Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

IRON BEAR RESOURCES LTD Investor Presentation 2006

Jul 9, 2006

65091_rns_2006-07-09_b19bef85-c041-44e0-821a-a2433e8e0314.pdf

Investor Presentation

Open in viewer

Opens in your device viewer

10 July 2006

The Company Announcements Office Australian Stock Exchange Limited

Via E Lodgement

CAPE LAMBERT IRON ORE LTD PRESENTATION

Please find attached a copy of the Cape Lambert Iron Ore Ltd (ASX:CFE) presentation as at July $7th$ 2006.

CFE Non-Executive Chairman, Ian Burston and Executive Director, Tony Sage will be visiting London this week to meet with current shareholders and broker representatives. The attached presentation will be use during this time.

Should there be any queries on this matter please do not hesitate to contact the writer.

Yours faithfully

CAPE LAMBERT IRON ORE LTD

Tony Sage

Executive Director

The mineral Resource is based on information compiled by Martin Reynolds who is a fellow of the Australian Institute of Mining & Metallurgy. Mr Reynolds is a Director of Mackay & Schnellmann Pty Ltd, an independent geological consultant. Mr Reynolds is qualified as a Competent person as defined in the 2004, "Australasian Code for Reporting of Mineral Resources and Reserves" $(JORC)$ .

For more information please contact: Tony Sage, Cape Lambert Iron Ore Ltd lan Burston, Cape Lambert Iron Ore Ltd. David Tasker, PPR Miikka Haromo, Collins Stewart Angus Prentice / Leesa Peters, Conduit PR-

+61 8 9380 9555 +610413998784 +61 8 9388 0944/ +61 433 112 936 +44 (0) 20 7523 8000 +44 (0) 20 7429 6603

Westen Australian Iron Ore Profect

Conocité Profile

Tolal Shares on Issue 24745 m
Opilons
31 October 2008 @ \$0.277 (ASX: CHEO) TOOLOGIA
31 October 2009 @ \$0.327 ROLL
31 October 2010 @ \$0.377 ZOTA
Oashadisahk ICTOR
Liquid Assets PAIN

Current as of July 2006

$\mathcal{L}$

Wajoriy Sharehologis

RELIES Numbar % Issued Capital
National Nominees Ltd. 40,986,261 1642%
ANZ Nominees Limited 23 119 668 9.27%
JP Morgan Fleming Aust Ltd. 22750,000 9.12%
Power United Limited 18,328,868 7.85%
Westpac Custodian Nominees Ltd 12280X272 4.90%
AWP Sace 11720075 470%
Computershare Clearing Pty Ltd. 5,544,4191 2.22%
Battle Mountain Pty Ltd. 4 998,631 2 00%
Mittenykel toneku 4.476.809 179%
Equitech Investments Limited 2-562-050 1.08%
Shareholders as at 4 July 2006. 146 658 428 58,80%

EC 1

IVISTORIO DE L

Dr lan Burston – Non-Exceutive Chairman

Ian has more than 30 years experience in mining related industries including positions as Managing Director, CEO, Vice President and Chairman for both prominent and junior Company's. Ian is currently a non-executive Chairman of Broome Port Authority, Imdex Ltd and Aztec Resources Pty Ltd and a TOT EXECUTIVE DITECTOR OF MITTEO EXESOURCES NL.

Mr Bran Maher – Technical Director

Brian has over 40 years in the mining industry, covering both underground and open cut operations, as a miner, supervisor, mining engineer, mine manager consultant, contractor and managing director. He has worked throughout the world, including Australia, Liberia, Guyana and the Philippines.

Mr Tony Sage - Executive Director

Tony has in excess of 25 years of experience in the field or corporate advisory services, funds management and capital raising. Tony has been involved in the management and financing of Isled mining companies in Australia and internationally for the last 12 years.

Cape Lander Region ENTRY AND THE STATE OF THE CONTRACTOR

g,

(October Pennsylvania (Ortodexectorione)

G

2.5 Billion Tonnes @ 30%Fe 1.4bt in Indicated Resource category 1 15 Min Interrett Restouree earetgory (250m depth & 25%Fe cut off)

1.2 Billion Tonnes @ 38%Fe 0.67bt in Indicated Resource category 0.53bt in Inferred Resource category (250m depth & 30%Fe cut off)

This Resource was calculated from 22,662 metres of Robe historical drilling consisting of 189 drill holes

Qualification: The mineral Resource is based on information compiled by Martin Reynolds who is a fellow of the Australian Institute of Mining & Metallurey, Mr Reynolds is a Director of Mackay & Schnellmann Pty Ed, an independent geological consultant. Mr Reynolds is qualified as a Competent person as defined in the 2004, "Australasian Code for Reporting of Mineral Resources and Reserves" (JORC)

Constantino de la familia de la familia de la familia de la familia de la familia de la familia de la familia

Logistic Advantages

  • Mariton Cost 7
  • Direct connection to Gas, Power, d Infrastructure, Local Workforce etc
  • C \$25million per/kme Fortescue (FMC) ZEORO Mi Gibson (MGX) 400km Iron Ore Holdings (IOH) 250km 260km Cindalbie (GBG)

IWato PAUSI izika wakati wa matu ECOCON

Cape Lambert deposit is located on the north west coast of Western Australia, 20km north of Karratha which is a major distribution hub for iron ore, gas, etc.

ESPERSOS ESPECIALES Lexembre de la partie de la partie de la

  • · 25 Billion Tonnes JORO compliant Resource
  • $\sim$ 50 year mine life
  • $\sim$ 5mipa 15mipa concentrator to >60% from
  • Gapital ex requirements to turn key, est. \$500 million
  • · AVG Waste Ratio 0.6: 1
  • Recovery 30 35% C

Gombarison of Similar Gombariss

Siteire Structure Resource
Willich
TOHICS
ESCOSE
Executives
RICO HONOR
KONGEN
Comment
Market
Cap
Millon St
Shares
(Million)
Options
(Williem)
BHP Billion 40,000 Lake 743 PS 0
Rio Hinlo 40.000 Laice 405 DSO
Fortescue Metals (FMG) 1,350 224 2 ENCO 2,500 NA DSO
Mi Gibson (MGX) 870 201 25 250 800 NA DSO &
Concentrate
Gindalbie Metals (GBG) 230 885 22 760 1400 MA Concentrie
Grange Resources (GRR) CETA 95 16 426 1500 NA Concentrale
Gape Lambert Ron Ore (GTE) CO PATA PHA 24500 650 836 Concentrate

Current as of July 2006

STERREN

  • Location 5km's from Coast 2
  • Significant infrastructure already in place € (power, road, water and populated areas)
  • Substantial Tonnage with significant upside 2
  • Stable colliteal and economic environment 3
  • Proximity to Asian markets 2

MAYA HVƏSILID OZUCU BƏDU XIDI

  • C Assembling Professional Team
  • Large Ore Body Capable of Concentration to Acceptable D Sieel Industry Standards
  • Princ Location
  • Competitve Cost Into Ship 0
  • Sirong Iron Ore Market 0
  • Sole Foots on Developing Gape Lambert Deposit C

NEXESION

State 41

  • RC Drilling Programme Commenced 2 State 2
  • Refine Metallurgical Process for Concentrate 3
  • Reine JORO Reserve / Resource Categories 2
  • Develop Capital and Operational Estimates 3
  • Complete BFS C