==> picture [595 x 150] intentionally omitted <==
NEW MAURICIO GOLD VEIN ADDS TO TARGETS AT TOPACIO
HIGHLIGHTS
ORO VERDE LIMITED (ASX code: OVL)
An emerging resource company focused on Nicaragua
KEY PROJECTS - Nicaragua Topacio Gold Project San Isidro Gold Project
BOARD OF DIRECTORS Executive
-
The Mauricio vein returns high grade gold in epithermal veins:
-
7.5 g/t Au and 4.4 g/t Au
-
Significant surface results from other target areas, including: • Isabella up to 6.8 g/t Au
-
Topacio West up to 5.9 g/t Au
-
• Tamara up to 2.3 g/t Au and 66 g/t Ag
-
An old trench was sampled and confirmed high grades:
-
Dispute 1.4m at 9.2 g/t Au (within 3.9m at 4.8 g/t Au)
-
New mineralisation extends resource potential further east and northeast of the existing resource
Trevor Woolfe - MD Brett Dickson - Finance Dir
Non-Executive
Wolf Martinick - Chairman Tony Rovira Brad Farrell
MANAGEMENT - NICARAGUA
David Turner - Country Mgr Jacques Levy – Admin Mgr
REGISTERED OFFICE
Level 1, 30 Richardson St, West Perth, WA 6005 AUSTRALIA +61 (0) 8 9481 2555
WEBSITE
www.oroverde.com.au
Oro Verde Limited (ASX: OVL) (“Oro Verde” or “the Company”) is pleased to announce that surface sampling of new areas at the Topacio Gold Project, located in southeastern Nicaragua (Figure 1), has uncovered additional high grade targets for future drill testing.
The Mauricio vein strikes roughly east-west and is located outside the existing resource area, near the Isabella and Su Majestad veins (Figure 3). The Company’s first pass surface mapping of the 600m long vein identified highly encouraging vuggy and drusy quartz veins, typical of low sulfidation epithermal vein systems. Sampling on the vein returned gold (Au) grades up to 7.5 g/t Au .
Recent high grade results from the Isabella vein of up to 21.3 g/t Au and 18g/t silver (Ag) - from a brecciated quartz vein – as reported in October[1] , were confirmed by the latest sampling with results up to 6.8 g/t Au.
In addition, a 3.9m trench sample across the Dispute vein returned an average of 4.9 g/t Au with a 1.4m section reaching 9.2 g/t Au on the vein margin.
Oro Verde’s Managing Director, Mr. Trevor Woolfe commented, “We continue to receive excellent results from Topacio. High grade gold results from the Mauricio vein add to a growing cluster of highly prospective veins including Isabella and Su Majestad to the east of the Topacio vein that, when drilled, are expected to expand the Topacio resource. New gold mineralisation in the northeast at Tamara and Palmita also shows promise outside the existing resource area.”
==> picture [596 x 45] intentionally omitted <==
1 Refer to ASX announcement dated 20 October 2015 “Isabella Vein Returns up to 21.3g/t Gold”
==> picture [447 x 337] intentionally omitted <==
----- Start of picture text -----
San Isidro
Topacio
----- End of picture text -----
Figure 1 Major Nicaraguan gold deposits and the Topacio Gold Project (Central America)
==> picture [461 x 302] intentionally omitted <==
----- Start of picture text -----
Tamara, Palmita and Topacio II
Topacio resource area West,
Silica boulders and Mico W
Isabella-Mauricio
Topacio resource area
----- End of picture text -----
Figure 2 Topacio – Mining concession with latest sample locations
==> picture [596 x 43] intentionally omitted <==
2
SURFACE SAMPLING
A total of 62 samples were collected from Oro Verde’s latest field campaign, which focused on three potential target zones, principally outside the existing Topacio Gold Project resource area (Figure 2):
-
Isabella-Mauricio Zone : a system of W-NW trending quartz veins east of the main resource
-
Tamara-Palmita Area : a group of veins 1.5-2 km to the northeast of the Topacio resource area
-
Topacio West Zone : veins at the western edge of the resource and boulders further west
Isabella-Mauricio Zone
The Isabella vein has a northwesterly strike and may be discontinuously linked to the high grade Su Majestad vein (Figure 3). A high grade result of 21.3 g/t Au - from a brecciated quartz vein – reported in October[2] , exceeded previous results that were <2.5 g/t Au. Latest sampling has identified further high grades with a zone of vuggy quartz veining returning 6.8 g/t Au (Sample #48710).
Approximately 300m to the southwest of Isabella lies the east-west trending Mauricio vein. This vein is almost 600m in length and is a possible splay off the Isabella-Rebeca line of veins (Figure 4). Initial sampling consisted of three rock chip samples with vuggy/drusy epithermal vein textures – often indicative of a low temperature epithermal system – all of which were mineralised in the range 1.1 to 7.5 g/t Au . These samples continue to enhance the potential of the vein system directly to the east of the Topacio resource area (Figure 2).
-
Sample 48681 7.54 g/t Au
-
Sample 48682 4.44 g/t Au
-
Sample 48683 1.16 g/t Au
Tamara-Palmita Area
The Company continues to explore new areas of the 93 km[2] Topacio concession that could provide additional drill targets for the 2016 work program. A number of veins have been identified approximately 1.5 km to the northeast of the Topacio resource area, including the Tamara and Palmita veins (Figure 3).
These veins show similar epithermal vein and breccia textures to those at Topacio. Initial sampling has been encouraging, with gold grades up to 2.3 g/t Au at Tamara East (#48709) and up to 3.0 g/t Au at Palmita (#48716). Manganese (up to 5,025 ppm) is also prominent at Tamara – a similar signature to the main Topacio resource veins. Tamara is along the same northeasterly trending vein set including the mineralised Topacio and Mico veins (Figure 3).
The Buena Vista stockwork style mineralisation, a further 4 km to the northeast (Figure 3), is also along that same trend, providing encouragement for a potential connection between the two styles of mineralisation. The intervening area is relatively unexplored to date.
The Topacio vein has a discontinuous strike length of at least 3.5 km (Figure 4). The far eastern extension of the Topacio vein in this same area near Tamara (Figure 4) was also sampled. The vein is anomalous in gold and silver, albeit at lower levels (#48717-22)(Table 1).
Topacio West Zone
A number of samples were collected at the western extremity of the resource area (Figure 2) to test the potential for extensions. On the Topacio vein, three mineralised samples returned values up to 5.9 g/t Au (Figure 3).
An old trench across the Dispute vein was sampled with individual results of up to 9.2 g/t Au over a width of 1.4m. This sample is part of a broader mineralised section of 3.9m at 4.8 g/t Au (Samples #48662-64).
A zone of bleached and silicified volcanic boulders, sometimes with fine quartz veinlets, approximately one kilometre further to the west (Figure 4), is interpreted as a layer of unmineralised altered volcanic cap rocks overlying the mineralised vein horizon.
==> picture [596 x 43] intentionally omitted <==
3
==> picture [486 x 343] intentionally omitted <==
----- Start of picture text -----
Tamara & Palmita
48698 2.0 g/t Au and 66 g/t Ag
48709 2.3 g/t Au
48716 3.0 g/t Au and 15 g/t Ag
Isabella & Mauricio
48681 7.5 g/t Au
48682 4.4 g/t Au
48710 6.8 g/t Au
Topacio & Dispute
48662 4.1 g/t Au
48664 9.2 g/t Au and 43 g/t Ag
48680 5.9 g/t Au
----- End of picture text -----
Figure 3 Topacio Gold Project – Combined Oro Verde sampling results (Au)
==> picture [400 x 282] intentionally omitted <==
Figure 4 Topacio – Latest Oro Verde sampling results (Au)
==> picture [596 x 43] intentionally omitted <==
4
Table 1 Topacio Gold Project - Details of latest Oro Verde sampling and precious metal grades
| SAMPLE NUMBER |
NORTHING | EASTING | VEIN | SAMPLE TYPE | Au (g/t) | Ag (g/t) |
|---|---|---|---|---|---|---|
| 48661 | 1,338,319 | 779,315 | Dispute | 1.0m channel sample | 0.42 | 0.4 |
| 48662 | 1,338,319 | 779,316 | Dispute | 1.3m channel sample | 4.06 | 1.4 |
| 48663 | 1,338,319 | 779,317 | Dispute | 1.2m channel sample | 0.63 | 8.8 |
| 48664 | 1,338,318 | 779,319 | Dispute | 1.4m channel sample | 9.15 | 43.1 |
| 48665 | 1,338,318 | 779,320 | Dispute | 1.0m channel sample | 0.60 | 1.3 |
| 48666 | 1,338,318 | 779,321 | Dispute | 0.8m channel sample | 1.07 | 2.6 |
| 48667 | 1,338,318 | 779,322 | Dispute | 0.9m channel sample | 0.44 | 1.1 |
| 48668 | 1,338,318 | 779,323 | Dispute | 1.5m channel sample | 0.73 | 16.4 |
| 48669 | 1,338,317 | 779,325 | Dispute | 1.3m channel sample | 0.22 | 0.5 |
| 48670 | 1,338,317 | 779,326 | Dispute | 1.3m channel sample | 0.18 | 1.9 |
| 48671 | 1,338,317 | 779,328 | Dispute | 1.5m channel sample | 0.13 | 3.6 |
| 48672 | 1,338,412 | 777,351 | Far West Mico | 1.2m quartz vein | <0.005 | <0.3 |
| 48673 | 1,338,381 | 777,330 | Far West Mico | 1.1m quartz vein - subcrop | <0.005 | <0.3 |
| 48674 | 1,338,362 | 777,335 | Far West Mico | 1.0m quartz vein - subcrop | <0.005 | <0.3 |
| 48675 | 1,338,401 | 777,233 | Far West Mico | 0.3m andesite - subcrop | <0.005 | <0.3 |
| 48676 | 1,338,330 | 777,318 | Far West Mico | 0.8m andesite - subcrop | <0.005 | <0.3 |
| 48677 | 1,337,589 | 779,004 | Topacio | 0.6m andesite - subcrop | <0.005 | <0.3 |
| 48678 | 1,337,680 | 779,144 | Topacio | 0.9m quartz vein – road cut | 1.33 | 3.6 |
| 48679 | 1,337,713 | 779,180 | Topacio | 1.1m quartz vein - boulders | 0.74 | 1.5 |
| 48680 | 1,337,811 | 779,280 | Topacio | 0.6m chip sample – qtz vein | 5.90 | 3.7 |
| 48681 | 1,338,206 | 781,312 | Mauricio | 0.4m quartz vein - subcrop | 7.54 | 4.7 |
| 48682 | 1,338,191 | 781,248 | Mauricio | 0.5m quartz vein - subcrop | 4.44 | 5.9 |
| 48683 | 1,338,210 | 781,526 | Mauricio | 0.7m quartz vein - subcrop | 1.16 | 1.4 |
| 48684 | 1,338,603 | 781,637 | Isabella | 0.5m chips – quartz boulder | 1.00 | 5.9 |
| 48685 | 1,338,574 | 781,673 | Isabella | 0.8m chips – quartz boulder | 1.22 | 1.0 |
| 48686 | 1,338,553 | 781,708 | Isabella | 0.5m chips – quartz boulder | 0.25 | 0.9 |
| 48687 | 1,338,559 | 779,065 | Mayflower | 0.55m quartz vein - subcrop | 0.10 | 2.8 |
| 48688 | 1,338,545 | 779,097 | Mayflower | 0.6m quartz vein - subcrop | 0.03 | <0.3 |
| 48689 | 1,338,552 | 779,183 | Mayflower | 0.5m quartz vein – old pit | 0.23 | <0.3 |
| 48690 | 1,338,580 | 779,228 | Mayflower | 0.65m quartz vein - subcrop | 0.09 | <0.3 |
| 48691 | 1,338,595 | 779,252 | Mayflower | 1.0m quartz vein - subcrop | 0.09 | <0.3 |
| 48692 | 1,340,004 | 781,555 | Tamara | 0.7m quartz vein - chips | 0.40 | 0.5 |
| 48693 | 1,340,046 | 781,591 | Tamara | 0.6m quartz vein - chips | 0.23 | <0.3 |
| 48694 | 1,340,063 | 781,616 | Tamara | 0.5m quartz vein - chips | 0.18 | <0.3 |
| 48695 | 1,340,071 | 781,628 | Tamara | 0.7m quartz vein - chips | 0.11 | <0.3 |
| 48696 | 1,340,130 | 781,806 | Tamara | 1.0m quartz vein - chips | 0.13 | <0.3 |
| 48697 | 1,340,124 | 781,697 | Tamara | 0.6m quartz vein - chips | 0.10 | 0.4 |
| 48698 | 1,340,125 | 782,360 | Tamara East | 1.0m quartz vein - subcrop | 1.98 | 65.8 |
| 48699 | 1,340,138 | 782,409 | Tamara East | 0.8m quartz vein - chips | 0.53 | 2.9 |
| 48700 | 1,340,147 | 782,436 | Tamara East | 1.0m quartz vein - trench | 0.41 | 2.0 |
==> picture [596 x 43] intentionally omitted <==
5
| SAMPLE NUMBER |
NORTHING | EASTING | VEIN | SAMPLE TYPE | Au (g/t) | Ag (g/t) |
|---|---|---|---|---|---|---|
| 48701 | 1,337,911 | 778,058 | ‘Silica’ Boulders | Bleachedpart silicified volcs | <0.005 | <0.3 |
| 48702 | 1,337,923 | 778,096 | ‘Silica’ Boulders | Bleachedpart silicified volcs | 0.02 | <0.3 |
| 48703 | 1,337,620 | 778,158 | ‘Silica’ Boulders | Bleachedpart silicified volcs | <0.005 | <0.3 |
| 48704 | 1,337,622 | 778,131 | ‘Silica’ Boulders | Bleachedpart silicified volcs | <0.005 | <0.3 |
| 48705 | 1,337,907 | 778,358 | ‘Silica’ Boulders | Bleachedpart silicified volcs | <0.005 | <0.3 |
| 48706 | 1,337,893 | 778,346 | ‘Silica’ Boulders | Bleachedpart silicified volcs | <0.005 | <0.3 |
| 48707 | 1,340,165 | 782,465 | Tamara East | Drusy qtz boulder | 0.03 | 0.7 |
| 48708 | 1,340,197 | 782,521 | Tamara East | 1.0m trench - Faultqtz chips | 0.21 | 7.0 |
| 48709 | 1,340,197 | 782,521 | Tamara East | 1.3m trench –qtz vein | 2.26 | 1.1 |
| 48710 | 1,338,502 | 781,769 | Isabella | 1.3m – vuggy qtz outcrop | 6.81 | 20.0 |
| 48711 | 1,338,503 | 781,770 | Isabella | 1.2m – vuggy qtz outcrop | 0.11 | 2.8 |
| 48712 | 1,338,617 | 781,610 | Isabella | 1.5m – sugary qtz outcrop | 0.26 | <0.3 |
| 48713 | 1,338,638 | 781,599 | Isabella | 1.0m – sugary qtz chips | 1.27 | 13.0 |
| 48714 | 1,338,654 | 781,570 | Isabella | 0.7m – sugary qtz chips | 0.24 | 2.3 |
| 48715 | 1,339,132 | 782,502 | Palmita East | Bandedqtz float | 0.23 | 1.2 |
| 48716 | 1,339,179 | 782,509 | Palmita East | Bandedqtz float | 2.97 | 15.2 |
| 48717 | 1,339,572 | 781,992 | Topacio II | Brecciatedqtz subcrop | 0.31 | 7.2 |
| 48718 | 1,339,548 | 782,023 | Topacio II | Brecciatedqtz subcrop | 0.27 | 0.6 |
| 48719 | 1,339,578 | 782,056 | Topacio II | Qtz vein in oldpit | 0.26 | 1.9 |
| 48720 | 1,339,602 | 782,086 | Topacio II | Vuggy qtz boulders | 0.13 | 2.4 |
| 48721 | 1,339,633 | 782,123 | Topacio II | Vuggy qtz boulders | 0.18 | 1.8 |
| 48722 | 1,339,662 | 782,077 | Topacio II | Vuggy qtz boulders | 0.26 | 2.4 |
Co-ordinate system UTM Zone 16 and datum NAD27 Central
==> picture [596 x 43] intentionally omitted <==
6
BACKGROUND
On 25 February 2015, Oro Verde announced the positive due diligence and acceptance of an Option to Purchase Agreement over the high grade Topacio Gold Project, located in southeastern Nicaragua (Figure 1). The project boasts a historical NI 43-101 (Canadian standard, similar to JORC) compliant Inferred Resource of:
2,716,176 tonnes at 3.9 g/t gold, containing 340,345 ounces of gold, at a 1.5 g/t gold cut-off[2] .
National Instrument 43-101 (“NI 43-101”) is a national instrument for the Standards of Disclosure for Mineral Projects within Canada and as such this estimate is a foreign estimate and is not reported in accordance with the JORC Code. A competent person has not done sufficient work to classify the foreign estimate as mineral resources in accordance with the JORC code and it is uncertain that following evaluation and/or further exploration work that the foreign estimate will be able to be reported as mineral resources in accordance with the JORC code.
For enquiries contact:
| For enquiries contact: | |
|---|---|
| Mr Trevor Woolfe | Mr Brett Dickson |
| Managing Director | Company Secretary |
| +61 411 127 837 | +61 8 9481 2555 |
About Oro Verde Limited: Oro Verde Ltd is a mineral exploration company focused on identifying and developing significant gold projects in Central America, particularly Nicaragua. Oro Verde holds an Option to Purchase Agreement on the Topacio Gold Project in Nicaragua that currently contains a NI43-101 compliant Inferred Mineral Resource of 340,000 ounces of gold. Oro Verde also holds 100% of the early stage San Isidro Gold Project, also in Nicaragua, located adjacent to the 2.3 million ounce La India gold project.
COMPETENT PERSON STATEMENTS
The information in this document that relates to Exploration Results is based on information compiled by Mr Trevor Woolfe BSc Hons (Geol), who is a Member of The Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists. Mr Woolfe is the Managing Director and a shareholder of the Company, and is employed through consultancy Shordean Pty Ltd. Mr Woolfe has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Woolfe consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
The information in this document that relates to earlier Exploration Results is extracted from the following reports: “High Grade Gold Potential Confirmed at Topacio Project” created on 3 February 2015 and “Isabella Vein Returns up to 21.3g/t Gold“ created on 20 October 2015, all completed under Mr Trevor Woolfe as Competent Person and available to view on www.asx.com. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcements continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcements.
The information in this document that relates to Historical Mineral Resources is extracted from the report entitled “Acquisition of High Grade Gold Project” created on 11 November 2014 and available to view on www.asx.com. The Company confirms that it is not in possession of any new information or data that materially impacts on the reliability of the estimates in the original market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
2 Refer to ASX announcement dated 11 November 2014 “Acquisition of High Grade Gold Project”
==> picture [596 x 43] intentionally omitted <==
7
JORC Code, 2012 Edition – Table 1 Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
| Criteria | JORC Code explanation | JORC Code explanation | Commentary | Commentary |
|---|---|---|---|---|
| Sampling techniques |
• | Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as |
• | Sampling is a combination of ore pile samples, rough channels extracted by geology hammer and random chips and combinations of chips as defined in Table 1 of the report. |
| down hole gamma sondes, or handheld XRF instruments, etc). | Individual sample volume is generally in the range 0.5-2.5kg. | |||
| These examples should not be taken as limiting the broad | • | Sampling was undertaken on a reconnaissance basis and as | ||
| meaning of sampling. | such was carried out on a quantitative basis rather than a | |||
| • | Include reference to measures taken to ensure sample | qualitative basis. Some selectivity has been engaged to target | ||
| representivity and the appropriate calibration of any |
the mineralised veins. | |||
| measurement tools or systems used. | • | Throughout our surface rock chip sampling campaigns, samples | ||
| • | Aspects of the determination of mineralisation that are Material | were crushed, pulverised and 30g submitted for analysis of gold | ||
| to the Public Report. | by fire assay and AAS finish. Over range gold (>10g/t Au) | |||
| • | In cases where ‘industry standard’ work has been done this | samples were re-submitted for analysis of 30g by fire assay and | ||
| would be relatively simple (eg ‘reverse circulation drilling was | gravimetric finish. All samples were also submitted for 33 | |||
| used to obtain 1 m samples from which 3 kg was pulverised to | element multi-element aqua regia digestion and analysis by ICP- | |||
| produce a 30 g charge for fire assay’). In other cases more | ES. Over range silver samples (>100g/t Ag) were re-submitted | |||
| explanation may be required, such as where there is coarse | for analysis by 4 acid digest and AAS finish. | |||
| gold that has inherent sampling problems. Unusual |
||||
| commodities or mineralisation types (eg submarine nodules) | ||||
| may warrant disclosure of detailed information. | ||||
| Drilling | • | Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core |
• | No drilling was undertaken in the current program |
| techniques | diameter, triple or standard tube, depth of diamond tails, face- | |||
| sampling bit or other type, whether core is oriented and if so, | ||||
| _by what method, etc). _ | ||||
| Drill sample | • | Method of recording and assessing core and chip sample recoveries and results assessed. |
• | No drilling was undertaken in the current program |
| recovery | • | Measures taken to maximise sample recovery and ensure | ||
| representative nature of the samples. | ||||
| • | Whether a relationship exists between sample recovery and | |||
| grade and whether sample bias may have occurred due to | ||||
| preferential loss/gain of fine/coarse material. | ||||
| Logging | • | Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate |
• | Rock chip and channel samples were logged geologically however will not be used in any Mineral Resource estimation or |
| Mineral Resource estimation, mining and metallurgical studies. | advanced studies. | |||
| • | Whether logging is qualitative or quantitative in nature. Core | • | Logging is considered to be qualitative given the nature of rock | |
| (or costean, channel, etc) photography. | chip sampling. Photographs of the samples and their locations | |||
| • | The total length and percentage of the relevant intersections | have been taken. | ||
| logged. | • | Not relevant as no drillingin currentprogram | ||
| Sub-sampling techniques and |
• • |
If core, whether cut or sawn and whether quarter, half or all core taken. If non-core, whether riffled, tube sampled, rotary split, etc and |
• • • |
No drilling was undertaken in the current program. No drilling was undertaken in the current program. Sample prep techniques used by the laboratory were considered |
| sample preparation |
• | whether sampled wet or dry. For all sample types, the nature, quality and appropriateness of the sample preparation technique. |
• | appropriate for reconnaissance rock chip style samples. No field duplicates were submitted as the samples were reconnaissance rock chip samples. |
| • | Quality control procedures adopted for all sub-sampling stages | • | A sample size of 0.5-2.5 kg was collected and considered | |
| to maximise representivity of samples. | appropriate and representative for the grain size and style of | |||
| • | Measures taken to ensure that the sampling is representative | mineralisation. | ||
| of the in situ material collected, including for instance results | ||||
| for field duplicate/second-half sampling. | ||||
| • | Whether sample sizes are appropriate to the grain size of the | |||
| material being sampled. | ||||
| Quality of assay data and |
• | The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total. |
• | ACME Laboratories (Managua and Vancouver) was used for all analysis work carried out on the current samples. The laboratory techniques below are for all samples submitted to ACME and are |
| laboratory tests | • | For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the |
considered appropriate for the style of mineralisation defined at the Topacio Gold Project: |
|
| analysis including instrument make and model, reading times, | oPRP70-250 (Sample Preparation Code) |
|||
| calibrations factors applied and their derivation, etc. | oFA430 - Lead collection Fire Assay Fusion – |
|||
| • | Nature of quality control procedures adopted (eg standards, | AAS Finish (for Au). | ||
| blanks, duplicates, external laboratory checks) and whether | oFA530 - Lead collection Fire Assay 30g |
|||
| acceptable levels of accuracy (ie lack of bias) and precision | Fusion – Gravimetric Finish (for Au >10g/t). | |||
| have been established. | oAQ300 - Aqua Regia Digestion ICP-ES |
|||
| analysis (for 33 standard elements) | ||||
oMA404 – 4 acid digest, AAS finish (for |
||||
| Ag>100ppm) | ||||
| • | No other analytical tools used in the current program | |||
| • | No field duplicates were submitted. The lab undertook duplicate | |||
| analysis at a rate of 1 in 20. One over range gold sample was | ||||
| also re-tested. The lab undertook tests on in-house standards | ||||
| and blanks. Results were deemed to be within the expected | ||||
| accuracy levels. | ||||
| Verification of | • | The verification of significant intersections by either |
• | Independent personnel have not reviewed significant |
| sampling and | • | independent or alternative company personnel. The use of twinned holes. |
• | intersections. No drilling was undertaken in the current program. |
| assaying | • | Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols. |
• | Data has been uploaded directly from laboratory and GPS files into a GIS system for verification of data and locations. |
==> picture [596 x 43] intentionally omitted <==
8
| Criteria | JORC Code explanation | JORC Code explanation | Commentary | Commentary |
|---|---|---|---|---|
| • | Discuss any adjustment to assay data. | • | No adjustments of assaydata are considered necessary. | |
| Location of data | • | Accuracy and quality of surveys used to locate drill holes | • | A Garmin GPSMap60Cx hand-held GPS was used to define the |
| points | (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation. |
location of the samples. The GPS was left at the sample point for a minimum period of 2 minutes to obtain a steady reading. |
||
| • | Specification of the grid system used. | Sample locations are considered to be accurate to within 5m. | ||
| • | Quality and adequacy of topographic control. | • | Grid system used is UTM Zone 16 with datum NAD27 Central | |
| • | It will be necessary to undertake a detailed topographic control | |||
| later in theprogram. | ||||
| Data spacing and distribution |
• • |
Data spacing for reporting of Exploration Results. Whether the data spacing and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied. |
• • • |
Data spacing (sample spacing) is variable and appropriate for an initial reconnaissance program. Sampling method not appropriate for resource estimation No sample compositing is appropriate |
| • | Whether sample compositing has been applied. | |||
| Orientation of | • | Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is |
• | Channel samples are planned to intersect the interpreted mineralised veins as near to perpendicular as possible. |
| data in relation to | known, considering the deposit type. | • | The majority of the current sampling was from rock chips and in | |
| geological structure |
• | If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and |
some cases were selective which may introduce a certain bias that can be expected from a reconnaissance program |
|
| reported if material. | ||||
| Sample security | • | The measures taken to ensure sample security. | • | The chain of custody is managed by the senior Company representative who places plastic sample bags in polyweave |
| sacks. Up to 10 calico sample bags are placed in each sack and | ||||
| sealed with ziplock ties. Each sack is clearly labelled with: | ||||
| • Company name |
||||
| • Name of laboratory |
||||
| • Sample number range |
||||
| • | Samples were delivered by senior Company personnel directly to | |||
| the ACME Laboratory in Managua. Detailed records are kept of | ||||
| all samples that are dispatched. | ||||
| Audits or reviews | • |
The results of any audits or reviews of sampling techniques | • | No audit of sampling techniques has been completed to date but |
| and data. | will be implemented as the Company increases its activities in | |||
| Nicaragua. |
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
| Criteria | JORC Code explanation | JORC Code explanation | Commentary | Commentary |
|---|---|---|---|---|
| Mineral tenement and | • |
Type, reference name/number, location and ownership including agreements or material issues with third parties |
• |
The Topacio Gold Project is a Nicaraguan mining concession, known as Presillitas, held by Topacio S.A. Oro Verde Limited |
| land tenure status | such as joint ventures, partnerships, overriding royalties, | holds an Option to Purchase Agreement over the concession | ||
| native title interests, historical sites, wilderness or national | through 100% owned subsidiary Minera San Cristobal SA. | |||
| park and environmental settings. | • | The concession is in good standing and no known | ||
| • | The security of the tenure held at the time of reporting along | impediments exist (see map elsewhere in this report for | ||
| with any known impediments to obtaining a licence to operate | locations). | |||
| in the area. | ||||
| Exploration done by other parties |
• | Acknowledgment and appraisal of exploration by other parties. |
• |
Previous exploration of the Topacio Gold Project has consisted of mapping, stream sampling, rock chip sampling, soil sampling, trenching, diamond drilling and feasibility |
| studies in 3 main periods: | ||||
| 1980s – CPRM (Brasil) | ||||
| 1990s – Triton Mining (Canada) | ||||
| 2010-2013 – FDG Mining/Tango Gold (Canada) | ||||
| The latter group has produced resource estimates that are | ||||
| consistent with NI 43-101 (Canadian) standards. | ||||
| • | The Company is reviewing previous exploration data and as | |||
| such is not in a position to appraise the quality of exploration | ||||
| byotherparties. | ||||
| • | Deposit type, geological setting and style of mineralisation. | • | The Topacio Gold Project is a low sulphidation epithermal | |
| gold-(silver) vein type system (along with stockworks and | ||||
| brecciation) set in a sequence of tertiary volcanics – | ||||
| essentially of andesitic and basaltic composition. The project | ||||
| is located in the SE of Nicaragua in the province known as | ||||
| RACCS (South Caribbean Coast Autonomous Region). | ||||
| • | The main veins are NE striking and dipping steeply and | |||
| variably to the NW and SE. Other veins in the broader | ||||
| concession strike NW and are also steeply dipping. Veins are | ||||
| generally up to 3m wide but in places may blow out to widths | ||||
| of more than 20m. | ||||
| Drill hole Information | • | A summary of all information material to the understanding of the exploration results including a tabulation of the following |
• |
No drilling was undertaken in the current program |
| information for all Material drill holes: | ||||
oeasting and northing of the drill hole collar |
||||
oelevation or RL (Reduced Level – elevation above sea |
||||
| level in metres) of the drill hole collar | ||||
odip and azimuth of the hole |
||||
odown hole length and interception depth |
||||
ohole length. |
||||
| • | If the exclusion of this information isjustified on the basis that |
==> picture [596 x 43] intentionally omitted <==
9
| Criteria | JORC Code explanation | JORC Code explanation | Commentary | Commentary |
|---|---|---|---|---|
| the information is not Material and this exclusion does not | ||||
| detract from the understanding of the report, the Competent | ||||
| Person should clearly explain why this is the case. | ||||
| Data aggregation methods |
• | In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material |
• |
No data aggregation methods have been applied |
| and should be stated. | ||||
| • | Where aggregate intercepts incorporate short lengths of high | |||
| grade results and longer lengths of low grade results, the | ||||
| procedure used for such aggregation should be stated and | ||||
| some typical examples of such aggregations should be shown | ||||
| in detail. | ||||
| • | The assumptions used for any reporting of metal equivalent | |||
| values should be clearly stated. | ||||
| Relationship between mineralisation widths |
• • |
These relationships are particularly important in the reporting of Exploration Results. If the geometry of the mineralisation with respect to the drill |
• |
This is not relevant to a reconnaissance rock chip sampling program |
| and intercept lengths | • | hole angle is known, its nature should be reported. If it is not known and only the down hole lengths are reported, |
||
| there should be a clear statement to this effect (eg ‘down hole | ||||
| _length, true width not known’). _ | ||||
| Diagrams | • | Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery |
• |
Appropriate maps relevant to the current sampling program are available in the body of this report. |
| being reported These should include, but not be limited to a | ||||
| plan view of drill hole collar locations and appropriate | ||||
| sectional views. | ||||
| Balanced reporting | • | Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high |
• |
Reporting of Oro Verde Limited results in this report is considered balanced. All samples have been reported for gold |
| grades and/or widths should be practiced to avoid misleading | and silver results. No other elements are considered | |||
| reporting of Exploration Results. | significant,unless stated in the text of the report. | |||
| Other substantive | • | Other exploration data, if meaningful and material, should be | • |
No other significant exploration work has been done by the |
| exploration data | reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk |
Company at this point. | ||
| samples – size and method of treatment; metallurgical test | ||||
| results; bulk density, groundwater, geotechnical and rock | ||||
| characteristics; potential deleterious or contaminating |
||||
| substances. | ||||
| Further work | • | The nature and scale of planned further work (eg tests for | • |
The Company is currently reviewing all available data on the |
| lateral extensions, depth extensions or large-scale step-out | project and formulating its ongoing work program. This is | |||
| drilling). | likely to include reconnaissance exploration on the broader | |||
| • | Diagrams clearly highlighting the areas of possible |
tenement but with additional drilling to expand the known | ||
| extensions, including the main geological interpretations and | resource. | |||
| future drilling areas, provided this information is not | ||||
| commercially sensitive. |
==> picture [596 x 43] intentionally omitted <==
10