IONIC RARE EARTHS LIMITED Interim / Quarterly Report 2017

Oct 30, 2017

65151_rns_2017-10-30_4e187784-5e7a-47c6-9fe1-22b7ab2702a0.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [595 x 150] intentionally omitted <==

ASX Announcement

31 October 2017

QUARTERLY REPORT FOR THE PERIOD ENDING 30 SEPTEMBER 2017

HIGHLIGHTS

ORO VERDE LIMITED (ASX code: OVL)

An emerging resource company focused on Nicaragua

  • Oro Verde resumed control of exploration at Topacio

  • Phase 2 trenching and drilling re-focused on the high grade potential around the Topacio resource area

  • Phase 2 drilling intersected bonanza gold grades including:

  • MTD-17-012 2.85m at 15.59 g/t gold (Mico West) Including 1.23m at 32.30 g/t gold

KEY PROJECTS - Nicaragua Topacio Gold Project San Isidro Gold Project

BOARD OF DIRECTORS Executive

Trevor Woolfe - MD Brett Dickson - Finance Dir

Non-Executive

Wolf Martinick - Chairman Tony Rovira Brad Farrell

MANAGEMENT - NICARAGUA

David Turner - Country Mgr Jacques Levy - Legal Rep.

REGISTERED OFFICE

Level 1, 34 Colin St, West Perth, WA 6005 AUSTRALIA +61 (0) 8 9481 2555

WEBSITE

www.oroverde.com.au

TWITTER

  • Phase 3 of trenching and drilling is currently underway

  • Capital raising via a Share Purchase Plan closes on 31 October


Oro Verde Limited (ASX: OVL) (“Oro Verde” or “the Company”) is pleased to provide its quarterly report for the period ending 30 September 2017. The September quarter saw Oro Verde continue its Phase 2 drilling program on the Topacio Gold Project in southeastern Nicaragua (Figure 4).

The Company resumed control of exploration activities at the Topacio Gold Project in August, after JV partner Newcrest did not satisfy its expenditure requirements on the project

Following Newcrest’s withdrawal, the Company re-focused its exploration activities on the high grade targets defined around the existing 340,000 ounce gold (Au) resource at the main Topacio area. Drilling beneath veins, where trenching had identified high grade vein intersections in the previous quarter, was successful in intersecting bonanza grade gold intercepts including:

  • MTD-17-012 2.85m at 15.59 g/t Au (Mico West Vein) - including 1.23m at 32.30 g/t Au

The Company is now advancing with a dual focus, firstly to explore the Topacio resource area - with trenching currently underway and drilling scheduled to follow - to expand the current resource , and secondly to determine the viability of early gold production from the currently defined mineralised zones.

@MDOroVerde

A capital raising, via a Share Purchase Plan, is currently underway to raise additional working capital for exploration activities.

Oro Verde Limited (ASX code: OVL) Level 1, 34 Colin St, West Perth, WA 6005 Phone: +61 8 9481 2555 Fax: +61 8 9485 1290 Email: [email protected]

TOPACIO GOLD PROJECT

Joint Venture Agreement

Oro Verde resumed control of exploration at the Topacio Gold Project during the quarter after Newcrest failed to reach its expenditure requirements and withdrew from the JV agreement in August. Our understanding of the Topacio project advanced significantly during the agreement period with the addition of concession wide multi-element geochemical and airborne geophysical data, as well as detailed geological mapping, presenting many new targets for Oro Verde to follow up.

Oro Verde Drilling - Phase 2

In June 2017[1] , Oro Verde announced the commencement of Phase 2 drilling to test for extensions to the 340,000oz Topacio gold resource. This second phase of drilling in 2017 was designed to test for gold mineralisation in veins that lie outside, but near, the historical 340,000oz Topacio gold resource (Figure 1) and to confirm the continuity of gold mineralisation at depth below recent high grade trench results[2] , as displayed in Table 1.

The Phase 2 program consisted of 402.16 metres of diamond drilling[3] , testing below high grade surface gold results on four key targets – the Su Majestad Vein, Topacio East Extension Vein, Dispute/Dos Amigos Veins and the Mico West Vein (Figure 2). The holes were relatively shallow to assess the continuity of the high grade veins approximately 30-50 metres below surface.

Drilling at the Dispute Vein (MTD-17-010) intersected a 9.25m mineralised interval averaging 2.21 g/t Au, including 1.52m at 7.43 g/t Au (Table 1), approximately 30m below surface (Figure 5). Drilling was also undertaken for the first time into the Su Majestad (MTD-17-008) and Topacio East Extension (MTD-17-009) Veins, located to the ENE from the existing Topacio gold resource (Figure 2) – both holes were successful in intersecting gold mineralisation.

Table 1 Topacio Area – Phase 2 Trench and Drill Results (>1 g/t Au)

LOCATION TRENCH or DRILL
HOLE NAME
SAMPLE TYPE INTERVAL
LENGTH
GOLD GRADES DOWNHOLE
DEPTH
Mico West OPMW1701 Trench 7.50 m 5.39g/t Au At surface
including 2.05 m 17.06g/t Au At surface
TMW1702 Trench 6.20 m 5.16g/t Au At surface
including 2.70 m 10.44g/t Au At surface
MTD-17-013 Drill hole 0.33 m 1.51g/t Au From 40.97m
MTD-17-012 Drill hole 2.85 m 15.59g/t Au From 21.25m
including 1.23 m 32.30g/t Au From 22.87m
Dispute RCD1701 Trench 1.10 m 53.10g/t Au At surface
MTD-17-010 Drill hole 9.25 m 2.21g/t Au From 32.30m
including 1.52 m 7.43g/t Au From 36.60m
Dos Amigos MTD-17-011 Drill hole 1.00 m 1.87g/t Au From 42.50m
Su Majestad MTD-17-008 Drill hole 3.00 m 1.84g/t Au From 53.15m
Topacio East MTD-17-009 Drill hole 1.55 m 1.28 g/t Au From 32.10m

All results previously reported to ASX on 21 June, 20 July, 1 August and 14 August 2017.

1 Refer to ASX announcement dated 5 June 2017 “Drilling of High Grade Targets Commences at Topacio Gold Project”

2 Refer to ASX announcement dated 20 July 2017 “High Grade Trench Results at Topacio”

3 Refer to ASX announcement dated 1 August 2017 “Drilling of New Zones Extends Gold Mineralisation”

==> picture [596 x 43] intentionally omitted <==

2

==> picture [469 x 366] intentionally omitted <==

Figure 1 Topacio Gold Project: Phase 2 drill area

==> picture [478 x 277] intentionally omitted <==

Figure 2 Topacio trench locations (blue titles), OVL drill holes (red titles) and previous rock chip results

==> picture [596 x 43] intentionally omitted <==

3

Drilling was undertaken for the first time at the Mico West Vein (MTD-17-012) and intersected a 2.85m mineralised interval averaging 15.59 g/t Au, including 1.23m at 32.30 g/t Au (Figure 6), approximately 20m below surface. A second hole (MTD-17-013) was also completed at Mico West, approximately 50m west of hole MTD-17-012, and MTD-17-011 was drilled into the SW extension of the Dos Amigos Vein (Figure 2).

As with the Phase 1 Drill Program at Rebeca, drill core was logged and sampled by Oro Verde personnel on site. Drill core samples were sent to the Inspectorate Laboratory in Managua for sample preparation. Pulps were then sent internally by the laboratory to its parent Bureau Veritas Laboratory in Vancouver for analysis. All samples were analysed for gold by fire assay/ICP-ES (FA330-Au) and 45 elements by four acid digest ICP-MS (MA200).

UPCOMING ACTIVITIES

This year has been a very active one for the Company with two drilling programs and a campaign of trenching at Topacio returning very high grade results. In particular, the exceptional gold grades received from the Mico West trenching and drilling are very encouraging and certainly warrant further follow-up.

Going forward Oro Verde will have a dual focus. The first is to further explore the Topacio concession, specifically drilling to expand the current resource , and secondly will be to determine the viability of early gold production from the currently defined mineralised zones.

To achieve the first objective, the Company will refocus on the Topacio resource area which has an historical NI 43-101 (Canadian standard, similar to JORC) compliant inferred resource of 2,716,176 tonnes at 3.9 g/t Au, containing 340,345 ounces of gold , at a 1.5 g/t gold cut-off[4] .

National Instrument 43-101 (“NI 43-101”) is a national instrument for the Standards of Disclosure for Mineral Projects within Canada and as such this estimate is a foreign estimate and is not reported in accordance with the JORC code (Australia). A competent person has not done sufficient work to classify the foreign estimate as mineral resources in accordance with the JORC code and it is uncertain that following evaluation and/or further exploration work that the foreign estimate will be able to be reported as mineral resources in accordance with the JORC code.

Oro Verde Trenching and Drilling - Phase 3

The Company has commenced Phase 3 exploration with the aim of increasing the current Topacio resource and delivering a maiden JORC resource. The recent drilling results, where some exceptional grades were recorded, provide an excellent platform from which to launch this program.

Given the historical resources and the recent trenching and drilling results, the Company believes that the Topacio project area could contain at least 1 million ounces of gold, with a near-term Exploration Target of:

3.5 - 4.0 MT @ 3.8 – 4.0 g/t Au (427,000 – 514,000 ounces gold)

This Exploration Target is conceptual in nature, but is based on reasonable grounds and assumptions. There has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

Many of the targets for future exploration are outcropping veins, such as at Dispute and Mico West, where very good first pass results have been achieved. Surface trenching has provided a fast and economic target refining tool prior to drilling. Phase 3 trenching has now commenced with extensive trenching over veins that have been identified by surface mapping and sampling where high gold grades have already been identified. Diamond drilling of priority targets is planned to follow trenching .

Early Production Opportunities

In addition to the planned resource extension and estimation activities, Oro Verde is investigating the possibility to commence a bulk sampling program at Topacio followed by toll treating at a nearby processing facility. The Company’s Nicaraguan-based team has commenced studies to identify the permits needed and possible trucking routes to the processing plant.

4 Refer to ASX announcement dated 27 February 2015 “Oro Verde Proceeds to Acquire Topacio Gold Project”

==> picture [596 x 43] intentionally omitted <==

4

NEW CONCESSIONS

Over the past two years, applications have been submitted for ground covering the land adjacent to the Topacio Project under the Iguanas, Galeano and Tigre applications (Figure 3). The Nicaraguan Ministry of Mines and Energy (MEM) has accepted these applications but has not yet approved grant of the concessions.

If Oro Verde is successful in having all three of its applications approved, the ground position in the Topacio region will increase by approximately 240% from 93km[2] to 316km[2] .

==> picture [456 x 279] intentionally omitted <==

Figure 3 Topacio Project and OVL concession applications – Iguanas, Galeano and Tigre

TOPACIO PROJECT BACKGROUND

On 27 February 2015[5] , Oro Verde announced the positive completion of due diligence and acceptance of an Option to Purchase Agreement (“the Option”) over the high grade Topacio Gold Project, located in southeastern Nicaragua (Figure 4). The project boasts a historical NI 43-101 (Canadian standard, similar to JORC) compliant Inferred Resource of:

2,716,176 tonnes at 3.9 g/t gold, containing 340,345 ounces of gold, at a 1.5 g/t gold cut-off[6]

National Instrument 43-101 (“NI 43-101”) is a national instrument for the Standards of Disclosure for Mineral Projects within Canada and as such this estimate is a foreign estimate and is not reported in accordance with the JORC Code. A competent person has not done sufficient work to classify the foreign estimate as mineral resources in accordance with the JORC code and it is uncertain that following evaluation and/or further exploration work that the foreign estimate will be able to be reported as mineral resources in accordance with the JORC code.

Newcrest and Oro Verde entered a farm-in Agreement in November 2015[2] . The Agreement was terminated in August 2017[7] .

5 Refer to ASX announcement dated 27 February 2015 “Oro Verde Proceeds to Acquire Topacio Gold Project”

6 Refer to ASX announcement dated 11 November 2014 “Acquisition of High Grade Gold Project”

7 Refer to ASX announcement dated 11 August 2017 “Oro Verde Resumes Exploration Control of High Grade Topacio Gold Project”

==> picture [596 x 43] intentionally omitted <==

5

SAN ISIDRO GOLD PROJECT (OVL 100%)

The San Isidro Gold Project, located in northwestern Nicaragua (Figure 4), consists of a 25km[2] mining concession held by Minera San Cristóbal S.A. (MSC), a 100% owned Nicaraguan subsidiary of Oro Verde.

San Isidro is located adjacent to the La India Gold Project which contains a 2.3 million ounce gold resource and is held by UK company Condor Gold plc, which released a positive PFS study in December 2014 with the potential for both open pit and underground mine development. Oro Verde’s San Isidro Gold Project has the potential to contain La India-style vein-hosted epithermal gold mineralisation.

During the September quarter, a follow up exploration program was carried out by the Company at San Isidro. The program was designed to investigate a number of targets generated by an initial 400m x 200m soil sampling grid and geological mapping earlier in the year. The latest exploration program included an infill soil sampling program over prospective areas identified in the initial program. The infill soil samples resulted in an offset 200m x 200m grid. More detailed geological mapping was also undertaken, with rock chip samples collected in areas of interest, typically demonstrating silicification and quartz veining.

Preliminary results for this program were received after the end of the quarter and were reported to the ASX on 30 October 2017.

CORPORATE

Until the August termination of the Farm-in Agreement with Newcrest over the Topacio Gold Project, the majority of exploration expenditure during the quarter was funded by Newcrest. Subsequent exploration activities were, and continue to be, funded by Oro Verde.

On 1 September 2017, the Company advised[8] that it had entered into a standby Bridging Loan Agreement, providing Oro Verde with access to up to $500,000 to advance the Company’s projects in Nicaragua as well as for general administrative expenses.

As at 30 September 2017, Oro Verde held cash and cash equivalents to the value of $161,000 of which $21,000 was previously advanced by Newcrest Mining Limited and is quarantined for use solely on the Topacio project (see Appendix 5B).

On 10 October 2017, the Company announced[9] details of a Share Purchase Plan (SPP) to raise additional funds to advance exploration activities and provide additional working capital. The Company is offering eligible shareholders the opportunity to subscribe for up to $15,000 worth of fully paid ordinary shares in the Company (Shares) at an issue price of 0.8 cents per Share. The SPP is scheduled to close at 5:00pm (WST) on 31 October 2017 .

Oro Verde continues to review gold-silver-copper opportunities in search of quality projects to enhance the existing portfolio. To date, suitable transactions have not been achieved on preferred projects. Discussions and reviews are ongoing as the Company aims to add shareholder value through the quality team and connections that it has assembled within Nicaragua and the region.

Schedule of Mining Tenements Owned

Common concession name Location Nature of Interest at beginning of
Interest at end of
Interest quarter quarter
HEMCO-SID (San Isidro) – 1351 Nicaragua Owned 100% 100%
Presillitas (Topacio) - 39 Nicaragua Option 0% 0%
Iguanas Nicaragua Application 0% 0%
Galeano Nicaragua Application 0% 0%
Tigre Nicaragua Application 0% 0%

8 Refer to ASX announcement dated 1 September 2017 “Standby Bridging Loan”

9 Refer to ASX announcement dated 10 October 2017 “Share Purchase Plan”

==> picture [596 x 43] intentionally omitted <==

6

==> picture [381 x 296] intentionally omitted <==

Figure 4 Major Nicaraguan Gold Projects and the Oro Verde projects (yellow)

For enquiries contact:

==> picture [58 x 60] intentionally omitted <==

Mr Trevor Woolfe Mr Brett Dickson Managing Director Company Secretary +61 411 127 837 +61 8 9481 2555

About Oro Verde Limited: Oro Verde Ltd is a mineral exploration company focused on identifying and developing significant gold projects in Central America, particularly Nicaragua. Oro Verde holds an Option to Purchase Agreement to acquire 100% of the Topacio Gold Project in Nicaragua that currently contains a NI43-101 compliant Inferred Mineral Resource of 340,000 ounces of gold. A US$7.9 million 5 year farm-in agreement was signed on November 30, 2015 with global gold major Newcrest Limited (ASX: NCM) – to jointly explore for multi-million ounce gold deposits on the Topacio Gold Project. Oro Verde also holds 100% of the early stage San Isidro Gold Project, also in Nicaragua, located adjacent to the 2.3 million ounce La India gold project.

COMPETENT PERSON STATEMENT

The information in this document that relates to earlier Exploration Results referred to throughout the text is extracted from reports completed under Mr Trevor Woolfe as Competent Person and available to view on www.asx.com. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements.

The information in this document that relates to Historical Mineral Resources is extracted from the report entitled “Acquisition of High Grade Gold Project” created on 11 November 2014 and available to view on www.asx.com. The Company confirms that it is not in possession of any new information or data that materially impacts on the reliability of the estimates in the original market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.

==> picture [596 x 43] intentionally omitted <==

7

==> picture [447 x 653] intentionally omitted <==

----- Start of picture text -----

9.25m at 2.21 g/t Au
Including 1.52m at 7.43 g/t Ay
----- End of picture text -----

Figure 5 Dispute Vein: Cross section MTD-17-010 (looking NE)

==> picture [596 x 43] intentionally omitted <==

8

==> picture [450 x 657] intentionally omitted <==

----- Start of picture text -----

2.85m at 15.59 g/t Au
Including 1.23m at 32.3 g/t Au
?
----- End of picture text -----

Figure 6 Mico West Vein: Cross section MTD-17-012 (looking NE)

==> picture [596 x 43] intentionally omitted <==

9

Appendix 5B Mining Exploration Entity Quarterly Report

==> picture [92 x 67] intentionally omitted <==

Appendix 5B

Name of entity

ORO VERDE LIMITED

ABN
84 083 646 477
Quarter ended (“current quarter”) Quarter ended (“current quarter”) Quarter ended (“current quarter”)
30 September 2017
Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Research and development refunds
1.8
Other - JV Advances
1.9
Net cash from / (used in) operating activities
-
(181)
-
-
(103)
(87)
-
-
-
-
-
-
-
(181)
-
-
(103)
(87)
-
-
-
-
-
-
(371) (371)
2.
Cash flows from investing activities
2.1
Payments to acquire:
(a) property, plant and equipment
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
2.2
Proceeds from the disposal of:
(a) property, plant and equipment
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing activities
(1)
(49)
-
-
-
-
-
-
-
-
-
(1)
(49)
-
-
-
-
-
-
-
-
-
(50) (50)

Page 1

Appendix 5B

Mining Exploration Entity Quarterly Report

==> picture [92 x 67] intentionally omitted <==

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(12 months)
$A’000
3.
Cash flows from financing activities
3.1
Proceeds from issues of shares
3.2
Proceeds from issue of convertible notes
3.3
Proceeds from exercise of share options
3.4
Transaction costs related to issues of shares,
convertible notes or options
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing activities
-
-
50
-
100
-
-
-
-
-
-
50
-
100
-
-
-
-
150 150
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4.2
Net cash from / (used in) operating activities
(item 1.9 above)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
4.5
Effect of movement in exchange rates on cash
held
4.6
Cash and cash equivalents at end of period
542
(371)
(50)
150
(110)
542
(371)
(50)
150
(110)
161* 161*
  • Note that cash at the end of the quarter includes approximately $21,000 which has been advanced by Newcrest Mining Limited and is quarantined for use solely on the Topacio project.
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of quarter
(should equal item 4.6 above)
128
33
-
-
509
33
-
-
161 542

Page 2

Appendix 5B Mining Exploration Entity Quarterly Report

==> picture [92 x 67] intentionally omitted <==

6. Payments to directors of the entity and their associates Current quarter
$A'000
6.1 Aggregate amount of payments to these parties included in item 1.2 79
6.2 Aggregate amount of cash flow from loans to these parties included -
in item 2.3
6.3 Include below any explanation necessary to understand the transactions included in
items 6.1 and 6.2
Includes $79,000 in fees to executive directors;
7. Payments to related entities of the entity and their Current quarter
associates $A'000
7.1 Aggregate amount of payments to these parties included in item 1.2 -
7.2 Aggregate amount of cash flow from loans to these parties included -
in item 2.3
7.3 Include below any explanation necessary to understand the transactions included in
items 7.1 and 7.2
8.
Financing facilities available
Add notes as necessary for an
understanding of the position
Total facility amount
at quarter end
$A’000
Amount drawn at
quarter end
$A’000
8.1
Loan facilities
500,000
100,000
8.2
Credit standby arrangements
-
-
8.3
Other (please specify)
-
-
8.4
Include below a description of each facility above, including the lender, interest rate and
whether it is secured or unsecured. If any additional facilities have been entered into or are
proposed to be entered into after quarter end, include details of those facilities as well.
Total facility amount
at quarter end
$A’000
Amount drawn at
quarter end
$A’000
500,000 100,000
- -
- -
Unsecured standby bridging loan up to $500,000, on an as needs basis, from Inkjar Pty Ltd a
related party of Dr Bradford Farrell, a director of the Company. Interest rate at NAB business loan
basis plus 2% calculated daily.

Unsecured standby bridging loan up to $500,000, on an as needs basis, from Inkjar Pty Ltd a related party of Dr Bradford Farrell, a director of the Company. Interest rate at NAB business loan basis plus 2% calculated daily.

9.
Estimated cash outflows for next quarter
$A’000
9.1
Exploration and evaluation
9.2
Development
9.3
Production
9.4
Staff costs
9.5
Administration and corporate costs
9.6
Other (provide details if material)
9.7
Total estimated cash outflows
50
-
-
50
20
-
120

Page 3

Appendix 5B

Mining Exploration Entity Quarterly Report

==> picture [92 x 67] intentionally omitted <==

10.
Changes in
tenements
(items 2.1(b) and
2.2(b) above)
Tenement
reference
and
location
Nature of interest Interest at
beginning
of quarter
Interest
at end of
quarter
10.1
Interests in mining
tenements and
petroleum tenements
lapsed, relinquished
or reduced
-
10.2
Interests in mining
tenements and
petroleum tenements
acquired or increased
-

Refer to Annexure 1 for full list of mining tenements

Compliance statement

  • 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.

  • 2 This statement gives a true and fair view of the matters disclosed.

Sign here: (Company secretary)

Date: 30 October 2017

Print name: Brett Dickson

Page 4