Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

IRIS METALS LIMITED Capital/Financing Update 2024

Jul 14, 2024

65139_rns_2024-07-14_a265054b-f190-4b86-998a-b3f9951804bf.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [139 x 36] intentionally omitted <==

ASX:IR1 - ASX RELEASE I 15 July 2024

Wide and High-grade lithium

HIGHLIGHTS

  • Ongoing diamond drilling continues to deliver strong results. New wide and highgrade lithium intersections include:

BDD-24-022 (Metallurgical drill hole)

41.8m @ 1.35% LiO from 45.2m, including:

5.6m @ 2.30% LiO from 55.3m

7.4m @ 2.22% LiO from 63.8m

1.9m @ 1.88% LiO from 74.5m

6.6m @ 1.42% Li₂O from 105.7m

BDD-24-025

39.8m @ 1.45% LiO from 53.7m, including: 17.6m @ 2.08% LiO from 53.7m 6.2m @ 1.84% LiO from 73.5m

BDD-24-029

21.5m @ 1.25% LiO from 48.7m, including: 4.5m @ 2.35% LiO from 62.5m

4.0m @ 1.81% LiO from 72.6m

8.9m @ 1.59% LiO from 87.0m including: 5.1m @ 2.43% LiO from 90.8m

1.1m @ 2.23% LiO from 104.3m

  • Ongoing diamond drilling is testing the strike and down-depth extensions of the mineralised Longview and Black Diamond pegmatites, with 48 diamond holes now completed.

  • Metallurgical diamond hole BDD-24-022 supplied mineralised material for initial HLS, DMS, and flotation process test work that is currently underway. Results of these studies will be reported once all data are received and analysed by IRIS.

  • Regional geological mapping and soil sampling programs are underway during the summer field season. These programs utilise advanced field screening techniques to investigate regional geological controls on spodumene bearing pegmatites, and identify additional pegmatites for future drill testing.

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

IRIS Metals President of U.S. Operations, Matt Hartmann, commented:

“The Beecher Project continues to provide consistent high-grade assay results, demonstrating both significant thickness and continuity at depth. Laboratory turnaround times have begun to decrease, and we anticipate an acceleration of data flow as we progress through the remainder of the ongoing drill program. With numerous exploration activities underway, including metallurgical testing and regional soil sampling, we are advancing our multi-faceted exploration program at an increased pace and are excited by the results to date.”

IRIS Metals Limited (ASX: IR1) (“IRIS” or “the Company”) is pleased to announce receipt of the next batch of results from the ongoing diamond drilling program from the Company’s 100% owned Beecher Project in South Dakota, USA. The results have continued to impress, with additional wide and high-grade lithium intersected at the historic Longview Mine and improved delineation of the Black Diamond Mine, both located within the Beecher Project.

Introduction

The Beecher Project is located 7km from the township of Custer in the Black Hills of South Dakota. The Project is located on patented claims comprising 50.88 hectares, surrounded by 20,300 hectares of unpatented Federal mining claims. Patented claims effectively bestow exclusive exploration and mining rights to the owner. The Beecher Project includes the historic Longview, Beecher and Black Diamond mines. Longview was mined in the 1950s for lithium, with lithium rich spodumene ore sent to Hill City for processing. The Longview and Black Diamond mines form part of the historic lithium producing mines on the Beecher Project with a combined pegmatite outcropping strike length of nearly 2,000m.

Diamond Drilling Program

The Company has received results from an additional seven diamond holes, with significant, wide intersections returned in three holes ( Figure 1 ). The best intercepts include:

BDD-24-022 (Metallurgical drill hole)

41.8m @ 1.35% LiO from 45.2m, including:

5.6m @ 2.30% LiO from 55.3m 7.4m @ 2.22% LiO from 63.8m 1.9m @ 1.88% LiO from 74.5m

6.6m @ 1.42% Li₂O from 105.7m

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

BDD-24-025

  • 39.8m @ 1.45% LiO from 53.7m, including:

  • 17.6m @ 2.08% LiO from 53.7m 6.2m @ 1.84% LiO from 73.5m

BDD-24-029

  • 21.5m @ 1.25% LiO from 48.7m, including:

  • 4.5m @ 2.35% LiO from 62.5m

  • 4.0m @ 1.81% LiO from 72.6m

  • 8.9m @ 1.59% LiO from 87.0m including:

  • 5.1m @ 2.43% LiO from 90.8m

  • 1.1m @ 2.23% LiO from 104.3m

==> picture [351 x 448] intentionally omitted <==

Figure 1 : Reverse circulation (RC) and diamond drill hole (DDH) locations.

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

The lithium mineralisation is in the form of primary magmatic spodumene crystals disseminated within the outer core of a zoned LCT pegmatite. The drill hole intercepts reported in this release continue to show spodumene occurrence in broad wide zones in the Longview Pegmatite. These zones often include multiple high-grade zones in one intercept. One example of this is shown in Figure 2 below, where a high-grade zone of 4.5m @ 2.35% Li₂O is within a broad zone of 21.5m @ 1.25% Li₂O in BDD-24-029.

==> picture [218 x 513] intentionally omitted <==

Figure 2: BDD-24-029 intercept 4.5m @ 2.35% Li₂O from 62.5m to 67.0m

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

The Company has completed a large diameter (PQ) metallurgical hole BDD-24-022 and preliminary HLS, DMS, and flotation test work is underway. BDD-24-022 was a twin of RC hole BDH-23-048 and designed as a resource definition hole and a metallurgical hole. This targeted a high-grade zone of the Longview Pegmatite, and assays received from ¼ PQ core show a wide, high-grade zone of spodumene mineralisation (Figure 3 - Section A – A’).

==> picture [405 x 311] intentionally omitted <==

Figure 3 : Section A-A’

Intercepts from BDD-24-025, BDD-24-027 (Figure 4 - Section B-B’) and BDD-24-029 (Figure 5 Section C-C’) show further significant mineralised zones as identified by drilling completed to date.

Diamond drilling is continuing at the Beecher property targeting both the Longview and Black Diamond extensions along strike and at depth.

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

==> picture [378 x 291] intentionally omitted <==

Figure 4 : Section B-B’

==> picture [381 x 291] intentionally omitted <==

Figure 5 : Section C-C’

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

Discussion

The results returned from the drilling to date continue show that the Longview pegmatite is a wide, continuously mineralised pegmatite that extends down dip for over 250m (still open at depth), and strikes for over 340m. Mineralisation starts at surface and weathering is very shallow, resulting in a potentially attractive mining strip ratio.

The Black Diamond pegmatite extends for over 950m within the project area and appears to be patchy in the northern portion of the project. However, based on mapping and limited southern drilling, all indicators suggest that both pegmatite and spodumene mineralisation widths are significantly increasing in the southern portion of the Black Diamond pegmatite. The ongoing diamond drilling program at the Beecher Project will focus on testing this theory with the current drilling now targeting the Black Diamond mineralisation.

Drilling of the Longview pegmatite has intercepted pegmatite down to 249m (215m vertical). The Black Diamond has intersected pegmatite down to 200m (170m vertical), with both pegmatites showing mineralisation extending to surface. These pegmatite bodies remain open at depth.

These initial results are significant when considering the additional material advantages associated with the Beecher Project. IRIS Metals has granted mining permits over the entire Beecher Project enabling mining activities to commence at the Company’s election. The Project’s location provides excellent infrastructure, including nearby road, rail, and power, in a mining-friendly jurisdiction within one of the most significant and largest lithium markets in the world. The US government has identified lithium as a critical mineral, providing large monetary grants to ensure local supply to move the US away from its current dependence on other nations.

Future Activities

The IRIS technical team has expanded exploration efforts across a large portion of the Company’s South Dakota project areas. The current drilling at Beecher is scheduled to be completed in late August. Following completion of that work and receipt of the necessary permits, the drill rig will be moved to the Tin Mountain Project for initial drill testing. Further drill targets have been identified at the Helen Beryl Project, and initial site preparation activities have also begun at the Edison Project.

Intensive regional exploration programs focused on geologic mapping and gridded soil surveys have commenced. These activities are focused on identifying prospective targets on the Federal mineral claims for drill testing. Once identified, targets will be prioritised, and drill permitting commenced to ensure a constant workflow. IRIS will report on this work flow once sufficient data has been generated to support interpretations and subsequent decisions.

The Company continues to also assess and undertake due diligence on other South Dakota based tenure for acquisition.

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

Table 1 : Table detailing significant lithium results from recent diamond drilling at the Beecher Project

Hole ID from to Interval(m) Grade Li2O%
BDD-24-022 35.4 36.8 1.4 1.62
AND 45.2 87.0 41.8 1.35
Including 55.3 60.9 5.6 2.30
Including 63.8 71.2 7.4 2.22
Including 74.5 76.4 1.9 1.88
AND 92.9 95.3 2.5 0.94
AND 105.7 112.3 6.6 1.42
BDD-24-023 0.0 NSR
BDD-24-024 0.0 NSR
BDD-24-025 53.7 93.5 39.8 1.45
Including 53.7 71.3 17.6 2.08
Including 73.5 79.7 6.2 1.84
BDD-24-026 9.8 10.6 0.9 0.93
AND 14.6 16.0 1.4 0.85
BDD-24-027 4.0 4.9 0.9 1.28
AND 6.6 8.8 2.2 1.02
AND 11.1 13.8 2.7 1.39
BDD-24-028 0.0
BDD-24-029 31.3 36.3 5.0 0.86
AND 39.6 44.6 5.0 1.16
AND 45.8 47.4 1.6 1.34
AND 48.7 70.2 21.5 1.25
Including 62.5 67.0 4.5 2.35
AND 72.6 76.6 4.0 1.81
AND 78.0 80.8 2.8 0.93
AND 87.0 95.9 8.9 1.59
Including 90.8 95.9 5.1 2.43
AND 98.6 105.4 6.8 0.82
Including 104.3 105.4 1.1 2.23

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

Table 2 : Details of the RC and DDH drill holes completed at the Beecher Project (Coordinate system NAD83_13N)

Hole_ID East North RL_m Azimuth
T
Dip EOH_m Project Hole-
**Type **
BDH-23-001 614598.4 4840322.1 1716.7 90 -60 180.0 Black
Diamond
RC
BDH-23-002 614599.1 4840356.0 1717.4 90 -60 125.0 Black
Diamond
RC
BDH-23-003 614640.5 4840312.4 1711.9 90 -60 108.0 Longview RC
BDH-23-004 614607.0 4840520.0 1719.5 90 -60 150.0 Longview RC
BDH-23-005 614605.9 4840477.9 1722.8 90 -60 132.0 Longview RC
BDH-23-006 614645.0 4840521.0 1719.7 90 -60 60.0 Longview RC
BDH-23-007 614597.0 4840441.2 1719.2 90 -60 132.0 Longview RC
BDH-23-008 614603.6 4840399.9 1717.8 90 -60 132.0 Longview RC
BDH-23-009 614599.6 4840277.2 1713.2 85 -60 156.0 Longview RC
BDH-23-010 614643.0 4840278.3 1711.9 85 -60 132.0 Longview RC
BDH-23-011 614598.5 4840322.2 1716.6 90 -85 108.0 Longview RC
BDH-23-012 614599.6 4840240.1 1707.2 70 -60 100.0 Longview RC
BDH-23-013 614717.6 4840235.8 1697.3 90 -60 60.0 Longview RC
BDH-23-014 614714.3 4840201.4 1697.3 90 -60 60.0 Longview RC
BDH-23-015 614649.2 4840367.5 1708.6 90 -70 96.0 Longview RC
BDH-23-016 614595.0 4840360.0 1715.0 270 -85 150.0 Black
Diamond
RC
BDH-23-017 614598.9 4840399.7 1717.8 270 -85 150.0 Black
Diamond
RC
BDH-23-018 614588.0 4840443.0 1718.3 270 -85 168.0 Black
Diamond
RC
BDH-23-019 614591.2 4840281.0 1713.3 270 -80 84.0 Black
Diamond
RC
BDH-23-020 614607.6 4840483.2 1722.9 90 -85 156.0 Black
Diamond
RC
BDH-23-021 614611.1 4840510.4 1720.8 90 -85 120.0 Black
Diamond
RC
BDH-23-022 614670.3 4840283.0 1705.6 90 -60 66.0 Longview RC
BDH-23-023 614636.0 4840406.0 1710.2 90 -55 102.0 Black
Diamond
RC
BDH-23-024 614680.0 4840240.0 1711.2 90 -60 120.0 Black
Diamond
RC
BDH-23-025 614719.5 4840286.4 1704.8 90 -60 72.0 Black
Diamond
RC
BDH-23-026 614619.7 4840559.5 1712.8 90 -60 72.0 Black
Diamond
RC
BDH-23-027 614621.2 4840599.2 1710.0 90 -60 78.0 Black
Diamond
RC
BDH-23-028 614609.3 4840559.9 1712.9 270 -85 120.0 Black
Diamond
RC
BDH-23-029 614613.4 4840599.0 1710.0 270 -85 100.0 Black
Diamond
RC
BDH-23-030 614618.1 4840639.1 1709.1 90 -60 76.0 Black
Diamond
RC
BDH-23-031 614578.3 4840480.4 1718.8 90 -85 64.0 Black
Diamond
RC
BDH-23-032 614593.6 4840238.4 1707.4 75 -85 88.0 Black
Diamond
RC
BDH-23-033 614646.0 4840242.0 1702.7 75 -50 58.0 Longview RC
BDH-23-034 614776.0 4840157.0 1684.8 270 -60 88.0 Longview RC
BDH-23-035 614610.1 4839878.0 1690.5 200 -50 148.0 Longview RC
BDH-23-036 614606.1 4839879.3 1690.5 255 -50 142.0 Longview RC
BDH-23-037 614600.6 4839917.7 1696.7 270 -50 88.0 Longview RC

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

BDH-23-038 614708.3 4840201.7 1697.1 90 -85 52.0 Longview RC
BDH-23-039 614742.9 4840142.4 1684.0 330 -85 30.0 Longview RC
BDH-23-040 614574.7 4840159.1 1712.1 350 -85 58.0 Longview RC
BDH-23-041 614569.4 4840150.3 1711.7 258 -50 100.0 Longview RC
BDH-23-042 614580.9 4840120.3 1708.9 245 -50 100.0 Longview RC
BDH-23-043 614576.0 4840081.0 1705.0 260 -50 100.0 Longview RC
BDH-23-044 614589.1 4840049.6 1706.1 265 -50 100.0 Longview RC
BDH-23-045 614606.9 4839954.4 1697.2 281 -50 100.0 Longview RC
BDH-23-046 614575.5 4840599.7 1711.9 85 -60 100.0 Black
Diamond
RC
BDH-23-047 614573.8 4840559.2 1712.1 92 -60 100.0 Black
Diamond
RC
BDH-23-048 614582.0 4840521.0 1715.0 112 -60 118.0 Black
Diamond
RC
BDH-23-049 614584.0 4840237.6 1707.2 270 -50 118.0 Black
Diamond
RC
BDH-23-050 614579.7 4840200.1 1706.5 270 -50 106.0 Black
Diamond
RC
BDD-23-001 614602.5 4839957.2 1697.2 270 -70 89.6 Black
Diamond
DDH
BDD-23-002 614604.6 4839918.8 1696.8 270 -70 221.4 Black
Diamond
DDH
BDD-23-003 614598.0 4840001.0 1698.0 270 -50 129.6 Black
Diamond
DDH
BDD-23-004 614594.0 4840000.0 1698.0 270 -85 53.8 Black
Diamond
DDH
BDD-23-004A 614606.0 4840001.1 1699.8 270 -80 107.7 Black
Diamond
DDH
BDD-23-005 614595.6 4840042.5 1706.5 270 -80 224.6 Black
Diamond
DDH
BDD-23-006 614584.3 4840073.0 1706.5 270 -70 199.9 Black
Diamond
DDH
BDD-23-007 614577.5 4840480.7 1719.9 90 -85 209.6 Longview DDH
BDD-23-008 614573.8 4840559.1 1712.1 90 -85 200.7 Longview DDH
BDD-23-009 614572.0 4840612.0 1706.0 90 -85 194.7 Longview DDH
BDD-23-010 614579.0 4840629.0 1706.0 90 -85 200.8 Longview DDH
BDD-23-011 614643.0 4840514.0 1721.0 270 -60 170.3 Longview DDH
BDD-23-012 614667.0 4840482.0 1721.0 90 -60 47.2 Longview DDH
BDD-24-013 614577.4 4840480.6 1719.5 270 -75 197.4 Longview DDH
BDD-24-014 614591.0 4840440.0 1720.0 270 -70 128.4 Black
Diamond
DDH
BDD-24-015 614637.6 4840407.4 1710.9 270 -60 281.4 Longview DDH
BDD-24-016 614577.4 4840480.6 1719.5 0 -90 187.8 Black
Diamond
DDH
BDD-24-017 614666.0 4840434.0 1716.0 100 -60 56.2 Longview DDH
BDD-24-018 614664.0 4840434.0 1716.0 100 -80 83.3 Black
Diamond
DDH
BDD-24-019 614701.0 4840375.0 1704.0 90 -60 89.4 Longview DDH
BDD-24-020 614676.2 4840317.7 1711.2 90 -60 98.7 Black
Diamond
DDH
BDD-24-021 614571.0 4840523.0 1713.0 90 -85 162.2 Longview DDH
BDD-24-022 614582.0 4840524.0 1715.0 112 -60 150.6 Longview DDH
BDD-24-023 614575.0 4840630.0 1706.0 90 -50 107.0 Longview DDH
BDD-24-024 614570.0 4840594.0 1707.0 90 -70 149.5 Longview DDH
BDD-24-025 614592.0 4840448.0 1720.0 90 -70 158.9 Longview DDH
BDD-24-026 614647.0 4840495.0 1720.0 100 -75 80.9 Longview DDH
BDD-24-027 614636.0 4840429.0 1710.0 90 -60 107.0 Longview DDH
BDD-24-028 614596.0 4840405.0 1715.0 90 -80 201.0 Longview DDH
BDD-24-029 614595.0 4840357.0 1715.0 90 -78 150.0 Longview DDH

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

BDD-24-030 614584.0 4840357.0 1716.0 270 -80 149.7 Longview DDH
BDD-24-031 614585.0 4840339.0 1722.0 90 -85 131.2 Longview DDH
BDD-24-032 614585.0 4840335.0 1722.0 230 -70 149.7 Longview DDH
BDD-24-033 614595.0 4840275.0 1713.0 270 -70 101.9 Longview DDH
BDD-24-034 614578.5 4840079.1 1706.5 90 -90 261.1 Black
Diamond
DDH
BDD-24-035 614583.0 4840083.0 1705.0 90 -75 328.6 Black
Diamond
DDH
BDD-24-036 614580.0 4840122.0 1711.0 90 90 264.2 Black
Diamond
DDH
BDD-24-037 614575.0 4840156.0 1718.0 0 90 186.2 Black
Diamond
DDH
BDD-24-038 614580.0 4840187.0 1721.0 0 -90 201.2 Black
Diamond
DDH
BDD-24-039 614609.0 4840238.0 1729.0 270 -85 300.1 Black
Diamond
DDH
BDD-24-040 614568.0 4840523.0 1715.0 90 -70 170.6 Longview DDH
BDD-24-041 614595.0 4840051.0 1706.0 90 -90 282.0 Black
Diamond
DDH
BDD-24-042 614606.0 4839960.0 1694.0 90 -90 249.1 Black
Diamond
DDH
BDD-24-043 614609.0 4839921.0 1696.0 90 -90 252.0 Black
Diamond
DDH
BDD-24-044 614610.0 4839919.0 1696.0 90 -70 80.9 Black
Diamond
DDH
BDD-24-045 614603.0 4839919.0 1696.0 90 -80 68.3 Black
Diamond
DDH
BDD-24-046 614611.0 4839881.0 1687.0 90 -90 180.1 Black
Diamond
DDH
BDD-24-047 614611.0 4839881.0 1687.0 90 -75 99.0 Black
Diamond
DDH
BDD-24-048 614611.0 4839881.0 1687.0 90 -60 69.0 Black
Diamond
DDH

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

About The South Dakota Project

The Black Hills of South Dakota are famous for historic lithium mining dating back to 1898 when Li-bearing spodumene, and amblygonite was first mined near the township of Custer. IRIS has staked 2,387 federal mineral claims and has agreements over two patented claim blocks.

Existing project areas include:

  • Beecher Project – including Longview and Black Diamond

  • Edison Project

  • Dewy Project

  • Custer Project

  • Ruby Project

  • Helen Beryl Project

  • Tinton Project

  • Keystone Project

The Beecher pegmatite trend was mined sporadically between the 1920’s and 1950’s for lithium, beryllium, tantalum, mica and feldspar. Limited amounts of lithium spodumene ore from the Beecher mines was shipped to Hill City during the 1940’s where it was processed through a flotation circuit.

IRIS’ local partner has been granted mining licenses permitting lithium pegmatite mining for these patented claims.

These mining licenses permitted by the State of South Dakota, enables IRIS to fast-track all exploration and mining activities including the right to explore and mine lithium bearing pegmatites.

==> picture [249 x 270] intentionally omitted <==

Location of IRIS’ projects within South Dakota

ENDS

This announcement was approved for release by the Board of Iris Metals.

For further information, please contact:

COMPANY

INVESTORS & MEDIA

Peter Marks Melissa Tempra E. [email protected] E. [email protected]

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

About IRIS Metals (ASX:IR1)

IRIS Metals Ltd (ASX:IR1) is an exploration company with an extensive suite of assets considered to be highly prospective for hard rock lithium located in South Dakota, United States (US). The company’s large and expanding South Dakota Project is located in a mining friendly jurisdiction and provides the company with strong exposure to the battery metals space, and the incentives offered by the US government for locally sourced critical minerals.

The Black Hills have a long and proud history of mining dating back to the late 1800s. The Black Hills pegmatites are famous for having the largest recorded lithium spodumene crystals ever mined. Extensive fields of fertile LCT-pegmatites outcrop throughout the Black Hills with significant volumes of lithium spodumene mined in numerous locations.

To learn more, please visit: www.irismetals.com

Forward looking Statements:

This announcement may contain certain forward-looking statements that have been based on current expectations about future acts, events and circumstances. These forward-looking statements are, however, subject to risks, uncertainties and assumptions that could cause those acts, events and circumstances to differ materially from the expectations described in such forward-looking statements. These factors include, among other things, commercial and other risks associated with exploration, estimation of resources, the meeting of objectives and other investment considerations, as well as other matters not yet known to IRIS or not currently considered material by the company. IRIS accepts no responsibility to update any person regarding any error or omission or change in the information in this presentation or any other information made available to a person or any obligation to furnish the person with further information.

Not an offer in the United States:

This announcement has been prepared for publication in Australia and may not be released to US wire services or distributed in the United States. This announcement does not constitute an offer to sell, or a solicitation of an offer to buy, securities in the United States or any other jurisdiction. Any securities described in this announcement have not been, and will not be, registered under the US Securities Act of 1933 and may not be offered or sold in the United States except in transactions exempt from, or not subject to, the registration requirements of the US Securities Act and applicable US state securities laws.

Competent Persons Statement:

The information in this announcement that relates to exploration results is based on information reviewed by Matt Hartmann, IRIS’ President of U.S. Operations, and a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy (MAusIMM) (318271), a Registered Member of the Society for Mining, Metallurgy and Exploration (RM-SME) (4170350RM). Matt Hartmann is an exploration geologist with over 20 years’ experience in mineral exploration, including lithium exploration and resource definition in the western United States, and has sufficient experience in the styles of mineralisation and type of deposit under consideration and to the activity undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Matt Hartmann has consented to the inclusion in this Public Report of the matters based on his information in the form and context in which it appears.

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

JORC Code, 2012 Edition – Table 1

JORC Code, 2012 Edition – Table 1 JORC Code, 2012 Edition – Table 1 JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling
(eg cut channels, random chips, or
specific specialised industry
standard measurement tools
appropriate to the minerals under
investigation, such as down hole
gamma sondes, or handheld XRF
instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
Samples collected on the RC drill rig
are split using a riffle splitter
mounted beneath a cyclone return
system to produce a representative
sample.
Core sampling protocols meet
industry standard practices.
· Core sampling is guided by
lithology as determined during
geological logging (i.e., by a
geologist). All pegmatite intervals are
sampled in their entirety (half-core),
regardless if spodumene
mineralization is noted or not (in
order to ensure an unbiased
sampling approach) in addition to
~1 to 3 m of sampling into the
adjacent host rock (dependent on
pegmatite interval length) to
“bookend” the sampled pegmatite.
· The minimum individual sample
length is typically 0.3-0.5 m and the
maximum sample length is typically
2.0 m. Targeted individual pegmatite
sample lengths are 1.0 m.
· All drill core is oriented to
maximum foliation prior to logging
and sampling and is cut with a core
saw into half-core pieces, with one
half-core collected for assay, and the
other half-core remaining in the box
for reference.
· Include reference to measures
taken to ensure sample
representivity and the appropriate
calibration of any measurement
tools or systems used.

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

· Aspects of the determination
of mineralisation that are Material
to the Public Report.
Lithium bearing minerals including
spodumene weather to clays in the
oxidised regolith and are not
recognised when drilling encounters
pegmatites at shallow depths.
Drilling techniques · Drill type (eg core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (eg core
diameter, triple or standard tube,
depth of diamond tails, face-
sampling bit or other type, whether
core is oriented and if so, by what
method, etc).
RC drilling was carried out by Scion
Drilling with a 5-inch bit.
Diamond drilling was carried out by
Scion cutting a mix of PQ and HQ
sized core.
Drill sample
recovery
· Method of recording and
assessing core and chip sample
recoveries and results assessed.
RC recoveries are being visually
assessed. All samples are dry and
recovery is good. No sample bias has
been noted.
Core recovery is very good and
typicallyexceeds 90%
· Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
Dry drilling conditions have
supported sample recovery and
quality.
· Whether a relationship exists
between sample recovery and grade
and whether sample bias may have
occurred due to preferential
loss/gain of fine/coarse material.
RC drill recoveries were visually
estimated from volume of sample
recovered. The majority of sample
recoveries reported were dry and
above 90% of expected.
RC samples were visually checked for
recovery, moisture and
contamination and notes made in the
logs.
The rigs splitter was emptied
between 1m samples by hammering
the cyclone bin with a mallet. The set-
up of the cyclone varied between rigs,
but a gate mechanism was used to
prevent inter-mingling between
metre intervals. The cyclone and
splitter were also regularly cleaned by
opening the doors, visually checking,
and if build-up of material was noted,
the equipment cleaned with either
compressed air or high-pressure
water. This process was in all cases
undertaken when the drilling frst
penetrated the pegmatite
mineralization, to ensure no host
rock contamination took place.

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

Logging · Whether core and chip
samples have been geologically and
geotechnically logged to a level of
detail to support appropriate
Mineral Resource estimation,
mining studies and metallurgical
studies.
All drill holes are routinely logged by
Senior geologists with extensive
experience in LCT pegmatites. Chip
samples are collected and
photographed.
Upon receipt at the core shack, all
drill core is pieced together, oriented
to maximum foliation, metre marked,
geotechnically logged (including
structure), alteration logged,
geologically logged, and sample
logged on an individual sample basis.
Core box photos are also collected of
all core drilled, regardless of
perceived mineralization. Specifc
gravity measurements of pegmatite
are also collected at systematic
intervals for all pegmatite drill core
using the water immersion method,
as well as select host rock drill core.
· The logging is qualitative by
nature, and includes estimates of
spodumene grain size, inclusions,
and model mineral estimates.
· These logging practices meet or
exceed current industry standard
practices.
· Whether logging is qualitative
or quantitative in nature. Core (or
costean, channel, etc) photography.
Logging is considered qualitative in
nature. Chip samples are collected
and photographed. The geological
logging adheres to the Company
policy and includes lithological,
mineralogical, alteration, veining and
weathering.
The core logging is qualitative by
nature, and includes estimates of
spodumene grain size, inclusions,
and model mineral estimates.
· The total length and
percentage of the relevant
intersections logged.
All holes were logged in full.
Sub-sampling
techniques and
sample preparation
· If core, whether cut or sawn
and whether quarter, half or all core
taken.
Drill core sampling follows industry
best practices. Drill core was saw-cut
with half-core sent for geochemical
analysis and half-core remaining in
the box for reference. The same side
of the core was sampled to maintain
representativeness.
· Sample sizes are appropriate for
the material being assayed.

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

· A Quality Assurance / Quality
Control (QAQC) protocol following
industry best practices was
incorporated into the program and
included systematic insertion of
quartz blanks and certifed reference
materials (CRMs) into sample
batches at a rate of approximately 5%
each. Additionally, analysis of pulp-
split and course-split sample
duplicates were completed to assess
analytical precision at different
stages of the laboratory preparation
process, and external (secondary)
laboratory pulp-split duplicates were
prepared at the primary lab for
subsequent check analysis and
validation at a secondary lab.
· All protocols employed are
considered appropriate for the
sample type and nature of
mineralization and are considered
the optimal approach for maintaining
representativeness in sampling.
· If non-core, whether riffled,
tube sampled, rotary split, etc and
whether sampled wet or dry.
All samples are split with a riffe
splitter. All samples are dry.
· For all sample types, the
nature, quality and appropriateness
of the sample preparation
technique.
Samples are collected in a labelled
calico bag, with each representing 1m
downhole
· Quality control procedures
adopted for all sub-sampling stages
to maximise representivity of
samples.
Standards and duplicates were
inserted every 20 samples - blanks
were inserted every 50 samples.
· Measures taken to ensure that
the sampling is representative of
the in situ material collected,
including for instance results for
field duplicate/second-half
sampling.
Results of standards, duplicates and
blanks will be compared to the
expected results for quality control
· Whether sample sizes are
appropriate to the grain size of the
material being sampled.
The ideal mass of 2kg-3kg samples is
appropriate to the sampling
methodology and the material being
sampled.

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

Quality of assay
data and laboratory
tests
· The nature, quality and
appropriateness of the assaying
and laboratory procedures used and
whether the technique is
considered partial or total.
Core samples collected were shipped
to SGS Canada’s laboratory in
Vancouver, for standard sample
preparation (code PRP89) which
includes drying at 105°C, crush to 75%
passing 2 mm, riffe split 250 g, and
pulverize 85% passing 75 microns.
The samples were homogenized and
subsequently analyzed for multi-
element (including Li and Ta) using
sodium peroxide fusion with ICP-
AES/MS fnish (codes GE_ICP91A50
and GE_IMS91A50).
The assay techniques are considered
appropriate for the nature and type of
mineralization present, and result in
a total digestion and assay for the
elements of interest.
The Company relies on both its
internal QAQC protocols (systematic
quarter-core duplicates, blanks,
certifed reference materials, and
external checks), as well as the
laboratory’s internal QAQC.
For assay results disclosed, samples
havepassedQAQC review.
· For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the parameters
used in determining the analysis
including instrument make and
model, reading times, calibrations
factors applied and their derivation,
etc.
NA.
· Nature of quality control
procedures adopted (eg standards,
blanks, duplicates, external
laboratory checks) and whether
acceptable levels of accuracy (ie
lack of bias) and precision have
been established.
Standards and duplicates were
inserted every 20 samples - blanks
were inserted every 50 samples. Along
with standard laboratory check
methods.
Verification of
sampling and
assaying
· The verification of significant
intersections by either independent
or alternative company personnel.
Intervals are reviewed and compiled
by the Exploration Manager and
Project Managers prior to disclosure,
including a review of the Company’s
internal QAQC sample analytical data.
No twinned holes have been
completed.
Data is stored directly into excel
templates, including direct import of
· The use of twinned holes.
· Documentation of primary
data, data entry procedures, data
verification, data storage (physical
and electronic) protocols.

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

· Discuss any adjustment to
assay data.
laboratory analytical certifcates as
they are received. The Company
employs various on-site and post
QAQC protocols to ensure data
integrity and accuracy.
Adjustments to data include
reporting lithium and tantalum in
their oxide forms, as it is reported in
elemental form in the assay
certifcates. Formulas used are Li2O =
Li x 2.1527.
Location of data
points
· Accuracy and quality of
surveys used to locate drill holes
(collar and down-hole surveys),
trenches, mine workings and other
locations used in Mineral Resource
estimation.
Sample locations were recorded
using a hand held GPS using the
NAD83_13 Datum.
· Specification of the grid
system used.
· Quality and adequacy of
topographic control.
Data spacing and
distribution
· Data spacing for reporting of
Exploration Results.
Sampling undertaken was of a
reconnaissance nature and
widespread across the pegmatite
bodies.
· Whether the data spacing and
distribution is sufficient to
establish the degree of geological
and grade continuity appropriate for
the Mineral Resource and Ore
Reserve estimation procedure(s)
and classifications applied.
Holes are generally drilled on a 40m
grid. Based on the nature of the
mineralization and continuity in
geological modelling, it is believed
that a 40 m spacing will be suffcient
to support a mineral resource
estimate.
· Whether sample compositing
has been applied.
Compositing was only applied to non-
pegmatite material.
Orientation of data
in relation to
geological structure
· Whether the orientation of
sampling achieves unbiased
sampling of possible structures and
the extent to which this is known,
considering the deposit type.
Drill holes were generally designed
orthaganal to the general trend of the
pegmatites as mapped at surface. No
bias is determined.
· If the relationship between the
drilling orientation and the
orientation of key mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and reported if
material.
Sample security · The measures taken to ensure
sample security.
Chain of custody is maintained by Iris
personnel on site and sent in sealed
pallets and bags to the Laboratory.

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

Audits or reviews · The results of any audits or
reviews of sampling techniques and
data.
Results were reviewed and deemed
reliable for the nature of the testing.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
· Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical
sites, wilderness or national park
and environmental settings.
The project is located in South
Dakota USA, the project comprises
free-hold patented claims owned by
Iris Metals
· The security of the tenure held
at the time of reporting along with
any known impediments to
obtaining a licence to operate in the
area.
No known impediments.
Exploration done by
other parties
· Acknowledgment and
appraisal of exploration by other
parties.
No modern exploration has been
conducted at this Project
Geology · Deposit type, geological
setting and style of mineralisation.
LCT-pegmatite hosted lithium
spodumene mineralisation similar in
nature to other zoned lithium
pegmatite deposits mined around the
world
Drill hole
Information
· A summary of all information
material to the understanding of
the exploration results including a
tabulation of the following
information for all Material drill
holes:
The relevant table is provided in Table
1 of the text.
o easting and northing of
the drill hole collar
o elevation or RL (Reduced
Level – elevation above sea level in
metres) of the drill hole collar
o dip and azimuth of the
hole
o down hole length and
interception depth
o hole length.

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

· If the exclusion of this
information is justified on the basis
that the information is not Material
and this exclusion does not detract
from the understanding of the
report, the Competent Person
should clearly explain why this is
the case.
Data aggregation
methods
· In reporting Exploration
Results, weighting averaging
techniques, maximum and/or
minimum grade truncations (eg
cutting of high grades) and cut-off
grades are usually Material and
should be stated.
NA.
· Where aggregate intercepts
incorporate short lengths of high
grade results and longer lengths of
low grade results, the procedure
used for such aggregation should
be stated and some typical
examples of such aggregations
should be shown in detail.
No specifc grade cap or cut-off was
used during grade width calculations.
The lithium and tantalum average of
the entire pegmatite interval is
calculated for all pegmatite intervals
over 2 m core length, as well as
higher grade zones at the discretion
of the geologist. Pegmatites have
inconsistent mineralization by
nature, resulting in most intervals
having a small number of poorly
mineralized samples throughout the
interval included in the calculation.
Non-pegmatite internal dilution is
limited to typically <4 m where
relevant intervals indicated where
assays are reported.
· The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
No metal equivalents have been
reported.
Relationship
between
mineralisation
widths and intercept
lengths
· These relationships are
particularly important in the
reporting of Exploration Results.
Relationship between mineralisation
widths and intercept lengths
· If the geometry of the
mineralisation with respect to the
drill hole angle is known, its nature
should be reported.
Geological modelling is ongoing;
however, current interpretation
supports a large pegmatite body
(Longview) of fat dipping 45 degrees
towards the west. Two other
pegmatite bodies have been drilled
but dip is uncertain at this stage.
All reported widths are very close to
true widths but may vary from hole to
hole based on the drill hole angle and
the highly variable nature of
pegmatite bodies, which tend to
pinch and swell aggressively along
strike and to depth. i.e. The dip of the
mineralized pegmatite body may vary
in a dip sense and along strike, so the
true widths are not always apparent

IRISMETALS.COM

ASX:IR1

==> picture [595 x 67] intentionally omitted <==

until several holes have been drilled
in any particular drill-fence.
· If it is not known and only the
down hole lengths are reported,
there should be a clear statement to
this effect (eg ‘down hole length,
true width not known’).
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
Diagrams · Appropriate maps and
sections (with scales) and
tabulations of intercepts should be
included for any significant
discovery being reported These
should include, but not be limited to
a plan view of drill hole collar
locations and appropriate sectional
views.
Provided in the text.
Balanced reporting · Where comprehensive
reporting of all Exploration Results
is not practicable, representative
reporting of both low and high
grades and/or widths should be
practiced to avoid misleading
reporting of Exploration Results.
Please refer to the table(s) included
herein as well as those posted on the
Company’s website.
Results for every individual
pegmatite interval that is greater
than 2 m has been reported.
Other substantive
exploration data
· Other exploration data, if
meaningful and material, should be
reported including (but not limited
to): geological observations;
geophysical survey results;
geochemical survey results; bulk
samples – size and method of
treatment; metallurgical test
results; bulk density, groundwater,
geotechnical and rock
characteristics; potential
deleterious or contaminating
substances.
Various mandates required for
advancing the Project towards
economic studies have been or are
about to be initiated, including but
not limited to, metallurgy,
geomechanics, hydrogeology,
hydrology, stakeholder engagement,
geochemical characterization, as well
as transportation and logistical
studies.
Further work · The nature and scale of
planned further work (eg tests for
lateral extensions or depth
extensions or large-scale step-out
drilling).
Future Drill testing is being planned,
further mapping and rock chip
collection is also ongoing.
· Diagrams clearly highlighting
the areas of possible extensions,
including the main geological
interpretations and future drilling
areas, provided this information is
not commercially sensitive.
Will be provided when drill testing is
reported.

IRISMETALS.COM

ASX:IR1