Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

IRIS METALS LIMITED Capital/Financing Update 2022

May 22, 2022

65139_rns_2022-05-22_51011b02-4f56-4d8d-be9e-4148f3083961.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX Release: 23 May 2022

==> picture [61 x 47] intentionally omitted <==

==> picture [61 x 49] intentionally omitted <==

IRIS to Acquire Lithium Project in Strategically Located, Tier-1, Historical Mining Jurisdiction of South Dakota, USA

The Company has concluded a $2.0m Placement to support planned activities

Highlights:

  • IRIS to acquire 100% of highly prospective and strategic hard rock lithium projects through the acquisition of White Rock, L.L.C. in the Tier-1 Jurisdiction of South Dakota, USA (the “South Dakota Project” or the “Project” ).

  • Within the greater South Dakota Project there are 2 sub projects:

  • Dewy Project

  • Custer Project

  • Combined total land holdings of approximately 10,846 Acres (approximately 4,400 Ha), across 525 Claims .

  • An abundance of mapped pegmatites are located within the project areas including historical lithium bearing mines

  • Experienced South Dakota-based in country consultant, RRL Consulting (the “ Consultant "), appointed to assist with ongoing business development activities and on budget.

  • Experienced geological team to progress exploration program, headed by, Chris Connell.

  • $2.0 million placement completed to support the acquisition and provide working capital to be directed to the acquisition and initial exploration in South Dakota.

  • Exploration to commence immediately post completion of the acquisition, starting with field mapping activities and geochemical works.

  • US President Joe Biden has recently invoked the Defense Production Act in an effort to encourage domestic production of battery materials within the United States.

  • IRIS’ USA Strategy is, through the process of exploration and development, to become a leading supplier of lithium to the North American Battery Metals industry.

  • IRIS’ WA strategy remains on track with expenditure and plans remaining unchanged and continuing to progress on plan and on budget.

Non-Executive Director, Chris Connell, commented : “Following introduction to this Project and completing a desktop assessment of its potential, I have for the past 6 weeks, been based in the Black Hills region with our consultant to assess the projects and confirm their prospectivity. The jurisdiction is also Tier One and includes townships in the Black Hills of South Dakota founded on mining, and having a long, proud history of supporting local mining operations, including for lithium.

I will be returning to South Dakota in the coming weeks to advance the Company’s exploration efforts.”

Executive Director, Tal Paneth, added : “After methodically assessing numerous projects to complement our suite of Australian assets, the Board has achieved an agreement that has met its key investment criteria of geographic and commodity diversification in a mining friendly jurisdiction.

The acquisition of the highly prospective hard rock lithium South Dakota Project sees IRIS join the green battery revolution at a time when the US President has recently enacted legislation to encourage domestic lithium production.”

IRIS Metals Limited ASX: IR1

Contact Details [email protected] www.irismetals.com

Directors Simon Lill, Non-Executive Chairman Tal Paneth, Executive Director Peter Marks, Executive Director Chris Connell, Non-Executive Director David Franks, Company Secretary

Registered Office ABN Level 6, 400 Collins Street 61 646 787 135 MELBOURNE VIC 3000

==> picture [61 x 47] intentionally omitted <==

==> picture [61 x 49] intentionally omitted <==

IRIS Metals Limited (“ IRIS ” or the “ Company ”) ( ASX:IR1 ) is pleased to announce it has entered a Share Sale Agreement (“ SSA ”), to acquire White Rock, L.L.C. (“ White Rock ”), a South Dakota incorporated corporation, which owns 525 lode claims covering approximately 10,846 Acres prospective for hard rock lithium, in South Dakota, USA .

Consistent with its objectives, and as outlined in the 2021 IRIS prospectus, the Company has been assessing various resource-based investment opportunities, with the aim of increasing shareholder value. The IRIS Board believes that this opportunity is consistent with achieving this objective.

Why Lithium, why USA, why Now?

Lithium is an appealing commodity from numerous perspectives, including:

  • Environmental & Social Responsibility - as a key ingredient in the rechargeable batteries powering the Electric Vehicle (“ EV” ) and energy storage revolutions; lithium is the basis for the clean, green power that will help address pollution, greenhouse gasses and climate change.

  • Macroeconomic - numerous reputable industry experts including McKinsey and Macquarie Bank point to strong demand/supply characteristics in the short, medium and long term, favourable for investment in the space.

  • The USA in general, and South Dakota in particular, provide a compelling lithium exploration jurisdiction:

  • Security of Tenure – a jurisdiction with guaranteed security of tenure.

  • Minimal Outlays – no minimum annual expenditure requirements or mandatory reduction in tenure.

  • Defense Production Act - to encourage domestic production of minerals required to make batteries for EVs and long-term energy storage. Potential government funding for strategic projects.

  • Politics – bipartisan support for promoting clean energy, with billions of dollars of available funding.

  • Geopolitics – recent global events have reaffirmed the importance of location of tenure and security of supply - and there is no better location than the USA, and no better location within the USA than South Dakota.

  • Mining Friendly Jurisdiction - South Dakota has a 145-year history of continuous mining . It has a stable government and supportive legislation, established infrastructure and experienced workforce and is continually ranked at the top or near the top of States for cost and ease of doing business.

The time is now for IRIS to:

  • Diversify Geographically – from its Tier-1 tenure in Australia to Tier-1 tenure in the USA.

  • Diversify Commodity – join the green revolution by exploring for lithium in a known jurisdiction

  • Increase Shareholder Value –by acquiring a highly prospective project.

  • Mitigate Commodity Risk – by investing in a project with a commodity that has outstanding medium and long term demand/supply characteristics.

www.irismetals.com

IRIS Metals Limited ASX: IR1

Contact Details [email protected]

Directors Simon Lill, Non-Executive Chairman Tal Paneth, Executive Director Peter Marks, Executive Director Chris Connell, Non-Executive Director David Franks, Company Secretary

Registered Office ABN Level 6, 400 Collins Street 61 646 787 135 MELBOURNE VIC 3000

==> picture [61 x 47] intentionally omitted <==

==> picture [61 x 49] intentionally omitted <==

The South Dakota Project

The Black Hills of South Dakota are famous for historic lithium mining dating back to 1898 when Li-bearing spodumene (contains up to 7% Li₂O), and amblygonite (contains up to 10% Li₂O) was first mined near the township of Custer.

Other economic minerals historically mined from the pegmatites of the Black Hills include: beryl, columbite-tantalite, mica, feldspar, quartz and tin.

The Black Hills of South Dakota are also famous for gold mining. The famous 40M oz Homestake gold mine is located in the Black Hills and several large-scale open cut gold mines continue operation today. The Black Hills were founded on a rich history of mining and remain favorable to future mining operations.

The acquisition of mining claims in the Black Hills include two main project areas covering:

  • the Dewy-High Climb ( Dewy Project ); and

  • Custer-Beecher trends ( Custer Project ).

These projects represent large areas of fertile lithium-cesium-tantalum (“ LCT ”)-pegmatites covering several historic lithium mines and numerous historical industrial mineral pegmatite mines.

==> picture [392 x 400] intentionally omitted <==

Figure 1: Location map of Dewy and Custer projects.

IRIS Metals Limited Contact Details ASX: IR1 [email protected] www.irismetals.com

Directors Simon Lill, Non-Executive Chairman Tal Paneth, Executive Director Peter Marks, Executive Director Chris Connell, Non-Executive Director David Franks, Company Secretary

Registered Office ABN Level 6, 400 Collins Street 61 646 787 135 MELBOURNE VIC 3000

==> picture [61 x 47] intentionally omitted <==

==> picture [61 x 49] intentionally omitted <==

Dewy Project

The Dewy Project consists of 250 BLM Lode Claims and covers an area of approximately 5,165 Acres of prospective LCT-pegmatites occurring in numerous discontinuous swarms represented along strike to many historic lithium mines ( Figures 2 & 3 ).

Historic lithium bearing mines in the Dewy project area include:

  • High Climb (spodumene)

  • Hunter & Louise (spodumene, amblygonite)

  • Tin Queen (spodumene, amblygonite, lithiophilite)

  • Dewy Lode (spodumene, amblygonite)

  • Oreville Spar (amblygonite)

  • Gap (lithiophilite)

==> picture [485 x 457] intentionally omitted <==

Figure 2: Location map of the Dewy Project, reflecting historic pegmatite mines in blue and lithium specific pegmatite mines in yellow.

Directors

IRIS Metals Limited Contact Details ASX: IR1 [email protected] www.irismetals.com

Simon Lill, Non-Executive Chairman Tal Paneth, Executive Director Peter Marks, Executive Director Chris Connell, Non-Executive Director David Franks, Company Secretary

Registered Office Level 6, 400 Collins Street MELBOURNE VIC 3000

ABN 61 646 787 135

==> picture [61 x 47] intentionally omitted <==

==> picture [61 x 49] intentionally omitted <==

Information on some of the historic Lithium mines within the Dewy Project

Historically, the High Climb pegmatite was mined for amblygonite, beryl, mica and feldspar (spodumene was left in situ or on waste dumps). The pegmatite is exposed for over 100m at surface with the open cut mine cutting across the 30m width of the pegmatite. The High Climb pegmatite is a classic example of a fractionated LCT pegmatite with internal zones of quartz-spodumene and cleavelandite-amblygonite with the un-mineralised exterior carapace composed of quartz-feldspar-muscovite.

The Hunter and Louise mine is composed of 6 small open cut pits primarily mined for mica and spodumene. The mineralized pegmatite is exposed at surface for over 200m with varying widths averaging 10m. The Hunter and Louise deposit is another good example of a zoned pegmatite with the carapace wall rock predominantly composed of feldspar and interior zones of quartz-spodumene± amblygonite.

The Tin Queen mine, comprising of three open cut pits, commenced operations in the early 1940’s, operating intermittently and initially targeting tin, with later production focusing primarily on mica with amblygonite and beryl recovery. Other lithium minerals identified at the Tin Queen mine include spodumene and lithiophilite-triphylite.

==> picture [340 x 355] intentionally omitted <==

  • Figure 3 : Photos of historic lithium producing mines in the Dewy Project. - A & B: Spodumene crystals in the wall of the Hunter & Louise pits.

  • C: High Climb open cut (spodumene & amblygonite).

  • D: Tin Queen open cut (spodumene, amblygonite, lithiophilite).

IRIS Metals Limited ASX: IR1

Contact Details [email protected] www.irismetals.com

Directors Simon Lill, Non-Executive Chairman Tal Paneth, Executive Director Peter Marks, Executive Director Chris Connell, Non-Executive Director David Franks, Company Secretary

Registered Office ABN Level 6, 400 Collins Street 61 646 787 135 MELBOURNE VIC 3000

==> picture [61 x 47] intentionally omitted <==

==> picture [61 x 49] intentionally omitted <==

Custer Project

The Custer Project consists of 275 BLM Lode Claims and covers an area of approximately 5,681 Acres of prospective LCT-pegmatites occurring in a north south corridor and containing many historic lithium mines ( Figures 4 & 5 ).

Historic lithium bearing mines in the Custer Project area include:

  • Custer Mountain (spodumene, amblygonite, lepidolite)

  • Earl Lode (spodumene, amblygonite)

  • L5 No.3 (spodumene)

  • Climax (amblygonite, lithiophilite-triphylite)

  • Elkhorn (lithiophilite)

==> picture [469 x 479] intentionally omitted <==

Figure 4: Location map of the Custer Project, reflecting historic pegmatite mines in blue and lithium specific pegmatite mines in yellow.

Directors Simon Lill, Non-Executive Chairman Tal Paneth, Executive Director Peter Marks, Executive Director Chris Connell, Non-Executive Director David Franks, Company Secretary

IRIS Metals Limited Contact Details ASX: IR1 [email protected] www.irismetals.com

Registered Office ABN Level 6, 400 Collins Street 61 646 787 135 MELBOURNE VIC 3000

==> picture [61 x 47] intentionally omitted <==

==> picture [61 x 49] intentionally omitted <==

Information on some of the historic lithium mines within the Custer Project

The Custer Mountain mine has been mined for feldspar and beryl sporadically since 1942 ( Figure 2). Mapping of the mine in 1945 by the United States Geological Survey (“ USGS ”) described pegmatite zones rich in spodumene, amblygonite and lepidolite. Spodumene crystals were documented up to 1.5m long and 0.5m thick. The Climax mine was one of the largest producers of mica in the Black Hills and has been intermittently operated since 1880. The pegmatite contains zones rich in lithium bearing minerals amblygonite and lithiophilite-triphylite.

==> picture [468 x 212] intentionally omitted <==

  • Figure 5 : Photos of historic lithium producing mines in the Custer Project. - A: The Custer Mountain open cut mine that produced spodumene, amblygonite and lepidolite.

  • B: The Elkhorn open cut mine that produced lithiophilite.

Initial Exploration Program

Initial exploration will consist of mapping, gridded soil and rock chip sampling to determine the priority targets for drill testing. To assist initial evaluation of the prospects, IRIS has acquired a Laser-Induced Breakdown Spectroscopy (“ LIBS ”) analyser, a technology that measures “light elements” (such as Li, Be, Al & Mg) and provides real time and infield analysis as to the presence of lithium (and other minerals) within the host medium. The acquisition and use of the LIBS analyser will assist the Company in rapidly identifying the highest priority target areas, prior to an in-depth geochemical and subsequent drill program.

Kookynie and Leonora Projects

The proposed acquisition is consistent with the Company’s strategy which seeks to expand its operations through the acquisition of additional projects to create shareholder value, a strategy which was outlined in the Company’s IPO Prospectus. Importantly, the proposed acquisition does not change IRIS’ focus on the exploration and development of its Western Australian assets. The strategies, budgets and plans for the exploration of the Kookynie and Leonora projects, per the Company’s prospectus, remain unchanged and will be pursued in parallel with the American opportunity, the subject of this release. The budget as updated is set out in Appendix 3. As referred to in the quarterly report dated 29 April 2022, the Company reported encouraging high-grade gold intercepts from its maiden RC drill program at Kookynie, however its maiden Aircore program returned no significant intercepts. Please refer to Appendix 3 for the collar table and JORC table 1.

IRIS will be resuming with its regional AC drill program at Kookynie to test targets identified via ground mapping, desktop reviews and geophysics, which is intended to commence in late Q2/early Q3, once the services of drilling contractors have been finalised. Given IRIS’ positive drilling results achieved at Lily, a follow up RC program is currently being planned to test for extensions and deeper mineralisation, with works scheduled to be undertaken in Q3. Once concluded at Kookynie, it is the Company’s intention to commence drill testing historic areas of interest as well as new targets delineated at Leonora, commencing at the Little Dipper project.

Directors IRIS Metals Limited Contact Details
Simon Lill, Non-Executive Chairman ASX: IR1 [email protected]
Tal Paneth, Executive Director www.irismetals.com
Peter Marks, Executive Director Registered Office ABN
Chris Connell, Non-Executive Director Level 6, 400 Collins Street 61 646 787 135
David Franks, Company Secretary MELBOURNE VIC 3000

==> picture [61 x 47] intentionally omitted <==

==> picture [61 x 49] intentionally omitted <==

Proposed Capital Raising

In connection with the acquisition, IRIS is undertaking a placement to raise $2,000,000 in new capital, through the issue of 5,000,000 fully paid ordinary shares which are being issued at a price of $0.40 per share (“ placement ” & “ Capital Raising ”). The funds used from this Capital Raising will be allocated to IRIS Metals’ South Dakota strategy and used to fund the acquisition and subsequent exploration activities and for general working capital purposes. The capital raising has been managed by S A Capital Pty Ltd who will receive a total fee of 4.0 million unlisted Options, noting no cash fee is payable. The Options have an exercise price of $0.40 expiring on 31 July 2025.

IRIS Metals Limited ASX: IR1

Contact Details [email protected] www.irismetals.com

Directors Simon Lill, Non-Executive Chairman Tal Paneth, Executive Director Peter Marks, Executive Director Chris Connell, Non-Executive Director David Franks, Company Secretary

Registered Office Level 6, 400 Collins Street MELBOURNE VIC 3000

ABN 61 646 787 135

==> picture [61 x 47] intentionally omitted <==

==> picture [61 x 49] intentionally omitted <==

Appendix 1: Agreements

Share Sale Agreement - White Rock, L.L.C.

IRIS has entered into a SSA with White Rocks, to acquire the South Dakota Project prospective for hard rock lithium, on the following key terms:

Consideration:

  • USD$50,000 cash consideration installment 1 (to secure exclusivity – already paid).

  • USD$50,000 cash consideration installment 2 (completion cash consideration), payable within 5 business days of completion.

  • Up to USD$300,000 of cash reimbursements, based on the provision of approved receipts.

  • IRIS is to issue White Rocks with 4,000,000 fully paid ordinary shares which will be escrowed for 2-years from the date of issue.

  • The Company will grant White Rocks a net smelter return (NSR) royalty of 1.25%.

White Rock have provided warranties & representations standard for a transaction of this nature.

Consulting Agreement – RLL Consulting, L.L.C. (RLL)

IRIS has entered into a consulting agreement with RLL, who will be appointed as IRIS’ South Dakota in country manager, to assist IRIS in a Business Development capacity and progress its South Dakota Project.

Consideration:

  • USD$100,000 annual retainer with a 3-month severance.

  • 2,000,000 shares vesting in equal tranches at the 12-, 24-, 36- & 48-month anniversary from the commencement date of the consulting agreement, which will be escrowed in line with ASX requirements at the time of issue.

  • Performance rights that upon achieving a drilling intercept of not less than 10m at 1.25% Li2O in South Dakota, RLL to be issued 1,000,000 fully paid ordinary shares which will be escrowed in line with ASX requirements at the time of issue.

  • In the event the consultant identifies, stakes, or introduces the Company to any additional ground in South Dakota, there is to be a NSR of 1.25% attributable to the consultant or its nominee.

RLL have provided warranties & representations standard for an agreement of this nature.

Pro Forma Capital Structure at Completion

Class Shares % Options
Shares currently on Issue 87,250,000 87.91%
Consideration shares under the SSA 4,000,000 4.03%
Capital Raising shares 5,000,000 5.04%
Performance shares under the Consulting Agreement 1,000,0001 1.01%
Retainer shares to be issued in line with the Consulting Agreement 2,000,0002 2.02%
Unlisted options on issue (exercisable at $0.30, Expiring 15/09/2024) - - 3,750,000
Unlisted options on issue (exercisable at $0.30, Expiring 15/10/2024) - - 1,000,0003
Broker Options - - 4,000,0004
Total Post Transaction 99,250,000 100% 8,750,000
  1. 1,000,000 shares to be issued in the event of achieving a drilling intercept of not less than 1.25% Li2O within 5 years. 2. 2,000,000 shares to be issued vesting in 4 equal tranches over 4 years in accordance with the agreement entered with RLL. 3. 500,000 have vested as of 15 April 2022 and a further 500,000 will vest as at 15 October 2022.

  2. To be issued in conjunction with the capital raise and subject to shareholder approval at the next shareholder meeting.

Directors

Simon Lill, Non-Executive Chairman Tal Paneth, Executive Director Peter Marks, Executive Director Chris Connell, Non-Executive Director David Franks, Company Secretary

Contact Details [email protected] www.irismetals.com

IRIS Metals Limited Contact Details ASX: IR1 www.irismetals.com Registered Office ABN Level 6, 400 Collins Street 61 646 787 135 MELBOURNE VIC 3000

==> picture [61 x 47] intentionally omitted <==

==> picture [61 x 49] intentionally omitted <==

Appendix 2: Acquisition Properties

Claims* Expiry
Date
Type of
Property
Approx. Size
in Acres
State Project Ownership
275 Registered
Claims^
1 Sep** Lode Claim 5,681 South Dakota Custer White Rock, L.L.C.
250 Registered
Claims^
1 Sep** Lode Claim 5,165 South Dakota Dewy White Rock, L.L.C.

*A standard claim is the equivalent of 20.66 Acres, noting that some claims may be smaller than others. ** Renewable annually, as of 1 September each year.

^ After taking all practical endeavours in the due diligence process that included site reconnaissance, review of publicly available information (including with the Bureau of Land Management), ground mapping and independent review of documentation provided by White Rock, L.L.C.; the Company believes the lode claims that are the subject of this report are not subject to any competing claims.

Directors

IRIS Metals Limited ASX: IR1

Contact Details [email protected] www.irismetals.com

Simon Lill, Non-Executive Chairman Tal Paneth, Executive Director Peter Marks, Executive Director Chris Connell, Non-Executive Director David Franks, Company Secretary

Registered Office Level 6, 400 Collins Street MELBOURNE VIC 3000

ABN 61 646 787 135

==> picture [61 x 47] intentionally omitted <==

==> picture [61 x 49] intentionally omitted <==

Appendix 3: Collar Table of Kookynie December Aircore drill program

Hole ID Tenement Hole Type Easting
(MGA94)
Northing
(MGA94)
RL Azi Dip EoH Grade
RSAC001 P40/1385 AC 348653 6760376 440 0 -60 38 NSI
RSAC002 P40/1385 AC 348652 6760349 440 0 -60 25 NSI
RSAC003 P40/1385 AC 348650 6760333 440 0 -60 50 NSI
RSAC004 P40/1385 AC 348649 6760308 440 0 -60 33 NSI
RSAC005 P40/1385 AC 348653 6760291 440 0 -60 39 NSI
RSAC006 P40/1385 AC 348646 6760267 440 0 -60 54 NSI
RSAC007 P40/1385 AC 348648 6760194 440 0 -60 1 NSI
RSAC008 P40/1385 AC 348649 6760187 440 0 -60 3 NSI
RSAC009 P40/1385 AC 348651 6760166 440 0 -60 1 NSI
RSAC010 P40/1385 AC 348650 6760133 440 0 -60 1 NSI
RSAC011 P40/1385 AC 348649 6760082 440 0 -60 4 NSI
RSAC012 P40/1385 AC 348652 6760043 440 0 -60 25 NSI
RSAC013 P40/1385 AC 348652 6760032 440 0 -60 27 NSI
RSAC014 P40/1385 AC 348651 6760021 440 0 -60 5 NSI
RSAC015 P40/1385 AC 348651 6760011 440 0 -60 14 NSI
RSAC016 P40/1385 AC 348650 6759997 440 0 -60 23 NSI
RSAC017 P40/1385 AC 348649 6759987 440 0 -60 14 NSI
RSAC018 P40/1385 AC 348649 6759974 440 0 -60 5 NSI
RSAC019 P40/1385 AC 348647 6759962 440 0 -60 19 NSI
RSAC020 P40/1385 AC 348646 6759955 440 0 -60 17 NSI
RSAC021 P40/1385 AC 348646 6759945 440 0 -60 17 NSI
RSAC022 P40/1385 AC 348646 6759935 440 0 -60 18 NSI
RSAC023 P40/1385 AC 348646 6759923 440 0 -60 20 NSI
RSAC024 P40/1385 AC 348648 6759913 440 0 -60 20 NSI
RSAC025 P40/1385 AC 348648 6759903 440 0 -60 25 NSI
RSAC026 P40/1385 AC 348646 6759890 440 0 -60 24 NSI
RSAC027 P40/1385 AC 348646 6759877 440 0 -60 27 NSI
RSAC028 P40/1385 AC 348651 6759866 440 0 -60 7 NSI
RSAC029 P40/1385 AC 348771 6760000 440 0 -60 65 NSI
RSAC030 P40/1385 AC 348771 6759974 440 0 -60 43 NSI
RSAC031 P40/1385 AC 348771 6759953 440 0 -60 8 NSI
RSAC032 P40/1385 AC 348885 6759946 440 0 -60 44 NSI
RSAC033 P40/1385 AC 348882 6759928 440 0 -60 55 NSI
RSAC034 P40/1385 AC 348882 6759908 440 0 -60 60 NSI
RSAC035 P40/1385 AC 348882 6759881 440 0 -60 61 NSI
RSAC036 P40/1385 AC 348882 6759861 440 0 -60 38 NSI
RSAC037 P40/1385 AC 348881 6759843 440 0 -60 17 NSI
RSAC038 P40/1385 AC 348879 6759830 440 0 -60 8 NSI
RSAC039 P40/1385 AC 348879 6759817 440 0 -60 11 NSI
TWAC001 P40/1334 AC 349910 6759287 430 320 -60 35 NSI
TWAC002 P40/1334 AC 349924 6759277 430 320 -60 25 NSI
TWAC003 P40/1334 AC 349930 6759269 430 320 -60 26 NSI
TWAC004 P40/1334 AC 349937 6759261 430 320 -60 24 NSI
TWAC005 P40/1334 AC 349948 6759251 430 320 -60 30 NSI
TWAC006 P40/1334 AC 349953 6759242 430 320 -60 24 NSI
TWAC007 P40/1334 AC 349960 6759234 430 320 -60 31 NSI
TWAC008 P40/1334 AC 349967 6759224 430 320 -60 24 NSI
TWAC009 P40/1334 AC 349972 6759212 430 320 -60 27 NSI
TWAC010 P40/1334 AC 349983 6759207 430 320 -60 30 NSI
TWAC011 P40/1334 AC 349990 6759195 430 320 -60 32 NSI
TWAC012 P40/1334 AC 350002 6759187 430 320 -60 39 NSI
TWAC013 P40/1334 AC 350014 6759172 430 320 -60 36 NSI
TWAC014 P40/1334 AC 350101 6759097 430 320 -60 48 NSI
TWAC015 P40/1334 AC 350116 6759077 430 320 -60 32 NSI
TWAC016 P40/1334 AC 350127 6759068 430 320 -60 28 NSI
TWAC017 P40/1334 AC 350140 6759055 430 320 -60 24 NSI
TWAC018 P40/1334 AC 350150 6759042 430 320 -60 29 NSI
TWAC019 P40/1334 AC 350145 6759012 430 320 -60 30 NSI
TWAC020 P40/1334 AC 350155 6758997 430 320 -60 30 NSI
TWAC021 P40/1334 AC 350164 6758984 430 320 -60 31 NSI
TWAC022 P40/1334 AC 350175 6758974 430 320 -60 32 NSI
TWAC023 P40/1334 AC 350213 6759186 430 320 -60 23 NSI
TWAC024 P40/1334 AC 350226 6759170 430 320 -60 32 NSI
TWAC025 P40/1334 AC 350236 6759155 430 320 -60 18 NSI
TWAC026 P40/1334 AC 350246 6759140 430 320 -60 42 NSI
TWAC027 P40/1334 AC 350259 6759129 430 320 -60 33 NSI
TWAC028 P40/1334 AC 350266 6759118 430 320 -60 40 NSI
TWAC029 P40/1334 AC 350276 6759105 430 320 -60 36 NSI
TWAC030 P40/1334 AC 350284 6759093 430 320 -60 33 NSI
TWAC031 P40/1334 AC 350293 6759082 430 320 -60 14 NSI
TWAC032 P40/1334 AC 350379 6759351 430 300 -60 6 NSI
TWAC033 P40/1334 AC 350394 6759343 430 300 -60 2 NSI
TWAC034 P40/1334 AC 350406 6759338 430 300 -60 4 NSI
TWAC035 P40/1334 AC 350418 6759330 430 300 -60 4 NSI
TWAC036 P40/1334 AC 350430 6759320 430 300 -60 4 NSI
TWAC037 P40/1334 AC 350444 6759258 430 300 -60 18 NSI

Directors

Simon Lill, Non-Executive Chairman Tal Paneth, Executive Director Peter Marks, Executive Director Chris Connell, Non-Executive Director David Franks, Company Secretary

IRIS Metals Limited ASX: IR1

Contact Details [email protected]

www.irismetals.com

Registered Office Level 6, 400 Collins Street MELBOURNE VIC 3000

ABN 61 646 787 135

==> picture [61 x 47] intentionally omitted <==

==> picture [61 x 49] intentionally omitted <==

Ongoing Compliance

The Directors confirm that the Company is in ongoing compliance with the ASX Listing Rules including, in particular, Listing Rule 3.1.

Financial

As of May 2022, cash was approximately $3.8 million, following net cash outflows from operations of $0.37 million for the period 1 April 2022 through to 1 May 2022. The material expense item of Exploration and Evaluation Costs is $0.28 million.

Use of Funds

IRIS provides the following disclosures required by ASX Listing Rule 5.3.4 regarding a comparison of its actual expenditure to date since listing on 23 September 2021 against the ‘Use of Funds’ statement in its Prospectus dated 16 July 2021. Going forward, it is expected that, barring any unforseen circumstances, the Use of Funds will be in line with that set out in the Company’s 2021 Prospectus.

Funds available Note Use of funds
statement
($000s)
Actual ($000s) Variance
($000s)
Existingcash reserves 1 100 194 (94)
Funds raised from thepublic offer 7,000 7,000 -
Total 7,100 7,194 (94)
Allocation of funds Note Estimated
expenditure
May 2022
($000s)⁴
Actual expenditure
to May 2022
($000s)⁵
Variance
($000s)
Exploration Expenditure 2 1,742 1,467 275
Payment to vendors of tenements contingent
upon IPO
2 105 110 (5)
Workingcapital and administration costs 2 799 1,227 (428)
Expenses of thepublic offer 3 721 566 155
Total 3,367 3,370 (3)

Notes:

  1. The actual opening cash balance at 1 July 2021 was higher than the balance used in the prospectus.

  2. The company settled the transactions contemplated in the prospectus as maximum subscription on 15 September 2021. The actual use of funds to May 2022 represents expenditure incurred since 01 July 2021 regarding exploration and evaluation of its two wholly owned projects.

  3. Some expenses of the public offer were incurred in the preceding quarter.

  4. Estimated expenditure 1 May 2022 is for the period 1 July 2021 through to 1 May 2022 and is calculated based on the forecasts provided in the Prospectus dated 16 July 2021, pro rated for the period.

  5. Actual expenditure is for the period 1 July 2021 through to 1 May 2022.

About IRIS Metals Limited:

IRIS Metals (ASX:IR1) is an Australian-based explorer with an extensive suite of assets prospective for gold, nickel and lithium in Western Australia and South Dakota, USA. Its wholly-owned WA tenement portfolio includes a compelling landholding in central Kookynie - a gold camp renowned for its historical high grade gold production and bonanza gold grades, and strategic tenure in the highly prospective Tier-1 mining jurisdiction of Leonora. The hard rock lithium South Dakota Project provides the Company and its shareholders with exposure to the battery metals space in a mining friendly jurisdiction with a history of past production. IRIS is pursuing a strategy of rapid prospect evaluation in recognised mineral fields, with a view to making economic discoveries, thereby enhancing shareholder value.

Directors

Simon Lill, Non-Executive Chairman Tal Paneth, Executive Director Peter Marks, Executive Director Chris Connell, Non-Executive Director David Franks, Company Secretary

IRIS Metals Limited Contact Details ASX: IR1 [email protected] www.irismetals.com Registered Office ABN Level 6, 400 Collins Street 61 646 787 135 MELBOURNE VIC 3000

==> picture [61 x 47] intentionally omitted <==

==> picture [61 x 49] intentionally omitted <==

Forward looking Statements:

This announcement may contain certain forward-looking statements that have been based on current expectations about future acts, events and circumstances. These forward-looking statements are, however, subject to risks, uncertainties and assumptions that could cause those acts, events and circumstances to differ materially from the expectations described in such forward-looking statements. These factors include, among other things, commercial and other risks associated with exploration, estimation of resources, the meeting of objectives and other investment considerations, as well as other matters not yet known to IRIS Metals or not currently considered material by the company. IRIS Metals accepts no responsibility to update any person regarding any error or omission or change in the information in this presentation or any other information made available to a person or any obligation to furnish the person with further information.

Competent Persons Statement:

The information in this announcement that relates to exploration results is based on information reviewed by Chris Connell a Competent Person who is a member of Australian Institute of Geologists and a Non-Executive Director to IRIS Metals Limited. Chris Connell is an exploration geologist with over 25 years’ experience in gold and base metal exploration including gold exploration and resource definition in the Eastern Goldfields and has sufficient experience in the styles of mineralisation and type of deposit under consideration and to the activity undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Chris Connell has consented to the inclusion in this Public Report of the matters based on his information in the form and context in which it appears.

This release is approved by the Board of IRIS Metals Limited.

Directors

Contact Details [email protected] www.irismetals.com ABN 61 646 787 135

IRIS Metals Limited ASX: IR1 Registered Office Level 6, 400 Collins Street MELBOURNE VIC 3000

Simon Lill, Non-Executive Chairman Tal Paneth, Executive Director Peter Marks, Executive Director Chris Connell, Non-Executive Director David Franks, Company Secretary

JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation JORC Code explanation Commentary Commentary
Sampling Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry Industry standard air-core drilling was used to obtain 1m samples via a rig-mounted cyclone
techniques standard measurement tools appropriate to the minerals under investigation, such as down hole and bucket with each sample placed in an individual pile and numbered calico bag after
gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as splitting via three tier jones riffle splitter. An approximately 2.5kg sample was then obtained
limiting the broad meaning of sampling. using a small scoop and sampling from individual piles to produce composite 4m samples
Include reference to measures taken to ensure sample representivity and the appropriate calibration
of any measurement tools or systems used.
except where the end of hole restricted the composite to 3m or less.

Aspects of the determination of mineralisation that are Material to the Public Report.
In cases where ‘industry standard’ work has been done this would be relatively simple (eg ‘reverse
circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30
Samples generally ranging from 2 to 3.5 kilograms were pulverised at the laboratory to -75
microns to produce a 50 g charge for fire assay.
g charge for fire assay’). In other cases more explanation may be required, such as where there is
coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg
submarine nodules) may warrant disclosure of detailed information.
Drilling Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, Air-core drilling by face-sampling blade bit with a hole diameter of approximately 120mm.
techniques etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face-sampling bit Holes drilled to ‘refusal’ where the blade bit can no longer penetrate. Depths ranged from 1m
_or other type, whether core is oriented and if so, by what method, etc). _ to 65m.
Drill sample Method of recording and assessing core and chip sample recoveries and results assessed. Overall recoveries were recorded as good and there were no significant recovery problems.
recovery Measures taken to maximise sample recovery and ensure representative nature of the samples. Air-core samples were collected from a rig mounted cyclone at 1m intervals, split into
Whether a relationship exists between sample recovery and grade and whether sample bias may numbered calico bags and laid on the ground in rows of 10 or 20m. All efforts made when
have occurred due to preferential loss/gain of fine/coarse material. composite sampling to achieve a representative sample.
Samples were visually checked for recovery and contamination.
There is no noted evidence of sample bias.
Logging Whether core and chip samples have been geologically and geotechnically logged to a level of All holes were logged by inspection of washed cuttings at time of drilling.
detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies. The drilling and sampling technique is appropriate for early-stage exploration but will not be
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography. used to support mineral resource estimation, mining studies and metallurgical studies.
The total length and percentage of the relevant intersections logged. Logging is qualitative in nature.
Chips from each metre were sieved and retained in compartmentalised chip trays.
Total length logged is 1942m,100% of meters drilled.
Sub-sampling If core, whether cut or sawn and whether quarter, half or all core taken. Samples were taken using a small scoop. Samples were mostly dry.
techniques and If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry. The sampling technique is appropriate to the early-stage style of exploration.
sample For all sample types, the nature, quality and appropriateness of the sample preparation technique.
preparation Quality control procedures adopted for all sub-sampling stages to maximise representivity of No duplicate samples were taken but industry standards and blanks were submitted at the
samples. ratio of 1 in 30 samples. These QC results are reported by the laboratory with final assays.

Measures taken to ensure that the sampling is representative of the in situ material collected,
including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to thegrain size of the material being sampled.
The sample preparation involved oven drying and then pulverisation of the entire sample in
an LM5 or equivalent pulverising mill to a grind size of 85% passing 75 micron.
Quality of assay The nature, quality and appropriateness of the assaying and laboratory procedures used and All samples were analysed by Fire assayof a 50g charge.
data and
laboratory tests
whether the technique is considered partial or total.
For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in
determining the analysis including instrument make and model, reading times, calibrations factors
applied and their derivation, etc.

No geophysical or handheld instruments were used for analysis.
Additional to IRIS Metals standards and blanks, Internal laboratory controls include duplicate
assaying of randomly selected assay pulps and assaying of internal laboratory standards. All
control data is reported to the Company and inspected for any discrepancy.
Criteria JORC Code explanation JORC Code explanation Commentary Commentary Commentary
Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy (ie lack of bias) and precision have been
established.
Verification of The verification of significant intersections by either independent or alternative company personnel. No significant intersections have been identified for the current program.
sampling and The use of twinned holes. No holes have been twinned in the current program.
assaying Documentation of primary data, data entry procedures, data verification, data storage (physical and Primary data was collected using a combination of excel and paper templates in the field.
electronic) protocols. No adjustments were made to assay data.
Discuss any adjustment to assay data.
Location of data Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, Hole collar positions were located using a hand-held GPS referenced to MGA GDA94, Zone
points mine workings and other locations used in Mineral Resource estimation. 51 and are accurate to approximately 5m. Dip and Azimuth were controlled by compass and
Specification of the grid system used. clinometer at the rig. No downhole surveys were taken.
Quality and adequacy of topographic control. Collar elevation values applied are arbitrary, based on the regional elevation average. This
is appropriate to early-stage exploration. Topographic control will be established where the
potential for economic mineralisation is demonstrated.
Data spacing and Data spacing for reporting of Exploration Results. Nominal hole spacing is 20m, however varies from 7m – 30m on section lines dependent on
distribution Whether the data spacing and distribution is sufficient to establish the degree of geological and hole depth.
grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) Further drilling of prospects with significant intersections may not necessarily result in
and classifications applied. definition of a mineral resource.
Whether sample compositing has been applied. 4m sample compositing occurred in the field except where the end of hole restricted the
composite to 3m or less. No data compositinghas used.
Orientation of data
Whether the orientation of sampling achieves unbiased sampling of possible structures and the AC drill lines oriented orthogonal to interpreted strike to the extent to which this is known.
in relation to
geological
extent to which this is known, considering the deposit type.
If the relationship between the drilling orientation and the orientation of key mineralised structures is
No sampling bias is believed to have been introduced. No direct structural measurements
have been taken.
structure considered to have introduced a sampling bias, this should be assessed and reported if material.
Sample security The measures taken to ensure sample security. Samples were collected by Iris Metals employees and personally delivered to the Intertek laboratory
in Kalgoorlie.
Audits or reviews The results of any audits or reviews of sampling techniques and data. No review or audit has been carried out.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation JORC Code explanation Commentary Commentary
Mineral tenement Type, reference name/number, location and ownership including agreements or material issues with
The Kookynie project results reported here are situated across P40/1334 and P40/1385 for
and land tenure third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical which IRIS Metals owns and operates and holds rights to 100%* of all metals with exception
status sites, wilderness or national park and environmental settings. made to alluvial rights agreed to prospecting parties.
The security of the tenure held at the time of reporting along with any known impediments to
obtaining a licence to operate in the area.
Exploration done Acknowledgment and appraisal of exploration by other parties. Of the two discrete prospect areas much of the historic work across the has been carried out
by other parties by Mount Eden from the mid-1980s, and by Britannia Gold Ltd in the mid 1990s. Soil
samples were taken over the prospect area on P40/1334.
Much of the modern-day exploration on P40 / 1334 was conducted by Mount Edon, including
vacuum drilling, rock chip sampling, costeaning and RAB drilling. Much of this activity was
centred on historic gold workings. Kookynie Resources completed a hand auger sampling
program across the same area in 2002.
Geology Deposit type, geological setting and style of mineralisation. Air-core drilling targeted favourable stratigraphy (basalt granite margins) and interpreted
structural targets. Target is shear hosted vein style gold mineralisation.
Drill hole A summary of all information material to the understanding of the exploration results including a A collar table and table is supplied in the appendices. No significant intercepts are reported.
Information tabulation of the following information for all Material drill holes:
o
easting and northing of the drill hole collar
o
elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole collar
o
dip and azimuth of the hole
o
down hole length and interception depth
o
hole length.
If the exclusion of this information is justified on the basis that the information is not Material and
this exclusion does not detract from the understanding of the report, the Competent Person should
clearly explain why this is the case.
Data aggregation In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade No significant intercepts are reported.
methods truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated. No metal equivalent values, or formulas used.
Where aggregate intercepts incorporate short lengths of high grade results and longer lengths of
low grade results, the procedure used for such aggregation should be stated and some typical
examples of such aggregations should be shown in detail.
The assumptions used for any reporting of metal equivalent values should be clearly stated.
Relationship These relationships are particularly important in the reporting of Exploration Results. No significant intercepts are reported.
between If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should
mineralisation be reported.
widths and If it is not known and only the down hole lengths are reported, there should be a clear statement to
intercept lengths this effect (eg ‘down hole length, true width not known’).
Diagrams Appropriate maps and sections (with scales) and tabulations of intercepts should be included for Appropriate summary figures including scale and MGA 94 coordinates are included in the
any significant discovery being reported These should include, but not be limited to a plan view of report.
drill hole collar locations and appropriate sectional views.
Criteria JORC Code explanation JORC Code explanation Commentary Commentary
Balanced Where comprehensive reporting of all Exploration Results is not practicable, representative A collar table and table of all holes drilled is supplied in the appendices and lists all holes
reporting reporting of both low and high grades and/or widths should be practiced to avoid misleading drilled.
reporting of Exploration Results.
Other substantive Other exploration data, if meaningful and material, should be reported including (but not limited to): Historical drill programs have reportedly defined anomalous mineralisation within the
exploration data geological observations; geophysical survey results; geochemical survey results; bulk samples – tenement package. Most of the historical drill collar locations cannot be confidently located
size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and the purpose of this program is in part to confirm historical work.
and rock characteristics; potential deleterious or contaminating substances.
Further work The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or Collection and analysis of selected 1m splits may be warranted.
large-scale step-out drilling).
Diagrams clearly highlighting the areas of possible extensions, including the main geological
interpretations and future drilling areas, provided this information is not commercially sensitive.