Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

IRIS METALS LIMITED Capital/Financing Update 2023

Oct 8, 2023

65139_rns_2023-10-08_e1a1c70f-00b5-4c3d-8a0d-bb62d0afd42a.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [86 x 84] intentionally omitted <==

ASX Announcement/Press Release | 9 October 2023

IRIS Metals Limited (ASX:IR1)

78m @ 1.03% Li₂O from 19m Confirms Major Lithium Discovery

Highlights

  • Assays from an additional 12 drillholes of a 50-hole RC program confirm the Beecher project as a major new lithium discovery. Results from the final 20 holes of the Stage One drilling program are imminent with 12 holes from Stage Two to follow.

o Intersections include:

  • 78m @ 1.03% Li₂O (70m true width) from 19m in BDH-23-020, including: ▪ 46m @ 1.36% Li₂O10m @ 2.00% Li₂O

  • 62m @ 1.02% Li₂O (60m true width) from 15m in BDH-23-011, including: ▪ 25m @ 1.30% Li₂O

  • 27m @ 1.54% Li₂O from 9m in BDH-23-019, including: ▪ 21m @ 1.81% Li₂O

  • 24m @ 1.00% Li₂O from 82m in BDH-23-017, including: ▪ 17m @ 1.23% Li₂O

  • The drilling demonstrates the continuation of shallow, broad lithium intersections which greatly boost the economics of the deposit. This is significant considering the company holds permitted Mining Licences across the Beecher Project.

  • A diamond drill rig is on site and has commenced drill testing deeper spodumene pegmatite extensions at the Beecher Project. Diamond core will also provide metallurgical and geotechnical samples to inform mining feasibility studies.

IR1 Technical Director Chris Connell, commented : “ Some of the greatest challenges faced by current hard rock spodumene lithium mines is achieving good recoveries in the processing of the ore. A significant obstacle to spodumene recoveries is mining dilution with host country rock. The wide consistent mineralized zones of pegmatites at Beecher will mitigate dilution as a risk when mining the project. Combining the likely positive recoveries with the shallow depths and consequent low mining strip ratios are extremely positive for likely Beecher economics. The Beecher project also provides speed to market with granted mining licences. With its granted mining permits, IRIS can fast track its plans to become the first modern day hard rock lithium mining company in the US.”

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

IRIS Metals Limited (ASX:IR1) (“IRIS” or “the Company”) is pleased to announce that the results from the next batch of 12 RC holes of a 50 hole program have been received from the 100% owned Beecher Project. The results are significant and confirm a major discovery at Beecher.

RC Drilling Program

The Beecher Project is located 7km from the township of Custer in the Black Hills of South Dakota. The Project is located on a 15-acre patented claim, surrounded by 20,300 hectares of Bureau of Land Management (BLM) staked claims. Patented claims effectively bestow immediate rights to mine to the owner. The Beecher Project includes the historic Longview, Beecher and Black Diamond mines. Longview was mined in the 1950s for lithium, with lithium rich spodumene ore sent to Hill City for processing. Having obtained permits for 42 drill pads across the Beecher mining areas 2 RC drill programs have now been completed for a total of 50 RC holes ( Table 2 ). Samples have been sent to SGS Laboratory in Canada for assaying.

RC Drilling Assay Results

An additional 12 holes of a 50-hole RC program have been returned that continue highlighting the width, grade and shallow depths of lithium mineralisation of the Longview pegmatite. The company has now received results from holes covering 360m of strike along the mapped 500m Longview pegmatite that drilling shows is open at depth and along strike in all directions (Figure 1, 2 & 4). The Longview mine is one of three historic lithium producing mines on the Beecher Project with a combined pegmatite outcropping strike length of nearly 2,000m.

Best intersections include:

  • 78m @ 1.03% Li₂O (70m true width) from 19m in BDH-23-020, including:

  • 46m @ 1.36% Li₂O

  • 10m @ 2.00% Li₂O

  • 62m @ 1.02% Li₂O (60m true width) from 15m in BDH-23-011, including:

  • 25m @ 1.30% Li₂O

  • 27m @ 1.54% Li₂O from 9m in BDH-23-019, including:

  • 21m @ 1.81% Li₂O

o 24m @ 1.00% Li₂O from 82m in BDH-23-017, including:

  • 17m @ 1.23% Li₂O

To further highlight the significant widths of mineralized pegmatite at the Beecher project, mineralization in BDH-23-020 was returned over 105 meters for:

  • 105m @ 0.88% Li₂O (True width 93m) from 19m in BDH-23-020

2

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

==> picture [433 x 552] intentionally omitted <==

Figure 1 : RC drill plan of hole locations.

3

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

==> picture [465 x 418] intentionally omitted <==

Figure 2 : Cross section showing reported lithium intersections.

4

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

==> picture [307 x 276] intentionally omitted <==

Figure 3 : Cross section showing reported lithium intersections.

==> picture [309 x 277] intentionally omitted <==

Figure 4 : Cross section showing reported lithium intersections.

5

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

Technical Discussion

These shallow, wide zones of the mineralised pegmatite further emphasize the potential economic advantages the Beecher project has over deposits comprising thin, stacked pegmatites at depth. Mining dilution is one of the key factors negatively affecting recoveries in spodumene processing.

Whilst BDH-23-028 & 029 intersected good widths of pegmatite, they failed to return significant lithium mineralization. Logging suggests these two holes only intersected the Kfeldspar-Albite-Qtz outer-intermediate zone of the pegmatite (outer zone of the pegmatite). Geological zonation and numerical modelling of all the drilling suggests the inner mineralized zone is plunging to the north and thus those two holes pierced above the mineralized zone. New drill holes are being designed to test interpreted inner mineralized zone at this northern section of the Beecher project.

Based on the drilling to date, a new geological interpretation suggests that the Black Diamond pegmatite is dipping back towards the east with the Longview pegmatite projected to intersect the Black Diamond pegmatite at around 180m below surface. Based on historical evidence from other mineralized pegmatites in the region, where pegmatites coalesce, the widths and grade also increase. Future diamond drill holes are being planned to test this theory.

A total of 11 RC holes have been drilled into the Black Diamond pegmatite with pegmatite intersections of up to 112m. No assays have been returned for the Black Diamond drilling.

A diamond drill is on site and has commenced drilling depth extensions and conceptual targets. Results for an additional 20 holes are expected imminently with a further 12 holes to be returned over coming weeks.

General Discussion

These initial results are significant when considering the additional material advantages associated with the Beecher Project. IRIS has granted mining permits over the entire Beecher Project enabling mining activities to commence at the Company’s election. The Project’s location provides excellent infrastructure in a mining jurisdiction within one of the most significant and largest lithium markets in the world. The US government has identified lithium as a critical mineral, providing large monetary grants to ensure local supply to move the US away from its current dependence on other nations.

Also of note is the regional scale of IRIS’ claim portfolio in the US. This drilling program is the Company’s first significant test for economic lithium in the Black Hills, focusing on 5 patented claims.

Whilst patented claims have distinct advantages with less onerous regulatory obligations for undertaking exploration and mining activities, the 2,400+ BLM claims IRIS has 100% ownership of, are considered equally prospective for lithium, and cover many square kilometers of fertile LCTpegmatites. IRIS’ first mover advantage enabled the company to be selective in its staking activities enabling the Company to secure what in the board’s opinion are the most prospective pegmatites in the Black Hills region.

The Black Hills of South Dakota was a historically significant lithium producing mining district in the 1940’s and is showing all the right indications of once again being a highly important district for supplying critical minerals in the US.

6

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

Future Activities

A diamond drill rig is on site continuing testing the pegmatites along strike and at greater depth, also providing metallurgical and geotechnical samples for future mining feasibility studies. An additional diamond rig is also being sourced to help rapidly advance the project towards a maiden resource estimation.

Applications are being prepared for additional drill pads at the Beecher Project for diamond drill testing of deeper mineralized targets. Diamond drilling will also be used for metallurgical and geotechnical test work for engineering and mining feasibility studies.

Geological mapping and sampling at the recently acquired Edison Lithium Mine will help delineate priority targets for drill testing. Once drill pad locations are identified applications will be submitted which generally take 30 days to obtain for patented claims.

Regional mapping and soil sampling programs will continue throughout the summer with results to be announced during the year. These regional programs will identify new pegmatites for future drill testing.

The Company continues to assess and undertake due diligence on other South Dakota based tenure for acquisition with the potential to enhance and complement the existing portfolio.

7

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

Hole ID from to **Interval(m) ** **Grade Li2O% ** comment
BDH-23-006 12 15 3 1.00% Shallow hole
BDH-23-007 32 35 3 1.17%
and 33 63 30 0.92%
incl 23 1.03%
incl 8 1.63%
BDH-23-011 15 77 62 1.02%
incl 30 1.21
BDH-23-018 NSR Fault blank intercepted
BDH-23-019 9 36 27 1.54%
incl 21 1.81%
BDH-23-017 82 106 24 1.00%
incl 17 1.23%
BDH-23-20 19 124 105 0.88%
incl 78 1.03%
incl 46 1.36%
incl 21 1.81%
incl 10 2.00%
BDH-23-021 16 35 19 1.14%
incl 14 1.37%
and 42 53 11 0.73%
incl 4 1.06%
and incl 2 1.15%
BDH-23-022 9 13 4 1.40%
BDH-23-023 1 6 5 0.62% Weathered underpit floor
BDH-23-028 NSR Outer-intermediate zone only
BDH-23-029 NSR Outer-intermediate zone only

Table 1 : Table detailing significant lithium results from the RC drilling at the Beecher Project

8

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

Hole ID East North RL Azimuth Dip Depth Prospect
BDH-23-001 614597 4840321 1717 90 60 180 LongView
BDH-23-002 614600 4840360 1716 90 60 125 LongView
BDH-23-003 614640 4840313 1711 90 60 108 LongView
BDH-23-004 614607 4840520 1719 90 60 150 LongView
BDH-23-005 614605 4840480 1722 90 60 132 LongView
BDH-23-006 614645 4840521 1720 90 60 60 LongView
BDH-23-007 614600 4840440 1720 90 60 132 LongView
BDH-23-008 614601 4840401 1717 90 60 132 LongView
BDH-23-009 614600 4840280 1713 85 60 156 LongView & Beecher Lode
BDH-23-010 614640 4840280 1707 85 60 132 LongView & Beecher Lode
BDH-23-011 614597 4840324 1717 90 85 108 LongView
BDH-23-012 614600 4840240 1706 70 60 100 LongView
BDH-23-013 614716 4840236 1701 90 60 60 Beecher Lode
BDH-23-014 614715 4840200 1698 90 60 60 Beecher Lode
BDH-23-015 614648 4840369 1708 90 70 84 LongView
BDH-23-016 614595 4840360 1715 270 85 150 LongView
BDH-23-017 614596 4840401 1715 270 85 150 LongView
BDH-23-018 614588 4840443 1718 270 85 168 LongView
BDH-23-019 614607 4840284 1711 270 80 84 LongView
BDH-23-020 614605 4840486 1721 90 85 156 LongView
BDH-23-021 614607 4840514 1719 90 85 120 LongView
BDH-23-022 614670 4840283 1707 90 60 66 LongView & Beecher Lode
BDH-23-023 614636 4840406 1710 90 55 102 LongView
BDH-23-024 614680 4840240 1700 90 60 120 Beecher Lode
BDH-23-025 614720 4840288 1703 90 60 72 Beecher Lode
BDH-23-026 614619 4840562 1713 90 60 72 LongView
BDH-23-027 614620 4840600 1710 90 60 78 LongView
BDH-23-028 614608 4840561 1713 270 85 120 LongView
BDH-23-029 614612 4840600 1709 270 85 100 LongView
BDH-23-030 614617 4840640 1709 90 60 76 LongView
BDH-23-031 614578 4840480 1719 90 85 64 LongView
BDH-23-032 614592 4840242 1707 75 85 88 LongView
BDH-23-033 614646 4840242 1703 75 50 58 LongView
BDH-23-034 614776 4840157 1685 270 60 88 Beecher Lode
BDH-23-035 614610 4839887 1691 200 50 148 Black Diamond
BDH-23-036 614604 4839880 1690 255 50 142 Black Diamond
BDH-23-037 614601 4839921 1696 270 50 88 Black Diamond
BDH-23-038 614707 4840199 1696 90 85 52 Beecher Lode
BDH-23-039 614739 4840140 1684 330 85 30 Black Diamond
BDH-23-040 614573 4840162 1711 350 85 58 Black Diamond
BDH-23-041 614565 4840150 1710 258 50 100 Black Diamond
BDH-23-042 614580 4840122 1708 245 50 100 Black Diamond
BDH-23-043 614576 4840081 1705 260 50 100 Black Diamond
BDH-23-044 614588 4840050 1706 265 50 100 Black Diamond
BDH-23-045 614606 4839955 1697 281 50 100 Black Diamond
BDH-23-046 614577 4840598 1708 85 60 100 Black Diamond
BDH-23-047 614584 4840556 1713 92 60 100 Black Diamond
BDH-23-048 614582 4840521 1715 85 60 118 Black Diamond
BDH-23-049 614583 4840249 1709 270 50 118 Black Diamond
BDH-23-050 614581 4840198 1709 270 50 106 Black Diamond

Table 2 : Details of the RC drill holes completed at the Beecher Project.

9

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

About The South Dakota Project

The Black Hills of South Dakota are famous for historic lithium mining dating back to 1898 when Libearing spodumene, and amblygonite was first mined near the township of Custer. IRIS has staked 2,387 BLM claims and has agreements over two patented claims.

Existing project areas include:

  • Beecher Project – including Longview and Black Diamond

  • Edison Project

  • Dewy Project

  • Custer Project

  • Ruby Project

  • Helen Beryl Project

  • Tinton Project

  • Keystone Project

The Beecher pegmatite trend was mined sporadically between the 1920’s and 1950’s for lithium, beryllium, tantalum, mica and feldspar. Limited amounts of lithium spodumene ore from the Beecher mines was shipped to Hill City during the 1940’s where it was processed through a flotation circuit.

IRIS’ local partner has been granted mining licenses permitting lithium pegmatite mining for these patented claims.

These mining licenses permitted by the State of South Dakota, enables IRIS to fasttrack all exploration and mining activities including the right to explore and mine lithium bearing pegmatites.

==> picture [285 x 310] intentionally omitted <==

Location of IRIS’ BLM and patented claims.

This ASX announcement has been authorised by the Board of IRIS Metals Limited.

For further information, please contact:

IRIS Metals Limited E: [email protected]

10

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

Forward looking Statements:

This announcement may contain certain forward-looking statements that have been based on current expectations about future acts, events and circumstances. These forward-looking statements are, however, subject to risks, uncertainties and assumptions that could cause those acts, events and circumstances to differ materially from the expectations described in such forward-looking statements. These factors include, among other things, commercial and other risks associated with exploration, estimation of resources, the meeting of objectives and other investment considerations, as well as other matters not yet known to IRIS or not currently considered material by the company. IRIS accepts no responsibility to update any person regarding any error or omission or change in the information in this presentation or any other information made available to a person or any obligation to furnish the person with further information.

Not an offer in the United States:

This announcement has been prepared for publication in Australia and may not be released to US wire services or distributed in the United States. This announcement does not constitute an offer to sell, or a solicitation of an offer to buy, securities in the United States or any other jurisdiction. Any securities described in this announcement have not been, and will not be, registered under the US Securities Act of 1933 and may not be offered or sold in the United States except in transactions exempt from, or not subject to, the registration requirements of the US Securities Act and applicable US state securities laws.

About IRIS Metals (ASX:IR1)

IRIS Metals (ASX:IR1) is an exploration company with an extensive suite of assets considered to be highly prospective for hard rock lithium located in South Dakota, United States (US). The company’s large and expanding South Dakota Project is located in a mining friendly jurisdiction and provides the company with strong exposure to the battery metals space, and the incentives offered by the US government for locally sourced critical minerals. The Black Hills have a long and proud history of mining dating back to the late 1800s. The Black Hills pegmatites are famous for having the largest recorded lithium spodumene crystals ever mined. Extensive fields of fertile LCT-pegmatites outcrop throughout the Black Hills with significant volumes of lithium spodumene mined in numerous locations.

To learn more, please visit: www.irismetals.com

Competent Persons Statement:

The information in this announcement that relates to exploration results is based on information reviewed by Chris Connell a Competent Person who is a member of Australian Institute of Geologists and Technical Executive Director to IRIS Metals Limited. Chris Connell is an exploration geologist with over 25 years’ experience in lithium exploration including lithium exploration and resource definition in the Eastern Goldfields and has sufficient experience in the styles of mineralisation and type of deposit under consideration and to the activity undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Chris Connell has consented to the inclusion in this Public Report of the matters based on his information in the form and context in which it appears.

11

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

JORC Code, 2012 Edition – Table 1 JORC Code, 2012 Edition – Table 1 JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling techniques Nature and quality of sampling (eg
cut channels, random chips, or
specific specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or
handheld XRF instruments, etc).
These examples should not be taken
as limiting the broad meaning of
sampling.
RC drilling (RC) has been carried out
by the vendors and Iris Metals at the
Beecher Project. Samples
representing one metre down-hole
intervals have been collected, with the
corresponding interval logged and
preserved in chip trays. The drill-hole
samples have been submitted for
laboratory analyses_._
·Include reference to measures
taken to ensure sample representivity
and the appropriate calibration of any
measurement tools or systems used.
Samples collected on the RC drill rig
are split using a riffle splitter mounted
beneath a cyclone return system to
produce a representative sample.
·Aspects of the determination of
mineralisation that are Material to the
Public Report.
Lithium bearing minerals including
spodumene weather to clays in the
oxidised regolith and are not
recognised when drilling encounters
pegmatites at shallowdepths.
Drilling techniques ·Drill type (eg core, reverse
circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc)
and details (eg core diameter, triple
or standard tube, depth of diamond
tails, face-sampling bit or other type,
whether core is oriented and if so, by
what method, etc).
RC drilling was carried out by Scion
Drilling with a 5 inch bit.

12

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

Drill sample recovery ·Method of recording and
assessing core and chip sample
recoveries and results assessed.
RC recoveries are being visually
assessed. All samples are dry and
recovery is good. No sample bias has
been noted.
·Measures taken to maximise
sample recovery and ensure
representative nature of the samples.
Dry drilling conditions have supported
sample recovery and quality.
·Whether a relationship exists
between sample recovery and grade
and whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
RC drill recoveries were visually
estimated from volume of sample
recovered. The majority of sample
recoveries reported were dry and
above 90% of expected.
RC samples were visually checked for
recovery, moisture and contamination
and notes made in the logs.
The rigs splitter was emptied between
1m samples by hammering the
cyclone bin with a mallet. The set-up of
the cyclone varied between rigs, but a
gate mechanism was used to prevent
inter-mingling between metre intervals.
The cyclone and splitter were also
regularly cleaned by opening the
doors, visually checking, and if build-
up of material was noted, the
equipment cleaned with either
compressed air or high-pressure
water. This process was in all cases
undertaken when the drilling first
penetrated the pegmatite
mineralization, to ensure no host rock
contamination took place.
Logging ·Whether core and chip
samples have been geologically and
geotechnically logged to a level of
detail to support appropriate Mineral
Resource estimation, mining studies
and metallurgical studies.
All drill holes are routinely logged by
Senior geologists with extensive
experience in LCT pegmatites. Chip
samples are collected and
photographed.

13

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

·Whether logging is qualitative
or quantitative in nature. Core (or
costean, channel, etc) photography.
Logging is considered qualitative in
nature. Chip samples are collected
and photographed. The geological
logging adheres to the Company policy
and includes lithological, mineralogical,
alteration, veining and weathering.
·The total length and
percentage of the relevant
intersections logged.
All holes were logged in full.
Sub-sampling
techniques and
sample preparation
·If core, whether cut or sawn
and whether quarter, half or all core
taken.
NA.
·If non-core, whether riffled,
tube sampled, rotary split, etc and
whether sampled wet or dry.
All samples are split with a riffle
splitter. All samples are dry.
·For all sample types, the
nature, quality and appropriateness
of the sample preparation technique.
Samples are collected in a labelled
calico bag, with each representing 1m
downhole
·Quality control procedures
adopted for all sub-sampling stages
to maximise representivity of
samples.
Standards and duplicates were
inserted every 20 samples - blanks
were inserted every 50 samples.
·Measures taken to ensure that
the sampling is representative of the
in situ material collected, including for
instance results for field
duplicate/second-half sampling.
Results of standards, duplicates and
blanks will be compared to the
expected results for quality control
·Whether sample sizes are
appropriate to the grain size of the
material being sampled.
The ideal mass of 2kg-3kg samples is
appropriate to the sampling
methodology and the material being
sampled.

14

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

Quality of assay data
and laboratory tests
·The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
Core samples collected were shipped
to SGS Canada’s laboratory in
Vancouver, for standard sample
preparation (code PRP89) which
includes drying at 105°C, crush to 75%
passing 2 mm, riffle split 250 g, and
pulverize 85% passing 75 microns.
The samples were homogenized and
subsequently analyzed for multi-
element (including Li and Ta) using
sodium peroxide fusion with ICP-
AES/MS finish (codes GE_ICP91A50
and GE_IMS91A50).
The assay techniques are considered
appropriate for the nature and type of
mineralization present, and result in a
total digestion and assay for the
elements of interest.
The Company relies on both its
internal QAQC protocols (systematic
quarter-core duplicates, blanks,
certified reference materials, and
external checks), as well as the
laboratory’s internal QAQC.
For assay results disclosed, samples
have passed QAQC review.
·For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the parameters
used in determining the analysis
including instrument make and
model, reading times, calibrations
factors applied and their derivation,
etc.
NA.
·Nature of quality control
procedures adopted (eg standards,
blanks, duplicates, external
laboratory checks) and whether
acceptable levels of accuracy (ie lack
of bias) and precision have been
established.
Standards and duplicates were
inserted every 20 samples - blanks
were inserted every 50 samples. Along
with standard laboratory check
methods.
Verification of
sampling and
assaying
·The verification of significant
intersections by either independent
or alternative company personnel.
Intervals are reviewed and compiled
by the VP Exploration and Project
Managers prior to disclosure, including
a review of the Company’s internal
QAQC sample analytical data.

15

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

·The use of twinned holes. No twinned holes have been
completed.
Data is stored directly into excel
templates, including direct import of
laboratory analytical certificates as
they are received. The Company
employs various on-site and post
QAQC protocols to ensure data
integrity and accuracy.
Adjustments to data include reporting
lithium and tantalum in their oxide
forms, as it is reported in elemental
form in the assay certificates.
Formulas used are Li2O=Li x 2.1527.
·Documentation of primary
data, data entry procedures, data
verification, data storage (physical
and electronic) protocols.
·Discuss any adjustment to
assay data.
Location of data
points
·Accuracy and quality of
surveys used to locate drill holes
(collar and down-hole surveys),
trenches, mine workings and other
locations used in Mineral Resource
estimation.
Sample locations were recorded using
a hand held GPS using the NAD83_13
Datum.
·Specification of the grid system
used.
·Quality and adequacy of
topographic control.
Data spacing and
distribution
·Data spacing for reporting of
Exploration Results.
Sampling undertaken was of a
reconnaissance nature and
widespread across the pegmatite
bodies.
·Whether the data spacing and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve
estimation procedure(s) and
classifications applied.
Holes are generally drilled on a 40m
grid. Based on the nature of the
mineralization and continuity in
geological modelling, it is believed that
a 40 m spacing will be sufficient to
support a mineral resource estimate.
·Whether sample compositing
has been applied.
Compositing was only applied to non-
pegmatite material.

16

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

Orientation of data in
relation to geological
structure
·Whether the orientation of
sampling achieves unbiased
sampling of possible structures and
the extent to which this is known,
considering the deposit type.
Drill holes were generally designed
orthaganal to the general trend of the
pegmatites as mapped at surface. No
bias is determined.
·If the relationship between the
drilling orientation and the orientation
of key mineralised structures is
considered to have introduced a
sampling bias, this should be
assessed and reported if material.
Sample security ·The measures taken to ensure
sample security.
Chain of custody is maintained by Iris
personnel on site and sent in sealed
pallets and bags to the Laboratory.
Audits or reviews ·The results of any audits or
reviews of sampling techniques and
data.
Results were reviewed and deemed
reliable for the nature of the testing.

17

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Section 2 Reporting of Exploration Results Section 2 Reporting of Exploration Results Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral tenement
and land tenure
status
·Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The project is located in South Dakota
USA, the project comprises free-hold
patented claims owned by Iris Metals
·The security of the tenure held
at the time of reporting along with
any known impediments to obtaining
a licence to operate in the area.
No known impediments.
Exploration done by
other parties
·Acknowledgment and appraisal
of exploration by other parties.
No modern exploration has been
conducted at this Project
Geology ·Deposit type, geological setting
and style of mineralisation.
LCT-pegmatite hosted lithium
spodumene mineralisation similar in
nature to other zoned lithium
pegmatite deposits mined around the
world
Drill hole Information ·A summary of all information
material to the understanding of the
exploration results including a
tabulation of the following information
for all Material drill holes:
The relevant table is provided in Table
1 of the text.
o_easting and northing of the_
drill hole collar
o_elevation or RL (Reduced_
Level – elevation above sea level in
metres) of the drill hole collar
o_dip and azimuth of the hole_
o_down hole length and_
interception depth
o_hole length._

18

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

·If the exclusion of this
information is justified on the basis
that the information is not Material
and this exclusion does not detract
from the understanding of the report,
the Competent Person should clearly
explain why this is the case.
Data aggregation
methods
·In reporting Exploration
Results, weighting averaging
techniques, maximum and/or
minimum grade truncations (eg
cutting of high grades) and cut-off
grades are usually Material and
should be stated.
NA.
·Where aggregate intercepts
incorporate short lengths of high
grade results and longer lengths of
low grade results, the procedure
used for such aggregation should be
stated and some typical examples of
such aggregations should be shown
in detail.
No specific grade cap or cut-off was
used during grade width calculations.
The lithium and tantalum average of
the entire pegmatite interval is
calculated for all pegmatite intervals
over 2 m core length, as well as higher
grade zones at the discretion of the
geologist. Pegmatites have
inconsistent mineralization by nature,
resulting in most intervals having a
small number of poorly mineralized
samples throughout the interval
included in the calculation. Non-
pegmatite internal dilution is limited to
typically <4 m where relevant intervals
indicated where assays are reported.
·The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
No metal equivalents have been
reported.
Relationship
between
·These relationships are
particularly important in the reporting
of Exploration Results.
Relationship between mineralisation
widths and intercept lengths

19

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

mineralisation widths
and intercept lengths
·If the geometry of the
mineralisation with respect to the drill
hole angle is known, its nature
should be reported.
Geological modelling is ongoing;
however, current interpretation
supports a large pegmatite body
(Longview) of flat dipping 45 degrees
towards the west. Two other
pegmatite bodies have been drilled but
dip is uncertain at this stage.
All reported widths are very close to
true widths but may vary from hole to
hole based on the drill hole angle and
the highly variable nature of pegmatite
bodies, which tend to pinch and swell
aggressively along strike and to depth.
i.e. The dip of the mineralized
pegmatite body may vary in a dip
sense and along strike, so the true
widths are not always apparent until
several holes have been drilled in any
particular drill-fence.
·If it is not known and only the
down hole lengths are reported, there
should be a clear statement to this
effect (eg ‘down hole length, true
width not known’).
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
Diagrams ·Appropriate maps and sections
(with scales) and tabulations of
intercepts should be included for any
significant discovery being reported
These should include, but not be
limited to a plan view of drill hole
collar locations and appropriate
sectional views.
Provided in the text.
Balanced reporting ·Where comprehensive
reporting of all Exploration Results is
not practicable, representative
reporting of both low and high grades
and/or widths should be practiced to
avoid misleading reporting of
Exploration Results.
Please refer to the table(s) included
herein as well as those posted on the
Company’s website.
Results for every individual pegmatite
interval that is greater than 2 m has
been reported.

20

www.IRISmetals.com

==> picture [86 x 84] intentionally omitted <==

Other substantive
exploration data
·Other exploration data, if
meaningful and material, should be
reported including (but not limited to):
geological observations; geophysical
survey results; geochemical survey
results; bulk samples – size and
method of treatment; metallurgical
test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious
or contaminating substances.
Various mandates required for
advancing the Project towards
economic studies have been or are
about to be initiated, including but not
limited to, metallurgy, geomechanics,
hydrogeology, hydrology, stakeholder
engagement, geochemical
characterization, as well as
transportation and logistical studies.
Further work ·The nature and scale of
planned further work (eg tests for
lateral extensions or depth
extensions or large-scale step-out
drilling).
Future Drill testing is being planned,
further mapping and rock chip
collection is also ongoing.
·Diagrams clearly highlighting
the areas of possible extensions,
including the main geological
interpretations and future drilling
areas, provided this information is not
commercially sensitive.
Will be provided when drill testing is
reported.

21

www.IRISmetals.com