Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

LAKE RESOURCES N.L. Interim / Quarterly Report 2018

Oct 31, 2017

65240_rns_2017-10-31_e501619e-a1b8-40b9-a18c-6bf1a1fb9161.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

LAKE RESOURCES N.L. QUARTERLY REPORT

ENDING 30 SEPTEMBER 2017

ABN 49 079 471 980

==> picture [125 x 77] intentionally omitted <==

HIGHLIGHTS

  • Four prime lithium projects – 3 brine projects and 1 hard rock project – each capable of being a ‘company maker’ in Argentina.

31 October 2017

Lake Resources N.L. ASX:LKE

Shares on Issue: 227,493,026

Options Listed: 19,350,000 (10c)

Options Unlisted: 39,039,250 (5c/10c) (32,789,250 vested)

Market Capitalisation: $25 million (@11c)

Share Price Range: $0.033 – 0.155 (12mth)

Contact: +61 2 91887864 steve@ lakeresources.com.au

  • Drilling to start in days at Kachi Lithium Brine Project in Catamarca after last stage of approval successfully completed with a local public hearing.

  • Diamond drill program of 1500m in at least 3 holes with initial payments made.

  • Lease approvals continue to progress in the Olaroz/Cauchari and Paso Projects in Jujuy province adjacent to Orocobre and SQM/Lithium Americas.

  • Letter of Intent (LOI) signed with Catamarca State mining & energy entity to advance Kachi Project.

  • Lake holds one of the largest listed lithium lease holdings in Argentina of 170,000 Ha, including areas under option.

  • Kachi Lithium Brine Project covers ~52,000Ha consolidated mining leases over an undrilled salt lake near to Albermarle’s Antofalla Project.

  • Catamarca Pegmatite Lithium Project (~72,000 Ha), under option, with large pegmatite swarms over 150km.

  • Focus in coming Quarter on drilling at Kachi Lithium Brine Project; Results expected to be substantially higher than current positive surface results.

  • Lake is organizing a debt security to provide additional funding for a drill program without dilution adding to the cash position to meet current exploration initiatives.

Lake Resources N.L. (ACN 079 471 980) ASX:LKE Suite 2, Level 10, 70 Phillip St, Sydney NSW 2000, Australia T: +61 2 9188 7864 E: [email protected]

1

LAKE RESOURCES N.L. QUARTERLY REPORT – ENDING 30 SEPTEMBER 2017

OPERATIONS

Kachi Lithium Brine Project - Catamarca Province, Argentina

The Kachi Lithium Brine Project is located in Catamarca province, Argentina, approximately 80km south of a lithium brine producer (FMC Corp’s Hombre Muerto Lithium brine operation) and Galaxy Resources Limited’s Sal de Vida lithium brine project. Albemarle Corp’s Antofalla lithium potash brine development project is in the adjacent basin. The project is positioned in the Lithium Triangle where the world’s largest and lowest cost production of lithium is located.

The Kachi Project is a consolidated mining lease package of ~52,000 Ha of mining leases owned 100% by Lake (90% granted), centred around a salt lake within a large basin almost 100km long. This area has been recently recognised as a potential lithium brine bearing basin and is the first time the area has been consolidated under one owner.

Lake’s Argentine subsidiary held a successful local community meeting, together with the regulators, to complete the final step in the approval process to allow drilling to commence over the Kachi Lithium Brine Project.

A diamond drill rig has been secured with initial payments made and the plan is to commence a maiden 1000m diamond drilling programme drilling in at least 3 holes in the coming days, with formal approval.

The leases cover the Carachi Pampa salt lake and surrounds that remain undrilled, yet displays positive lithium results near-surface of up to 322 mg/L in auger brine sampling with high conductivities.

The exploration programme has continued over approved lithium brine mining leases in the Kachi Lithium Brine Project in Catamarca province. Due to the recent renewed interest and substantial increase in applications for lithium exploration in Argentina, the regulators have experienced increased demands on their time which have affected the timelines for drilling access.

Letter of Intent Signed with Argentine Government Entity

A Letter of Intent (LOI) was signed with the Catamarca State mining and energy entity, CAMYEN, to aid the development of the Kachi Lithium Brine Project in Catamarca. The Kachi project was selected by the State of Catamarca to be accelerated together with a select few energy and mining projects in the province to ensure appropriate development.

The Letter of Intent (LOI) is to facilitate the project through various permitting stages in exploration and development to production, including environmental and community support, while assisting in the provision of services.

CAMYEN (Catamarca Minera y Energetica Sociedad Del Estado) has recent experience in assisting renewable energy projects and mining projects in the province, both with permitting, including presentations to the state and local authorities and communities, together with the provision of exploration services.

Lake Resources N.L. (ACN 079 471 980) ASX:LKE Suite 2, Level 10, 70 Phillip St, Sydney NSW 2000, Australia T: +61 2 9188 7864 E: [email protected]

2

Catamarca Lithium Pegmatite Project - Catamarca Province, Argentina

An option agreement with Petra Energy SA exists over a large area (~72,000 Ha) of potential lithium bearing pegmatites in Ancasti, Catamarca Province, Argentina. The optioned leases (exploration and mining leases and applications) cover a large part of this newly recognised 150km long belt of pegmatite swarms. These areas are at low altitudes with good year-round access.

The agreement was extended under similar terms to allow for completion of the formation of the local entity to allow a share transfer if the option is exercised in full.

The pegmatites were recognised following a study of past lithium (spodumene) mining leases, satellite image interpretation together with field visits. Spodumene is a lithium-bearing mineral, usually in pegmatites, used as feedstock by most of the world’s hard-rock lithium producers. Within these areas, eight exploration leases (cateos) and a small number of mining leases (minas) were applied for with approximately half granted to date. Lake has conducted initial field visits to assess the project. The aim is to locate a large swarm of pegmatites with spodumene as a drill target and development target.

Olaroz/Cauchari & Paso Lithium Brine Projects - Jujuy Province, Argentina

Lake holds mining lease applications over almost 45,000 hectares in two areas in Jujuy Province, in NW Argentina. The initial applications from March 2016 were successfully appealed in a local court. The application process has progressed since that time and will progress further in the coming months with the aim to gain access. Most of the area was reapplied for in November 2016 when a moratorium on new applications was lifted by the provincial government to ensure the areas were covered. Leases/applications are held 100% through Lake’s local subsidiaries.

The leases cover areas in and around Orocobre Limited, currently in production, and Lithium Americas Corporation, currently developing a project with the major lithium producer SQM, in the Cauchari/Olaroz basin in Jujuy Province, Argentina. Although data is limited within the properties, the tenements may cover potential extensions to the Cauchari/Olaroz projects with potential extensions to aquifers.

Exploration will commence as soon as access is available to the areas. Substantial ground geophysics and drilling has been completed in the surrounding leases at Olaroz/Cauchari.

CORPORATE

Cash Position

Lake holds cash of $0.93 million as at 30 September 2017 (with no debt), in AUD, USD and Argentine Pesos. Lake is organizing a debt security to provide additional funding for a drill program without dilution adding to the cash position to meet current exploration initiatives. .

Capital Structure

Lake has 227,493,026 shares on issue as at 30 September 2017. Listed options include 19,350,000 options (LKEO1) with an exercise price of $0.10 (expiry 28 Aug 2018). Unlisted options include 31,250,000 options with an exercise price of $0.05 (expiry 4 Apr 2018) and 1,539,250 options with an exercise price of $0.10 (expiry 14 Jun 2018). Another 6,250,000 unlisted options and 12,500,000 performance rights were included in the transaction with Lith NRG Pty Ltd, together with 8,500,000 LTI Plan Performance Rights, which have yet to reach the required hurdles for vesting.

Lake Resources N.L. (ACN 079 471 980) ASX:LKE Suite 2, Level 10, 70 Phillip St, Sydney NSW 2000, Australia T: +61 2 9188 7864 E: [email protected]

3

AGM Notice

Lake has issued a Notice of Meeting for the Annual General Meeting to be held on 30 November 2017 in Brisbane Australia at the offices of HopgoodGanim. If shareholders have not received the information they are requested to contact the office in Sydney.

Director Appointment

Dr Nick Lindsay was appointed as a Non-Executive Director of the Company in July. Nick has over 25 years’ experience in Argentina, Chile and Peru in technical and commercial roles in the resources sector with major and mid-tier companies, as well as start-ups. Nick has an BSc (Hons) degree in Geology, a PhD in Metallurgy and Materials Engineering as well as an MBA.

A fluent Spanish speaker, he has successfully taken companies in South America, such as Laguna Resources which he led as Managing Director, from inception to listing, development and subsequent acquisition. Mr Lindsay is currently CEO of Manuka Resources Ltd, an unlisted company, having previously held the position of President – Chilean Operations for Kingsgate Consolidated Ltd and is a member of the AusIMM and the AIG.

Mr Peter Gilchrist made the decision to step down from the Board in July after more than 10 years’ service. Mr Gilchrist was instrumental in establishing Lake Resources privately and listing the Company, focused on copper-gold assets, including leases in Argentina, and was central to the successful acquisition of the lithium projects of Lith NRG Pty Ltd. The Board has thanked him for his assistance and good guidance of the Company.

Outlook

The focus in the coming quarter will be:

Kachi Lithium Brine Project

  • Commencement of the drilling

  • Initial results from drilling

Catamarca Lithium Pegmatites Project

  • Further sampling and assessment of option arrangements

For further information, please contact:

Steve Promnitz Managing Director +61 2 9188 7864 [email protected]

http://www.lakeresources.com.au.

Released through: Henry Jordan, Six Degrees Investor Relations: +61 (0) 431 271 538

Follow Lake Resources on Twitter:

==> picture [36 x 29] intentionally omitted <==

https://twitter.com/Lake_Resources

______________

Background on Lake Resources NL (ASX:LKE)

Lake Resources NL (ASX:LKE, Lake) is undertaking an aggressive exploration programme to explore and develop prime lithium projects in Argentina, owned 100%, among some of the largest players in the lithium sector. Lake holds one of the largest lithium tenement packages in Argentina (~170,000Ha) secured prior to a significant ‘rush’ by major companies with three key lithium brine projects located in the Lithium Triangle which produces half of the world’s lithium. Lake also holds one large package of lithium pegmatite properties which were an unappreciated source of lithium in Argentina until recently.

The three key brine projects, Olaroz/Cauchari, Paso and Kachi, have similar settings to major world class brine projects being developed in the highly prospective Jujuy and Catamarca Provinces. One project is located next to Orocobre’s Olaroz lithium production and SQM/Lithium Americas Cauchari project. The Kachi project covers 50,000 Ha over a salt lake south

Lake Resources N.L. (ACN 079 471 980) ASX:LKE Suite 2, Level 10, 70 Phillip St, Sydney NSW 2000, Australia T: +61 2 9188 7864 E: [email protected]

4

of FMC’s lithium operation and near Albemarle’s Antofalla project. Exploration and permitting will provide several catalysts for the company’s growth as these areas are assessed for major discoveries

Significant corporate transactions continue in adjacent leases with development of SQM/Lithium Americas Olaroz/Cauchari project with an equity/debt investment over $300 million and Advantage Lithium’s equity transaction in some of Orocobre’s leases. LSC Lithium has also raised over $60 million on a large lease package in similar areas as Lake’s properties.

==> picture [437 x 658] intentionally omitted <==

Figure 1: Location map of Lake Resources lithium brine and hard rock (pegmatite) projects in NW Argentina

Lake Resources N.L. (ACN 079 471 980) ASX:LKE Suite 2, Level 10, 70 Phillip St, Sydney NSW 2000, Australia T: +61 2 9188 7864 E: [email protected]

5

==> picture [368 x 212] intentionally omitted <==

==> picture [260 x 197] intentionally omitted <==

==> picture [98 x 197] intentionally omitted <==

==> picture [207 x 188] intentionally omitted <==

==> picture [497 x 96] intentionally omitted <==

Fig 2: Images from the community meeting, the contracted drill rig, a rig on the adjacent property and a side view of the Kachi Lithium Brine Project

Lake Resources N.L. (ACN 079 471 980) ASX:LKE Suite 2, Level 10, 70 Phillip St, Sydney NSW 2000, Australia T: +61 2 9188 7864 E: [email protected]

6

APPENDIX 1 - JORC Code, 2012 Edition

Table 1 Report: Kachi Lithium Brine Project

Criteria Section 1 - Sampling Techniques and Data
Sampling techniques
Brine samples were taken from groundwater with a bailing device from a hand dug pit that was
deepened using a soil auger at depths of 0.2m to 1.7m. The bailer is lowered to the base of the
hole and the brine sample collected and brought to surface.

The brine sample was collected in a clean plastic bottle (1 litre) and filled to the top to minimize
air space within the bottle. A duplicate was collected at the same time for storage and submission
of duplicates to the laboratory. Each bottle was taped and marked with the sample number.
Logging
Soil, salt and cuttings from each auger pit was examined for geologic logging by a geologist and a
photo taken for reference.
Sub-sampling
techniques and sample
preparation

Brine samples were collected by bailing brine, which collects at the base of the hole. Bailing
homogenizes samples and no sub-sampling is undertaken in the field.

The brine sample was collected in one-litre sample bottles, rinsed and filled with brine. Each
bottle was taped and marked with the sample number.
Quality of assay data
and laboratory tests

The SGS laboratory in Buenos Aires, Argentina was used for these analyses of brine samples as a
comparison to the primary laboratory of Alex Stewart Argentina/Norlab SA in Palpala, Jujuy,
Argentina, used to conduct the assaying of the prior brine samples collected. SGS also analyzed
blind control samples and duplicates in the analysis chain. Both the SGS laboratory and the Alex
Stewart/Norlab SA laboratory are ISO 9001 and ISO 14001 certified, and both have significant
experience in the chemical analysis of brines and inorganic salts. The Alex Stewart Argentina S.A.
laboratory in Mendoza, Argentina, has significant experience in this field and has been operating
for a considerable period. The reader is cautioned that no certified standard samples were included
with this small batch (as certified standards were not available at this time), but will be included in
all future batches of analyses. However field duplicates and blank samples were included with the
primary samples analyzed.

The quality control and analytical procedures used at the SGS laboratories and Alex Stewart/Norlab
SA laboratory are considered to be of high quality and comparable to those employed by ISO
certified laboratories specializingin analysis of brines and inorganic salts.
Verification of
sampling and assaying

Certified standards were not included with the samples. However field duplicates and blanks
were included to monitor potential contamination of samples and the repeatability of analyses. A
detailed QA/QC program is planned as part of the future sampling programme and would be in a
future drilling program. Accuracy, the closeness of measurements to the “true” or accepted value,
will be monitored by the insertion of certified laboratory standards, or reference samples, and by
check analysis at an independent (or umpire) laboratory.

Duplicate samples in the analysis chain were submitted to SGS laboratories and Alex
Stewart/Norlab SA as unique samples (blind duplicates) during the process

Stable blank samples (distilled water) were used to evaluate potential sample contamination and
will be inserted in future to measure any potential cross contamination

Samples were analysed for conductivity using a hand held Hanna pH/EC multiprobe. Higher
conductivity samples were sent to the lab for analysis, together with some low conductivity
samples as a check.
Location of data points
The auger hole sample sites were located with a hand held GPS.

The location is in POSGAR Faja 2 and Faja 3(UTM 19)or in WGS84 UTM.
Data spacing and
distribution

Brine samples were collected at approximately 500m points on 1000m spaced lines north-south.
Orientation of data in
relation to geological
structure

The salt lake (salar) deposits that contain lithium-bearing brines generally have sub-horizontal
beds and lenses that may contain sand, gravel, salt, silt and clay. The near-surface auger samples
test the near-surface groundwater. Future planned vertical drill holes would be essentially
perpendicular to these units,intersectingtheir true thickness
Sample security
Samples transported to the SGS laboratory or the Alex Stewart/Norlab SA laboratory for chemical
analysis were transported in sealed 1-litre rigid plastic bottles with sample numbers clearly
identified. Samples were transported by a trusted member of the team.

The samples were moved from the auger sample site to secure storage at the hotel on a daily
basis. All brine sample bottles are marked with a unique label not related to the location.
Review (and Audit)
No audit of data has been conducted to date.

Lake Resources N.L. (ACN 079 471 980) ASX:LKE Suite 2, Level 10, 70 Phillip St, Sydney NSW 2000, Australia T: +61 2 9188 7864 E: [email protected]

7

Criteria Section 2 - Mineral Tenement and Land Tenure Status
Mineral tenement and
land tenure status

The Kachi Lithium Brine project is located approximately 100km south-southwest of FMC’s
Hombre Muerto lithium operation and 45km south of Antofagasta de la Sierra in Catamarca
province of north western Argentina at an elevation of approximately 3,000m asl.

The project comprises approximately 52,300 Ha in twenty seven mineral leases (minas) of which
twenty three leases (46,000 Ha) are granted for initial exploration and four leases are applications
pending granting.

The tenements are believed to be in good standing, with payments made to relevant government
departments.
Exploration by other
parties

Marifil Mines Ltd conducted sparse near-surface pit sampling of groundwater at depths less than
1m during 2009.

Samples were taken from each hole and analysed at Alex Stewart laboratories in Mendoza
Argentina.

Results were reported in an NI 43-101 report by J. Ebisch in December 2009 for Marifil Mines Ltd.

NRG Metals Inc has recently commenced exploration in adjacent leases under option. A Vertical
Electrical Sounding (VES) geophysical survey was completed by NRG Metals Inc recently on
adjoining leases which revealed a consistent sub-surface horizon which is conductive and
interpreted to represent a thick, brine-rich zone, with plans for drilling soon. Geophysical data
was collected by ConHidro SRL of Salta and Catamarca, Argentina and interpreted by Sergio Lopez
& Associates, Salta.

Results were reported in an NI 43-101 report by Rojas y Asociados Mining Consultants dated
December 2016 for NRG Metals Inc.

No other exploration results were able to be located
Geology
The known sediments within the_salar_consist of salt/halite and some clay. The sediments below
2 m are not known, but may include, sands, gravels, silts and clays accumulated in the_salar_from
terrestrial sedimentation and evaporation of brines .

Brines within the salt lake are formed by solar concentration, with brines hosted within
sedimentary units, which are unknown beyond 2 m depth.

Geologywas recorded duringthe auger drillingof all the holes
Further work
The company will undertake ground geophysics and consider drilling on the tenements once the
next auger sampling programme has been completed and results assessed.

Competent Person’s Statement – Kachi Lithium Brine Project

The information contained in this ASX release relating to Exploration Results has been compiled by Mr Andrew Fulton. Mr Fulton is a Hydrogeologist and a Member of the Australian Institute of Geoscientists and the Association of Hydrogeologists. Mr Fulton has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a competent person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.

Andrew Fulton is an employee of Groundwater Exploration Services Pty Ltd and an independent consultant to Lake Resources NL. Mr Fulton consents to the inclusion in this announcement of this information in the form and context in which it appears. The information in this announcement is an accurate representation of the available data from initial exploration at the Kachi project.

Lake Resources N.L. (ACN 079 471 980) ASX:LKE Suite 2, Level 10, 70 Phillip St, Sydney NSW 2000, Australia T: +61 2 9188 7864 E: [email protected]

8

SCHEDULE OF TENEMENTS (Appendix 5B)

TOTAL AREA TOTAL NUMBER TENEMENTS: TENEMENTS: 58 100,721 Ha

REF TENEMENT NAME NUMBER AREA
Ha
INTEREST
%
PROVINCE STATUS
OLAROZ - CAUCHARI
AREA
Cauchari Bajo I 2156-P-2016 375 100 Jujuy Application
Cauchari Bajo II 2157-P-2016 363 100 Jujuy Application
Cauchari Bajo III 2158-P-2016 125 100 Jujuy Application
Cauchari Bajo IV 2155-P-2016 30 100 Jujuy Application
Cauchari Bajo V 2154-P-2016 952 100 Jujuy Application
Cauchari Bajo VI 2159-P-2016 32 100 Jujuy Application
Cauchari Centro I 2150-P-2016 32 100 Jujuy Application
Cauchari Centro II 2151-P-2016 10 100 Jujuy Application
Cauchari Centro III 2152-P-2016 10 100 Jujuy Application
Cauchari Centro IV 2153-P-2016 10 100 Jujuy Application
Cauchari West I 2160-P-2016 1938 100 Jujuy Application
Cauchari West II 2161-P-2016 10 100 Jujuy Application
Olaroz Centro I 2163-D-
2016
35 100 Jujuy Application
Olaroz Centro II
2164-D-
2016
268
100
Jujuy
Application
Olaroz Centro III
2165-D-
2016
25
100
Jujuy
Application
Olaroz Centro IV
2166-D-
2016
32
100
Jujuy
Application
Olaroz East I
2167-D-
2016
3344
100
Jujuy
Application
Olaroz East II
2168-D-
2016
2072
100
Jujuy
Application
Olaroz East III
2169-D-
2016
3033
100
Jujuy
Application
Olaroz East IV
2170-D-
2016
3034
100
Jujuy
Application
Olaroz East V
2171-D-
2016
3007
100
Jujuy
Application
PASO AREA
Paso I
2135-P-2016
3482
100
Jujuy
Application
Paso II
2136-P-2016
3196
100
Jujuy
Application
Paso III
2137-P-2016
2950
100
Jujuy
Application
Paso IV
2138-P-2016
2985
100
Jujuy
Application
Paso V
2139-P-2016
3195
100
Jujuy
Application
Paso VI
2140-P-2016
2210
100
Jujuy
Application
Paso VII
2141-P-2016
3227
100
Jujuy
Application
Paso VIII
2142-P-2016
3070
100
Jujuy
Application
Paso IX
2143-P-2016
3321
100
Jujuy
Application
Paso X
2144-P-2016
1913
100
Jujuy
Application

Lake Resources N.L. (ACN 079 471 980) ASX:LKE Suite 2, Level 10, 70 Phillip St, Sydney NSW 2000, Australia T: +61 2 9188 7864 E: [email protected]

9

REF TENEMENT NAME NUMBER AREA
Ha
INTEREST
%
PROVINCE STATUS
KACHI AREA
Kachi Inca 13-D-2016 1273 100 Catamarca Granted
Kachi Inca I 16-D-2016 2880 100 Catamarca Application
Kachi Inca II 17-D-2016 2823 100 Catamarca Granted
Kachi Inca III 47-M-2016
3354
100 Catamarca Granted
Kachi Inca IV 46-M-2016
186
100 Catamarca Application
Kachi Inca V 45-M-2016
310
100 Catamarca Application
Kachi Inca VI 44-M-2016
110
100 Catamarca Granted
Dona Amparo I 22-D-2016 3000 100 Catamarca Granted
Dona Carmen 24-D-2016 873 100 Catamarca Granted
Debbie I 21-D-2016 1501 100 Catamarca Granted
Divina Victoria I 25-D-2016 1265 100 Catamarca Granted
Daniel Armando 23-D-2016 2115 100 Catamarca Granted
Daniel Armando II 97-M-2016
1387
100 Catamarca Granted
Maria Luz 34-M-2017
2573
100 Catamarca Application
Maria II 14-D-2016 888 100 Catamarca Granted
Maria III 15-D-2016 1395 100 Catamarca Granted
Morena 1 72-M-2016
3024
100 Catamarca Granted
Morena 2 73-M-2016
2989
100 Catamarca Granted
Morena 3 74-M-2016
3007
100 Catamarca Granted
Morena 6 75-M-2016
1606
100 Catamarca Granted
Morena 7 76-M-2016
2805
100 Catamarca Granted
Morena 8 77-M-2016
2961
100 Catamarca Granted
Morena 12 78-M-2016
2704
100 Catamarca Granted
Morena 13 79-M-2016
3024
100 Catamarca Granted
Pampa I 129-S-
2013
2312 100 Catamarca Granted
Pampa II 128-S-
2013
1119 100 Catamarca Granted
Pampa III 130-S-
2013
477 100 Catamarca Granted
58 100721 100
CATAMARCA
PEGMATITES
OPTION
Petra I, II, III, IV Cateos 40000 option Catamarca Granted
Petra V, VI, VII, VIII Cateos 30000 option Catamarca Application
Aguada I, II, III, IV Minas 9500 option Catamarca Application

Lake Resources N.L. (ACN 079 471 980) ASX:LKE Suite 2, Level 10, 70 Phillip St, Sydney NSW 2000, Australia T: +61 2 9188 7864 E: [email protected]

10

INTEREST TENEMENT NAME NUMBER AREA Ha PROVINCE STATUS %

REF

OLAROZ - CAUCHARI & PASO REAPPLICATION AREA OLAROZ - CAUCHARI & PASO REAPPLICATION AREA OLAROZ - CAUCHARI & PASO REAPPLICATION AREA
MASA 1 2223-M-2016 375 100 Jujuy Application
MASA 2 2224-M-2016 363 100 Jujuy Application
MASA 3 2225-M-2016 125 100 Jujuy Application
MASA 4 2226-M-2016 952 100 Jujuy Application
MASA 5 2227-M-2016 1937 100 Jujuy Application
MASA 6 2228-M-2016 268 100 Jujuy Application
MASA 7 2229-M-2016 2072 100 Jujuy Application
MASA 8 2230-M-2016 2950 100 Jujuy Application
MASA 9 2231-M-2016 2985 100 Jujuy Application
MASA 10 2232-M-2016 2210 100 Jujuy Application
MASA 11 2233-M-2016 1913 100 Jujuy Application
MASA 12 2234-M-2016 3000 100 Jujuy Application
MASA 13 2235-M-2016 3000 100 Jujuy Application
MASA 14 2236-M-2016 3000 100 Jujuy Application
MASA 15 2237-M-2016 3000 100 Jujuy Application
MASA 16 2238-M-2016 3000 100 Jujuy Application
MASA 17 2239-M-2016 3000 100 Jujuy Application
MASA 18 2240-M-2016 3000 100 Jujuy Application
MASA 19 2241-M-2016 3000 100 Jujuy Application
MASA 20 2242-M-2016 3000 100 Jujuy Application
MASA 21 2243-M-2016 3000 100 Jujuy Application
MASA 22 2244-M-2016 2548 100 Jujuy Application
MASA 23 2245-M-2016 2406 100 Jujuy Application
23 Lease Applications 51104 Ha 100% LKE

Lake Resources N.L. (ACN 079 471 980) ASX:LKE Suite 2, Level 10, 70 Phillip St, Sydney NSW 2000, Australia T: +61 2 9188 7864 E: [email protected]

11

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

+Rule 5.5

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

Name of entity

LAKE RESOURCES N.L.

ABN
49 079 471 980
Quarter ended (“current quarter”)
49 079 471 980 30 September 2017
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Research and development refunds
1.8
Other (provide details if material)
1.9
Net cash from / (used in) operating
activities
(215)
(66)
(187)
(215)
(66)
(187)
(468) (468)
2.
Cash flows from investing activities
2.1
Payments to acquire:
(a) property, plant and equipment
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
  • See chapter 19 for defined terms

1 September 2016

Page 1

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
2.2
Proceeds from the disposal of:
(a) property, plant and equipment
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of shares
3.2
Proceeds from issue of convertible notes
3.3
Proceeds from exercise of share options
3.4
Transaction costs related to issues of
shares, convertible notes or options
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
1,397
(468)
1,397
(468)
929 929
  • See chapter 19 for defined terms 1 September 2016

Page 2

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
929 1,397
929 1,397
6.
Payments to directors of the entity and their associates
Current quarter
$A'000
6.1
Aggregate amount of payments to these parties included in item 1.2
66
6.2
Aggregate amount of cash flow from loans to these parties included
in item 2.3
6.3
Include below any explanation necessary to understand the transactions included in
items 6.1 and 6.2
Current quarter
$A'000
66

Remuneration and fees paid to Directors

Current quarter $A'000

7. Payments to related entities of the entity and their associates $A'000

7.1 Aggregate amount of payments to these parties included in item 1.2 7.2 Aggregate amount of cash flow from loans to these parties included in item 2.3

7.3 Include below any explanation necessary to understand the transactions included in items 7.1 and 7.2

  • See chapter 19 for defined terms 1 September 2016

Page 3

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

8.
Financing facilities available
Add notes as necessary for an
understanding of the position
Total facility amount
at quarter end
$A’000
Amount drawn at
quarter end
$A’000
8.1
Loan facilities
8.2
Credit standby arrangements
8.3
Other (please specify)
8.4
Include below a description of each facility above, including the lender, interest rate and
whether it is secured or unsecured. If any additional facilities have been entered into or are
proposed to be entered into after quarter end, include details of those facilities as well.
Total facility amount
at quarter end
$A’000
Amount drawn at
quarter end
$A’000
9.
Estimated cash outflows for next quarter
$A’000
9.1
Exploration and evaluation
9.2
Development
9.3
Production
9.4
Staff costs
9.5
Administration and corporate costs
9.6
Other (provide details if material)
9.7
Total estimated cash outflows
(261)
(106)
(183)
(550)
10.
Changes in
tenements
(items 2.1(b) and
2.2(b) above)
Tenement
reference
and
location
Nature of interest Interest at
beginning
of quarter
Interest
at end of
quarter
10.1
Interests in mining
tenements and
petroleum tenements
lapsed, relinquished
or reduced
10.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
  • See chapter 19 for defined terms 1 September 2016

Page 4

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

Compliance statement

  • 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.

  • 2 This statement gives a true and fair view of the matters disclosed.

==> picture [79 x 32] intentionally omitted <==

Sign here: ............................................................ (Company secretary)

Date: ......... 31 OCTOBER 2017 ....

Print name: ...... ANDREW BURSILL ......................

Notes

  1. The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity that wishes to disclose additional information is encouraged to do so, in a note or notes included in or attached to this report.

  2. If this quarterly report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.

  3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

  4. See chapter 19 for defined terms 1 September 2016

Page 5