Lubin, 20 July 2022

The following report contains preliminary monthly data – the final quarterly production and sales results will be published in the consolidated report for the first half of 2022. Data of the KGHM Polska Miedź S.A. Group contain the results of Sierra Gorda reflecting the 55% share held by KGHM Polska Miedź S.A.
| Production and sales of the KGHM Group |
June 2022 |
June 2021 |
I - VI 2022 |
I - VI 2021 |
|---|---|---|---|---|
| Production | ||||
| Payable copper (kt) | 58.1 | 65.0 | 377.7 | 380.7 |
| - including KGHM Polska Miedź S.A.* | 46.7 | 48.4 | 296.3 | 293.2 |
| Payable silver (t) | 123.4 | 117.6 | 683.2 | 676.2 |
| TPM (koz t) | 15.3 | 15.6 | 91.2 | 78.7 |
| Molybdenum (mn lbs) | 0.3 | 0.8 | 2.0 | 4.7 |
| Sales | ||||
| Copper (kt) | 63.8 | 65.7 | 364.9 | 364.9 |
| Silver (t) | 138.1 | 121.5 | 731.8 | 634.5 |
| TPM (koz t) | 12.2 | 10.9 | 83.6 | 74.8 |
| Molybdenum (mn lbs) | 0.2 | 0.7 | 2.1 | 4.3 |
* Production of electrolytic copper
In the period January-June 2022 production of all of the main metals by the Group was above the levels set in the budget as well as at a level higher than or similar to the amounts recorded in the first half of 2021.
| Production and sales of KGHM Polska Miedź S.A. |
June 2022 |
June 2021 |
I - VI 2022 |
I - VI 2021 |
|
|---|---|---|---|---|---|
| Mine production | |||||
| Copper in concentrate (kt) | 33.1 | 33.0 | 198.9 | 195.1 | |
| Silver in concentrate (t) | 110.4 | 109.2 | 662.2 | 640.3 | |
| Metallurgical production | |||||
| Electrolytic copper (kt) | 46.7 | 48.4 | 296.3 | 293.2 | |
| - including from own concentrate | 25.5 | 30.2 | 177.7 | 192.2 | |
| Metallic silver (t) | 121.6 | 114.8 | 668.5 | 659.4 | |
| TPM (koz t) | 7.4 | 7.9 | 40.9 | 38.1 | |
| Sales | |||||
| Copper (kt) | 53.4 | 51.0 | 292.6 | 285.0 | |
| Silver (t) | 135.4 | 118.0 | 713.5 | 619.2 | |
| TPM (koz t) | 5.3 | 5.4 | 41.8 | 38.0 |
| Production and sales of KGHM INTERNATIONAL LTD. |
June 2022 |
June 2021 |
I - VI 2022 |
I - VI 2021 |
|---|---|---|---|---|
| Production | ||||
| Payable copper (kt) | 5.3 | 6.9 | 36.9 | 36.3 |
| TPM (koz t) | 5.4 | 5.0 | 34.7 | 26.3 |
| Sales | ||||
| Copper (kt) | 4.5 | 3.6 | 28.2 | 31.1 |
| TPM (koz t) | 4.3 | 2.3 | 26.9 | 22.6 |
| Silver (t) | 0.9 | 0.3 | 4.2 | 0.4 |
| Production and sales of Sierra Gorda (on a 55% basis) |
June 2022 |
June 2021 |
I - VI 2022 |
I - VI 2021 |
|
|---|---|---|---|---|---|
| Production | |||||
| Payable copper (kt) | 6.1 | 9.7 | 44.5 | 51.2 | |
| Molybdenum (mn lbs) | 0.3 | 0.8 | 1.9 | 4.6 | |
| Payable silver (t) | 1.7 | 2.6 | 13.9 | 15.6 | |
| TPM (koz t) | 2.5 | 2.7 | 15.6 | 14.3 | |
| Sales | |||||
| Copper (kt) | 5.9 | 11.1 | 44.1 | 48.8 | |
| Molybdenum (mn lbs) | 0.2 | 0.8 | 2.0 | 4.2 | |
| Silver (t) | 1.8 | 3.2 | 14.1 | 14.9 | |
| TPM (koz t) | 2.6 | 3.2 | 14.9 | 14.1 |