Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

IRON BEAR RESOURCES LTD Capital/Financing Update 2017

May 21, 2017

65091_rns_2017-05-21_023d840e-5995-4f13-9316-39caccc5e71d.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX Announcement 22 May 2017

Further Strategic Cobalt Acquisition Binding Terms Sheet Signed to Acquire 70% Interest in the Kitwe Cobalt-Copper Tailings Project, Zambia

Cape Lambert Resources Limited (ASX: CFE) is a fully funded mineral development company with exposure to iron ore, copper, gold, uranium, manganese, lithium and lead-silverzinc assets in Australia, Europe, Africa and South America.

HIGHLIGHTS:

  • Cape Lambert signs Binding Terms Sheet with Australian Mining Company Zambia Limited to acquire a 70% interest in the Kitwe Cobalt-Copper Tailings Project

  • The Kitwe Cobalt-Copper Tailings Project is located in Zambia’s Copperbelt, one of the world’s largest producing regions of high grade cobalt and copper concentrates and LME grade copper metal

  • The historic cobalt-copper rich tailings dump operated in the 1960s and extends over an area of 0.5km[2] and is. 15m in height

  • Zambian Ministry of Mines and Minerals Development, Geological Survey Department confirm its survey completed on 9 May 2017 estimated the license to contain 17.72 million tonnes of tailings

  • Samples taken by Cape Lambert’s technical consultants in May 2017 and assayed through SGS Inspection Services Ltd laboratory in Zambia reported cobalt grades of up to 0.43%

Australian Securities Exchange

Code: CFE

Ordinary shares 720,686,586

Unlisted Options 23,500,000 ($0.05 exp 18 Dec 2018)

Board of Directors

Tony Sage Executive Chairman

Tim Turner Non-executive Director

Jason Brewer Non-executive Director

Melissa Chapman Company Secretary

  • Cape Lambert’s management have visited the site and met with senior government officials in order to accelerate its technical and legal due diligence review and joint venture discussions

  • Acquisition further strengthens Cape Lambert’s position as an emerging cobalt developer and producer at a time of record high cobalt demand and prices of approx. US$55,000/t

  • Acquisition also provides the Company with a number of operating synergies as it looks to establish an operating base in one of the largest cobalt and copper rich geological environment in the world

  • This acquisition follows the signing by Cape Lambert on 17 May 2017 of the Joint Venture Agreement with Paragon Mining (SARL) to develop the Kipushi Cobalt Tailings and Kasombo Cobalt Projects in the Democratic Republic of Congo

Cape Lambert Contact

Investor Relations

Phone: +61 8 9380 9555 Email: [email protected]

Australian Enquiries

Professional Public Relations

David Tasker Phone: +61 8 9388 0944 Mobile: +61 433 112 936 Email: [email protected]

www.capelam.com.au

Australian resource and investment company, Cape Lambert Resources Limited ( ASX: CFE ) ( Cape Lambert or the Company ) is pleased to announce that it has executed a binding terms sheet to conditionally acquire 70% of the shares in Zambian entity Australian Mining Company Zambia Limited ( Seller or AMCZL ), which is the holder of exploration licence No 21853-HQ-SEL ( Licence or Project) (Acquisition) . The Licence covers an historic cobalt-copper rich tailings dump located near Kitwe in Zambia.

Cape Lambert Resources Limited ABN 71 095 047 920 Corporate - 32 Harrogate Street, West Leederville WA 6007

ASX Announcement 22 May 2017

Commenting on this Acquisition, Cape Lambert Resources Executive Chairman, Mr Tony Sage, said, “the acquisition of this significant high-grade cobalt-copper tailings dam emphasises the Company’s commitment to becoming a significant player in the cobalt sector. There will be obvious synergies available to us with our recently acquired Kipushi Tailings Project located just over 170 kms away accross border in the Democratic Republic of Congo. The Company looks forward to advancing both ” these projects to production for the benefit of our shareholders and stakeholders in the projects .

Figure 1: Location of the Kitwe Cobalt-Copper Tailings Project

==> picture [335 x 225] intentionally omitted <==

Figure 2: Location of the Kitwe Cobalt-Copper Tailings Project

The Project is located approximately 3km from the outskirts of Kitwe, in the Copperbelt region of Zambia (refer Figure 2). Kitwe is the second largest city, in terms of size and population, in Zambia and is one of the most developed commercial and industrial areas in the nation, alongside Ndola and Lusaka. The Copperbelt is centreed around the towns of Ndola, Kitwe, Chingola, Luanshya and Mufulira – a string of towns on Zambia's northern border with the Democratic Republic of Congo.

Cape Lambert Resources Limited ASX: CFE

Page 2 of 10

ASX Announcement 22 May 2017

The Copperbelt is one of the world’s largest producing regions of high grade cobalt and copper concentrates and LME grade copper metal with several of the world’s largest copper producing companies operating in the area.

The tailings dam has a footprint of approximately 750m x 650m and is up to 15m in height.

==> picture [238 x 190] intentionally omitted <==

==> picture [222 x 190] intentionally omitted <==

Figure 3: The Kitwe Cobalt-Copper Tailings Project

Under the terms of the Binding Terms Sheet, Cape Lambert is to pay US$25,000 on execution of the Terms Sheet. On executing the Terms Sheet, Cape Lambert will have 6 months to decide whether it wishes to exercise an option to expend US$500,000 within 6 months from the date of exercising the option ( Option ).

If Cape Lambert does not exercise the Option, or fails to spend the US$500,000 within the 6 months option period, then the 70% shareholding will be returned to the Seller.

Should Cape Lambert satisfy the requirements of the Option, then the Seller will also be entitled to Milestone Payments as follows:

  • a) US$50,000 upon AMCZL receiving environmental approvals in the respect of the Project

  • b) US$50,000 upon AMCZL being granted a mining licence in respect of the Project;

  • c) US$50,000 upon AMCZL receiving an export licence.

The Acquisition is subject to Cape Lambert completing due diligence on AMCZL and the Project and the execution of a share sale agreement, to be completed by 31 May 2017, or as extended by agreement of the parties.

Upon completion of the Acquisition Cape Lambert will be responsible for managing and funding the development of the Project, with the Seller having a “Free Carry” until a “Decision to Mine” at the Project.

A representative of the Board visited the Project in early May 2017 and the Chairman subsequently met a number of government officials in Lusaka.

Cape Lambert’s technical consultants visited the site in early May 2017 and have collected 7 samples from the tailings dam, refer Figure 3, which were assayed for Copper and Cobalt at the Kalalushi laboratory of SGS Inspection Services Ltd in Zambia.

Cape Lambert Resources Limited ASX: CFE

Page 3 of 10

ASX Announcement 22 May 2017

The assay results are presented in Table 1.

Table 1: Key Assay Results

Sample
ID
Co-Ordinates Co-Ordinates Estimated
thickness
Co Grade (%) Cu Grade (%)
Easting Northing
Pit 1 28°10’12”” E 12°50’32”” S 1.0m 0.30 0.43
Pit 2 28°10’21”” E 12°50’42”” S 1.0m 0.43 0.56
Pit 3 28°10’10”” E 12°50’51”” S 1.0m 0.25 0.53
Pit 4 28°09’56”” E 12°50’50”” S 1.0m 0.20 0.50
Pit 5 28°10’03”” E 12°50’41”” S 1.0m 0.41 0.75
Pit 6 28°10’05”” E 12°50’37”” S 1.0m 0.20 0.84
Pit7 28°09’57”” E 12°50’34”” S 1.0m 0.22 0.93

Figure 4: Sample locations on Kitwe Tailings Dam

==> picture [359 x 290] intentionally omitted <==

Yours faithfully Cape Lambert Resources Limited

Tony Sage Executive Chairman

Cape Lambert Resources Limited ASX: CFE

Page 4 of 10

ASX Announcement 22 May 2017

Competent Persons Statement

The information in this report that relates to Exploration Results is based on information compiled by Mr Olaf Frederickson. Mr Frederickson is a Member of The Australasian Institute of Mining and Metallurgy (AusIMM) and has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the “JORC Code”). Mr Frederickson is a consultant to Cape Lambert Resources. Mr Frederickson consents to the inclusion in the report of the Exploration Results in the form and context in which they appear.

Cape Lambert Resources Limited ASX: CFE

Page 5 of 10

ASX Announcement 22 May 2017

JORC Code, 2012 Edition Table 1 Kitwe Tailings

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling Nature and quality of sampling (eg cut channels, random chips, or •A small pit was manually dug to 1m depth
techniques specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as down hole gamma
•Manual channel samples were taken vertically through the
excavated pit wall.
sondes, or handheld XRF instruments, etc). These examples should •Samples were collected in zip lock plastics and placed into
not be taken as limiting the broad meaning of sampling. calico bags.
Include reference to measures taken to ensure sample representivity •Samples were despatched to an SGS laboratory and
and the appropriate calibration of any measurement tools or systems assayed.
used.
Aspects of the determination of mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work has been done this would be
relatively simple (eg ‘reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
Drilling Drill type (eg core, reverse circulation, open-hole hammer, rotary air •No drilling conducted.
techniques blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
_type, whether core is oriented and if so, by what method, etc). _
Drill sample
Method of recording and assessing core and chip sample recoveries
•No drilling conducted.
recovery and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.

Cape Lambert Resources Limited ASX: CFE

Page 6 of 10

ASX Announcement 22 May 2017

Criteria JORC Code explanation Commentary
Logging Whether core and chip samples have been geologically and •Samples were not logged.
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
The total length andpercentage of the relevant intersections logged.
Sub- If core, whether cut or sawn and whether quarter, half or all core •All samples were partially wet but were competent to the
sampling
techniques
and sample
preparation

taken.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
touch. The material was in the form of stratigraphically
layered non saturated tailings of fairly uniform consistency.
• The samples have been sorted & dried. The whole
sample has been pulverised in a vibrating disc
pulveriser.
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the in
situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
Quality of The nature, quality and appropriateness of the assaying and •Samples were submitted to the SGS Kalulushi lab in
assay data
and
laboratory
tests
laboratory procedures used and whether the technique is considered
partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc,
the parameters used in determining the analysis including instrument
make and model, reading times, calibrations factors applied and their

Zambia and analysed using the following method

3 or 4 acid digest and refluxed with a mixture of Acids
including HydrofluoricNitric Hydrochloric and Perchloric
Acids. This extended digest approaches a Total digest
for many elements however some refractory minerals
derivation, etc. are not completely attacked.
Nature of quality control procedures adopted (eg standards, blanks,
Co, Cu determined by Atomic Absorbtion
duplicates, external laboratory checks) and whether acceptable levels
Spectrometry (AAS) after acid digest.
of accuracy (ie lack of bias) and precision have been established.
Verification The verification of significant intersections by either independent or •Lab standards and repeat samples were carried out as part
of sampling
and
assaying

alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
of the assay procedure.

Cape Lambert Resources Limited ASX: CFE

Page 7 of 10

ASX Announcement 22 May 2017

Criteria JORC Code explanation Commentary
Discuss any adjustment to assay data.
Location of Accuracy and quality of surveys used to locate drill holes (collar and •Samples were located with handheld GPS.
data points down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data Data spacing for reporting of Exploration Results. •Samples were taken at random with the intent to generally
spacing
and
distribution
Whether the data spacing and distribution is sufficient to establish the
degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and
classifications applied.
cover the tailings dam.
•The data is not suitable for resource estimation.
•Samples were composited as described prior.
Whether sample compositing has been applied.
Orientation Whether the orientation of sampling achieves unbiased sampling of •No particular geological structure is evident in the tailings
of data in possible structures and the extent to which this is known, considering
relation to
geological
structure
the deposit type.
If the relationship between the drilling orientation and the orientation
of key mineralised structures is considered to have introduced a
sampling bias, this should be assessed and reported if material.
Sample The measures taken to ensure sample security. •Sample chain of custody was maintained by the geologist
security throughout delivery to their place of storage.
Audits or The results of any audits or reviews of sampling techniques and data.
•No audits or reviews have been done.
reviews

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral Type, reference name/number, location and ownership including •Work was conducted on 21853-HQ-SEL in the Kitwe Cobalt
tenement and
agreements or material issues with third parties such as joint
Copper Tailings Project near Kitwe in northern Zambia..
land tenure
status
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
•The licence is reportedly held by Australian Mining
Company Zambia Limited and is now the subject of an
option agreement with Cape Lambert Resources Details of
The security of the tenure held at the time of reporting along with any tenure are to be confirmed as part of the due diligence.

Cape Lambert Resources Limited ASX: CFE

Page 8 of 10

ASX Announcement 22 May 2017

Criteria JORC Code explanation Commentary
known impediments to obtaining a licence to operate in the area.
Exploration Acknowledgment and appraisal of exploration by other parties. •No known exploration has been conducted on the tailings.
done by other •Historical plant records are being sought.
parties
Geology Deposit type, geological setting and style of mineralisation. •Post processing tailings.
Drill hole A summary of all information material to the understanding of the •See attached table for sample information.
Information exploration results including a tabulation of the following information
for all Material drill holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.
If the exclusion of this information is justified on the basis that the
information is not Material and this exclusion does not detract from
the understanding of the report, the Competent Person should clearly
explain why this is the case.
Data In reporting Exploration Results, weighting averaging techniques, •No data aggregation was done. Assays represent individual
aggregation
methods
maximum and/or minimum grade truncations (eg cutting of high
grades) and cut-off grades are usually Material and should be stated.
Where aggregate intercepts incorporate short lengths of high grade
samples taken.
results and longer lengths of low grade results, the procedure used
for such aggregation should be stated and some typical examples of
such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values
should be clearly stated.
Relationship These relationships are particularly important in the reporting of •Samples were taken vertically down the walls of pit
between Exploration Results. excavations.
mineralisation
widths and
intercept

If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported, there
should be a clear statement to this effect (eg ‘down hole length, true
•The base of the tailings was not intersected at any time.
lengths width not known’).

Cape Lambert Resources Limited ASX: CFE

Page 9 of 10

ASX Announcement 22 May 2017

Criteria JORC Code explanation Commentary
Diagrams Appropriate maps and sections (with scales) and tabulations of •See attached location plan.
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view of
drill hole collar locations and appropriate sectional views.
Balanced Where comprehensive reporting of all Exploration Results is not •All results have been reported
reporting practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting of
Exploration Results.
Other Other exploration data, if meaningful and material, should be reported
•N/A
substantive including (but not limited to): geological observations; geophysical
exploration
data
survey results; geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics; potential
deleterious or contaminating substances.
Further work The nature and scale of planned further work (eg tests for lateral •The tailings are to be drilled on a regular grid to ascertain
extensions or depth extensions or large-scale step-out drilling). representative grades and accurate depths of tails.
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling areas,
provided this information is not commercially sensitive.

Cape Lambert Resources Limited ASX: CFE

Page 10 of 10