IRON ROAD LIMITED Management Reports 2013

Jul 15, 2013

65140_rns_2013-07-15_2b25030f-ef59-4dfa-b835-400e337408bb.pdf

Management Reports

Open in viewer

Opens in your device viewer

Iron Road continues to advance its objective of becoming a premium supplier of iron concentrates to the Asian marketplace. Significant progress was achieved at both the Central Eyre Iron Project and the Gawler Iron Project.

Highlights

Central Eyre Iron Project (CEIP)

  • Significant global Mineral Resource increase for CEIP, increasing by 42% to 3.7Bt at a grade of 16% iron (Refer to Attachment 1, page 19).

  • Mineral Resource contains 2.7Bt in the Measured and Indicated categories at a grade of 15.7% iron, eligible for conversion to a Mining Reserve.

  • CEIP is the largest Measured + Indicated magnetite resource in Australia and ranks within the Top 20 magnetite projects globally by tonnage.

  • Additional Resource tonnage and increased confidence comes at a gross cost of only 0.67 of a cent per tonne

  • Definitive Feasibility Study (DFS) continues to progress well and on schedule in all areas – including mine site, infrastructure and port.

  • Work progressed towards establishing a Community Consultative Committee (CCC) for the Warramboo-Wudinna area.

Gawler Iron Project

  • Stage III drilling programme of 21 holes completed.

  • Continued scoping study evaluating the feasibility of an iron ore operation producing 1-2 million tonnes of high quality iron concentrates per annum.

Corporate

  • Fully underwritten capital raising to raise $50.7 million launched. Funds to be used to complete the CEIP definitive feasibility and infrastructure studies, as well as enabling Iron Road to continue strategic acquisitions of property. Gawler to also receive funding beyond completion of the current scoping study.

==> picture [432 x 117] intentionally omitted <==

Preliminary Warramboo pit optimisation is underway.

Email: [email protected]

==> picture [595 x 117] intentionally omitted <==

Projects

South Australia – Central Eyre Iron Project

The Central Eyre Iron Project (CEIP) is located on the Eyre Peninsula of South Australia approximately 30km southeast of the regional centre of Wudinna (Figure 1). Project studies incorporate mining and ore processing, as well as rail and concentrate export facilities. Concentrate is being marketed primarily as a 67% iron, high quality blending feedstock to the international sinter market, which feeds the majority of blast furnaces.

==> picture [400 x 289] intentionally omitted <==

Figure 1

Location of the CEIP (EL4849) on the Eyre Peninsula.

The CEIP is being studied with a potential operating life exceeding 30 years. Components include a large scale mine, ore treatment facilities, as well as concentrate transport and export facilities. The defined resource at Warramboo contains continuous and consistent mineralisation over more than 6km of strike and is amenable to large scale, open pit extraction methods.

The Murphy South - Rob Roy prospects were remodelled incorporating new drilling results and global

mineral resources at the CEIP were upgraded, now 3.7 billion tonnes magnetite gneiss at 16% iron.[1]

CEIP Resource Expansion

During May 2013 it was announced that an additional one billion tonnes in Mineral Resources had been added to the Central Eyre Iron Project (CEIP), increasing from 2.6 billion tonnes to 3.7 billion tonnes at a grade of 16% iron. The Measured and highest confidence level part of the resource now makes up 2.2 billion tonnes or 60% of the overall Mineral Resource.

1 Resource statement contained at Attachment 1, page 19.

Page | 2

==> picture [595 x 117] intentionally omitted <==

The global mineral resource of 3.7 billion tonnes includes the Murphy South, Rob Roy and Boo-Loo prospects, collectively known as Warramboo (Figure 2).

==> picture [342 x 281] intentionally omitted <==

Figure 2

CEIP tenement (EL4849) highlighting the Murphy South, Rob Roy and Boo-Loo prospects at the Warramboo project area.

Drill hole locations used to calculate the global mineral resource estimate are shown in Figure 3 and the solids model in Figure 4.

==> picture [468 x 190] intentionally omitted <==

Figure 3

Drill hole locations at Warramboo, Central Eyre Iron Project.

Page | 3

==> picture [595 x 117] intentionally omitted <==

==> picture [341 x 178] intentionally omitted <==

Figure 4 Cross section through Murphy South-Rob Roy and Boo-Loo-Dolphin solids model of the CEIP.

Mineral Resource highlights:

  • The Global Mineral Resource for CEIP increased by 42% to 3.7Bt at a grade of 16% iron for the Warramboo mineralisation (Table 1).

  • The Mineral Resource contains 2.7Bt in the Measured and Indicated categories (at a grade of 15.7% iron) that is eligible for conversion to a Mining Reserve (Table 2 and Figure 5).

  • CEIP has the largest Measured + Indicated magnetite resource in Australia – whilst test work also indicates the project is one of the easiest to process with significantly less grinding required than other large scale projects.

  • The additional tonnage and increased confidence comes at a gross cost of only 0.67 cents per tonne.

  • Globally, the project now ranks in the Top 20 of magnetite projects alongside producing projects from Russia and the Ukraine together with advanced development projects in Canada.

  • The upgrade demonstrates the potential for a long mine life that is expected to impact positively on discussions with development and financing partners, whilst also enhancing the potential returns from the associated rail and port infrastructure.

Table 1

CEIP Global Mineral Resource
Location Classification Tonnes
(Mt)
Fe
(%)
SiO2
(%)
Al2O3
(%)
P
(%)
Murphy
South/Rob Roy
Measured
Indicated
Inferred
2,222
474
667
15.69
15.6
16
53.70
53.7
53
12.84
12.8
12
0.08
0.08
0.08
Boo-Loo Inferred 328 17 52 12 0.09
Total 3,691 16 53 13 0.08
CEIP Indicative Concentrate Specification – 106 micron (p80)
Iron (Fe) **Silica (SiO2) ** **Alumina (Al2O3) ** Phosphorous (P)
67% 3.3% 1.9% 0.005%

The updated Mineral Resource estimate for the Murphy South – Rob Roy prospect was completed by Heather Pearce following the guidelines of the JORC Code (2004) and peer reviewed by Xstract personnel including Dr Isobel Clark, Kevin Lowe and Michelle Smith. The Mineral Resource Estimate for Boo-Loo was carried out following the guidelines of the JORC Code (2004) by Coffey Mining Ltd.

Page | 4

==> picture [595 x 117] intentionally omitted <==

==> picture [472 x 244] intentionally omitted <==

----- Start of picture text -----

Australian Magnetite Resources
Measured + Indicated Categories
3,000
2,500
Figure 5
Resource Category
2,000 Measured (tonnes) Australian Magnetite
Indicated (tonnes) Resources detailing
1,500 categories.
Source: Public
1,000
company reports
500
0
M+I Resources - tonnes (millions)
----- End of picture text -----

Results from drilling at Stage VIII Murphy South strongly suggest potential flattening of the mineralised horizon, translating into further down-dip accessibility of the ore horizon and presenting opportunity for future resource expansion drilling activities at Murphy South (Figure 6).

==> picture [469 x 246] intentionally omitted <==

Figure 6 Cross section through the Murphy South - Rob Roy area of the Warramboo Resource block model.

Page | 5

==> picture [595 x 117] intentionally omitted <==

==> picture [356 x 234] intentionally omitted <==

Figure 7

Looking south towards IRD’s core facility at ‘Crow’s Nest’, Kyancutta.

Definitive Feasibility Study (DFS)

Ore treatment by conventional crushing, milling and magnetic separation is being planned to deliver highgrade concentrates containing 67% iron at a relatively coarse size distribution of -106µm or 150 mesh (80% passing; P80). Fine and coarse tailings will be distributed into a storage facility at the mine site, via conventional slurry spigotting and beaching or into bulk storage respectively.

Iron Road has acquired 1,100 hectares of land at Cape Hardy for a Capesize port facility as part of its integrated export solution for the CEIP iron concentrate. The port is planned to have an initial capacity of 30Mtpa, with 10Mtpa of the capacity available to third parties. Planning is underway to construct a heavy haulage, standard gauge rail line between the mine and port sites. The rail line could potentially be expanded to connect with the existing national rail network, extending port access for the larger Capesize vessels to approximately 25% of Australia’s land mass. The site has relatively benign weather all year round, with no seasonal cyclonic activity to hinder operations.

Studies are continuing for the delivery of power and water to the sites. A water treatment and storage facility at the mine site is being investigated to supply fresh water for concentrate washing as well as potable water for construction and domestic uses. The majority of water used in the project will be untreated seawater.

Environmental impact and benefit assessments are progressing well in the areas of air (including dust), water (ground, surface and marine), flora and fauna. Social, transport, noise and tailings assessments will be a focus during the upcoming quarter.

Mine, Processing Plant and Associated Infrastructure

Coffey Mining has commenced open pit optimisation and mine planning following the close-out of the recent Murphy South – Rob Roy drilling programme and upgraded mineral resource estimate. This planning exercise will result in feasibility pit designs for the Murphy South and Boo-Loo resources, and will generate indicative life of mine production schedules, along with improved confidence in site layouts and infrastructure configuration (Figure 8). Progressive mine production schedules, generated during the course of feasibility studies, will be used to refine mining cost models and mining equipment requirements.

Page | 6

==> picture [595 x 117] intentionally omitted <==

==> picture [364 x 249] intentionally omitted <==

Figure 8 Pit optimisation work is underway.

Mine optimisation and planning utilises recent open pit geotechnical analysis and assessment, also completed by Coffey Mining. Geotechnical criteria from this assessment are based on data acquired from a combination of exploration and dedicated drilling of geotechnical core. The geotechnical database is extensive, totalling 338 diamond core holes that have been geotechnically logged, including 295 angled holes that provide defect orientation data. In addition to the primary acquisition of rock defect data, geotechnical investigations over recent months includes:

  • Compressive and shear strength test work,

  • Rockfall analysis; and

  • Rock-mass and structural stability analysis.

Geotechnical review during the recent quarter excludes some of the last exploratory holes drilled in the resource upgrade programme. These holes, along with the most up to date hydro-geological assessment, will be included in a final geotechnical analysis, to be completed later in the year.

SKM commenced the second phase of hydrogeological investigation and assessment in May 2013, which will build on findings from the initial investigations completed in 2012. The earlier investigations considered the broader characterisation of the ground water regime, along with a conceptual understanding of potential influences of likely mining activities on the groundwater system. The first programme included the installation of eight long-term monitoring bores, which are suitable for detecting changes to the groundwater level and quality as the CEIP progresses from exploration through study to operation. The second phase of investigation is intended to include the installation of additional test bores and pumping test work. Hydrogeological studies will specifically quantify the likely dewatering requirements and consider dewatering infrastructure associated with open pit mining and other activities, along with assessment of potential influences on the groundwater in vicinity of the open pit.

Page | 7

==> picture [595 x 117] intentionally omitted <==

A preliminary study into the tailings storage facility (TSF) was completed in 2012, which has been the subject of intense internal and external review during the first half of 2013. The definitive feasibility stage of study commenced in June 2013 and will be completed by ATC Williams Pty Ltd; an Australian engineering consultancy with international experience in the areas of mine tailings storage and management. The feasibility study will investigate, analyse and assess a TSF design proposal which is expected to provide robust and safe disposal or tailings over the life of mine, as well as suitable closure time-frame and long-term arrangements for site rehabilitation.

Investigations and study of infrastructure and concentrate delivery facilities continued throughout the quarter. The basis of design has been established for the following facilities.

  • Port marine – design development of tug harbour, wharf and jetty arrangements and module offloading facilities (Figure 9), including confirmation of the general arrangement of facilities.

  • Port infrastructure – optimisation of cut and fill, building layout and configuration, drainage design, and improved alignment of the access roads.

  • Materials handling – design development including confirmation of stockyard machines and length of pile, conveyors alignment and profiles, rail car dumper and dust controls.

  • Rail system – simulation of the network was completed based on steady state production of concentrate.

Planning to complete the infrastructure studies is well advanced and design and engineering will now ramp-up. Estimation and capital costs for infrastructure components are envisaged to commence during the September quarter, leading to completion of the DFS Report by year-end.

==> picture [345 x 251] intentionally omitted <==

Figure 9 Tug harbour and module offloading facilities (MOF).

Proposals have been received for study of seawater supply to the ore processing facilities and treatment of sea water to provide desalinated water for concentrate washing, as well as for the construction camp and operations village. Adjudication and award of study service will be closed early in the next quarter.

Tenova Projects, (formerly Bateman), has made significant progress through the preliminary engineering of the process plant and associated facilities. Sizing and budget costing of all major equipment in the current layout has been completed and costs estimates are well underway.

Page | 8

==> picture [595 x 117] intentionally omitted <==

Recently completed modelling, based on data derived from microscopic analysis of the ore body, has indicated that potential benefits may be gained from a gravity circuit in the milling area scalping off a high grade, coarser concentrate.

This is expected to yield further early rejection of tailings with an overall saving in mill power and reduction in the number of operating units required in the screening and cleaner magnetic separation circuits, as less material is required to pass through. The overall outcome is a reduction in consumed power as well as both capital and operating costs. A gravity test work campaign will be conducted in July and August 2013 to confirm the magnitude of the benefits and to provide information for the design of the circuit to be included in the definitive feasibility study.

Metallurgical Test Work

AMDEL-BV, a leading mineral testing service provider, is conducting metallurgical investigation of core intersections from mineralised zones drilled in zones likely to be mined early in the mine life. Testing has advanced to completion of a pilot milling campaign on a bulk sample, generating a ‘rougher’ concentrate sample for further confirmatory classification test work in the USA. The products of this screening investigation will then be used for the proposed gravity recovery test work and to conduct a cleaner magnetic separation pilot trial. This definitive test work programme will confirm process design criteria for improved iron recovery and generate additional concentrate for marketing purposes.

A programme of metallurgical Davis tube recovery tests (MDTR), at the target grind size of the process plant (106µm), were conducted in parallel with geological Davis tube recovery tests (GDTR) on the same core intervals. The GDTR tests are conducted at a finer grind size, and provide a quicker procedure for determination of magnetite recovery compared to conventional metallurgical test work. More than 5000 GDTR tests have been conducted to date across the CEIP prospects. The results from both DTR test datasets were analysed statistically and demonstrated a strong, positive, linear relationship between the MDTR and GDTR recoveries (R[2] = 0.95) (Figure 10). This outcome allows the GDTR tests results to be applied to the prediction of metallurgical recovery of mineralisation across the mining zones, enabling Iron Road to avoid the costly requirement to run additional MDTR tests.

==> picture [467 x 222] intentionally omitted <==

----- Start of picture text -----

GDTR vs MDTR Iron Recovery
100.0
90.0 R² = 0.946
80.0
Figure 10
70.0
60.0 Strong linear relationship
between geological and
50.0
metallurgical DTR iron
40.0 recoveries.
30.0
20.0
10.0
0.0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00 90.00 100.00
GDTR Fe
MDTR Fe
----- End of picture text -----

The Davis tube recovery test apparatus containing a CEIP magnetite sample during testing is shown in Figure 11. The black accumulation in the glass tube in the middle of the image is the magnetite concentrate being held in the Davis tube magnetic field while the gangue minerals are washed clear through to the discharge stream.

Page | 9

==> picture [595 x 117] intentionally omitted <==

==> picture [196 x 261] intentionally omitted <==

Figure 11

Close up of Davis Tube Recovery Test apparatus showing magnetite concentrate between the two magnetic poles.

The bulk composite material, obtained from PQ cores was subjected to high pressure rolls crushing, (HPRC) and wet screening to the target RMS feed size. Rougher magnetic separation (RMS) testing of the bulk sample was conducted in wet condition to reflect plant operation, and an expected small increase in the efficiency of fine particle separation was realised. A 100kg portion of the RMS concentrate was subsequently milled and put through cleaner magnetic separation (CMS) to generate final concentrate and tailings samples for further test work for confirmation of tailings properties and to confirm mass recovery in this section of the flowsheet. Figure 12 shows the CMS concentrate and tailings (unfiltered) and Figure 13 the pilot milling circuit used for the test work.

==> picture [288 x 217] intentionally omitted <==

Figure 12

Final concentrate (left) and cleaner magnetic separation tails (right).

Page | 10

==> picture [595 x 117] intentionally omitted <==

==> picture [279 x 210] intentionally omitted <==

Figure 13

Pilot milling circuit in operation at Amdel. The mill is located within the yellow guarding in centre right of the picture.

Marketing

Iron Road marketing and senior staff continue to visit the Chinese steel market and receive strong expressions of interest in the CEIP as a future provider of iron concentrate. The possibility of IRD providing the market with earlier iron concentrate from the Gawler Iron Project (GIP) has also been well received.

A significant acceleration in marketing related visits to Chinese steel mills is planned for the next quarter.

Community Engagement

Iron Road hosted two public information sessions at Warramboo and Wudinna during May 2013 to discuss the next phase of community engagement and how community members could take a lead role in the development of a Community Consultative Committee (CCC) or similar reference group, in relation to the proposed mine at Warramboo.

The sessions comprised presentations from Iron Road’s community team, the Department of Manufacturing, Innovation, Trade, Resources and Energy (DMITRE) and Community Engagement Group Australia (cega), highlighting how a CCC could work to meet the needs of the community, the Regulator and the Company. Cega provided information on how other companies have utilised consultative groups to effectively involve communities in developing projects and representatives from DMITRE gave an overview of the Regulator’s expectations in relation to community consultation.

The nomination process is underway, with the aim of capturing broad community representation. The CCC will be chaired by an Independent Chairperson acceptable to the community and the Company.

==> picture [305 x 122] intentionally omitted <==

Figure 14 Wudinna Information Session L-R: Bob Goreing, cega, Peter Treloar MP, Michael Smith and Melissa Muller, DMITRE, Tim Scholz and Tilly Smart, Iron Road.

(Photo courtesy J & T Spence).

Page | 11

==> picture [595 x 117] intentionally omitted <==

South Australia – Gawler Iron Project

The Gawler Iron Project is located approximately 25km north of the standard gauge Trans-Australian Railway that connects to the Central Australia Railway at Tarcoola and ultimately a number of ports.

The project hosts potential for a small to medium scale iron ore development with the potential to produce 1-2Mtpa of a high quality concentrate through simple beneficiation, with similar characteristics to that proposed for the larger CEIP. A scoping study to further define that potential is currently underway.

Exploration by Iron Road at Gawler commenced during July 2009. This work included the Stage I regional RC drilling programme (6,101m) and follow-up Stage II diamond drilling programme (1,433m). The results from Stage I & II drilling identified the Boomer prospect as a potentially significant iron deposit situated below 25m of unconsolidated sand. The iron mineralisation has a thin cap of hematite mineralisation and occurs in a ~110m wide zone of moderately to steeply dipping folded and faulted, coarse-grained, magnetite-rich ironstone.

The ironstone has been mapped along strike for at least 1,000m and is open at depth. Drill samples from the Boomer prospect returned an average grade of 25% iron with high grade zones containing over 40% iron. During June 2012 the Company moved to secure 90% ownership of the iron ore rights at Gawler. Shortly afterward the current scoping study was initiated to review the economic viability of potential mining and beneficiation operations.

As part of the scoping study the Stage III drilling programme commenced during March 2013 at the Boomer prospect and concluded during the quarter (Figure 15). The programme comprised three PQ diamond drill holes (669m) and 21 RC (reverse circulation) holes (3,795m), for a total of 4,464m. Rehabilitation of drill sites has commenced and is expected to be completed shortly.

==> picture [311 x 323] intentionally omitted <==

----- Start of picture text -----

SCALE
2Km N
Stage III drilling
programme area
----- End of picture text -----

==> picture [42 x 10] intentionally omitted <==

----- Start of picture text -----

Figure 15
----- End of picture text -----

Stage III drill programme location map, together with Stage I and II collar locations.

Page | 12

==> picture [595 x 117] intentionally omitted <==

All RC holes were drilled at –60 degrees set on north-westerly azimuth of 300⁰ at depths varying from 108m to 319m, with a total of eight sections completed. Sections are spaced varying from 100m to 200m apart and specifically planned to determine the strike extent of the Boomer prospect in a south-westerly and north-easterly direction (Figure 16 & 17).

==> picture [234 x 265] intentionally omitted <==

==> picture [237 x 265] intentionally omitted <==

Figure 16 Magnetic anomaly and interpreted geology at the Boomer prospect showing Stage III drilling traverses.

==> picture [383 x 269] intentionally omitted <==

Figure 17 Cross-section looking northeast, section B0425, Stage III drilling, Boomer Prospect.

Page | 13

==> picture [595 x 117] intentionally omitted <==

Eighteen of the 21 RC drill holes intersected magnetite-rich ironstone with significant downhole intercepts shown in bold in Table 2. Two drill holes, GWL090 and GWL105, were abandoned due to hole collapse.

Table 2

SiteID Drilling
Type
Date Finished Section
ID
Planned
mE
Planned
mN
Planned Depth
(m)
Final Depth
(m)
Mineralization
from m
Mineralization
to m
Mineralization
interval m
GWL082 DD 23/03/2013 B0325 350,944 6,645,998 200 190.9 31 188 157
GWL083 DD 7/04/2013 B0525 351,038 6,646,176 200 210.3 46 199 153
GWL084 RC 1/04/2013 B0425 351,063 6,646,037 320 319.0 5 265 260
GWL085 DD 15/04/2013 B0250 350,983 6,645,879 305 267.5 121 256 135
GWL086 RC 17/04/2013 B0050 350,725 6,645,816 150 151.0 120 127 7
GWL087 RC 22/04/2013 B0050 350,786 6,645,773 150 151.0 51 89 38
GWL088 RC 24/04/2013 B0050 350,848 6,645,730 150 107.5 72 85 13
GWL089 RC 25/04/2013 B1050 351,155 6,646,735 150 157.0 120 126 6
GWL090 RC 26/04/2013 B1050 351,217 6,646,692 200 37.0 10 30 20
GWL091 RC 28/04/2013 B1050 351,217 6,646,692 200 145.0 12 40 28
GWL092 RC 1/05/2013 B1050 351,278 6,646,649 150 145.0 119 133 14
GWL093 RC 3/05/2013 B1050 351,339 6,646,606 150 151.0 No Mineralisation -
GWL094 RC 5/05/2013 B1050 351,401 6,646,563 200 157.0 No Mineralisation -
GWL095 RC 7/05/2013 B0650 351,171 6,646,235 350 331.0 145 331 186
GWL096 RC 8/05/2013 B0850 351,184 6,646,471 150 129.0 No Mineralisation -
GWL097 RC 10/05/2013 B0850 351,245 6,646,428 200 253.0 147 222 75
GWL098 RC 13/05/2013 B1050 351,307 6,646,385 300 331.0 184 328 144
GWL099 RC 15/05/2013 B0850 351,188 6,646,346 250 253.0 118 240 122
GWL100 RC 19/05/2013 B0850 351,229 6,646,317 300 301.0 153 301 148
GWL101 RC 22/05/2013 B0850 351,126 664,387 150 115.0 53 70 17
GWL102 RC 26/05/2013 B0525 350,995 6,646,206 150 151.0 6 113 107
GWL103 RC 27/05/2013 B0150 350,783 6,645,897 150 151.0 28 40 12
GWL104 RC 28/05/2013 B0150 350,844 6,645,854 200 199.0 32 125 93
GWL105 RC 29/05/2013 B0150 350,906 6,645,811 250 60.0 - - -

From visual estimates, grades are expected to vary from less than 10% to above 30% of magnetite iron which are within expectations. The three large diameter (PQ) diamond holes were drilled at -60 degrees dip with downhole ironstone mineralisation intercepts of up to 260m, providing four tonnes of ironstone sample for dispatch to Europe for metallurgical test work.

Drilling suggests that mineralisation at the Boomer Prospects extends at least 600m along strike in a north-easterly direction, with an apparent width of intercepts varying from 6m to 260m and averaging 87m. The two holes terminated due to technical issues were still in mineralisation. Geological and assay data will allow for geological interpretation, geostatistical evaluation and mineral resource modelling of the Boomer Prospect during the next quarter. The current exploration target at Boomer is 55-95Mt ironstone at an estimated grade of 25-30% iron[2] .

The metallurgical test programme commenced during June 2013 and is expected to be completed by the end of August 2013. The test programme will provide data necessary for the design of the ore processing facility.

2 It is common practice for a company to comment on and discuss its exploration in terms of target size, grade and type. The potential quantity and grade of an exploration target is conceptual in nature since there has been insufficient work completed to define the prospects as anything beyond exploration target. It is uncertain if further exploration will result in the determination of a Mineral Resource.

Page | 14

==> picture [595 x 117] intentionally omitted <==

Work is also being undertaken in the areas of:

  • a) Concentrate transport, including rail and port facilities;

  • b) Haul road construction from the ore treatment facility to the (existing) rail siding and provision of road haulage services for concentrate transport;

  • c) Water supply and treatment; and

  • d) Transportation of modularised ore treatment plant to site.

Further discussions have taken in relation to access to the Wynbring rail siding on the Trans-Australian railway line. After rail operators have submitted concentrate transport proposals, assessment will be made of the works required to make the Wynbring rail siding operational.

CORPORATE

Iron Road launched a fully underwritten one-for-one non-renounceable entitlement offer of new Iron Road shares at an offer price of $0.18 per New Share to raise approximately $50.7 million (after the costs of the Entitlement Offer).

The Entitlement Offer is fully underwritten by two of Iron Road’s major shareholders, and private equity resources funds, being Sentient Global Resources Fund III, L.P. and Sentient Global Resources Fund IV, L.P.

The Entitlement Offer will provide funding to complete the DFS, as well as enabling Iron Road to continue strategic acquisitions of property to support the combined mining, processing, rail and port operation. Iron Road’s smaller scale Gawler Iron Project will also receive a portion of the funds to formally establish, beyond the current scoping study, the potential for shorter term production with lower capital outlay.

Continuing community activities included the sponsorship of the Wudinna Area School, Girls U16 Pedal Prix Team, being the third year that Iron Road has sponsored Wudinna Area School's participation in the Pedal Prix.

Figure 21

Iron Road sponsored the Wudinna Area School, Girls U16 Pedal Prix Team.

==> picture [312 x 182] intentionally omitted <==

  • ENDS -

Page | 15

==> picture [595 x 117] intentionally omitted <==

ADDITIONAL INFORMATION – Glossary

Aeromag survey – Short for aeromagnetic survey, an aeromag survey is a common type of geophysical method carried out using a magnetometer aboard or towed behind an aircraft. The aircraft typically flies in a grid like pattern with height and line spacing determining the resolution of the data. As the aircraft flies, the magnetometer records tiny variations in the intensity of the ambient magnetic field and spatial variations in the Earth’s magnetic field. By subtracting the solar and regional effects, the resulting aeromagnetic map shows the spatial distribution and relative abundance of magnetic minerals (most commonly magnetite) in the upper levels of the crust.

DTR – Davis Tube Recovery testing is used to separate ferromagnetic and non-magnetic fractions in small samples of approximately 20g at a time. The test is suited to establishing the recoveries likely from a magnetic separation process. This can assist mineral body assessment for magnetite, hematite or combinations thereof.

Gravity survey – A geophysical method undertaken from the surface or from the air which identifies variations in the density of the earth from surface to depth. It is used to directly measure the density of the subsurface, effectively the rate of change of rock properties. From this information a picture of subsurface anomalies may be built up to more accurately target mineral deposits. For iron exploration gravity surveys are commonly overlain on magnetic surveys to help identify and target fresh and oxidised iron ore (ie. magnetite and hematite).

HBF – Horizontal Belt Filters are commonly used vacuum filters due to their flexibility of operation and suitability to handle large throughputs.

Hematite – Hematite is a mineral, coloured black to steel or silver-grey, brown to reddish brown or red. Hematite is a form of Iron (III) oxide (Fe2O3), one of several iron oxides.

LiDAR – Light Detection and Ranging. LiDAR is an active remote sensing system that uses a laser light beam to measure vertical distance from the features of interest.

Magnetite – Magnetite is a form of iron ore, one of several iron oxides and a ferrimagnetic mineral with chemical formula Fe3O4 and a member of the spinel group. It is metallic or dull black and a valuable source of iron ore. Magnetite is the most magnetic of all the naturally occurring minerals on Earth, and these magnetic properties allow it to be readily refined into an iron ore concentrate.

Martite – The name given for Hematite pseudomorphs after Magnetite. More simply put primary magnetite that has been totally replaced by secondary hematite through oxidation.

Specularite – A black or grey variety of hematite with brilliant metallic lustre, occurring in micaceous / foliated masses or in tabular or disk-like crystals. Also known as specular iron.

XRF – X-Ray Fluorescence spectroscopy is used for the qualitative and quantitative elemental analysis of geological and other samples. It provides a fairly uniform detection limit across a large portion of the Periodic Table and is applicable to a wide range of concentrations, from 100% to few parts per million (ppm).

HBF – Horizontal Belt Filters are commonly used vacuum filters due to their flexibility of operation and suitability to handle large throughputs.

Page | 16

==> picture [595 x 117] intentionally omitted <==

Attachment 1 – Mineral Resource Estimates

CEIP Global Mineral Resource
Location Classification Tonnes
(Mt)
Fe
(%)
SiO2
(%)
Al2O3
(%)
P
(%)
LOI
(%)
Murphy
South/Rob Roy
Measured
Indicated
Inferred
2,222
474
667
15.69
15.6
16
53.70
53.7
53
12.84
12.8
12
0.08
0.08
0.08
4.5
4.5
4.3
Boo-Loo Inferred 328 17 52 12 0.09 2.1
Total 3,691 16 53 13 0.08 4.3

The Murphy South/Rob Roy mineral resource estimate was carried out following the guidelines of the JORC Code (2004) by Iron Road Limited and peer reviewed by Xstract Mining Consultants (Rob Roy). The Boo-Loo mineral resource estimate was carried out following the guidelines of the JORC Code (2004) by Coffey Mining Ltd.

CEIP Indicative Concentrate Specification – 106 micron (p80)

CEIP Indicative Concentrate Specification – 106 micron (p80) CEIP Indicative Concentrate Specification – 106 micron (p80) CEIP Indicative Concentrate Specification – 106 micron (p80) CEIP Indicative Concentrate Specification – 106 micron (p80)
Iron (Fe) **Silica (SiO2) ** **Alumina (Al2O3) ** Phosphorous (P)
67% 3.3% 1.9% 0.005%

Murphy South - Rob Roy Mineral Resource Estimate

Murphy South - Rob Roy Mineral Resource Estimate Murphy South - Rob Roy Mineral Resource Estimate Murphy South - Rob Roy Mineral Resource Estimate Murphy South - Rob Roy Mineral Resource Estimate Murphy South - Rob Roy Mineral Resource Estimate Murphy South - Rob Roy Mineral Resource Estimate Murphy South - Rob Roy Mineral Resource Estimate Murphy South - Rob Roy Mineral Resource Estimate
Resource
**Classification **
Oxidation Tonnes
(Mt)
Fe
(%)
SiO2
(%)
Al2O3
(%)
P
(%)
LOI
(%)
Measured
Fresh
2,222 15.69 53.70 12.84 0.08 4.5
Indicated
Fresh
474 15.6 53.7 12.8 0.08 4.5
Inferred
Fresh
Transitional
Oxide
548
32
87
16
16
16
53
51
51
12
14
14
0.09
0.05
0.05
4.0
5.5
5.8
Total
Murphy South/Rob Roy
3,363 16 53 13 0.08 4.5

The Murphy South/Rob Roy mineral resource estimate was carried out following the guidelines of the JORC Code (2004) by Iron Road Limited and peer reviewed by Xstract Mining Consultants (Rob Roy).

Boo-Loo Mineral Resource Estimate

Boo-Loo Mineral Resource Estimate Boo-Loo Mineral Resource Estimate Boo-Loo Mineral Resource Estimate Boo-Loo Mineral Resource Estimate Boo-Loo Mineral Resource Estimate Boo-Loo Mineral Resource Estimate Boo-Loo Mineral Resource Estimate Boo-Loo Mineral Resource Estimate
Resource
**Classification **
Oxidation Tonnes
(Mt)
Fe
(%)
SiO2
(%)
Al2O3
(%)
P
(%)
LOI
(%)
Inferred Fresh
Transitional
Oxide
277
13
38
17
17
17
52
52
52
12
12
12
0.01
0.09
0.09
0.5
10.7
10.8
Total 328 17 52 12 0.09 2.1

The Boo-Loo mineral resource estimate was carried out following the guidelines of the JORC Code (2004) by Coffey Mining Ltd.

Page | 17

==> picture [595 x 117] intentionally omitted <==

For further information, please contact:

Andrew Stocks, Managing Director Iron Road Limited Tel: +61 8 9200 6020 Mob: +61 (0)403 226 748 Email: [email protected]

Shane Murphy FTI Consulting Tel: +61 8 9485 8888 Mob: +61 (0)420 945 291 Email: [email protected]

Or visit www.ironroadlimited.com.au

Iron Road’s principal project is the Central Eyre Iron Project (CEIP) in South Australia. The wholly owned CEIP is a collection of three iron occurrences (Warramboo, Kopi & Hambidge) with an exploration potential of 2.8-5.7 billion tonnes of magnetite gneiss at a grade of 18-25 % iron*.

A prefeasibility study has demonstrated the viability of a mining and beneficiation operation initially producing 12.4Mtpa of premium iron concentrate for export. A definitive feasibility study is currently assessing production of 20Mtpa of iron concentrates

Metallurgical test work indicates that a coarsegrained, high grade, blast furnace quality concentrate may be produced at a grind size of -106µm grading 67% iron with low impurities.

* Coffey Mining (Iron Road Limited ASX announcement 01 September 2009).

==> picture [224 x 226] intentionally omitted <==

* It is common practice for a company to comment on and discuss its exploration in terms of target size, grade and type. The potential quantity and grade of an exploration target is conceptual in nature since there has been insufficient work completed to define the prospects as anything beyond an exploration target. It is uncertain if further exploration will result in the determination of a Mineral Resource, in cases other than the Boo-Loo and Murphy South-Rob Roy prospects.

The information in this report that relates to global exploration targets at the Central Eyre Iron Project is based on and accurately reflects information compiled by Mr Albert Thamm, Coffey Mining, who is a consultant and advisor to Iron Road Limited and a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Thamm has sufficient experience relevant to the style of mineralisation and the type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Coffey consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to Resources estimated for the Boo-Loo prospect is based on and accurately reflects information compiled by Mr Ian MacFarlane, Coffey Mining, who is a consultant and advisor to Iron Road Limited and a Fellow of the Australasian Institute of Mining and Metallurgy. Mr MacFarlane has sufficient experience relevant to the style of mineralisation and the type of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Coffey Mining consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

The information in this report that relates to Resources estimated for the Murphy South – Rob Roy prospect is based on and accurately reflects information compiled by Ms Heather Pearce, who is a full time employee of Iron Road Limited. This estimation was peer reviewed by Dr Isobel Clark of Xstract Mining Consultants. Dr Clark has sufficient experience relevant to the style of mineralisation and the type of deposits under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Xstract Mining Consultants consents to the inclusion in the report of the matters based on the information in the form and context in which it appears.

Page | 18

Appendix 5B Mining exploration entity quarterly report

Rule 5.3

Appendix 5B

Mining exploration entity quarterly report

Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001, 01/06/10.

Name of entity

IRON ROAD LIMITED

ABN
51 128 698 108
Quarter ended (“current quarter”)
51 128 698 108 30 June 2013

Consolidated statement of cash flows

Cash flows related to operating activities
1.1
Receipts from product sales and related debtors
1.2
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) administration
1.3
Dividends received
1.4
Interest and other items of a similar nature
received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Other
GST to be recouped
NetOperating Cash Flows
Current quarter
$A’000
Year to date
$A’000
(12 months)
-
(7,442)
-
-
(932)
-
192
-
-
(105)
-
(28,184)
-
-
(4,041)
-
795
-
-
(264)
(8,287) (31,694)
Cash flows related to investing activities
1.8
Payment for purchases of:
(a) prospects
(b) equity investments
(c) other fixed assets
1.9
Proceeds from sale of:
(a) prospects
(b) equity investments
(c) other fixed assets
1.10
Loans to other entities
1.11
Loans repaid by other entities
1.12
Other (provide details if material)
Net investing cash flows
1.13
Total operating and investing cash flows
(carried forward)
-
-
(57)
-
-
-
-
-
-
-
-
(6,708)
-
-
-
-
-
-
(57) (6,708)
(8,344) (38,402)
  • See chapter 19 for defined terms.

Appendix 5B Page 1

30/9/2001

Appendix 5B Mining exploration entity quarterly report

1.13
Total operating and investing cash flows
(brought forward)
(8,344) (38,402)
Cash flows related to financing activities
1.14
Proceeds from issues of shares, options, etc.
1.15
Proceeds from sale of forfeited shares
1.16
Proceeds from borrowings
1.17
Repayment of borrowings
1.18
Dividends paid
1.19
Other – capital raising costs
Net financing cash flows
-
-
-
-
-
(293)
40,909
-
-
-
-
(2,097)
(293) 38,812
Net increase (decrease) in cash held
1.20
Cash at beginning of quarter/year to date
1.21
Exchange rate adjustments to item 1.20
1.22
Cash at end ofquarter
(8,637)
15,547
-
410
6,500
-
6,910 6,910

Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities

1.23
1.24
Aggregate amount of payments to the parties included in item 1.2
Aggregate amount of loans to the parties included in item 1.10
Current quarter
$A'000
169
Nil
1.25 Explanation necessaryfor an understandingof the transactions
All transactions involving Directors and associates were on normal commercial terms.

Non-cash financing and investing activities

  • 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows Nil

  • 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest Nil

  • See chapter 19 for defined terms.

Appendix 5B Page 2

30/9/2001

Appendix 5B Mining exploration entity quarterly report

Financing facilities available

Add notes as necessary for an understanding of the position.

Amount available Amount used
$A’000 $A’000
Nil Nil
Nil Nil
Financing facilities available
Add notes as necessary for an understanding of the position.
Financing facilities available
Add notes as necessary for an understanding of the position.
Amount available
$A’000
Amount used
$A’000
3.1
Loan facilities
3.2
Credit standby arrangements
Nil Nil
Nil Nil
Estimated cash outflows for next quarter
4.1
Exploration and evaluation
4.2
Development
4.3
Production
4.4
Administration
$A’000
12,550
-
-
940
Total 13,490
Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows) to
the related items in the accounts is as follows.
Current quarter
$A’000
Previous quarter
$A’000
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
2,638
4,272
-
-
3,775
11,772
-
-
Total: cash at end of quarter(item 1.22) 6,910 15,547

Changes in interests in mining tenements

6.1
Interests in mining
tenements relinquished,
reduced or lapsed
6.2
Interests in mining
tenements acquired or
increased
Tenement
reference
Nature of interest
(note (2))
Interest at
beginning
ofquarter
Interest at
end of
quarter
Nil
Nil
  • See chapter 19 for defined terms.

Appendix 5B Page 3

30/9/2001

Appendix 5B Mining exploration entity quarterly report

Issued and quoted securities at end of current quarter

Description includes rate of interest and any redemption or conversion rights together with prices and dates.

Total number Number quoted Issue price per
security (see
note 3)
Amount paid up per
security (see note 3)
7.1
Preference+securities
(description)
7.2
Changes during quarter
(a) Increases through
issues
(b) Decreases through
returns of capital, buy-
backs,redemptions
7.3
+Ordinary securities
7.4
Changes during quarter
(a) Increases through
issues
(b) Decreases through
returns of capital, buy-
backs
290,968,452* 290,968,452 Fully paid
7.5
+Convertible debt
securities(description)
7.6
Changes during quarter
(a) Increases through
issues
(b) Decreases through
securities matured,
converted
7.7
Options (description
and conversion factor)
7.8
Issued during quarter
7.9
Exercised during
quarter
7.10
Expired during quarter
3,000,000
625,000
625,000
625,000
625,000
500,000
100,000
100,000
100,000
Exercise price
$0.3426
$0.1926
$0.2426
$0.2926
$0.3426
$0.9926
$0.9926
$1.2426
$1.4926
Expiry date
6/8/13
15/12/14
15/12/14
15/12/14
15/12/14
25/07/16
24/08/16
24/08/16
24/08/16
7.11
Debentures
(totals only)
7.12
Unsecured notes
(totals only)

Note *: This does not include the proposed issue of 290,968,452 fully paid ordinary shares pursuant to the fully underwritten pro-rata 1 for 1 non-renounceable entitlement offer announced by Iron Road on 13 June 2013 to eligible shareholders of Iron Road (Entitlement Offer).

  • See chapter 19 for defined terms.

Appendix 5B Page 4

30/9/2001

Appendix 5B Mining exploration entity quarterly report

Compliance statement

  • 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 4).

  • 2 This statement does /does not* (delete one) give a true and fair view of the matters disclosed.

Sign here:

............................................... Date: 16 July 2013 ( ~~Director~~ /Company secretary)

Print name: GRAHAM DOUGLAS ANDERSON

Notes

  • 1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.

  • 2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.

  • 3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .

  • 4 The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and AASB 1026: Statement of Cash Flows apply to this report.

  • 5 Accounting Standards ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.

== == == == ==

  • See chapter 19 for defined terms.

Appendix 5B Page 5

30/9/2001