Earnings Release • Dec 22, 2025
Earnings Release
Open in ViewerOpens in native device viewer

The following report contains preliminary monthly data – the final quarterly and annual production and sales results will be published in the consolidated report for 2025. Data of the KGHM Polska Miedź S.A. Group contain the results of Sierra Gorda S.C.M. reflecting the 55% share held by KGHM Polska Miedź S.A.
| Production and sales of the KGHM Group |
November 2025 |
November 2024 |
I - XI 2025 |
I - XI 2024 |
|---|---|---|---|---|
| Production | ||||
| Payable copper (kt) | 60.3 | 61.5 | 647.4 | 666.9 |
| - including KGHM Polska Miedź S.A.* | 48.8 | 48.5 | 520.3 | 538.3 |
| Payable silver (t) | 128.4 | 121.6 | 1 235.0 | 1 220.9 |
| TPM (koz t) | 14.7 | 15.6 | 147.7 | 156.6 |
| Molybdenum (mn lb) | 0.5 | 0.5 | 4.9 | 3.2 |
| Sales | ||||
| Copper (kt) | 62.1 | 60.9 | 648.7 | 669.2 |
| Silver (t) | 140.2 | 100.8 | 1258.6 | 1259.8 |
| TPM (koz t) | 7.7 | 16.2 | 148.8 | 158.5 |
| Molybdenum (mn lb) | 0.4 | 0.2 | 4.6 | 3.1 |
* Production of electrolytic copper
In the period January-November 2025 the production of copper, silver and precious metals (TPM) by the KGHM Group was above the budget targets for this period.
| Production and sales of KGHM Polska Miedź S.A. |
November 2025 |
November 2024 |
I - XI 2025 |
I - XI 2024 |
|---|---|---|---|---|
| Mine production | ||||
| Copper in concentrate (kt) | 32.9 | 32.7 | 373.7 | 371.4 |
| Silver in concentrate (t) | 112.6 | 108.0 | 1 228.6 | 1 226.0 |
| Metallurgical production | ||||
| Electrolytic copper (kt) | 48.8 | 48.5 | 520.3 | 538.3 |
| - including from own concentrate | 29.9 | 34.4 | 342.3 | 347.4 |
| Metallic silver (t) | 126.1 | 119.6 | 1 213.6 | 1 198.6 |
| TPM (koz t) | 9.4 | 7.4 | 81.1 | 77.6 |
| Sales | ||||
| Copper (kt) | 50.3 | 48.1 | 524.1 | 546.2 |
| Silver (t) | 137.3 | 99.1 | 1233.1 | 1236.0 |
| TPM (koz t) | 1.7 | 7.8 | 82.0 | 84.6 |
| Production and sales of KGHM INTERNATIONAL LTD. |
November 2025 |
November 2024 |
I - XI 2025 |
I - XI 2024 |
|---|---|---|---|---|
| Production | ||||
| Payable copper (kt) | 3.8 | 4.8 | 48.1 | 56.5 |
| TPM (koz t) | 3.2 | 4.6 | 40.4 | 49.3 |
| Sales | ||||
| Copper (kt) | 4.7 | 5.2 | 47.9 | 51.6 |
| TPM (koz t) | 4.0 | 5.0 | 41.1 | 44.5 |
| Silver (t) | 0.7 | 0 | 5.0 | 2.6 |
| Production and sales of Sierra Gorda S.C.M. (on a 55% basis) |
November 2025 |
November 2024 |
I - XI 2025 |
I - XI 2024 |
|
|---|---|---|---|---|---|
| Production | |||||
| Payable copper (kt) | 7.6 | 8.2 | 79.0 | 72.1 | |
| Molybdenum (mn lbs) | 0.5 | 0.5 | 4.7 | 3.1 | |
| Payable silver (t) | 2.3 | 1.9 | 21.3 | 21.3 | |
| TPM (koz t) | 2.1 | 3.6 | 26.2 | 29.6 | |
| Sales | |||||
| Copper (kt) | 7.0 | 7.6 | 76.7 | 71.4 | |
| Molybdenum (mn lbs) | 0.4 | 0.2 | 4.5 | 2.9 | |
| Silver (t) | 2.2 | 1.8 | 20.4 | 21.2 | |
| TPM (koz t) | 2.1 | 3.3 | 25.7 | 29.4 |
Building tools?
Free accounts include 100 API calls/year for testing.
Have a question? We'll get back to you promptly.