 3062 204.5 -63 1753.35 767 1700 933 0.51 407
includes 878 1187 309 0.97 1,052
CD-62 287298 8130550 2913 212.5 -60.5 1195.05 652 976 324 0.53 51
CD-63 287047 8130677 2941 200 -60 1137.7 140 231 91 0.16 9
424 451 27 0.24 14
666 685 19 1.32 23
698 987 289 0.35 93
1006 1051 45 0.24 20
CD-64 286703 8131161 3030 206 -60 1419.9 345 391 46 0.51 37
464 1420 956 0.48 408
includes 494 557 63 1.07 565
includes 914 956 42 1.23 2224
CD-65 287412 8130778 2940 200 -65 1804.2 1087 1262 175 0.17 39
1414 1438 24 0.18 75
CD-66B 286277 8130089 3064 20 -65 1812.6 688 1139 451 0.24 142
1254 1812 558 0.29 63
CD-67 286500 8130080 3035 24 -65 1538.25 490 844 354 0.22 80
899 1003 104 0.22 98
1054 1205 151 0.21 101
CD-68 286723 8131475 3047 208.5 -72 1807.5
CD-69 286582 8130422 2955 35 -63 856.2 70 233 163 0.20 84
323 417 94 0.19 264
428 659 231 0.27 260
CD-70 287054 8130737 2934 215 -67 1528.85 608 1382 774 0.30 131
1399 1423 24 0.11 6
includes 1254 1311 57 0.92 343

Page | 15

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

Easting Northing RL Azimuth true Dip Hole depth Depth (m) Interval Cu Mo
Hole ID
(m) (m) (m) (degrees) (degrees) (m) From To (m) (%) (ppm)
CD-71 287214 8130937 3024 212 -62 1487.45 608 631 23 0.24 1
1028 1253 225 0.23 134
1285 1356 71 0.23 34
CD-72 286715 8130449 2941 41 -61 570 34 170 136 0.16 25
200 325 125 0.25 49
405 468 63 0.28 137
CD-73 286924 8131264 3018 207 -62 1912.5 1256 1903 647 0.36 92
includes 1385 1464 79 0.53 59
CD-74 286293 8131005 2956 217 -66 1045.5 481 569 88 0.13 29
651 690 39 0.11 21
716 1037 321 0.15 13
CD-75B 286507 8130078 3028 18.7 -74 1559.2 635 1265 630 0.22 213
1351 1530 179 0.61 79
includes 1411 1478 67 1.07 139
CD-76 287338 8130382 2920 220.7 -60.5 926.15 539 597 58 0.45 12
685 813 128 0.59 43
CD-77 286296 8130092 3036 14 -74.5 1595.35 826 1157 331 0.20 133
1222 1482 260 0.26 87

Page | 16

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

APPENDIX 3

Los Calatos Project: Drill hole locality plan and sections.

Figure 1: Cu (%) x Thickness (m) contour plan showing Los Calatos drilling program.

==> picture [461 x 378] intentionally omitted <==

Note

  • a) Drill holes CD-61 to CD-77 are annotated for reference purposes.

  • b) Contours are projected to surface. See figures 2, 3 and 4 for elevation of mineralisation relative to surface.

Page | 17

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

Figure 2: Section 10300E showing the high grade Cu zones associated with the mineralised breccia system.

==> picture [482 x 399] intentionally omitted <==

Page | 18

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

Figure 3: Section 11200E showing the high grade Cu zones associated with the diatreme complex.

==> picture [479 x 396] intentionally omitted <==

Page | 19

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

Figure 4: Section 10500E showing the low to medium Cu grades associated with the mineralised porphyry.

==> picture [479 x 396] intentionally omitted <==

Page | 20

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

APPENDIX 4

Mollacas Project: Grade – Tonnage Tables.

Sensitivity of Oxide and Secondary Sulphide Mineral Resource to Cu cut-off grade.

Measured Indicated Total
Cut-
off
Tonnes CuT% CuT_Sol
%
Au g/t Tonnes CuT% CuT_Sol
%
Au
g/t
Tonnes CuT% CuT_Sol
%
Au g/t
0.50
0.45
0.40
0.35
0.30
0.25
5,748,787
6,624,195
7,596,322
8,512,722
9,389,161
10,226,378
0.74
0.71
0.67
0.64
0.61
0.58
0.61
0.58
0.54
0.51
0.49
0.46
0.130
0.129
0.128
0.127
0.126
0.125
974,082
1,326,330
1,822,051
2,293,979
2,862,375
3,464,758
0.68
0.63
0.57
0.53
0.49
0.45
0.52
0.47
0.43
0.39
0.36
0.33
0.190
0.176
0.165
0.159
0.153
0.145
6,722,869
7,950,525
9,418,373
10,806,701
12,251,536
13,691,136
0.73
0.69
0.65
0.62
0.58
0.55
0.59
0.56
0.52
0.49
0.46
0.43
0.138
0.137
0.135
0.134
0.132
0.130
0.20 11,168,047 0.55 0.44 0.124 4,313,870 0.41 0.29 0.138 15,481,917 0.51 0.40 0.128
0.15
0.10
0.05
0.00
11,944,517
12,226,785
12,309,859
12,310,808
0.53
0.52
0.52
0.52
0.42
0.41
0.41
0.41
0.123
0.122
0.121
0.121
5,139,273
5,316,567
5,432,947
5,432,947
0.37
0.36
0.36
0.36
0.26
0.26
0.25
0.25
0.135
0.132
0.130
0.130
17,083,790
17,543,352
17,742,806
17,743,755
0.48
0.47
0.47
0.47
0.37
0.36
0.36
0.36
0.127
0.125
0.124
0.124
Total 12,310,808 0.52 0.41 0.121 2,646,378 0.73 0.52 0.267 14,957,186 0.55 0.43 0.147

Sensitivity of Transitional Sulphide and Primary Sulphide Mineral Resource to Cu cut-off grade.

Measured Measured Indicated Indicated Inferred Inferred Total
Cut-
off
Tonnes CuT% Au g/t Tonnes CuT% Au g/t Tonnes CuT% Au g/t Tonnes CuT% Au g/t
0.50
0.45
0.40
0.35
0.30
0.25
3,587
152,347
648,854
1,895,279
3,828,766
6,211,721
0.51
0.47
0.43
0.39
0.36
0.33
0.335
0.318
0.306
0.289
0.263
0.236
-
20,617
124,209
545,811
1,324,746
3,099,973
-
0.46
0.42
0.38
0.35
0.31
-
0.302
0.294
0.292
0.250
0.210
-
982
17,357
218,114
728,359
2,710,716
-
0.45
0.42
0.37
0.33
0.29
-
0.287
0.297
0.283
0.204
0.167
3,587
173,946
790,420
2,659,204
5,881,871
12,022,410
0.51
0.47
0.43
0.39
0.35
0.31
0.335
0.316
0.303
0.289
0.253
0.214
0.20 8,206,798 0.30 0.216 5,113,495 0.27 0.182 5,465,646 0.26 0.147 18,785,939 0.28 0.187
0.15
0.10
0.05
0.00
9,789,800
11,232,307
12,697,699
13,497,631
0.28
0.26
0.24
0.23
0.197
0.180
0.165
0.157
6,516,995
7,710,280
8,585,655
9,517,810
0.25
0.23
0.22
0.20
0.161
0.144
0.133
0.123
7,525,621
8,195,358
8,382,033
8,398,080
0.23
0.23
0.22
0.22
0.133
0.128
0.126
0.126
23,832,416
27,137,945
29,665,387
31,413,521
0.26
0.24
0.23
0.22
0.167
0.154
0.144
0.138
Total 13,497,631 0.23 0.157 9,517,810 0.20 0.123 8,398,080 0.22 0.126 31,413,521 0.22 0.138

Page | 21

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

Sensitivity of Total Mineral Resource to Cu cut-off grade.

Measured Measured Indicated Indicated Inferred Inferred Total Total
Cut-
off
Tonnes CuT% Au g/t Tonnes CuT% Au g/t Tonnes CuT% Au g/t Tonnes CuT% Au g/t
0.50
0.45
0.40
0.35
0.30
0.25
5,752,374
6,776,542
8,245,176
10,408,001
13,217,927
16,438,099
0.74
0.70
0.65
0.59
0.54
0.49
0.130
0.133
0.142
0.156
0.165
0.167
974,082
1,346,947
1,946,260
2,839,790
4,187,121
6,564,731
0.68
0.62
0.56
0.50
0.44
0.38
0.190
0.178
0.173
0.184
0.184
0.176
-
982
17,357
218,114
728,359
2,710,716
-
0.45
0.42
0.37
0.33
0.29
-
0.287
0.297
0.283
0.204
0.167
6,726,456
8,124,471
10,208,793
13,465,905
18,133,407
25,713,546
0.73
0.69
0.63
0.57
0.51
0.44
0.138
0.140
0.148
0.164
0.171
0.169
0.20 19,374,845 0.45 0.163 9,427,365 0.34 0.162 5,465,646 0.26 0.147 34,267,856 0.39 0.160
0.15
0.10
0.05
0.00
21,734,317
23,459,092
25,007,558
25,808,439
0.42
0.40
0.38
0.36
0.156
0.150
0.143
0.140
11,656,268
13,026,847
14,018,602
14,950,757
0.30
0.29
0.27
0.26
0.149
0.139
0.132
0.125
7,525,621
8,195,358
8,382,033
8,398,080
0.23
0.23
0.22
0.22
0.133
0.128
0.126
0.126
40,916,206
44,681,297
47,408,193
49,157,276
0.35
0.33
0.32
0.31
0.150
0.143
0.137
0.133
Total 25,808,439 0.36 0.140 12,164,188 0.31 0.154 8,398,080 0.22 0.126 46,370,707 0.33 0.141

Note: The table above excludes the low grade Leached Zone

Page | 22

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

APPENDIX 5

Mollacas Copper Leach Project.

Figure 1: Cu (%) x Thickness (m).

==> picture [414 x 303] intentionally omitted <==

Figure 2: East-west section showing CuT% (All ore types).

==> picture [494 x 232] intentionally omitted <==

Page | 23

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

APPENDIX 6

Vallecillo Project: La Colorada deposit - Drill hole locality plan.

==> picture [416 x 520] intentionally omitted <==

Page | 24

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

ABBREVIATED GLOSSARY

Assay

An analysis to determine the presence, absence or quantity of one or more chemical components.

Base Metal

A metal, such as copper, lead, nickel, zinc or cobalt.

Block caving

A method of underground mining in which large blocks of ore are undercut, causing the ore to break or cave under its own weight enabling extraction of the ore at a relatively low cost.

Breccia

Rock fragmented into angular components.

Circuit

A processing facility for removing valuable minerals from the ore so that it can be processed and sold.

Copper (Cu)

A ductile, malleable base metal with a myriad of uses in construction (piping, wire) and electronics due to its high electrical and thermal conductivity and good resistance to corrosion.

Copper equivalent (CuEq)

Copper equivalent is generally based on the value of the non-copper by-products (such as gold and molybdenum) relative to the copper price. For example, at a long term copper price of US$3.00 per pound of copper and a molybdenum price of US$15.00 per pound, 1 pound of molybdenum is equivalent to 5 pounds of copper (Cu:Mo ratio of 1:5).

Diamond drilling / drill hole

A method of obtaining a cylindrical core of rock by drilling with a diamond impregnated bit.

Diatreme

A diatreme is a breccia-filled volcanic pipe that was formed by a gaseous explosion. Diatremes often breach the surface and produce a tuff cone, a filled relatively shallow crater known as a Maar, or other volcanic pipes.

Drill core

The long cylindrical piece of rock brought to surface by diamond drilling.

Environmental impact study (EIS)

A written report, compiled prior to a production decision that examines the effects proposed mining activities will have on the natural surroundings.

Exploration

Prospecting, sampling, mapping, diamond drilling and other work involved in searching for ore.

Feasibility Study

A feasibility study is an evaluation of a mineral resource to determine whether it can be mined effectively and profitably. It includes the detailed study of reserve estimation, mining methods evaluation, processing technique analysis, capital and operating cost determination and the process effect on the environment and community. This detailed study forms the basis for capital estimation, and provides budget figures for the development of the project. It requires a significant amount of formal engineering work and an accuracy within 10 to 15%.

Geo-domain

Homogeneous geological domains within a deposit identified on the basis of spatial continuity of grades and geological features such as lithology, mineralogy and alteration.

Gold (Au)

A heavy, soft, ductile, malleable precious metal used in jewellery, dentistry, electronics and as an investment.

Grade

The amount of valuable metal in each tonne or ore, expressed as grams per tonne for precious metals and percent in the case of copper and parts per million (ppm) in the case of molybdenum. Cut-off grade – is the minimum metal grade at which a tonne of rock can be processed on an economic basis. Recovered grade – is the actual metal grade realised by the metallurgical process and treatment of ore, based on actual experience or laboratory testing.

Page | 25

ASX ANNOUNCEMENT

METMINCO LIMITED

31 July 2012

ICP

Inductively Coupled Plasma. Analytical technique used for the detection of trace elements in soils.

Indicated Mineral Resource

An ‘Indicated Mineral Resource’ is that part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence. It is based on exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are too widely or inappropriately spaced to confirm geological and/or grade continuity but are spaced closely enough for continuity to be assumed.

Inferred Mineral Resource

An ‘Inferred Mineral Resource’ is that part of a Mineral Resource for which tonnage, grade and mineral content can be estimated with a low level of confidence. It is inferred from geological evidence and assumed but not verified geological and/or grade continuity. It is based on information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes which may be limited or of uncertain quality and reliability.

JORC Code

The Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves sets out minimum standards, recommendations and guidelines for Public Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves.

Leachable (soluble) copper

Total acid and cyanide soluble copper.

Leaching

A chemical process for the extraction of valuable minerals from ore.

Measured Mineral Resource

A ‘Measured Mineral Resource’ is that part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a high level of confidence. It is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes. The locations are spaced closely enough to confirm geological and grade continuity.

Metallurgy

The science and technology of extraction of metals from their ores and the refining of metals.

Mineralisation

The concentration of metals and their chemical compounds within a body of rock.

Mineralised envelope

The boundary constraining the extent of the identified mineralisation, as delineated by a nominated grade or cut-off.

Mineral Resource

A concentration or occurrence of material of intrinsic economic interest in or on the Earth’s crust in such form, quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade, geological characteristics and continuity of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge. Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated and Measured categories.

Molydenum (Mo)

Molybdenum is commonly a by-product of copper mining. It has the ability to withstand extreme temperatures and has a high resistance to corrosion. Molybdenum is widely used as an alloy agent in stainless steel. It is also used to manufacture aircraft parts and industrial motors.

NPV

Net present value is the difference between the present value of a future cash flow from an investment and the amount of investment, where the present value of the expected cash flow is computed by discounting the cash flow at the required rate of return.

Open Pit

A mine that is entirely on surface. Also referred to as open-cut or open-cast mine.

Ore

Rock containing mineral(s) or metals that can be economically extracted to produce a profit.

Page | 26

ASX ANNOUNCEMENT METMINCO LIMITED

31 July 2012

Oz

Troy ounce (31.1035 grams).

Pit optimisation study

Pit optimisation studies are used for open pit mine planning to determine those pit limits and mining sequences that yield maximum financial returns based on defined technical parameters, operating costs and commodity prices.

Porphyry

A rock consisting of larger crystals embedded in a more compact finer grained groundmass.

Porphyry copper deposit

A copper deposit which is associated with porphyritic intrusive rocks and the fluids that accompany them during the transition and cooling from magma to rock. Porphyry copper deposits are typically mined by open-pit methods.

PPM

Parts per million, also grams/tonne

Pre-feasibility study

A preliminary assessment of the technical and economic viability of a proposed project. Alternative approaches to various elements of the project are compared, and the most suitable alternative for each element is recommended for further analysis. Costs of development and operations are estimated. Anticipated benefits are assessed such that some preliminary economic criteria for evaluation can be calculated. Preliminary feasibility studies are completed by a small group of multi-disciplined technical individuals and have an accuracy within 20 to 30%.

Recovery

A term used in process metallurgy to indicate the proportion of valuable material obtained in the processing of an ore. It is generally stated as a percentage of valuable metal in the ore that is recovered compared to the total valuable metal present in the ore.

Reverse circulation drilling (RC drilling)

Percussion drilling method using a rotating bit and high pressure air to sample sub-surface material through the recovery of broken rock fragments (‘rock chips’).

Solvent extraction and electrowinning (SX-EW)

A metallurgical technique, so far applied only to copper ores, in which metal is dissolved from the rock by organic solvents and recovered from solution by electrolysis.

Stripping ratio

The ratio of tonnes removed as waste relative to the number of tonnes of ore removed from an open-pit mine.

Page | 27

Appendix 5B Mining exploration entity quarterly report

Rule 5.3

Appendix 5B

Mining exploration entity quarterly report

Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001.

Name of entity

Metminco Limited

ABN
43 119 759 349
Quarter ended (“current quarter”)
43 119 759 349 30 June 2012

Consolidated statement of cash flows

Consolidated statement of cash flows
Cash flows related to operating activities
1.1
Receipts from product sales and related debtors
1.2
Payments for (a) exploration and evaluation
(b) development
(c) production
(d) administration
1.3
Dividends received
1.4
Interest and other items of a similar nature
received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Other (bank charges)
NetOperating Cash Flows
Current quarter
$A’000
Year to date 6.months
$A’000
(10,129)
-
-
(1,563)
-
100
-
-
(6)
(19,262)
-
-
(3,298)
-
149
-
-
(12)
(11,598) (22,423)
Cash flows related to investing activities
1.8
Payment for purchases of: (a)prospects
(b)equity investments
(c) other fixed assets
1.9
Proceeds from sale of:
(a)prospects
(b)equity investments
(c)other fixed assets
1.10
Loans to other entities
1.11
Loans repaid by other entities
1.12
Other
Net investing cash flows
-
-
(33)
-
-
-
-
-
-
-
-
(246)
-
-
-
-
-
-
(33) (246)
1.13
Total operating and investing cash flows (carried
forward)
(11,631) (22,669)
  • See chapter 19 for defined terms.

Appendix 5B Page 1

30/9/2001

Appendix 5B Mining exploration entity quarterly report

1.13
Total operating and investing cash flows (brought
forward)

(11,631)
(22,669)
Cash flows related to financing activities
1.14
Proceeds from issues of shares, options, etc.
Costs of issue
1.15
Proceeds from sale of forfeited shares
1.16
Proceeds from borrowings
1.17
Repayment of borrowings
1.18
Dividends paid
1.19
Other (proceeds from equity swap)
Net financing cash flows
-
-
-
-
-
-
360
10,511
(1,255)
-
-
-
-
735
360 9,991
Net increase (decrease) in cash held
1.20
Cash at beginning of quarter/year to date
1.21
Exchange rate adjustments to item 1.20
1.22
Cash at end ofquarter
(11,271)
42,322
1,226
(12,678)
44,032
923
32,277 32,277

Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities

1.23
1.24
Aggregate amount of payments to the parties included in item 1.2
Aggregate amount of loans to the parties included in item 1.10
Current quarter
$A'000
301
-
1.25 Explanation necessaryfor an understandingof the transactions
Item 1.23 includes aggregate amounts paid to directors for the period 01 Apr 12
Directors’ fees: $231,250
Directors’ services and consultingfees: 70,199
– 30 June 12 for:

Non-cash financing and investing activities

2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows

None

2.2 Details of outlays made by other entities to establish or increase their share in projects in which the
reportingentityhas an interest
None
  • See chapter 19 for defined terms.

Appendix 5B Page 2

30/9/2001

Appendix 5B Mining exploration entity quarterly report

Financing facilities available

Add notes as necessary for an understanding of the position.

3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
Amount used
$A’000
- -
- -

Estimated cash outflows for next quarter

Estimated cash outflows for next quarter
4.1
Exploration and evaluation
4.2
Development
4.3
Production
4.4
Administration
$A’000
10,000
-
-
1,300
Total 11,300

Reconciliation of cash

Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows) to
the related items in the accounts is as follows.
Current quarter
$A’000
Previous quarter
$A’000
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other(provide details)
32,277 42,322
- -
- -
- -
Total: cash at end ofquarter(item 1.22) 32,277 42,322

Changes in interests in mining tenements

6.1
Interests in mining
tenements relinquished,
reduced or lapsed
6.2
Interests in mining
tenements acquired or
increased
Tenement
reference
Nature of interest
(note (2))
Interest at
beginning
ofquarter
Interest at
end of
quarter
  • See chapter 19 for defined terms.

Appendix 5B Page 3

30/9/2001

Appendix 5B Mining exploration entity quarterly report

Issued and quoted securities at end of current quarter

Description includes rate of interest and any redemption or conversion rights together with prices and dates.

Total
number
Total
number
Number
quoted
Number
quoted
Issue price per
security
(see note 3)
(cents)
Amount paid
up per
security
(see note 3)
(cents)
7.1 Preference
+securities
(description)
7.2 Changes
during quarter
(a) Increases
through issues
(b) Decreases through
returns of capital, buy
backs, redemptions
7.3 +Ordinary securities 1,749,541,573 1,749,541,573
7.4 Changes during
quarter
(a) Increases through
Issues
(b) Decreases through
returns of capital, buy
backs
7.5 +Convertible Debt
securities
(description)
7.6 Changes
during quarter
(a) Increases through
issues
(b) Decreases through
Securities matured,
converted
7.7 Options (description
and conversion factor)
Listed:
27,217,517
Unlisted:
4,500,000
14,250,000
14,250,000
2,000,000
2,000,000
2,500,000
2,500,000
2,000,000
2,000,000
Listed:
27,217,517
Unlisted:
4,500,000
14,250,000
14,250,000
2,000,000
2,000,000
2,500,000
2,500,000
2,000,000
2,000,000
Exercise price
A$0.25
A$ 0.30
A$ 0.44
A$ 0.525
A$ 0.44
A$ 0.525
A$ 0.215
A$ 0.260
A$ 0.175
A$ 0.210
Expiry date:
04 Dec 2012
31 Jul 2012
06 Dec 2013
06 Dec 2013
06 Dec 2013
06 Dec 2013
05 Dec 2014
05 Dec 2014
15 Jun 2015
15 Jun 2015
  • See chapter 19 for defined terms.

Appendix 5B Page 4

30/9/2001

Appendix 5B Mining exploration entity quarterly report

7.8 Issued during quarter 2,000,000
2,000,000
2,000,000
2,000,000
A$ 0.175
A$ 0.210
15 Jun 2015
15 Jun 2015
7.9 Exercised during
quarter
7.10 Expired during quarter
7.11 Debentures(totals only)
7.12 Unsecured notes
(totals only)

Compliance statement

  • 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 4).

  • 2 This statement does give a true and fair view of the matters disclosed.

Sign here: Date: 31.07.2012 (Director/Company secretary)

Print name: Philip Killen

Notes

  • 1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.

  • 2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.

  • 3 Issued and quoted securities: The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .

  • 4 The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and AASB 1026: Statement of Cash Flows apply to this report.

  • 5 Accounting Standards: ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.

  • See chapter 19 for defined terms.

Appendix 5B Page 5

30/9/2001