Lachlan Star Limited (ASX:LSA) ACN 000 759 535

27 January 2021

Liontown Resources to farm-in to Koojan Cu-Ni-PGE Project

Lachlan Star to acquire Killaloe gold project in the Eastern Goldfields of Western Australia

Highlights

  • Lachlan Star and Liontown Resources Limited (ASX:LTR, Liontown ) have executed a binding term sheet, granting the ability for Liontown to earn a 51% interest in the highly-prospective Koojan CuNi-PGE Project.

  • Liontown expenditure of $4,000,000 required over a five year period to earn 51% of the Koojan Project and Lachlan Star to co-fund $1,000,000 to retain a 24% interest.

  • Liontown will manage exploration on the project and will undertake a broad exploration program in conjunction with its existing campaign on the Moora Cu-Ni-PGE project located on the eastern boundary of the Koojan project.

  • Separately to the Koojan farm-in joint venture, Lachlan Star and Liontown have signed a binding term sheet for the acquisition by Lachlan Star of Liontown’s Killaloe Gold Project, in the Eastern Goldfields, WA.

Lachlan Star Limited (ASX:LSA, Lachlan Star or the Company ) is pleased to announce that the Company has entered into a binding terms sheet ( Term Sheet ) with Liontown Resources Limited ( Liontown ) which grants Liontown the ability to earn a 51% interest in the Koojan Cu-Ni-PGE Project ( Project ) held by Coobaloo Minerals (LSA 50%) ( Farm-in ).

Lachlan Star Director, Bernard Aylward said “we are very pleased to welcome Liontown as a joint-venture partner in the Koojan Project. Liontown’s Moora Cu-Ni-PGE-Au project borders our Koojan project, which brings obvious synergies when undertaking exploration activities and importantly allows the benefits of the knowledge from both projects to be focussed on the best exploration targets.

“The Koojan project area, while highly-prospective as a new copper-nickel-PGE province, is largely underexplored. Liontown will be commencing auger geochemical drilling on the project, with areas of focus on the eastern zone where Liontown are currently exploring in their Moora project. The sampling will also be a first pass exploration program on the western portion of the Koojan project where geological and aeromagnetic interpretation highlights possible extension of the Julimar-Yarawindah trend. Having access to the strong balance sheet and technical capabilities of Liontown will allow for a more aggressive exploration approach to Koojan, which we believe is warranted.

“The acquisition of the Killaloe gold project is exciting for Lachlan Star as previous exploration has defined a number of drill-ready gold targets within this project area located on the southern extension of highly mineralised structures of the Eastern Goldfields of Western Australia.”

Lachlan Star Limited ABN 88 000 759 535 www.lachlanstar.com

Level 1, 33 Ord Street West Perth WA 6005 Tel: +61 8 9420 9300

==> picture [459 x 541] intentionally omitted <==

Figure 1: The Koojan Project location – regional geology and major tenement holders

Killaloe Gold Project

The Killaloe Project, located in southeast Western Australia approximately 600km east of Perth and 2030km northeast of the historic gold mining town of Norseman ( Figure 2 ), comprises two, largely contiguous exploration licences (E63/1018 and E63/1713) and a separate mining licence (M63/177) covering a total combined area of 94km[2] . There are no other land users and access is generally good although sometimes limited by thick bush and weather events.

2

There has been extensive previous exploration by multiple companies since the early 1960s targeting gold and nickel mineralisation. The project is located in the Eastern Goldfields of Western Australia with the interpreted extensions of major structures within the project area. The basement geology of the project consists of a northwest/southeast trending sequence of Archaean greenstones including mafics, ultramafics, volcanoclastic metasediments and granodiorite. Regionally significant, layer parallel structures are interpreted from regional magnetic data and movement along these may have caused structural thickening. Bedrock exposure varies with fresh outcrops separated by large areas of relatively shallow soil cover.

Historic exploration and recent work undertaken by Liontown has identified number of gold and base metal targets that are drill ready and warrant further work ( Figure 3 and 4 ). These include:

  • Barrall Prospect – A 4km long gold target defined by the alignment of nugget patches and coincident As-Cu-Te anomalism

  • 1713 Prospect – A 800m long coincident gold/arsenic anomaly that remains open along strike

  • Buldania Prospect – Multiple historic workings where historic drilling (Pre-1983) recorded significant intersections including:

  • 11m @ 1.7g/t Au from 18m

  • 7.6m @ 2.4g/t Au from 90m

  • 6m @ 4.7g/t Au from 210.6m

  • A number of other targets partially tested by previous explorers with better intersections including: o 28m @ 2.1g/t Au (Duke Prospect); o 48m @ 0.3g/t Au (Gossan East Prospect); and o 2m @ 6g/t Au (Cashel Prospect)

In addition to being prospective for gold, previous work has also recorded significant nickel and zinc mineralisation which warrants further assessment.

Lachlan Star is planning a work program for the Killaloe project. A total of 550 auger geochemical samples have recently been collected that cover the majority of tenement E63/1713 and results are expected within in the March quarter. The program planned by Lachlan Star will consist of aircore drilling to follow-up defined structural zones and reverse circulation drilling at the Buldania Gold prospect to follow-up and define the high-grade gold mineralisation and determine the potential for gold mineralisation.

3

==> picture [457 x 542] intentionally omitted <==

Figure 2: Killaloe Gold Project Location

4

==> picture [456 x 540] intentionally omitted <==

Figure 3: Killaloe Gold Project – geology and prospect location

5

==> picture [456 x 315] intentionally omitted <==

Figure 4: Killaloe Gold Project – Buldania Gold prospect historic drilling, significant intersections and workings

Koojan Transaction Terms

The Koojan Project area totals ~600km[2] and comprises three granted Exploration Licences (ELs 70/5312, 70/5337 and 70/5429), three applications for Exploration Licences (ELs 70/5450, 70/5515 and 70/5516) and one application for a Prospecting Licence (PL 70/1743). All tenements are 100%-owned by Coobaloo Minerals Pty Ltd, which is owned 50% by Lachlan Star and 50% by private group Wavetime Nominees Pty Ltd. The transaction details are summarised in the table below:

Liontown Option to Earn 51% in Koojan Project
JV Earn In Liontown (or nominee) Coobaloo Minerals Pty Ltd
Lachlan Star
(or nominee)
Wavetime
Spend Holding Spend Holding Spend Holding
Stage 1 - Minimum
exploration
commitment
within
18
months
of
execution
$500,000 0% - 75%* - 25%
Stage 2 – within 60
months of execution
$1,000,000 30% $250,000 45% - 25%
Stage 3 – within 60
months of execution
$2,500,000 51% $750,000 24% - 25%
Total $4,000,000 $1,000,000 -

*Following LSA satisfying 75% earn-in requirement.

6

  • Provided that it satisfies the $500,000 minimum expenditure obligation in Stage 1, Liontown may withdraw from the Koojan Project at any time prior to the end of Stage 2. Liontown may also elect not to incur the Stage 3 expenditure and, if it does, the parties shall stay at their Stage 2 participating interests. Following Stage 3 (or in the event Liontown elects not to incur the Stage 3 expenditure), Liontown and Lachlan Star shall contribute according to their participating interests.

  • Liontown will manage the Koojan Project and will determine the work programs and budgets during Stages 1, 2 and 3 at its sole election. Following Stage 3, management committee voting between Liontown and Coobaloo shall be on a simple majority basis other than certain market standard reserved decisions (e.g., tenement surrenders) that will be on a unanimous basis.

  • Wavetime shall have a 25% free carried interest and a 1% NSR (Net Smelter Return) through to completion of a Bankable Feasibility Study (BFS). Following completion of a BFS, Wavetime shall have a one-time right to elect to convert its retained contributing interest to an additional 1% NSR (Wavetime total 2% NSR). If Wavetime chooses not to convert its interest to an NSR, it shall be responsible for funding its share of joint venture expenditure or dilute using the standard AMPLA dilution clause but will retain the initial 1% NSR.

  • The Wavetime NSR will apply to all precious, industrial minerals and base metals produced, sold and proceeds received from the Koojan Project.

Completion under the transaction remains subject to the satisfaction (or where permitted, waiver) of a number of conditions precedent, including:

  • Satisfactory completion of due diligence by Liontown;

  • Lachlan Star increasing its interest in the Koojan Project to 75%;

  • Wavetime consenting to an acceptable Joint Venture Agreement arrangement or satisfactory alternative agreement between Lachlan Star and Liontown;

  • Receipt of all necessary third-party, legal and ASX authorisations, approvals and consents required by both parties; and

  • No material breach of warranties.

Completion is anticipated to occur in Q1 2021.

Killaloe Transaction Terms

The Killaloe Project comprises two granted Exploration Licences (EL 63/1018 and EL 63/1713) and one granted Mining Lease (M 63/177).

EL 63/1018 is subject to an agreement between Liontown and Cullen Exploration Pty Ltd ( Cullen ), with Cullen owning 20% of this tenement. The other tenements are 100%-owned by LRL (Aust) Pty Ltd, which is a wholly-owned subsidiary of Liontown.

Under the agreement, Lachlan Star will acquire Liontown’s rights to the Killaloe Project for A$600,000 to be satisfied by issuing 40 million fully-paid ordinary shares to Liontown at an issue price of $0.015 each as follows:

  • 15 million shares in relation to Liontown’s wholly-owned tenure (Tranche 1);

  • 25 million shares in relation to Liontown’s 80%-owned tenure (Tranche 2); and

  • Paying Liontown a 1% NSR for all minerals produced by Lachlan Star.

Tranche 2 is conditional on Cullen not exercising its pre-emptive rights under its agreement with Liontown. Cullen has up to 45 days to exercise its pre-emptive rights.

7

Completion under the transaction remains subject to the satisfaction (or where permitted, waiver) of a number of conditions precedent, including:

  • Satisfactory completion of due diligence by Lachlan Star;

  • Receipt of all necessary authorisations, approvals and consents required by both parties (which may include shareholder approval by Lachlan Star in accordance with ASX Listing Rules) and confirmation that ASX Listing rule 11.1.3 does not apply to the transaction; and

  • No material breach of warranties.

The divestment of the Killaloe Project and the acquisition of the earn-in interest in the Koojan Project are separate transactions and are not inter-conditional.

Completion is anticipated to occur in Q1 2021.

Board Changes

At completion of the Killaloe transaction, Liontown have the right to nominate a director to join the board of Lachlan Star.

Mr Klaus Eckhof has resigned from the Board, effective immediately, and will retain his Tranche A performance rights being 20,000,000 performance rights with a vesting condition being a 20-day volume weighted average share price (VWAP) on the ASX of $0.025 or higher.

Proposed issue of Director Performance Rights

In recognition of the considerable work undertaken by Bernard Aylward, a non-executive director of the Company, in securing the Liontown farm-in and proposed acquisition of the Killaloe project, the Company will issue Mr Aylward, subject to shareholder approval, with 10 million performance rights.

The performance rights will vest upon the Company achieving a 20 day VWAP of $0.025 or higher per share.

For more information contact:

Gary Steinepreis Dan Smith Director Director and Company Secretary +61 8 9420 9300 +61 8 9486 4036

This announcement was approved by the Board of Lachlan Star Limited.

Competent Person’s Statement – Exploration Results

The information in this report that relates to exploration results is based on, and fairly represents information and supporting documentation prepared by Mr Bernard Aylward, a Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Aylward is a Director of Lachlan Star Limited. Mr Aylward has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resource and Ore Reserves”. Mr Aylward consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

8

Forward Looking Statements and Important Notice

This report contains forecasts, projections and forward-looking information. Although the Company believes that its expectations, estimates and forecast outcomes are based on reasonable assumptions it can give no assurance that these will be achieved. Expectations and estimates and projections and information provided by the Company are not a guarantee of future performance and involve unknown risks and uncertainties, many of which are out of Lachlan Star’s control.

Actual results and developments will almost certainly differ materially from those expressed or implied. Lachlan Star has not audited or investigated the accuracy or completeness of the information, statements and opinions contained in this announcement. To the maximum extent permitted by applicable laws, Lachlan makes no representation and can give no assurance, guarantee or warranty, express or implied, as to, and takes no responsibility and assumes no liability for the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omission from, any information, statement or opinion contained in this report and without prejudice, to the generality of the foregoing, the achievement or accuracy of any forecasts, projections or other forward looking information contained or referred to in this report.

Investors should make and rely upon their own enquiries before deciding to acquire or deal in the Company’s securities.

9

KILLALOE – JORC CODE 2012 TABLE 1 CRITERIA

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut channels, random
chips,
or
specific
specialised
industry
standard
measurement tools appropriate to the minerals under
investigation, such as down hole gamma sondes, or
handheld XRF instruments, etc). These examples should
not be taken as limiting the broad meaning of sampling.

No drilling completed by Liontown Resources.

Liontown auger samples collected from 0.8 -1m depth
with 200-500g, -2mm material collected for assay.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done
this would be relatively simple (eg ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for fire assay’).
In other cases more explanation may be required, such as
where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types
(eg submarine nodules) may warrant disclosure of
detailed information.

Auger samples collected on regular grid pattern on
200x50 or 400x50m spacing.
Drilling
techniques
Drill type (eg core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic, etc) and
details (eg core diameter, triple or standard tube, depth
of diamond tails, face-sampling bit or other type,
whether core is oriented and if so, by what method, etc).

No drilling completed by Liontown Resources.
Drill
sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.

No drilling completed by Liontown Resources.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.

No drilling completed by Liontown Resources.
Whether a relationship exists between sample recovery
and grade and whether sample bias may have occurred
due to preferential loss/gain of fine/coarse material.

No drilling completed by Liontown Resources.
Logging Whether core and chip samples have been geologically
and geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.

No drilling completed by Liontown Resources.
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc) photography.

No drilling completed by Liontown Resources.
The total length and percentage of the relevant
intersections logged.

No drilling completed by Liontown Resources.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or
all core taken.

No core drilling completed by Liontown Resources.
If non-core, whether riffled, tube sampled, rotary split,
etc and whether sampled wet or dry.

No drilling completed by Liontown Resources.
For
all sample types, the
nature,
quality
and
appropriateness of the sample preparation technique.

Sample preparation follows industry best practice
standards and is conducted by internationally
recognised laboratories; i.e.

10

Criteria JORC Code explanation Commentary
o Oven drying, jaw crushing and pulverising so that
80%passes -75 microns.
Quality control procedures adopted for all sub-sampling
stages to maximise representivity of samples.

Duplicates, standards and blanks submitted
approximately every 20 samples.
Measures taken to ensure that the sampling is
representative of the in situ material collected, including
for instance results for field duplicate/second-half
sampling.

Analysis of duplicates v original sample indicates no
issues with repeatability.

Analysis of results from blanks and standards indicates
no issues with contamination (or sample mix-ups) and
a high level of accuracy.
Whether sample sizes are appropriate to the grain size of
the material being sampled.

Sample size is considered appropriate for the stage of
exploration
Quality
of
assay data and
laboratory
tests
The nature, quality and appropriateness of the assaying
and laboratory procedures used and whether the
technique is considered partial or total.

Assay and laboratory procedures have been selected
following a review of techniques provided by
internationally certified laboratories_._

Samples are submitted for multi-element analyses by
Bureau Veritas aqua-regia techniques following mixed-
acid digest.

The assaytechniques used are total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc, the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation,
etc.

None used.
Nature of quality control procedures adopted (eg
standards, blanks, duplicates, external laboratory checks)
and whether acceptable levels of accuracy (ie lack of
bias) and precision have been established.

Duplicates and blanks submitted approximately every
20 samples.

Standards are submitted every 20 samples.

Analysis of reference blanks, standards and duplicate
samples show the data to be of acceptable accuracy
andprecision.
Verification of
sampling and
assaying
The verification of significant intersections by either
independent or alternative company personnel.

None completed.
The use of twinned holes.
No drilling completed by Liontown Resources
Documentation of primary data, data entry procedures,
data verification, data storage (physical and electronic)
protocols.

Field data is entered into Microsoft Excel
spreadsheets. Data is then loaded into an Access
Database and validated before being processed by
industry standard software packages such as MapInfo
and Micromine.
Discuss any adjustment to assay data.
None required
Location
of
data points
Accuracy and quality of surveys used to locate drill holes
(collar and down-hole surveys), trenches, mine workings
and other locations used in Mineral Resource estimation.

All auger samples are located using a handheld GPS
Specification of the grid system used.
GDA 94 Zone 51
Quality and adequacy of topographic control.
Initial elevations are based on regional topographic
dataset and GPS.
Data
spacing
and
distribution
Data spacing for reporting of Exploration Results.
Auger samples collected on regular grid spacing
(200x50m and 400x50m) to ensure representative first
pass sampling.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.

MRE not being prepared.
Whether sample compositing has been applied.
None undertaken.
Orientation of Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which

Sample lines oriented perpendicular to the interpreted

11

Criteria JORC Code explanation Commentary
data
in
relation
to
geological
structure
this is known, considering the deposit type. strike of geology and mineralisation.
If the relationship between the drilling orientation and
the orientation of key mineralised structures is
considered to have introduced a sampling bias, this
should be assessed and reported if material.

No drilling completed by Liontown Resources.
Sample
security
The measures taken to ensure sample security.
Recognised transport providers and sample dispatch
procedures directly from the field to the laboratory,
and the large number of samples are considered
sufficient to ensure appropriate sample security.

Company personnel supervises all sampling and
subsequent storage in field.
Audits
or
reviews
The results of any audits or reviews of sampling
techniques and data.

None completed

Section 2 Reporting of Exploration Results

Criteria JORC Code explanation Commentary
Mineral
tenement and
land
tenure
status
Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or
national park and environmental settings.
The Killaloe Project is located ~600km east of Perth and
20-30km ENE of Norseman in Western Australia. The
Project area totals ~94km2and comprises 2 granted
exploration licences (EL 63/1018 and 1713) and 1 granted
mining lease (M63/177).
EL 63/1018 is subject to an agreement between LRL (Aust)
Pty Ltd and Cullen Exploration Pty Ltd, with Cullen owning
20% of this tenement. All other tenements are 100%-
owned by LRL (Aust) Pty Ltd, which is a wholly-owned
subsidiary of Liontown Resources.
A Binding Term Sheet has been executed under which
Lachlan Star will acquire Liontown’s rights to the Killaloe
Project by issuing 40 million fully-paid ordinary shares, at a
deemed value of 1.5cps, to Liontown as follows:

15 million shares in relation to Liontown’s wholly-
owned tenure (Tranche 1);

25 million shares in relation to Liontown’s 80%-owned
tenure (Tranche 2); and

Paying Liontown a 1% NSR for all minerals produced
by Lachlan Star.
Tranche 2 is conditional on Cullen not exercising its pre-
emptive rights under its agreement with Liontown. Cullen
has up to 50 days to exercise its pre-emptive rights.
The Tenements are covered by the Ngadju Determined
Native Title Claim (WCD2014/004). Liontown has an
Access Agreement with the Ngadju which will apply to
Lachlan Star’s exploration activities.
The security of the tenure held at the time of reporting
along with any known impediments to obtaining a licence
to operate in the area.
All tenements are in good standing.
Exploration
done by other
Acknowledgment and appraisal of exploration by other
parties.
Prior to Liontown acquiring the Killaloe Project, multiple
phases of exploration were completed for gold and nickel.
Target definition comprisedgeological, geochemical and

12

Criteria JORC Code explanation Commentary
parties geophysical surveys followed by various drilling programs
using assorted techniques.
Liontown primarily focussed on lithium – no drill targets
were defined.
Subsequent
auger
sampling
by
Liontown
across
unexplored areas of the Project has defined a number of
gold anomalies which have not yet been assessed by
drilling.
Geology Deposit
type,
geological
setting
and
style
of
mineralisation.
The Killaloe Project is underlain by a NW/SE trending
sequence of Archaean greenstones interpreted to be
situated between regionally significant structures, the Zuleika
Shear and the Lefroy Fault, which are thought to control the
location of major gold deposits to the north. The Zuleika
Shear intersects the western part of the project area while
the Lefroy Fault is located approximately 10km to the east.
Locally the Project is largely underlain by basaltic and
ultramafic units with the latter being clearly distinguished by
a high magnetic response.
Carbonaceous shale, volcanogenic sediments and a
hornblende granodiorite comprise the bedrock geology in
the eastern part of the Project.
Within ML63/177, high grade gold (>5g/t) is hosted by
multiple (5-6), narrow (0.5-1.5m), E/W trending, cherty
mylonite zones within broader (~10m), lower grade
(>0.5g/t) haloes. Mineralisation is hosted by a weakly
oxidised, E/W trending, steeply dipping mafic sequence.
Drillhole
Information
A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drillholes:
easting and northing of the drillhole collar
elevation or RL (elevation above sea level in metres)
of the drillhole collar
dip and azimuth of the hole
down hole length and interception depth
hole length.
No drilling completed by Liontown.
Data
aggregation
methods
In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(e.g. cutting of high grades) and cut-off grades are
usually Material and should be stated.
None completed.
Relationship
between
mineralisation
widths
and
intercept
lengths
If the geometry of the mineralisation with respect to the
drillhole angle is known, its nature should be reported.
If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(e.g. ‘down hole length, true width not known’).
No drilling completed by Liontown.
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should include,
but not be limited to a plan view of drill hole collar
locations and appropriate sectional views.
See figures in accompanying report
Balanced Where comprehensive reporting of all Exploration Results
is not practicable, representative reporting of both low
and high grades and/or widths should bepracticed to
All recent exploration results reported and tabulated.

13

Criteria JORC Code explanation Commentary
reporting avoid misleading reporting of Exploration Results.
Other
substantive
exploration
data
Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density,
groundwater,
geotechnical
and
rock
characteristics; potential deleterious or contaminating
substances.
All meaningful and material data reported
Further work The nature and scale of planned further work (e.g. tests
for lateral extensions or depth extensions or large-scale
step-out drilling).

Completion of acquisition by Lachlan Star

Drill follow up of geochemical anomalies.

14