KGL RESOURCES LIMITED — AGM Information 2022
Nov 27, 2022
65179_rns_2022-11-27_84e068c3-c403-452a-a475-21e84d6b32e8.pdf
AGM Information
Open in viewerOpens in your device viewer
==> picture [596 x 172] intentionally omitted <==
----- Start of picture text -----
AGM Address
----- End of picture text -----
28 November 2022
Attached is the presentation to be given at today’s Annual General Meeting.
This announcement has been approved by the directors of KGL Resources Limited.
Page 1 of 1
KGL Resources Limited | AGM Presentation
Welcome to today’s Annual General Meeting of KGL Resources. I respectfully acknowledge that we meet today on the lands of Turrbal people and pay my respects to their elders, past, present and emerging. I also acknowledge the traditional custodians of the land in the southern Northern Territory, represented by the Central Land Council, are the past and present Traditional Custodians of the land on which the Jervois Copper Projectis located and pay my respects to their elders, past, present and emerging.
KGL has made significant progress along the road to becoming an Australian copper producer. Despite the difficult inflationary environment, global uncertainties and other challenges experienced over the last couple of years, the Feasibility Study delivers an extended mine life of 11.75 years with an average grade of resource of over 2% to achieve a NPV of A$241 million, assuming a long term copper price of A$4.23/lb. We are targetting near term growth opportunities based on the most recent exploration drilling results for resource and mine life extensions. Funding options are being considered. We have an offtake with Glencore, an experienced development team and a supportive mining jurisdiction.
And finally, KGL provides investors with exposure to an exciting independent pure-play copper company with all necessary approvals leveraged to strong copper market fundamentals associated with the clean energy transition to Net Zero by 2050.
KGL has 455 million shares outstanding, a market capitalisation of A$131 million, cash on hand as at 30 September 2022 of $18 million and a very stable and supportive shareholder base
As previously mentioned, we recently completed the Feasibility Study for the Jervois Copper Project including an updated JORC Resource which is the successful culmination of 7 years of effort to reposition Jervois as a more robust high-grade copper project in order to maximise operational efficiencies and shareholder returns.
The latest JORC Resource update supporting the Feasibility Study reflects a 25% increase in Ore Reserves to 11.7 Mt at 2.1% Cu, 0.29 g/t Au and 29.8% g/t Ag when compared to the Dec 2020 PFS which was a period severely impacted by COVID restrictions.
This chart demonstrates the dramatic transformation of the project doubling the copper grade from ~ 1.0% in 2015 to ~ 2.0% today.
As a result of KGL’s efforts to reposition the project as a more robust high grade copper project, this chart shows how well positioned KGL is as one of the highest-grade development projects in Australia with all necessary licenses and approvals and significant exploration potential. In an environment of strong inflationary pressures, high fuel costs and labour shortages, achieving maximum operational efficiency is important to long term sustainability and minimising KGL’s carbon footprint.
KGL also benefits from the location of the Jervois Copper project in a tier one mining jurisdiction, in a highly prospective region for critical energy transition metals, in a low sovereign risk country, close to processing facilities and on the doorstep of the major growth markets of Asia.
As noted in our recent company announcement of 10 November, 2022, the Feasibility Study has confirmed the Jervois Copper Project is technically robust and financially viable based on a copper price of US$4.23/lb and supports a high-grade copper mine with production for 11.25 years. The Project is
forecast to come online in 2025 coinciding with the forecast long-term structural deficit in the copper market.
Key highlights from the Feasibility Study include the following:
-
Average annual production of about 25kt pa
-
Ore reserves of Cu grade of 2.1%
-
Production contained copper of 278kt
-
Plant commissioning in 2025
-
Project Construction Capital of A$298 million
-
NPV of A$241 million and an IRR of 20.7%
-
The project is leveraged to significant potential upside from expected long term supply deficits to meet decarbonisation goals, based on “price to meet forecast market demand: of US$5.90/lb (US$13.000 per metric tonne) which increases the NPV to A$701 million and 40.1%
-
Jervois has the potential for an extension to its mine life based on recent exploration success and has additional potential future revenue streams from lead and zinc .
Leading industry and financial analysts are forecasting a long-term structural deficit in the copper market due to commence in the 2[nd] half of this decade driven by a coordinated effort to decarbonise the global economy and achieve Net Zero emissions by 2050.
As demand from the energy transition begins to accelerate over the next few years driven strongly by the forecast rapid adoption of electric vehicles and renewable energy, the world is facing significant supply challenges arising from a combination of factors including declining grades and reserves from existing mines, a lack of new discoveries despite increased exploration budgets and an extended approval process of on average 16 years from discovery to production.
Peak mine supply is expected to occur in 2024.
A significant increase in the incentive price for copper is required to attract the required investment in new supply to meet forecast demand. However, this is unlikely to be in time to address the chronic shortages in copper expected to occur from the 2[nd] half of this decade. And the recent softening in economic growth forecasts has likely further restrained investment in new supply.
KGL plans to commence with open pit operations for approximately three years to commission and ramp up production. This reduces up front mining costs, simplifies operations during commissioning and reduces pre-production capital expenditure. Underground operations are progressively scheduled to commence ore production to sustain a 1.6Mtpa process plant feed once open-cut operations cease. This mine development sequence results in higher grade underground resources being delayed until later in the mine life, but results in reduced Project execution risk. Each of the deposits are potentially open at depth.
Growing the high-grade copper resource and mine life at Jervois is a key potential value driver for KGL shareholders. Drilling during the past 12 months has successfully increased the Jervois mineral resource to 23.8 million tonnes at 2.02% copper, 25.3 g/t silver and 0.25 g/t gold.
The focus in 2023 will be to continue exploration to grow the high-grade resource focusing on resources and reserves within the known mineral deposits and in prospective parts of the Jervois tenements with
the goal of increasing the mine life and upgrading the existing Mineral Resources and Reserves. The potential to add considerable value by extending the mine life justifies a focused exploration program.
The Jervois copper project is well positioned to benefit from the accelerated demand in copper and other critical metals required for the clean energy transition to achieve Net Zero emissions by 2050.
The workstream leading up to the FID includes:
-
Competitive tendering of contracts
-
Further optimising underground mining
-
Scope to reduce offsite transportation costs
Ongoing exploration success can add materially to the value of the project as it drives capital efficiencies, cashflow and IRR improvement.
A robust market for copper may also provide KGL with additional production options in our mine plan.
We’ve highlighted the key workstreams for 2023. A FID is subject to market conditions at that time including a supportive macroeconomic environment and the availability of labour necessary to complete construction on time.
2022 has been a successful year for KGL despite the challenges.
I want to thank the Jervois stakeholders, in particular the Central Lands Council, Bonya community Lucy Creek and Jervois Station pastoralists and the Northern Territory government for their ongoing support and I know they are looking forward to helping us deliver the Jervois copper project. I also acknowledge the native title holders with whom we negotiated an indigenous land use agreement in 2016.
Sincere thanks to my fellow directors, in particular Jeff and Ian. Jeff has driven the finalisation of the Feasibility Study since he joined the board in June of this year. Ian kindly stepped in to assist as we progressed to our next phase of development and has contributed significantly to legal and governance matters.
I’d also like to thank our employees for their contributions in challenging times and look forward to making significant progress over the next 12 months in accelerating development of the Jervois Copper Project.
And my profound thanks to you, our loyal shareholders, for your patience and confidence in the company.
We are looking forward to making the necessary progress to start construction in 2023, subject to achieving some normalisation in market conditions - more specifically, the availability of labour, pricing of key inputs and supportive macroeconomic conditions. Regardless, KGL will continue to increase the value of the Project by focusing on its exciting exploration campaign for 2023 with the goal of expanding the resource and extending the mine life of this high grade deposit. I’m looking forward to our future and I hope you are too. I am very confident our patience will be rewarded.
==> picture [217 x 165] intentionally omitted <==
28 November 2022
KGL Resources Limited
Equity Raising 2022
KGL Resources
Becoming an Australian copper producer
==> picture [48 x 57] intentionally omitted <==
==> picture [66 x 66] intentionally omitted <==
==> picture [66 x 66] intentionally omitted <==
==> picture [66 x 66] intentionally omitted <==
Feasibility delivered High >2.0% copper Near-term growth – 11.75 year mine life grade Resource[2 ] opportunities $241 NPV[1] unique vs. global Cu for Resource and 4.2 year payback projects Mine Life extension
Funding plan being finalised
- 20.7% IRR
==> picture [66 x 66] intentionally omitted <==
==> picture [73 x 73] intentionally omitted <==
==> picture [66 x 66] intentionally omitted <==
==> picture [65 x 66] intentionally omitted <==
Offtake signed with Low sovereign risk Experienced team with Glencore Project located in development expertise pro-mining Northern Territory
Independent pure-play copper exposure with all necessary approvals leveraged to strong market fundamentals
- Refer KGL Resources Limited ASX announcements 11 November 2022, and 15 November 2022 2. Refer KGL Resources Limited ASX announcement 14 September 2022
KGL Resources Limited
28 Nov ember 2022 AGM presentation 3
Corporate Structure and Shareholders
Ca ital Structure p
| Capital Structure | |
|---|---|
| Australian Stock Exchange (ASX) code | KGL |
| ASX Share price (close 25 Nov 2022) | $0.29 |
| Shares outstanding | 455 M |
| Options on Issue | 1 M |
| Market capitalisation | A$131.8M |
| Cash (30 Sep 2022) | A$18.1M |
| Debt | Nil |
| Enterprise value | A$113.7M |
Financial Position
-
Cash $18.1m (30 Sep 2022)
-
No debt
Supportive shareholder base
-
11% institutional funds, including substantial holder Paradice (5.9%)
-
10% owned by directors
-
KMP investments, part of the Salim Group
Major Shareholders
Shareholder breakdown
| Major Shareholders | |
|---|---|
| KMP Investments Pte Ltd | 26.1% |
| Denis Wood | 7.9% |
| Marshall Plenty Investments LLC | 7.2% |
| Paradice Investment Management | 5.9% |
| Pegasus CP One | 4.8% |
==> picture [316 x 160] intentionally omitted <==
----- Start of picture text -----
Other Funds
46% 11%
Marshall
Plenty KMP
7% Investments
26%
Directors
10%
----- End of picture text -----
KGL Resources Limited
28 Nov ember 2022 AGM presentation 4
Jervois Copper Project Update
-
KGL recently completed a technically robust and financially viable Feasibility Study in a challenging environment of high inflation, ongoing supply chain challenges and increased global uncertainty
-
The most recent JORC Resource was updated in September 2022
-
Ongoing exploration success demonstrates potential to expand the mine life
-
Whilst KGL acquired the Jervois lease in 2011, the project was repositioned in 2016 with the goal of becoming a more robust high-grade copper project to maximize operational efficiencies and shareholder returns.
2016 2017 2018 2019 2020 2022 APR AUG OCT OCT APR NOV Mining lease EIS lodged Mining FS New strategy EPA granted management Completed adopted to recommends plan lodged enhance the approval of project EIS 2017 2018 2019 2020 2020 2022 MAR MAY AUG FEB Q4 SEP Acquisition JORC JORC Site closed JORC PFS of UNCA Resource Reserve due to Resource released Creek update COVID update
KGL Resources Limited
28 Nov ember 2022 AGM presentation
5
==> picture [112 x 330] intentionally omitted <==
Resource Update
The total resource estimates now stand at:
-
23.80 million tonnes at 2.02% copper, 25.3 g/t silver and 0.25 g/t gold
-
containing 481,200 tonnes copper, 19.34 million ounces silver and 189,600 ounces of gold.
==> picture [546 x 356] intentionally omitted <==
Note: Resource estimate 2018 – 2022 are for Rew ard, Bellbird & Rockface deposit only
KGL Resources Limited
28 Nov ember 2022 AGM presentation 6
Located in a Tier One Mining Jurisdiction Highly prospective for Critical Energy Transition Metals
==> picture [145 x 204] intentionally omitted <==
----- Start of picture text -----
29
Cu
Copper
79 30
Au Zn
Gold Zinc
47 82
Ag Pb
Silver Lead
----- End of picture text -----
==> picture [57 x 53] intentionally omitted <==
KGL Resources Limited
28 Nov ember 2022 AGM presentation 8
Feasibility Study: Highlights
The Feasibility Study has confirmed the Jervois Copper Project is technically robust and financially viable with a copper price of US$4.23/lb and supports a high-grade copper mine with production for 11.25 years. The Project is anticipated to come online in 2025 coinciding with the forecast long-term structural deficit in the copper market.
==> picture [657 x 275] intentionally omitted <==
KGL Resources Limited
Equity Raising 202228 Nov ember 2022 AGM presentation 9
==> picture [112 x 330] intentionally omitted <==
Feasibility Study: Summary Highlights
==> picture [164 x 103] intentionally omitted <==
----- Start of picture text -----
11.75 year mine life
----- End of picture text -----
==> picture [164 x 103] intentionally omitted <==
----- Start of picture text -----
Average annual
copper production of
~25kt
----- End of picture text -----
==> picture [164 x 103] intentionally omitted <==
----- Start of picture text -----
Ore Reserves:
Average Cu grade
2.1%
----- End of picture text -----
==> picture [164 x 103] intentionally omitted <==
----- Start of picture text -----
Plant commissioning
and first concentrate
delivery in 2025
----- End of picture text -----
==> picture [164 x 103] intentionally omitted <==
----- Start of picture text -----
Project Construction
Capital A$298 million
----- End of picture text -----
==> picture [164 x 103] intentionally omitted <==
----- Start of picture text -----
NPV A$241 million
----- End of picture text -----
==> picture [164 x 102] intentionally omitted <==
----- Start of picture text -----
Meet Future Demand
US$5.90:
NPV A$701 Mn
IRR 40.1%
----- End of picture text -----
==> picture [164 x 102] intentionally omitted <==
----- Start of picture text -----
Concentrate offtake
secured with
Glencore’s
Mt Isa smelter
----- End of picture text -----
==> picture [164 x 102] intentionally omitted <==
----- Start of picture text -----
Potential additional
resource streams for
Pb and Zn
----- End of picture text -----
==> picture [171 x 103] intentionally omitted <==
----- Start of picture text -----
Resource extension
in a highly
prospective region
could support a mine
life extension
----- End of picture text -----
KGL Resources Limited
28 Nov ember 2022 AGM presentation 10
Robust Long-Term Outlook for Copper
Long-term supply gap remains unsolved, with widening mid-term deficits[3]
-
S&P Global[1] forecasts refined copper demand doubling by 2035 from 25 Mt to almost 50 Mt driven by growing demand for renewable energy and EV's under the clean energy transition.
-
Wood Mackenzie note that, given the substantial growth in new mine supply needed to meet zero-carbon targets, the industry will have to deliver new projects at a frequency and consistent level of investment never previously accomplished.
-
The additional volume of copper needed means that 9.7 Mt of new mine supply will be required over the next decade from projects that have yet to be sanctioned – equivalent to nearly a third of current refined consumption.
-
Investment would need to be more than $23 billion a year in new projects, which is 64% higher than the average annual spend over the last 30 years.
-
Mine supply is expected to peak in 2024.
-
A chronic shortfall in copper supply is expected to commence in the later half of this decade driven by robust demand and declining grades and reserves from existing mines, a lack of new discoveries from increased exploration budgets and long lead times from discovery to production of on average 16 years.
1. S&P Global: The Future of Copper: Will the looming supply gap short-circuit the energy transition?” ,
-
Wood Mackenzie. Red metal, green demand. Copper’s critical role in achieving net zero. (October 2022)
-
Goldman Sachs: Copper Top Projects. A deficit on the horizon. 1 September 2022 4. S&P Mkt Intelligence. Copper discoveries - Declining trend continues. 1 June 2022
==> picture [285 x 179] intentionally omitted <==
Major copper discovery drought continues[4]
==> picture [261 x 186] intentionally omitted <==
KGL Resources Limited
28 Nov ember 2022 AGM presentation 11
12
==> picture [61 x 39] intentionally omitted <==
==> picture [341 x 508] intentionally omitted <==
----- Start of picture text -----
Rockface
& Bellbird
Simple Cross Section of
Reward O/C & UG
Reward &
Marshall
from East
Simple Cross Section of
Rockface UG
----- End of picture text -----
Current Resource & Mine Plan
-
Current Resource (Sept 2022) is 23.8Mt @2.02% Cu, 0.25g/t Au and 25.3g/t Ag.
-
Approximatelyhalf of the resource has beenconverted in Ore Reserve (11.7Mt @2.10% Cu).
-
Based on the contained copper of Sep 2022 Resources, Reward/Marshall, Rockface and Bellbird represent 50.7%, 22.5% and 26.8% respectively.
-
The mining strategy is to initially mine opencuts, whilst underground development is initiated at the Reward/Marshall underground.
-
Bellbird open-cut is commenced first due to the higher copper grades.
-
Development of the Rockface underground mine then commences after Bellbird open-cut concludes in early 2026.
-
Total Copper Produced is 278 Kt over an 11.75 year mine life.
KGL Resources Limited
28 Nov ember 2022 AGM presentation 13
Expanding the current resource
Unlocking the potential of the Jervois copper hub
-
✓ Significant Resource increase reported
-
✓ Focus in 2023 will be on infill drilling to expand reserves and exploration drilling to expand the mineral resource and extend mine life around known deposits
-
✓ Ongoing drilling at Reward (Marshall)
-
✓ Ongoing drilling at Rockface: intersected high-grade, thick Cu 120 metres below previous drilling confirming depth potential
==> picture [400 x 408] intentionally omitted <==
KGL Resources Limited
28 Nov ember 2022 AGM presentation 14
Growing the value of Jervois
==> picture [61 x 40] intentionally omitted <==
Growing the value of Jervois
Workstream pre FID to include:
-
Competitive Tendering of major contracts
-
Unit cost improvement via optimising underground mining
-
Offsite transportcostreductions
Opportunities to significantly improve the value of the Project include:.
-
Progressing along the developmentpathway (FID, finance, etc.)
-
Ongoing exploration success has the potential to increase mine life and drive capital efficiencies, cash flow and IRR improvement
-
Margin improvement via polymetallic recovery of lead and zinc
-
The accelerated energy transition driving increased demand for copper will likely require higher incentive pricing to attract investment in new supply which may provide additional mine development opportunities
KGL Resources Limited
28 Nov ember 2022 AGM presentation 16
Summary and Outlook
-
✓ Globally significant high-grade greenfield copper project poised for development
-
✓ Approvals complete
-
✓ Clear pathway to production with offtake signed
-
✓ Feasibility Study Completed showing A$241 million NPV & Reserve Statement Released
-
✓ Experienced team to deliver the project
-
✓ Pure-play ASX copper exposure leveraged to strong market fundamentals
Key workstreams for 2023
-
Finalise funding strategy
-
• Final Investment Decision
-
Early works & long lead items
-
Operational readiness
-
Focused exploration program with goal of expanding reserves and extending mine life
KGL Resources Limited
17
28 November 2022 AGM presentation
Disclaimer and Competent Persons’ Statement
- The Jervois Resources information were first released to the market on 14/09/2022 and complies with JORC 2012. The company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
The Jervois Ore Reserves Estimates was first released to the market on 10/11/2022 and complies with JORC 2012. The company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
Forward Looking statements
- This release includes certain forward-looking statements. The words “forecast”, “estimate”, “like”, “anticipate”, “project”, “opinion”, “should”, “could”, “may”, “target” and other similar expressions are intended to identify forward looking statements. All statements, other than statements of historical fact, included herein, including without limitation, statements regarding forecast cash flows and potential mineralisation, resources and reserves, exploration results and future expansion plans and development objectives of KGL are forward-looking statements that involve various risks and uncertainties. Although every effort has been made to verify such forward-looking statements, there can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. You should therefore not place undue reliance on such forward-looking statements.
Statements regarding plans with respect to the Company’s mineral properties may contain forward looking statements. Statements in relation to future matters can only be made where the Company has a reasonable basis for making those statements.
KGL Resources Limited
28 Nov ember 2022 AGM presentation 18
==> picture [237 x 152] intentionally omitted <==
Contact us: