KEY PETROLEUM LIMITED Capital/Financing Update 2014

Aug 20, 2014

65176_rns_2014-08-20_b897063c-ae31-4846-bd29-fc1961eda48e.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

Ground Floor 39 Stirling Highway Nedlands WA 6009

==> picture [182 x 60] intentionally omitted <==

T: + 61 (08) 6389 0322 F: + 61 (08) 6389 0697

21 August 2014

The Manager The Australian Securities Exchange The Announcements Officer Level 4/20 Bridge Street SYDNEY NSW 2000

Dear Sir

DRILLING REPORT NO. 9 FOR DUNNART-2 IN EP437, PERTH BASIN, WESTERN AUSTRALIA FOR THE PERIOD 0600 HOURS 21 AUGUST 2014 TO 0845 HOURS 21 AUGUST 2014

We attach herewith ASX Announcement for Investors regarding the drilling activities at Dunnart-2, EP437, Onshore Perth Basin.

Joint Venture participants in EP437 are:

Key Petroleum Limited (Key Petroleum (Australia) Pty Ltd) (Operator) 43.47% Rey Resources Limited (Rey Oil and Gas Perth Pty Ltd) 43.47% Caracal Exploration Pty Limited 13.06%

Regards

JL KANE MARSHALL Managing Director KEY PETROLEUM LIMITED

==> picture [511 x 55] intentionally omitted <==

Ground Floor 39 Stirling Highway Nedlands WA 6009

==> picture [343 x 99] intentionally omitted <==

T: + 61 (08) 6389 0322 F: + 61 (08) 6389 0697

ASX RELEASE

DRILLING REPORT NO. 9 FOR DUNNART-2 IN EP437, PERTH BASIN, WESTERN AUSTRALIA FOR THE PERIOD 0600 HOURS 21 AUGUST 2014 TO 0845 HOURS 21 AUGUST 2014

Key Petroleum Limited (“Key”) advises that since this morning’s disclosure to the ASX, the Drill Stem Test (“DST”) tools have been pulled out of hole and examined for plugging at surface. Key can confirm that the sample chamber and main part of the tool are completely plugged with shale fill from the overlying Kockatea Shale Formation. This confirms the test was invalid.

The forward plan is to run in the hole, circulate bottoms up and either condition the hole for a re-test in clean hole or drill further into the Bookara Sandstone and conduct another test. The market will be kept fully informed of any further developments.

Daily drilling reports to the ASX will continue until all drilling and formation evaluation of Dunnart-2 has been completed.

For more information please contact: Key Petroleum Limited +61 8 6389 0322

JL Kane Marshall Managing Director

21 August 2014

==> picture [123 x 41] intentionally omitted <==

==> picture [550 x 19] intentionally omitted <==

Ground Floor 39 Stirling Highway Nedlands WA 6009

==> picture [343 x 99] intentionally omitted <==

T: + 61 (08) 6389 0322 F: + 61 (08) 6389 0697

DUNNART-2 PETROLEUM EXPLORATION WELL EP437 – PERTH BASIN

1. Well Name/Permit: Dunnart-2 EP437, Perth Basin, Western Australia Dunnart-2 EP437, Perth Basin, Western Australia Dunnart-2 EP437, Perth Basin, Western Australia
2. The Report is for the Period: 0600 – 21 August 2014 to 0900 – 21 August 2014
3. This ASX Release Time and Date: 0845 WST – 21 August 2014
4. Report No: Nine
5. Start Date/DCA Rig #7: 13 July 2014
6. Days since commencement of
drilling operations:
Thirty nine
7. Locations of the Well: North Perth Basin
8. Elevation: GL 40.96m
RT from GL (MSL) 3.5m
RT to MSL 44.46m
9. Proposed Total Depth: 670 metres TVD RT
10. Targets: _Primary:_Bookara Sandstone Formation
_Secondary:_Basement
11. Present Depth: 616.87m RT
12. Geological Summary: Formation Tops (m RT):
Prognosed Actual Difference
Yarragadee Sandstone 82m 82m -
Cadda Formation 280m 281m -1
Cattamarra Formation 325m 324m +1
Woodada Formation 484m 482.5m +1.5
Kockatea Shale 504m 503m +1.0
Bookara Sandstone Formation 615m 614m +1
Basement 670m

==> picture [123 x 41] intentionally omitted <==

==> picture [550 x 19] intentionally omitted <==

Ground Floor 39 Stirling Highway Nedlands WA 6009

T: + 61 (08) 6389 0322 F: + 61 (08) 6389 0697

==> picture [343 x 99] intentionally omitted <==

13. Hydrocarbon Indications: Oil Shows: At 614m a drilling break was observed over a 1.5m interval
(614m – 615.5m).
Live light oil was observed and collected. The oil is light and has been
evaluated at 34⁰ API. A further 1.37m was drilled with live oil also
circulated up.
An open hole DST was conducted over this interval in the Bookara
Sandstone from 614m - 616.87m but test has confirmed tool was
plugged.
Oil Shows: At 614m a drilling break was observed over a 1.5m interval
(614m – 615.5m).
Live light oil was observed and collected. The oil is light and has been
evaluated at 34⁰ API. A further 1.37m was drilled with live oil also
circulated up.
An open hole DST was conducted over this interval in the Bookara
Sandstone from 614m - 616.87m but test has confirmed tool was
plugged.
14. Operations since last Report: DST tools examined and confirmed plugging of test tools.
15. Current Operations: Running in back in hole to circulate and clean hole.
16. Future Operations: Either re-run DST or drill ahead then conduct another DST.
17. Prospect Description: The Dunnart prospect is a well-defined moderate relief fault closed
structure with the top seal provided by the proven regional seal, the
Kockatea Shale which is the source rock for oil discovered to date in the
North Perth Basin.
The Bookara Sandstone is middle to upper shoreface sand which laps the
south-western
margin
of
the
Northampton
Block.
Dunnart-1
encountered good oil shows in Bookara sands but was never tested or
cored. Estimated prospective resources in the best case estimate are 2
million barrels under SPE-PRMS guidelines.
18. Participants in the Well: Key Petroleum (Australia) Pty Ltd (Operator) 43.47%
Rey Oil and Gas Perth Pty Ltd 43.47%
Caracal Exploration Pty Ltd 13.06%

==> picture [123 x 41] intentionally omitted <==

==> picture [550 x 19] intentionally omitted <==