LCL RESOURCES LIMITED Capital/Financing Update 2011

Oct 18, 2011

65217_rns_2011-10-18_5bac5ee5-c0f7-4155-b08c-1e49e6c591bd.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [220 x 37] intentionally omitted <==

Level 6, 122 Walker St North Sydney, NSW 2060 Australia T +61 (0)2 9460 1856 F +61 (0)2 9460 1857

19 October 2011

ASX ANNOUNCEMENT

LOS CALATOS: DRILLING UPDATE CONFIRMING A WORLD CLASS COPPER PROJECT

Latest drilling results from Metminco Limited‟s 100% owned Los Calatos copper/molybdenum project in Peru provide further confirmation that it is indeed a world class project with intersections demonstrating mineralisation from surface to vertical depths of approximately 2000 metres.

Metminco has now received all assay data for drill holes CD-34 to CD-39 and incomplete assay data for drill hole CD-40, which is currently being drilled. Significant cumulative intersections for CD-38, CD-39 and CD-40 holes are summarised below:

CD-38 1,158 metres @ 0.33% Cu and 165ppm Mo ) (EOH 1,457 metres) (intersection from 56 metres to 1,310 metres down hole)  CD-39 1,242 metres @ 0.32% Cu and 269ppm Mo (EOH 1,611 metres) (intersection from 333 metres to 1,590 metres down hole)  CD-40 607 metres @ 0.49% Cu and 170ppm Mo[1] Including 112 metres @ 0.78% Cu and 338ppm Mo (intersection from 328 metres to 959 metres down hole) ([1 ] - drill hole in progress and assays outstanding)

These holes form part of the current Phase 3 drill program, which is designed to define the outer limits of the mineralised porphyry system at Los Calatos. Phase 3 cumulative drill results received to date are summarised in Table 1 below.

Table 1: Los Calatos Project: Summary of significant cumulative intersections.

Hl ID Intrt C % M m
oe ecep u o pp
CD-24 851m 0.43% 482
CD-25 630m 0.67% 1467
CD-27 1073m 0.42% 227
CD-28 335m 0.49% 76
CD-31 1690m 0.60% 353
CD-33 373m 0.38% 328
CD-34 187m 0.38% 20
CD-35 442m 0.41% 103
CD-38 1158m 0.33% 165
CD-39 1242m 0.32% 269
CD-40 607m 0.49% 170

Los Calatos Project

The main area of interest at Los Calatos is defined by the “LIX capping” (Figure 1), which correlates with an underlying, near vertical, porphyry system that is developed to depths in excess of 2,000 metres. Furthermore, the width of the system increases from 700 metres near surface, to in excess of 1,000 metres at a vertical depth of 1,500 metres as defined by drill holes CD-27, CD-31, CD-38 and CD-39 and demonstrated in figures 2, 3 and 4.

Five drill rigs are currently operating on site, with a further drill rig being requested in order to expedite the completion of the Phase 3 drill program of which 21 holes have been completed or are close to completion for a total of 24,700 metres completed to date (Table 2). Five drill holes are in progress and a further 5 drill holes are planned for the Phase 3 drill program, totalling 9,000 metres to define the mineralisation limits. This program is expected to be completed by the end of 2011.

The current drill program (Figure 1) will test the full strike length of the porphyry system (delineated by the “LIX capping”), as well as the broad geometry of the system and associated mineralization. Figures 2, 3 and 4 graphically depict key geological attributes of the porphyry system, in addition to some of the drill hole results returned to date.

On completion of these drill holes, Metminco expects to be in a position to commence an in-fill drill program of the mineralized porphyry system, to be completed by the end of 2012. This drill program will be undertaken in 2 phases:

  • Phase 1 in-fill program: approximately 30,000 metres of diamond drilling with drill hole spacing to 100m X 200m to be completed by April 2012 (interim resource estimation completed by mid 2012).

  • Phase 2 in-fill program: approximately 70,000 metres of diamond drilling with drill hole spacing to 100m X 100m to be completed by end 2012 (updated resource estimation completed early 2013).

On completion of this drill program Metminco will commission a pre-feasibility study on the Los Calatos Project.

Chilean Projects Update

In Chile, Metminco has completed a drilling program comprising 1,154 metres of Reverse Circulation (RC) drilling and 2,250 metres of diamond drilling at the Mollacas Project to provide ore for further metallurgical testwork and additional information for a final resource estimate.

Drilling has commenced at the Company‟s Vallecillo project where 9,000 metres of diamond drilling (2 drill rigs) will test the La Colorada deposit and La Colorada type geochemical anomalies and 4,000 metres of RC drilling (1 drill rig) is testing the Cu/Au porphyry system. On completion of the Vallecillo drilling, 10,000 metres of RC drilling will be completed at the Camaron and La Piedra projects. These drill programs are expected to be completed during first quarter 2012.

A geophysical survey comprising IP and ground magnetics has recently been initiated at Vallecillo to assist in refining existing drill targets. A similar geophysical program is being planned for the Camaron and La Piedra projects prior to the commencement of drilling.

Drilling Programs Fully Funded

The current phase of drilling programs at the Los Calatos, Mollacas, Vallecillo, Camaron and La Piedra projects are fully funded from existing cash reserves. As announced in the Company‟s June 11 Quarterly Report, Metminco had $A31.5 million as at 30 June 2011.

Figure 1: Los Calatos Project: Surface geological plan showing the “LIX capping” and location of phase 3 drill holes.

==> picture [468 x 609] intentionally omitted <==

Figure 2: Los Calatos Project: Section 10,300W showing the porphyry zone, alteration halo, and drill holes with associated assay data.

==> picture [468 x 590] intentionally omitted <==

Figure 3: Los Calatos Project: Section 10,000W showing the porphyry zone, alteration halo, and drill holes with associated assay data.

==> picture [522 x 660] intentionally omitted <==

Figure 4: Los Calatos Project: Section 9,800W showing the porphyry zone, alteration halo, and drill holes with associated assay data.

==> picture [522 x 667] intentionally omitted <==

Table 2: Los Calatos Project: Summary of Phase 3 drill hole results (19 October 2011).

Easting Northing RL Azimuth
true
Dip Hole
depth
Depth (m) Interval Cu Mo
Hole ID (m) (m) (m)
(degrees)

(degrees)

(m)
From To (m) (%) (ppm)
CD-24 286612 8130619 2957 360 -65 1035 26 118 92 0.29 20
118 265 147 0.24 210
339 907 568 0.49 649
includes 542 612 70 1.02 620
918 943 25 0.49 260
959 972 13 0.55 130
978 984 6 0.62 90
cumulative 851m @ 0.43%Cu and 482ppm Mo
CD-25 286513 8130527 2974 360 -65 909 75 94 19 0.01 350
192 617 425 0.52 1360
628 833 205 0.98 1690
includes 637 772 136 1.21 2190
cumulative 192m to 833m, 630m @ 0.67%Cu and 1467ppm Mo
CD-26 286413 8130660 2983 220 -60 1041 94 111 17 0.22 20
CD-27 286920 8131284 3024 220 -60 1940 770 778 8 0.22 0
816 826 10 0.16 0
847 869 22 0.39 70
877 916 39 0.44 720
931 1037 106 0.51 670
1037 1124 87 0.83 560
1139 1940 801 0.37 118
cumulative 1073m @ 0.42% Cu and 227ppm Mo
CD-28 287198 8130528 2918 220 -60 1212 231 274 43 0.20 20
285 342 57 0.54 60
370 374 4 0.28 10
418 434 16 0.2 110
853 1068 215 0.57 90
cumulative 335m @ 0.49% Cu and 76ppm Mo
CD-29 286087 8131602 2894 220 -60 1250 1035 1166 131 0.19 20
CD-30 287006 8130240 2939 220 -60 850 144 177 33 0.43 40

Table 2: Los Calatos Project: Summary of Phase 3 drill hole results (19 October 2011)

(Continued)

Easting Northing RL Azimuth
true
Dip Hole
depth
Depth (m) Interval Cu Mo
Hole ID (m) (m) (m)
(degrees)

(degrees)

(m)
From To (m) (%) (ppm)
CD-31 286671 8130926 2965 220 -60 1769 16 32 16 0.13 0
59 314 255 1.68 310
includes 125 262 137 2.79 520
328 475 147 0.23 126
481 944 463 0.31 344
includes 875 944 69 0.43 1040
944 1419 475 0.52 512
1419 1446 27 0.34 250
1446 1555 109 0.43 190
1555 1646 91 0.40 240
1646 1728 82 0.54 350
1728 1769 41 0.48 450
cumulative 1,690m @ 0.60% Cu and 353ppm Mo
CD-32 287514 8130896 2940 220 -70 1569 1338 1436 98 0.14 10
1448 1463 15 0.29 30
CD-33 286949 8130876 2965 220 -60 1319 537 782 245 0.40 402
1082 1095 13 0.25 0
1204 1319 115 0.35 207
cumulative 373m @ 0.38% Cu and 328ppm Mo
CD-34 287053 8130373 2931 220 -60 829 238 425 187 0.38 20
includes 298 414 116 0.55 20
CD-35 287395 8130787 2881 218 -60 1631 791 911 120 0.50 50
920 938 18 0.18 10
1039 1093 54 0.14 30
1247 1254 7 0.15 70
1261 1504 243 0.45 154
cumulative 442m @ 0.41% Cu and 103ppm Mo
CD-36 286644 8131286 3012 218 -60 1601 561 576 15 0.27 0
1097 1151 51 0.32 10
1384 1403 19 0.20 0
1413 1445 32 0.15 0
1479 1546 67 0.15 0
1560 1586 26 0.15 0
cumulative 210m@ 0.20% Cu and 2ppm Mo

Table 2: Los Calatos Project: Summary of Phase 3 drill hole results (19 October 2011)

(Continued)

Easting Northing RL Azimuth
true
Dip Hole
depth
Depth (m) Interval Cu Mo
Hole ID (m) (m) (m)
(degrees)

(degrees)

(m)
From To (m) (%) (ppm)
CD-37 287224 8130277 2928 218 -60 993 213 240 27 0.2 10
259 271 12 0.21 0
277 286 9 0.19 10
295 316 21 0.20 0
354 373 19 0.50 20
381 386 5 0.23 10
402 407 5 0.20 0
491 493 2 0.92 0
cumulative 100m @ 0.27% Cu and 8ppm Mo
CD-38 286839 8130744 2859 218 -60 1457 56 427 371 0.38 234
includes 379 427 48 0.70 160
499 573 74 0.30 50
573 846 273 0.26 30
846 969 123 0.33 120
977 1023 46 0.24 180
1039 1310 271 0.36 256
1310 1447 137 0.17 30
cumulative 56m to 1310m 1,158m@ 0.33% Cu; 165ppm Mo
CD-39 286684 8130869 2850 220 -60 1611 159 195 36 0.19 30
219 230 11 0.19 60
257 262 5 0.14 100
284 330 46 0.14 50
333 641 308 0.25 223
780 896 116 0.4 376
942 1451 509 0.41 417
1281 1590 309 0.20 31
cumulative 333m to 1590m 1242m@ 0.32% Cu; 269ppm Mo
CD-40 287056 8130681 2931 218 -60 n/a 69 76 7 0.25 15
150 157 7 0.64 25
225 229 4 0.29 0
240 243 3 0.30 0
250 328 78 0.15 22
328 823 495 0.43 132
847 959 112 0.78 338
cumulative 328 to 959m 607m @ 0.49% Cu ; 170ppm Mo

==> picture [89 x 55] intentionally omitted <==

William Howe Managing Director

About Metminco:

Metminco is a dual ASX and AIM listed company with a portfolio of copper and gold projects in Peru and Chile. The Los Calatos project, located in southern Peru, has a JORC compliant resource of 926 million tonnes, comprising Indicated Resources of 111 million tonnes at 0.39% Cu and 380ppm Mo, and an Inferred Resource of 815 million tonnes at 0.37% Cu and 260ppm Mo (at a 0.2% copper cut-off grade).

The Chilean assets include the Mollacas copper leach project with a JORC compliant resource of 17 million tonnes consisting of Indicated Resources of 7.2 million tonnes at 0.56% copper and Inferred Resources of 9.8 million tonnes @ 0.52% copper (at a 0.2% copper cut-off grade); and the Vallecillo gold zinc project with a JORC compliant resource of 10.1 million tonnes consisting of Indicated Resources of 7.9 million tonnes @ 1.14g/t Au; 11.4g/t Ag; 1.32% Zn; 0.29% Pb and an Inferred Resource of 2.2 million tonnes @ 0.78g/t Au; 8.2g/t Ag; 0.58% Zn; 0.26% Pb (at a cut-off grade of 0.3g/t Au).

Competent Persons Statement

The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Colin Sinclair, BSc, MSc, who is a Member of the Australasian Institute of Mining and Metallurgy and is a full-time employee of the Company as General Manager Exploration.

Colin Sinclair has sufficient experience (over 30 years) which is relevant to the style of mineralisation, type of deposit under consideration, and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the „Australasian Code for Reporting of Exploration Results‟. Mr Sinclair, as Competent Person for this announcement, has consented to the inclusion of this information in the form and context in which it appears herein.

For further information please contact:

South America :

William Howe - Managing Director Ph: +56 (2) 411 2600

Australia:

Stephen Tainton - Investor Relations Ph: +61 (0) 9460 1856 Philip Killen - Company Secretary & CFO Ph: +61 (0) 408 609 916 Broker – BGF Equities Warwick Grigor / Marcus Freeman Ph: + +61 3 8688 9100 Financial Public Relations Consultant – Collins St Media Ian Howarth Ph: +61 (0) 407 822 319

United Kingdom:

Tim Read – Non-Executive Director Ph: +44 (0) 777 072 1809 Nomad and Joint Broker – Canaccord Genuity Limited Robert Finlay/ Andrew Chubb Ph: +44 (0) 207 050 6500 Joint Broker – Liberum Capital Limited Michael Rawlinson / Clayton Bush Ph: +44 (0) 20 3100 2227 Financial Public Relations Consultant - Buchanan Tim Thompson / James Strong Ph: +44 (0) 20 7466 5000