Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

IRON BEAR RESOURCES LTD Interim / Quarterly Report 2009

Apr 29, 2009

65091_rns_2009-04-29_0a34d87e-df50-465a-97b4-3a35ed3679e4.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [200 x 59] intentionally omitted <==

30 April 2009

The Company Announcements Office ASX Limited

Via E Lodgement

QUARTERLY OPERATIONS REPORT AND APPENDIX 5B FOR PERIOD ENDING 31 MARCH 2009.

Yours faithfully CAPE LAMBERT IRON ORE LIMITED

==> picture [579 x 75] intentionally omitted <==

Tony Sage Executive Chairman

Cape Lambert Iron Ore Limited March 2009 Quarterly Operations Report

30 April 2009 Page 2 of 7

HIGHLIGHTS FOR THE QUARTER

Corporate

  • The Company acquired the secured debt owed by ASX listed CopperCo Limited and its subsidiaries from Macquarie Bank Limited and LinQ Capital Limited as Responsible Entity for the LinQ Resources Fund for a total cash payment of approximately AUD$72.7 million (of which approximately AUD$15.0 million is deferred until late July 2009),

  • Admission of the Company's ordinary shares to the AIM Market of the London Stock Exchange was cancelled following Shareholder approval,

  • As at 31 March 2009, the Company had cash reserves of approximately AUD$127 million,

  • A secured convertible note with a 12% coupon rate and face value of AUD$2.24 million was provided to unlisted, public company Latin Resources Pty Ltd. Latin Resources holds a number of iron ore concessions in Peru and funds provided via the convertible note will be used to explore these concessions,

  • Cape Lambert is continuing to work closely with China Metallurgical Group Corporation (purchaser in 2008 of the Company’s namesake Pilbara magnetite project), providing assistance and guidance in respect to permitting and mining approvals to enable receipt of the final cash payment of AUD$80 million in the shortest possible timeframe.

Cape Lambert South Project (100% interest, Pilbara, Western Australia)

  • Positive Davis Tube Recovery (“DTR”) results received from the initial drilling program at Cape Lambert South show that magnetite mineralisation is capable of being concentrated to a product suitable for the manufacture of blast furnace feed pellets (+65% Fe and ≤5% (silica + alumina));

  • Significant DTR intercepts include;

  • 64m (from 39m) at an average DTR recovery of 27.7% mass to concentrate with a concentrate grade of 69.6% Fe and 2.5% silica from reverse circulation (“RC”) drill hole SRC04; and

  • 52m (from 106m) at an average DTR recovery of 22.2% mass to concentrate with a concentrate grade of 68.3% Fe and 3.6% silica from RC drill hole SRC14.

Marampa Iron Ore Project (35% interest and Manager, Sierra Leone, West Africa)

  • Interest in the Marampa Project increased to 35%,

  • Air core drilling of historical tailings dumps located at the Marampa Project commenced during the quarter. Results from the air core program will enable the preparation of a JORC compliant mineral resource estimate for the tailings, which is scheduled to be completed in the September 2009 quarter,

  • Metallurgical test results received for a bulk, composite sample of historical hematite tailings located at the Marampa Project. The hematite concentrate produced from the tailings graded 65% Fe and 3.9% silica for a mass and Fe recovery of 46% and 91.6% respectively.

Cape Lambert Iron Ore Limited March 2009 Quarterly Operations Report

30 April 2009 Page 3 of 7

Company Overview

Cape Lambert Iron Ore Limited (“Cape Lambert” or the “Company”) (ASX: CFE) is an Australian domiciled, cashed-up resources and investment company, with interests in a number of resource projects and companies.

The Company manages two early definition iron assets located in the Pilbara region of Western Australia and Sierra Leone, West Africa (Figure 1). Through the provision of convertible notes it has exposure to iron ore assets in Africa and Peru, coal in South Africa and uranium in Australia.

The Company’s objective is to use its cash reserves to invest in a portfolio of early definition resource assets, principally iron ore and related steel making assets and to add value to those assets to position them for either development and/or sale.

Acquisition of CopperCo Debt

During the quarter, the Company acquired the secured debt owed by ASX listed CopperCo Limited (“CopperCo”) and its subsidiaries from Macquarie Bank Limited (“Macquarie”) and LinQ Capital Limited as Responsible Entity for the LinQ Resources Fund (hereafter “Secured Parties”).

The directors of CopperCo and other members of the CopperCo corporate group appointed joint and several administrators on 26 November 2008. On the following day, Macquarie appointed joint and several receivers and managers. Following the acquisition of the secured debt by Cape Lambert, the Macquarie receivers and managers were replaced by its own receivers and managers.

Under the transaction, Cape Lambert acquired CopperCo’s outstanding secured debt to the Secured Parties for a total cash payment of approximately AUD$72.7 million (of which approximately AUD$15.0 million is deferred until late July 2009).

In addition, Cape Lambert provided bank guarantees in place of existing performance bonds and receivers unpaid liabilities to an approximate aggregate of AUD$33.8 million.

The Board of Cape Lambert believes that the CopperCo group holds an attractive portfolio of undervalued assets and that this transaction provides an exposure to these assets in a relatively low-risk manner, whilst receiving above market returns on funds invested.

Cancellation of AIM Listing

During the quarter and following Shareholder approval on 27 February 2009, admission of the Company’s ordinary shares to the AIM Market of the London Stock Exchange was cancelled.

The Company listed on AIM on 4 May 2006 because the Directors considered at that time that the AIM market would offer additional liquidity for Shareholders and that the listing would assist the Company in its funding requirements for the Cape Lambert Iron Ore project, which was subsequently sold in 2008.

Maintaining a listing on AIM involves considerable expense and compliance with applicable laws and regulations. The Directors did not consider that the initial benefits of listing the Company on AIM remained relevant and having regard for the significant costs and resources incurred in retaining the listing, sought and received approval from Shareholders to remove the Company’s listing on AIM.

Cape Lambert Iron Ore Limited March 2009 Quarterly Operations Report

30 April 2009 Page 4 of 7

– Project Sale Final Cash Payment

During 2008, the Company sold its Pilbara namesake magnetite project to China Metallurgical Group Corporation (“MCC”) and has received AUD$320 million of the AUD$400 million sale price. The final cash payment of AUD$80 million is to be paid by MCC on the grant of a mining lease and related construction approvals in respect of the project.

The Company is continuing to work closely with MCC, providing assistance and guidance in respect to permitting and mining approvals to facilitate the grant of a mining lease and related construction approvals in the shortest possible time frame, thereby enabling receipt of the final AUD$80 million cash payment.

Mezzanine Financings

During the quarter, and through its 100% owned subsidiary Dempsey Resources Pty Ltd (“Dempsey”), the Company provided AUD$2.24 million via a secured convertible note to unlisted, public company Latin Resources Pty Ltd (“Latin Resources”). Latin Resources holds a portfolio of iron ore concessions in Peru, South America and the funds received from the convertible note will be used to advance exploration on these concessions.

Interest is payable quarterly in advance at a rate of 12% per annum and the term of the convertible note is 18 months.

Pursuant to the terms of the convertible note, Dempsey has the right before the repayment dates to convert the note into ordinary shares.

Cape Lambert is evaluating other convertible note opportunities that potentially enable it to convert to a controlling equity position in resource companies with assets the Company believes to be attractive.

Cape Lambert South Project (100% interest, Pilbara, Western Australia)

Cape Lambert South is the southern extension of China Metallurgical Group Corporation’s 1.5 billion tonne magnetite iron ore resource, and is located on granted Exploration Licence E47/1493 in the coastal Pilbara region of Western Australia (Figure 2).

During the quarter, the Company received the results from the initial drilling program at Cape Lambert South, which was completed in the December 2008 quarter.

The objective of the initial drilling program (which comprised 14 RC holes for a total advance of 4,107m and a single diamond hole (375m)) was to test an identified 3km long magnetic anomaly for magnetite mineralisation, and if successful, to determine if the magnetite mineralisation could be concentrated into suitable feed stock for the steel making industry.

The drilling has identified two units of magnetite bearing banded iron formation (“BIF”) over a strike length of approximately 1km, dipping steeply to the south, and located in the central portion of the magnetic anomaly. The BIF is open to the southwest (Figure 3).

Significant drill results are summarised in Table 1, and show that magnetite mineralisation at Cape Lambert South is capable of being concentrated to a product suitable for the manufacture of blast furnace feed pellets (+65% Fe and ≤5% (SiO2 + AI2O3)).

Based on the initial results, the Company is proposing to complete an infill drill program, which is expected to commence in the second half of 2009. Several step-out holes are also planned to test the extension to the southwest.

Core from diamond drill hole SDD1 (which is located within the magnetite bearing BIF) has been prepared for a metallurgical test program, which incorporates crushing, grinding, coarse

Cape Lambert Iron Ore Limited March 2009 Quarterly Operations Report

30 April 2009 Page 5 of 7

cobbing, laboratory scale magnetic separation and concentrate sulphur reduction. Furthermore, given the high iron, and low silica and alumina DTR concentrate grades, the metallurgical test program will also assess the suitability of the concentrate for Direct Reduction feed pellets, which receive a significant price premium to blast furnace feed pellets. Results from this program will be announced when they are available.

Marampa Iron Ore Project (35% interest and Manager, Sierra Leone, West Africa)

On 1 October 2008, the Company completed an agreement with AIM listed African Minerals Limited (“African Minerals”) for a 30% investment in the Marampa iron ore project (“Marampa Project”), located in Sierra Leone, West Africa (Figure 4) (refer ASX release dated 1 October 2008 for the terms of the investment). During the quarter, the Company increased its investment in the Marampa Project to 35% (refer ASX release dated 22 January 2009).

The Marampa Project comprises;

  • A 319km[2] granted exploration licence (EXPL09/06),

  • An inventory of specular hematite tailings from former mining operations, and

  • A brownfields exploration opportunity representing extensions of specular hematite mineralisation to the northeast and west of the former Marampa mining operations, and regional exploration targets.

The Company’s near term work plan for the Marampa Project is to evaluate the development of a tailings retreatment operation, and to explore the extensions to the hematite mineralisation and regional targets.

The Marampa Project has reduced barriers to entry compared to a “greenfields” project through its connection by an 84km railway to an existing deep water port, stockpiling and ship loading facility located at Pepel (“Rail and Port Infrastructure”) (Figure 4). Pursuant to its investment, the Company has a right of access to the Rail and Port Infrastructure, which is currently leased from the government of Sierra Leone by African Minerals.

Tailings

During the quarter, the Company collected a 370kg bulk tailings sample for metallurgical test work. This sample was despatched to independent, Australian metallurgical testing group, AMMTEC Limited, where a sighter test program was completed. The objective of the sighter test program was to assess a number of beneficiation options to enable the production of a hematite concentrate from the tailings at greater than or equal to 65% Fe for, blast furnace or direct reduction, pellet production.

The sighter metallurgical test regime, which comprised wet, high intensity magnetic separation for roughing and cleaning, and reverse flotation cleaning of the middlings fraction produced a high-grade concentrate suitable for the manufacture of blast furnace feed pellets and/or sinter (Table 2). Importantly, the high-grade concentrate was produced with a mass recovery of 46.2% and a high iron recovery of 91.6%. It is expected that further cleaning of the concentrate will enhance its quality, with a small reduction in mass and iron recovery, thereby enabling it to be utilised for direct reduction pellet production.

Cape Lambert Iron Ore Limited March 2009 Quarterly Operations Report

30 April 2009 Page 6 of 7

Table 2: Summary Metallurgical Test Results – Marampa Project Tailings

Item Mass
(%)
Fe
Recovery
(%)
Fe
Grade
(%)
SiO2
Grade
(%)
Al2O3
Grade
(%)
P
Grade
(%)
S
Grade
(%)
Feed 100.0 100.0 32.8 45.3 4.2 0.021 0.007
Concentrate 46.2 91.6 65.0 3.9 1.5 0.019 0.001
Tail 53.8 8.4 5.1 81.4 6.2 0.025 0.006

Shallow, air core drilling of the hematite tailings commenced in late March 2009. The initial phase of the air core drilling is expected to be completed in early May with drill samples to be despatched to Australia for assay, density determination and follow-up, bench scale metallurgical test work. The Company is targeting completion of a JORC compliant tailings resource estimate for late in the September 2009 quarter.

Hardrock

During the quarter, detailed regional mapping over the entire area of the exploration licence was completed by SRK Consulting. The regional mapping confirmed and better defined the occurrence of extensions of folded specular hematite schist units to the west and north of the historic Marampa mine. Trenching and pitting of the mapped extensions to define structure and prioritise drill targets also commenced. Diamond drilling of the mapped units is expected to commence late in the June 2009 quarter.

Yours faithfully Cape Lambert Iron Ore Limited

Tony Sage Executive Chairman

For more information please contact:

Cape Lambert Iron Ore Limited:

Tony Sage +61 (0)8 9380 9555

Australian Enquiries:

Professional Public Relations David Tasker +61 (0)8 9388 0944/ +61 433 112 936

UK Enquiries: Conduit PR: Jos Simson +44 (0)20 7429 6603/+44 (0)7899 870 450 Gareth Tredway +44 (0)20 7429 6612

Website: www.capelam.com.au

Cape Lambert Iron Ore Limited March 2009 Quarterly Operations Report

30 April 2009 Page 7 of 7

Table 1: Significant Davis Tube Recovery Results (Cape Lambert South Project)

Hole ID LOCATION LOCATION COLLAR COLLAR SAMPLE SAMPLE HEAD DTR RESULT DTR RESULT DTR RESULT
Easting Northing Dip Azimuth from to interval Fe Mass
Recovery
Fe SiO2 AI2O3 P S
(MGA94) (MGA94) Degrees (m) (m) (m) (%) (%) (%) (%) (%) (%) (%)
SRC04 505088 7702671 -59.7 348.7 39 103 64 36.00 27.74 69.59 2.54 0.14 0.011 0.55
SRC12 504751 7702465 -50.2 327.2 68 115 47 29.00 22.50 61.65 1.59 0.13 0.005 0.51
178 196 18 35.35 22.56 69.84 2.05 0.17 0.005 0.82
SRC14 505463 7702836 -59.3 348.4 106 158 52 33.49 22.16 68.30 3.63 0.32 0.008 0.84
SRC16 506183 7703194 -60.6 337.8 102 128 26 35.84 24.20 69.29 2.34 0.15 0.008 2.55

Notes:

  • Sample intervals comprise 2-5m composites.

  • Each composite is individually tested by DTR, with all composite results averaged for the interval.

  • Sample interval is apparent, not true thickness.

  • DTR head samples prepared to nominally 100% passing 45 micrometers.

  • DTR testing performed by AMDEL Limited (Welshpool laboratory) with chemical analysis by X-ray Fluorescence Spectrometry (XRF).

  • Minimum reported DTR interval is 12 metres at a 7% SiO2 concentrate grade top-cut and a 20% mass recovery to concentrate bottom cut-off.

Competent Persons Attributes:

The Metallurgical information in this report is based on information compiled by GV Ariti who is a Member of The Australasian Institute of Mining and Metallurgy. Mr. Ariti has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Ariti consents to the inclusion in this report of the matters based on his information in the form and the context in which it appears.

The Exploration information in this report is based on information compiled by K Bischoff who is a Member of The Australasian Institute of Mining and Metallurgy. Mr. Bischoff has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr. Bischoff consents to the inclusion in this report of the matters based on his information in the form and the context in which it appears.

==> picture [588 x 497] intentionally omitted <==

----- Start of picture text -----

30º 0º 30º 60º 90º 120º 150º
60º
30º
N

Head Office
-30º
Perth, Western
Australia
Sierra Leone Pilbara, Australia
MARAMPA CAPE LAMBERT
-60º PROJECT SOUTH PROJECT
PROJECT LOCATIONS
Figure 1
----- End of picture text -----

==> picture [706 x 524] intentionally omitted <==

----- Start of picture text -----

MCC Mining’s
1.6 Billion Tonne
Magnetite Resource
CAPE LAMBERT
N
Indian DAMPIER
Ocean
Cape Preston
Sino Iron Project Cape Lambert South Mt Oscar
2 Billion Tonne Magnetite Project
Magnetite Project
(20% MCC) Magnetite Exploration Project
Balmoral South
1 Billion Tonne Magnetite Project Map Area
CAPE LAMBERT WESTERN
AUSTRALIA
SOUTH PROJECT
Figure 2
0 20km
Wickham
Karratha
Roebourne
----- End of picture text -----

==> picture [698 x 477] intentionally omitted <==

----- Start of picture text -----

504 000mE 505 000mE 506 000mE
RC Drill Hole with significant
Davis Tube Recovery interval
Diamond Drill Hole
Completed RC Drill Hole
7 704 000mN
Magnetic Anomaly
Tenement Boundary
N
7 703 000mN
OPEN CAPE LAMBERT
SOUTH PROJECT
Figure 3
0 500m
7 702 000mN
x
----- End of picture text -----

==> picture [656 x 483] intentionally omitted <==

----- Start of picture text -----

Kindia
10º -14º -12º -11º 2000km
CONAKRY MARAMPA Kabala
MAP
PROJECT AREA
Atlantic
Kissdougou
Ocean
Existing
9º Railway Bumbuna
Pepel Port Makeni
Port Loko N
Former DELCO
Mining Area
Lunsar
Yengema
FREETOWN
Waterloo
8º BO
Kenema
Gbangbatok
L I B E R I A
MARAMPA IRON ORE PROJECT
100km
Figure 4
----- End of picture text -----

Appendix 5B Mining exploration entity quarterly report

Rule 5.3

Appendix 5B

Mining exploration entity quarterly report

Introduced 1/7/96. Origin: Appendix 8. Amended 1/7/97, 1/7/98, 30/9/2001.

Name of entity

CAPE LAMBERT IRON ORE LTD

ABN
71 095 047 920
Consolidated statement of cash flows
Quarter ended (“current quarter”)
31 March 2009
Quarter ended (“current quarter”)
31 March 2009
Cash flows related to operating activities
1.1
Receipts from product sales and related debtors
1.2
Payments for
(a) exploration and evaluation
(b) development
(c) production
(d) administration
1.3
Dividends received
1.4
Interest and other items of a similar nature
received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Other: other income received
NetOperating Cash Flows
Current quarter
$A’000
Year to date
(9 months)
$A’000
-
(296)
-
-
(1,026)
-
882
-
-
-
-
(1,741)
-
-
(5,501)
-
6,267
-
-
26
(440) (949)
Cash flows related to investing activities
1.8
Payment for purchases of:
(a)prospects
(b)equity investments
(c) other fixed assets
1.9
Proceeds from sale of:
(a)prospects
(b)equity investments
(c)other fixed assets
1.10
Loans to other entities
1.11
Loans repaid by other entities
1.12
Other : Payment for Convertible Notes
Other: Purchase of interest in associated entity
Other: Proceeds on sale of tenements
Other: payment of commission
Other: payments in relation to new projects
Net investing cash flows
1.13
Total
operating
and
investing
cash
flows
(carried forward)
-
(5,666)
(55)
-
-
-
(79,717)
-
(2,240)
-
-
-
-
(7,614)
(60)
-
-
-
(94,858)
-
(10,040)
(6,922)
315,000
(30,400)
(87,678) 165,106
(88,118) 164,157
  • See chapter 19 for defined terms.

Appendix 5B Page 1

30/9/2001

Appendix 5B Mining exploration entity quarterly report

1.13
Total
operating
and
investing
cash
flows
(brought forward)
(88,118) 164,157
Cash flows related to financing activities
1.14
Proceeds from issues of shares, options, etc.
1.15
Proceeds from sale of forfeited shares
1.16
Proceeds from borrowings
1.17
Repayment of borrowings
1.18
Dividends paid
1.19
Other
-
repayment of issue proceeds
-
capital
return
paid
to
shareholders
-
refund of withholding tax on
dividend payments (to be repaid)
Net financing cash flows
-
-
-
-
-
-
-
-
4,762
41,358
-
-
-
(68,969)
-
-
(31,349)
4,762
4,762 (54,198)
Net (decrease) in cash held
1.20
Cash at beginning of quarter/year to date
1.21
Exchange rate adjustments to item 1.20
1.22
Cash at end ofquarter
(83,356)
209,452
-
109,959
16,137
-
126,906 126,906

Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities

1.23
1.24
1.23
1.24
Aggregate amount of payments to the parties included in item 1.2
Aggregate amount of loans to the parties included in item 1.10
Current quarter
$A'000
147
1.25
Explanation necessaryfor an understandingof the transactions
$139,375 payment for executive and non-executive salaries;
$7,481 payment for accounting fees to entity related to non-executive director.
Non-cash financing and investing activities
2.1
Details of financing and investing transactions which have had a material effect on consolidated
assets and liabilities but did not involve cash flows
17,000,000 shares issued to acquire an additional 5% equity interest in Marampa Iron Ore Limited
2.2
Details of outlays made by other entities to establish or increase their share in projects in which the
reportingentityhas an interest
Explanation necessaryfor an understandingof the transactions
$139,375 payment for executive and non-executive salaries;
$7,481 payment for accounting fees to entity related to non-executive director.
17,000,000 shares issued to acquire an additional 5% equity interest in Marampa Iron Ore Limited
Details of outlays made by other entities to establish or increase their share in projects in which the
reportingentityhas an interest
  • See chapter 19 for defined terms.

Appendix 5B Page 2

30/9/2001

Appendix 5B Mining exploration entity quarterly report

Financing facilities available

Add notes as necessary for an understanding of the position.

3.1
Loan facilities
3.2
Credit standby arrangements
Amount available
$A’000
Amount used
$A’000
- -
- -

Estimated cash outflows for next quarter

4.1 Exploration and evaluation 4.2 Development

Total

$A’000 1 - 1

Reconciliation of cash

Reconciliation of cash
Reconciliation of cash at the end of the quarter (as
shown in the consolidated statement of cash flows) to
the related items in the accounts is as follows.
Current quarter
$A’000
Previous quarter
$A’000
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
5,390 1,094
120,706 208,358
- -
- -
Total: cash at end of quarter(item 1.22) 126,096 209,452

Changes in interests in mining tenements

6.1
Interests in mining
tenements relinquished,
reduced or lapsed
6.2
Interests in mining
tenements acquired or
increased
Tenement
reference
Nature of interest
(note (2))
Interest at
beginning
ofquarter
Interest at
end of
quarter
N/A
N/A
  • See chapter 19 for defined terms.

Appendix 5B Page 3

30/9/2001

Appendix 5B Mining exploration entity quarterly report

Issued and quoted securities at end of current quarter

Description includes rate of interest and any redemption or conversion rights together with prices and dates.

Total number Number quoted Issue
price
per
security (see note
3) (cents)
Amount paid up per
security (see note 3)
(cents)
7.1
Preference
+securities
(description)
7.2
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns of
capital, buy-
backs,
redemptions
7.3
+Ordinary
securities
7.4
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through returns of
capital,buy-backs
523,797,213 523,797,213
17,000,000 17,000,000
7.5
+Convertible
debt securities
(description)
7.6
Changes during
quarter
(a) Increases
through issues
(b) Decreases
through securities
matured,
converted
7.7
Options
(description and
conversion factor)
7.8
Issued during
quarter
7.9
Exercised during
quarter
7.10
Expired during
quarter
28,000,000
3,300,000
8,350,000
-
-
-
Exercise price
37.7 cents
$1.40
43.2 cents
Expiry date
31 October 2010
30 June 2009
30 June 2010
7.11
Debentures
(totals only)
7.12
Unsecured notes
(totals only)
  • See chapter 19 for defined terms.

Appendix 5B Page 4

30/9/2001

Appendix 5B Mining exploration entity quarterly report

Compliance statement

  • 1 This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 4).

  • 2 This statement does give a true and fair view of the matters disclosed.

Sign here: ................................................................. (Director/Company secretary)

Date:

Print name: ......Timothy Turner.............................................

Notes

  • 1 The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.

  • 2 The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.

  • 3 Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .

  • 4 The definitions in, and provisions of, AASB 1022: Accounting for Extractive Industries and AASB 1026: Statement of Cash Flows apply to this report.

  • 5 Accounting Standards ASX will accept, for example, the use of International Accounting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.

  • See chapter 19 for defined terms.

Appendix 5B Page 5

30/9/2001