Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

KGL RESOURCES LIMITED Capital/Financing Update 2011

Aug 30, 2011

65179_rns_2011-08-30_48917b4e-4186-4319-9f2f-5eba9000dd24.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [52 x 194] intentionally omitted <==

Kentor Gold Ltd ACN 082 6 58 080

31 August 2011

Kentor Gold (ASX: KGL) is an Australian-ba s ed, emergin g midtier gold com p any with ad v anced projects in Australia and the Kyrgyz Republic. Formed in 1998 and listed on the ASX in 2005, the C o mpany expects to c o mmence high grade gold producti o n at Burnakura in Western Au s tralia in mi d -2012, with potenti a l additional goldcopper pro d uction fro m the neighbouring Gabanintha d e posit. At Jervois in the N o rthern Territory, the C ompany is s t udying the feasibility o f developing a large, high grade c o pper-silver resource with potential for the produ c tion of gold and othe r base metals. In the Kyrgyz R epublic, Kent o r Gold is ready to proceed wi t h the development of the Co m pany’s 80% owned h igh grade, v e ry low cost Andash Gold-Copper Project once site access has been obtained. A n dash is targ e ted to produce 70,0 0 0 oz gold an d 7,400 tonnes coppe r pa for an in i tial six years, with high potent i al for expansion.

==> picture [58 x 4] intentionally omitted <==

==> picture [57 x 4] intentionally omitted <==

==> picture [30 x 4] intentionally omitted <==

Issued capital:

1,062.1 millio n ordinary shares 63.6 million u n listed options

==> picture [54 x 194] intentionally omitted <==

==> picture [55 x 194] intentionally omitted <==

==> picture [55 x 194] intentionally omitted <==

==> picture [55 x 194] intentionally omitted <==

==> picture [55 x 194] intentionally omitted <==

==> picture [54 x 194] intentionally omitted <==

==> picture [16 x 194] intentionally omitted <==

Jervois Exploration Highlights

  • New copper-silve r mineralisation at Jervo i s, NT

  • High grade cop p er-silver-g o ld intersected betwe e n existing Resources

Kentor Gol d Limited (“K e ntor Gold” o r “the Company”) is pleas e d to announce that a regional explora t ion drilling p rogram at t h e Jervois Pro j ect in the N o rthern Terri t ory has bee n successful in identifying n ew copper-s i lver minerali s ation.

The Rever s e Circulatio n (RC) drilli n g program is one of t w o intensive p r ograms tar g eting increa s ed Resour c es at Jervo i s. The other D iamond Drilling progra m , aimed at upgrading a n d extending t he initial J O RC Resour c es at Jerv o is, is due to conclude n e xt month.

Assay results have be e n received for all the R C holes in t h e program w h ich was de s igned to ga i n an under s tanding of t h e potential fo r mineralisati o n on structu r al features i n terpreted from a ground based geophysical program undert a ken in 2010. Encouragin g anomalou s results support the ex p loration model and indicat e the minerali s ed potential of the projec t area.

New mineralisation: Hole RJ 194, drilled to the north of t h e known Res o urces at th e Bellbird pro s pect and south of those at Bellbird No r th, returned  6m @3.18% co p per, 23.55 g /t silver an d 0.45 g/t g o ld fro m 59m.

Green Parrot: Hole R J 198, drilled under the e xisting Gre e n Parrot Pit fr o m the eastern wall, prod u ced a best i n tersection of

  • 7.0 m @ 0.42% copper, 0.3 3 % lead and 19.91g/t silver fro m 124m.

Drill hole l o cations are presented i n Figure 1. a nd significant assay results from the R C drilling a r e tabulated i n Appendix 1.

Market Capitalisation

30 August. 2011: $122 million

Kentor Gold Ltd ACN 082 658 080

==> picture [38 x 35] intentionally omitted <==

Announcing the results, Kentor Gold Managing Director Simon Milroy said:

“The encouraging regional RC results form an excellent foundation from which future exploration activities can be planned.

“The grades emerging at Jervois are very significant.

“In July 2011, we established an Inferred Resource of 8.8 million tonnes @ 1.3% copper and 26.7 g/t silver to give 113,000 tonnes copper and 7.6 million ounces silver.

“Two weeks ago, we announced the assays from the first diamond drill holes which included a best result of 8.1m @ 2.56% copper and 13.45 g/t silver at the Reward deposit.

“Results from the ongoing diamond drilling at Reward, Green Parrot, Bellbird and Bell Bird North prospects will be available in the coming weeks.”

For further information contact:

Mr Simon Milroy Managing Director Phone: (07) 3121 3206 Email: [email protected]

Mr. David Waterhouse Investor Relations Phone (03) 9670 5008 Email: [email protected]

Kentor Gold Ltd ACN 082 658 080

==> picture [38 x 35] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 23] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 23] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 23] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 23] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 23] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 23] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 23] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

Figure 1.Regional view of the Jervois Project.

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 23] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 23] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 23] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 23] intentionally omitted <==

==> picture [515 x 22] intentionally omitted <==

==> picture [515 x 23] intentionally omitted <==

==> picture [515 x 21] intentionally omitted <==

Kentor Gold Limited

www.kentorgold.com.au

==> picture [39 x 35] intentionally omitted <==

Appendix 1. Table of Significant Drilling Results

Hole Number Interval %Cu %Pb %Zn g/t Ag g/t Au Depth From
RJ175 1m 0.42 0.01 0.04 0.01 40 m
RJ176 3m
1m
0.39
0.25
0.02
0.01
0.80
0.60
0.01
0.01
23 m
43 m
RJ182 1m 0.49 0.12 0.22 6.10 0.01 100 m
RJ183 1m
1m
0.37
0.32
0.02
0.01
0.70
1.10
0.01 45 m
53 m
RJ184 1m
1m
1m
4m
1m
0.10
0.20
0.21
0.28
0.37
0.01 0.01
0.01
0.01
0.01
0.01
1.00
1.38
0.70
0.01
0.01
0.03
51 m
57 m
85 m
87 m
101 m
RJ185 4m
3m
3m
25m
0.01
0.01
0.01
0.01
0.02
0.01
0.23
0.65
0.22
0.24
0.70
0.17
0.02
10 m
18 m
22 m
31 m
RJ186 1m
1m
1m
0.17
0.17
0.36
0.03 0.02
0.02
0.02
0.50
0.50
0.01
0.01
0.02
66 m
93 m
96 m
RJ187 1m
3m
1m
0.29
0.53
0.16
0.02
0.05
0.04
1.00
2.13
0.01
0.01
42 m
55 m
79 m
RJ188 1m
2m
0.58
0.21
0.02
0.05
5.60
0.90
0.01
0.01
25 m
44 m
RJ189 6m
1m
6m
0.09
0.01
0.55
0.04
0.01
0.10
7.42
0.26
14.22
4.00
0.37
0.01
0.01
28 m
41 m
42 m
RJ190 4m 0.03 0.01 0.10 24 m
RJ193 7m
1m
1m
2m
7m
0.08
0.06
0.01
0.86
0.39
0.10
0.50
0.17
0.01
0.02
0.03
0.12
0.02
0.02
0.04
1.40
3.80
1.00
4.90
2.46
0.01
0.04
0.05
2 m
12 m
28 m
109 m
113 m
RJ194 6m
1m
3.18
0.59
0.03
0.01
0.07
0.04
23.55
2.70
0.45
0.03
59 m
68 m
RJ196 1m 0.01 0.01 0.27 1 m
RJ198 1m
1m
3m
1m
7m
3m
7m
3m
0.02
0.26
0.23
0.03
0.42
0.26
0.05
0.08
0.03
0.04
0.14
0.44
0.33
0.15
0.48
0.04
0.02
0.09
0.22
0.16
0.08
0.29
0.19
0.16
2.90
2.50
9.30
9.80
19.91
25.67
12.97
5.30
0.36
0.06
0.06
0.02
0.01
0.03
0.01
0.01
15 m
34 m
36 m
83 m
124 m
138 m
148 m
190 m

Page 4 of 5

31 August 2011

Kentor Gold Limited

www.kentorgold.com.au

==> picture [39 x 35] intentionally omitted <==

Competent Person Statement

The data in this report is based on information compiled by Rudy Lennartz, who is a member of the Australian Institute of Mining and Metallurgy and a full time employee of Jinka Minerals Ltd. Mr. Lennartz has sufficient experience which is relevant to the style of the mineralisation and the type of deposit under consideration and to the activity to which he is undertaking, to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr.Lennartz has consented to the inclusion of this information in the form and context in which it appears in this report.

The data in this report that relates to Mineral Resource Estimates is based on information evaluated by Mr Simon Tear who is a Member of The Australasian Institute of Mining and Metallurgy (MAusIMM) and who has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”). Mr Tear is a full-time employee of Hellman & Schofield Pty Ltd and he consents to the inclusion in the report of the Mineral Resource in the form and context in which they appear.

Page 5 of 5

31 August 2011