Quarterly Activities Report to 30 September 2021

  • Deokon Project (SAU 100%) : Drill testing of the Nettle zone completed, with a third diamond hole for 210.75m completed. Assays received with a peak intersection of 8.89m @ 0.16g/t Au. Further exploration in this area is required.

  • Yeongdong District (SAU 100%) : Regional reconnaissance rock sampling continued with a peak assay of 16.6g/t Au in float with work ongoing.

  • Project Generation (SAU 100%) : Systematic baseline geological, geophysical and geochemical database compilation process initiated to help streamline future Project Generation work.

  • Newly appointed exploration manager, Mr Robert Smillie, is on the ground in South Korea post quarter end to drive and expand exploration activity.

  • First tranche of 50m BMV shares (25% of the ultimate total of 200m BMV shares) received for the sale of the Gubong and Kochang Joint Venture.

  • Total cash, listed securities and receivables of approximately A$20 million.

  • Current Managing Director Mr Simon Mitchell to depart at the end of October.

==> picture [368 x 364] intentionally omitted <==

Photo 1 – Drilling at Nettle, Deokon Project

Telephone: (08) 8368 8888

10 George St Stepney SA 5069, PO Box 255, Kent Town

South Korea

During the September 2021 quarter, Southern Gold Limited (ASX:SAU) (“Southern Gold” or “the company”) continued activities on the ground in South Korea. The focus was on field reconnaissance sampling and database compilation for upcoming Project Generation work. The diamond drill program commencing in the previous quarter targeting the northern section of the Golden Surprise trend at the Deokon Project was completed, with one HQ3 diamond drill hole for 210.75m completed in the quarter, utilizing one drill rig.

Drilling during the quarter took place at Deokon, and regional surface sampling was conducted in the Yeongdong Basin.

==> picture [357 x 523] intentionally omitted <==

Figure 1: Southern Gold project Locations in South Korea including former JV Projects sold to BMV. 100% owned projects in red, BMV former Joint Venture projects in blue. 100% owned projects under application in purple.

-2-

Deokon (SAU 100%)

==> picture [259 x 384] intentionally omitted <==

Drilling was completed at the Deokon Project in response to the previously announced discovery of the Thistle and Nettle zones. The outcrop at the Nettle Zone has returned a previously announced peak rock chip assay of 8.56g/t gold and 8,940g/t silver.

The drilling targeted a strong Au-Ag-As soil anomaly at Nettle, with a coincident interpreted intersecting structural position of the NNW Golden Surprise trend with an NNE trend from detailed structural mapping. Two holes for 251.2m were drilled in the June quarter, with a third hole for 210.75m drilled in July completing the program.

All results have been received across all three holes with maximum Au and Ag values being 0.22g/t Au and 2.7g/t Ag, with a peak intersection of 8.89m @ 0.16g/t Au in the third hole DKDD0013 (Table 1) .

Results, although disappointing, were attributed to the poor host rock and lack of vein development or presence at depth. The overall Deokon Project region remains prospective where vein development occurs.

Figure 2 : Deokon Project Location.

==> picture [329 x 246] intentionally omitted <==

Figure 3 - Deokon established Prospect Locations

-3-

Hole ID mFrom mTo Length
(m)
ETW
(m)
Au
g/t
Ag
g/t
As
ppm
Bi
ppm
Cu
ppm
Pb
ppm
Sb
ppm
Zn
ppm
DKDD013 197.17 206.06 8.89 8.89 0.16 1.5 411 1 4 18 5 43
DKDD012 41.31 41.52 0.21 0.21 0.15 2.1 90 1 4 29 4 11
DKDD012 37.5 37.78 0.28 0.28 0.14 1.8 142 1 3 21 5 46

Table 1 – Deokon elevated gold and arsenic results. ETW = Estimated true width. Max internal dilution of

0.59m <0.1g/t Au but >0.05g/t Au in DKDD013 intercept.

==> picture [491 x 345] intentionally omitted <==

Figure 4 - Nettle surface geology, structure, and soil geochemistry with completed drillholes.

Geology generally consisted of volcanogenic tuffaceous mud to sandstone sediments and weak flow foliated and quartz-feldspar pyritic rhyolite occasionally intruded by rhyolite dykes. Quartz-carbonate +/- sulphide veins and breccias were noted in areas of contact between carbonaceous mudstones and rhyolite units.

No significant veining or mineralisation was intersected in the drilling. The highest assays came from pyrite altered and quartz-carbonate veined carbonaceous mudstone on contact with rhyolite units ( Figure 5 ).

The silica vein textural features and geochemical signatures of the Golden Surprise vein corridor are interpreted to be indicative of an overall epithermal system, characterised by a component of lithologic controlled lateral fluid flow and resultant alteration/ore metal zonation. Within the overall epithermal alteration/mineralisation trend, an intermediate-sulfidation signature is interpreted for the south (Bonanza Zone) and a low-sulfidation signature to the north (Thorn-Thistle-Nettle Zone).

-4-

==> picture [487 x 497] intentionally omitted <==

Figure 5 – DKDD013 assay results and sample intervals showing an example of arsenopyrite altered carbonaceous mudstone on rhyolite contact.

Project Generation

Project generation regional reconnaissance sampling continued in the Yeongdong Basin and surrounds to the north-west and south-east of Southern Gold’s former Weolyu Project, with 70 rock samples taken before the onset of the wet season. All assays have been received, along with the remaining 114 assays for samples taken in the previous quarter. A further eleven samples returned >0.5g/t gold with a peak assay of 16.6g/t gold with numerous high grade base metal results from dumps from historical workings ( Table 2 ). Further work is ongoing in the Yeongdong Basin.

-5-

Sample ID Sample
Type
Au g/t Ag g/t Bi ppm Pb ppm Zn ppm Easting Northing mASL
KRS208485 Float 16.6 1.6 95 32 3 405908 4005240 287
KRS208598 Float 6.92 80.9 123 5890 2630 388671 4018097 219
KRS208594 Float 6.83 44.5 57 6140 5990 388670 4018082 217
KRS208486 Float 3.97 0.5 15 20 1 405905 4005257 266
KRS208596 Float 3.53 131 83 33200 62300 388673 4018083 218
KRS208600 Float 2.74 77.5 129 7820 4700 388671 4018100 220
KRS208539 Float 1.25 1.7 1 5 3 398215 4011653 180
KRS208602 Float 1.1 2.6 4 242 1240 388674 4018097 220
KRS208607 Float 0.63 1.6 <2 13 17 386739 4019284 165
KRS208569 Float 0.62 4.5 5 240 4280 391361 3987636 312
KRS208597 Float 0.58 92.7 151 11900 8810 388678 4018089 218

Table 2 – Yeongdong Project Generation regional reconnaissance sampling details >0.5g/t Au (WGS84 Z52N).

Exploration Database

The current Southern Gold Exploration database that incorporates a large amount of geological, geophysical and geochemical data is not fully GIS-integrated and requires systematic revision and updating for new target and project generation. Our Korean national staff’s time is being focussed during the wet season to coordinate and execute the systematic collection and organisation of publicly available data and information from Government sources including Korea Resources Corporation (KORES), Korea Institute of Geoscience and Minerals Resources (KIGAM), Korean Mine Reclamation Corporation (MIRECO). Data from Korean Universities and non-Government sources, including the existing SGK database, various Journals, Japanese databases, are also being added into the database. Spatial infrastructure development and land category data will also be included in the database to allow for more precise prioritisation of exploration efforts in newly targeted areas based on land access regulations and restrictions.

This revised and updated database will be applied for the purpose of refreshed basin-hosted epithermal goldsilver exploration targeting. Team members will be able to develop multi-theme GIS data packages and supporting data for each basin, allowing more targeted and effective fieldwork.

Systematic subcrop and outcrop mapping and sampling of targeted regions is planned utilising Korean Geological staff next quarter, because of ongoing international travel restrictions. There will be a dual focus:

  • within Projects or ‘Near Project’ areas; and

  • new target areas not previously worked on by the Southern Gold team.

Community and Environment

Community engagement continued at Deokon, Dokcheon, Janghwal and Yeongdong and will continue during the next quarter. Community liaison officers continue to diligently listen to the locals and determining the various issues within the wider Jeolla province community and have built very positive working relationships. Southern Gold has been optimising best periods to drill when farming areas are vacant and working around

-6-

various other local priorities. In addition, all regulatory compliance work is being completed on time and to the required standard amongst all the other exploration activities. Recent work was the rehabilitation of the drill site track at the Weolyu Project.

Drilling Schedule

The immediate plan is to focus on Project Generation in the short term to define new targets after the summer wet season break, which can be systematically worked up into quality drill targets. The Daeam project is close to being drill-ready after planned geological fact mapping in October-November once the vegetation recedes post wet season and prior to winter.

Tenure

The single tenement at Janghwal was granted. No new tenement applications were applied for. Tenement applications were resubmitted for Aphae, Deokon, Dokcheon, Geum Mar, Hampyeong and Yeongdong.

Corporate

Southern Gold’s recently appointed Exploration Manager, Mr Robert Smillie, has travelled to South Korea post quarter end and is now on the ground directing exploration efforts in country. It is expected that the technical team will reactivate field work shortly.

Bluebird Merchant Ventures Ltd (BMV) is now the sole owner of the former JV and manages all site activities at the Gubong and Kochang projects. The projects are currently on care and maintenance until such time as international travel resumes more broadly.

The first tranche of 50 million BMV shares has been received by Southern Gold, with a further 150 million shares in BMV remaining to be issued which is contingent on a prospectus being approved by the FCA in the UK. This process is now well advanced.

Southern Gold is in a strong cash position (A$8 million) and has a “drill for equity” arrangement with Ausino Drilling Services to the value of US$1.1 million (approx. A$1.5 million). Southern Gold’s 50m BMV shares currently held have a “mark to market” value of A$2.7 million (1 AUD = 0.54 GBP and BMV share price of 2.9p) with the balance of the shares to be issued having a deemed value of A$8.1 million. Total cash, listed securities and receivables for Southern Gold are approximately A$20 million.

For the quarter, the Company had:

  • Net cash outflows from Operating and Investing activities of $0.94 million, which included $0.36 million of exploration expenditure;

  • Net cash outflows from Financing activities of $0.02 million, comprising leasing costs;

  • Providing total cash outflow of $0.96 million, and an ending cash balance of $8.0 million.

Cash flows for the quarter include related party payments of $0.21 million comprising Directors fees and remuneration paid to the Managing Director Simon Mitchell and Executive Director Beejay Kim.

During the quarter the departure of Managing Director, Mr Simon Mitchell, was announced. Mr Mitchell ends his employment at Southern Gold on Friday 29 October 2021.

Authorised by: Simon Mitchell Managing Director

-7-

Related ASX Announcements

20180806 – ASX Tenements granted at Deokon, South Korea.

20181002 – ASX High grade gold confirmed at Shin Adit, Deokon Project, South Korea. 20190129 – ASX High grade gold-silver zones confirmed at Weolyu South Project, South Korea. 20190403 – ASX 2019 South Korea Field Work Commences.

20190527 – ASX Beopseongpo, Major Epithermal Target Defined.

20190717 – ASX Deokon ‘Golden Surprise’ High Grade Au-Ag Discovery

20190905 – ASX High-Grade Gold results Neungju Project

20191029 – ASX Bonanza Drilling Commences

20191210 – ASX Beopseongpo Drilling – Major Epithermal System Confirmed 20200128 – ASX Deokon Scout Diamond Drilling Results

20200128 – ASX Project Pipeline Extended from Project Generation Initiative 20200316 – ASX Operations Update

20200414 – ASX Two New Gold Mineralised Areas Confirmed: Geum-Mar and Daeam Valley 20200525 – ASX Drilling Operations Update

20200617 – ASX Drilling Operations Update – Mineralised Breccia at Aphae 20200812 – ASX High Grade Gold and Silver confirmed at Aphae

20200914 – ASX South Korean Drilling Operations Update

20201126 – ASX Operations Update - South Korean Exploration 20201130 – ASX Sale price US$9.945m for BMV JV Interest

20210419 – ASX Deokon Project – Golden Surprise Au-Ag Trend Extended 20210618 – ASX Drilling at Nettle Zone Commences and field update

100% Owned Projects

Project Name Tenement Info Tenement Info Tenement Info Register Info Register Info Register Info
Korean English Block ID No. Type Date of
Granting
Hampyeong 나주 Naju 136 200970 Exploration 11/01/2018
Aphae 무안 Muan 109 200996 Exploration 6/03/2018
무안 Muan 99 201136 Exploration 26/03/2019
Beopseongpo 법성포 Beopseongpo 29 201028 Exploration 11/07/2018
법성포 Beopseongpo 30 201029 Exploration 11/07/2018
Deokon 전주 Jeonju 70 201041 Exploration 31/07/2018
전주 Jeonju 80 201040 Exploration 31/07/2018
전주 Jeonju 60 201218 Exploration 17/12/2019
Dokcheon 영암 Yeongam 116 201143 Exploration 12/04/2019
Janghwal 해남 Haenam 139 201302 Exploration 20/08/2021
Neungju 능주 Neungju 33 201042 Exploration 31/07/2018

-8-

Drill Hole Collar Details

Hole ID Prospect Easting Northing mASL Dip Grid Azi Length (m)
DKDD011 Nettle 332471 3950361 297 -45 234 150.4
DKDD012 Nettle 332471 3950361 297 -45 287 100.8
DKDD013 Nettle 332526 3950315 291 -45 236 210.75

Table 3 – Deokon drill hole collar details (WGS84 Z52N)

Southern Gold Limited: Company Profile

Southern Gold Ltd is a successful gold explorer listed on the Australian Securities Exchange (under ASX ticker “SAU”). Southern Gold owns 100% of a substantial portfolio of high-grade gold projects in South Korea that are largely greenfield epithermal gold-silver targets in the south-west of the country. Backed by a first-class technical team, Southern Gold’s aim is to find world-class epithermal gold-silver deposits in a jurisdiction that has seen very little modern exploration.

Competent Person’s Statements

The information in this report that relates to Exploration Results has been compiled under the supervision of Mr. Paul Wittwer (AIG, AusIMM). Mr Wittwer who was an employee of Southern Gold Limited during the reporting period and a Member of the Australian Institute of Geoscientists and the Australasian Institute of Mining and Metallurgy, has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity he has undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for the Reporting of Mineral Resources and Ore Reserves. Mr Wittwer consents to the inclusion in this report of the matters based on the information in the form and context in which it appears.

Forward-looking statements

Some statements in this release regarding estimates or future events are forward looking statements. These may include, without limitation:

  • Estimates of future cash flows, the sensitivity of cash flows to metal prices and foreign exchange rate movements;

  • Estimates of future metal production; and

  • Estimates of the resource base and statements regarding future exploration results.

Such forward looking statements are based on a number of estimates and assumptions made by the Company and its consultants in light of experience, current conditions and expectations of future developments which the Company believes are appropriate in the current circumstances. Such statements are expressed in good faith and believed to have a reasonable basis. However, the estimates are subject to known and unknown risks and uncertainties that could cause actual results to differ materially from estimated results.

All reasonable efforts have been made to provide accurate information, but the Company does not undertake any obligation to release publicly any revisions to any “forward-looking statement” to reflect events or circumstances after the date of this presentation or ASX release, except as may be required under applicable laws. Recipients should make their own enquiries in relation to any investment decisions from a licensed investment advisor.

-9-

JORC Code, 2012 Edition – Table 1

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as
limiting the broad meaning of sampling.
The nature of the samples and assay results in the body of this
ASX Release that relate to drilling results not previously
announced are within tenement Jeonju 70 held by Southern
Gold at Deokon. Assay results related to new surface rock
samples not previously announced are not within any
tenements or tenement applications held by Southern Gold
in the Yeongdong Basin and are of a regional reconnaissance
nature.
Surface reconnaissance rock chip sampling was taken based
upon geological features relevant to the target style of
mineralisation.
Sample sites were chosen selectively to reflect geological
features relevant to the target style of mineralisation.
Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or systems
used.
Surface and underground reconnaissance rock chip samples
are not considered representative and only used as an
exploration tool to plan potential future representative
sampling programs.
Drill samples were geologically logged for lithology,
mineralisation, alteration, veining, structure and also
geotechnically logged. Sample intervals were chosen in order
to separate different geological domains or features at
appropriate boundaries and provide sufficient sample
representivity, ranging from 0.1m to 1.4m in length.
Aspects of the determination of mineralisation
that are Material to the Public Report.
Determination of mineralisation was achieved by geological
logging of samples by an experienced SAU or consultant
geologist or representative, with structural measurements
taken where possible. Samples were geologically logged for
lithology, mineralisation, alteration, veining, and structure.
SAU mapping, channel saw sampling and rock sampling
results has been used to inform the determination of
mineralisation at an earlystage of exploration.
In cases where ‘industry standard’ work has been
done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases, more
explanation may be required, such as where there
is coarse gold that has inherent sampling
problems. Unusual commodities or mineralisation
types (e.g. submarine nodules) may warrant
disclosure of detailed information.
Surface and underground reconnaissance rock chip samples
are not considered representative and only used as an
exploration tool to plan potential future representative
sampling programs.
HQ3 size (61.1mm diameter) Diamond drill core was obtained
for logging and sampling.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc.) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
HQ3 triple tube Diamond drilling was completed to obtain
drill core.

-10-

Criteria JORC Code explanation Commentary
Drill sample
recovery
Method of recording and assessing core and chip
sample recoveries and results assessed.
Core was measured and the recovery was calculated for each
drill run
Measures taken to maximise sample recovery and
ensure representative nature of the samples.
Industry standard barrel configuration was utilized at all drill
sites. No sample bias is expected where recoveries are good.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
No sample bias is expected where recoveries are good. All
samples reported have sufficient recovery unless otherwise
stated.
Where historical drilling may be reported in past reporting, it
is not known if a relationship exists between sample recovery
andgrade,or if there is anybiaspresent.
Logging Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
No Mineral Resource estimation, mining studies or
metallurgical studies have been conducted at this stage but
samples have been logged with sufficient detail to use for this
function.
Whether logging is qualitative or quantitative in
nature.
Core
(or
costean,
channel,
etc.)
photography.
Geological logging was qualitative in nature. Structural
logging was quantitative in nature. Slab photography of all
surface reconnaissance rock samples was completed and core
photography of all drill core was completed.
The total length and percentage of the relevant
intersections logged.
No surface rock sampling reported in this release refers to
sample intervals. Sampling conducted is reconnaissance in
nature.
The entire drill core from all holes were logged, as well as the
channel samples.
Sub-sampling
techniques
and sample
preparation
If core, whether cut or sawn and whether quarter,
half or all core taken.
Sampling was completed by cutting the core in half 1cm to
the right of the orientation line when viewed in the downhole
direction and sampling the half without the orientation line.
Only zones likely to have a chance of mineralization based on
geological observation were sampled.
If non-core, whether riffled, tube sampled, rotary
split, etc. and whether sampled wet or dry.
Samples were taken dry. Rock chip and grab samples had
representative slabs cut and all of the remaining offcuts of
each sample were sent for assay.
For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
All samples were sent to SGS laboratory in South Korea for
sample preparation. SGS is an ISO/IEC 17025:2005 certified
laboratory.
Samples were dried and crushed to 75% passing 2mm, split to
1,000g, then pulverised to 85% passing 150 microns. Pulp
samples are then split using a micro-riffle splitter to produce
500g of pulp reject, 250g of pulp duplicate, and 250g of
sample for shipment to Intertek Laboratories in Jakarta,
Indonesia.
The nature of the laboratory preparation techniques is
considered ‘industry standard’ and appropriate.
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
The crushing stage unit is a Rocklabs Smart Boyd-RSD Crusher
capable of over 5kg primary sample in one load, with rotating
sample divider (RSD) ensuring single pass crushing, producing
representative coarse sample split sent to grinding, typically
up to 1,000g. Coarse rejects are retained for each sample.
The grinding stage unit is an Essa LM2 and utilises a large
grinding bowl (1,600g) ensuring single pass grinding of the
coarse split. The 1kg of pulp material is then split using a
micro-riffle splitter toproduce 500gofpulpreject,250gof

-11-

Criteria JORC Code explanation Commentary
pulp duplicate, and 250g of sample for shipment to Intertek
Laboratories in Jakarta, Indonesia.
Pulp rejects are retained for each sample.
The soil samples were sieved in the field to <6 mesh (~3mm)
Bulk samples were sent to Intertek Laboratories in Jakarta,
Indonesia for sieving to <80mesh and >80mesh (SV101) and
both fractions were pulverized to 95% passing 200 mesh.
These procedures are considered appropriate to maximise
representivityof samples,for firstpass exploration.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including
for
instance
results
for
field
duplicate/second-half sampling.
Given the nature of the reconnaissance rock sampling, no
QAQC samples were considered appropriate for the reporting
of early-stage Exploration Results. The same QAQC
methodology for the drilling was applied to the surface
channel samples.
No field core duplicates were taken, just splits in the sample
preparation phase. Sampling is considered representative of
the in-situ material.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
Sample size is considered appropriate for the target style of
mineralisation, the requirements for laboratory sample
preparation and analyses, for early-stage Exploration Results.
Quality of
assay data
and
laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
Pulps from drill core samples and rock samples (typically 200
to 400g) prepared by SGS in South Korea are sent through
registered airfreight (e.g. DHL) to Intertek Laboratories in
Jakarta, Indonesia, for Au and multielement analysis. Intertek
is an ISO/IEC 17025:2005 certified laboratory.
Gold was analyzed on a 50g charge using fire assay fusion with
an atomic absorption spectroscopy finish (Intertek method
FA51/AA). Detection limit range is 0.01g/t to 50g/t Au.
Samples returning a result above 50g/t Au were re-analysed
to ore-grade using a 50g charge using fire assay fusion with a
gravimetric finish (Intertek method FA50/GR200) with lower
detection limit of 3g/t Au.
A 35 multi-element suite was analyzed on a 0.5g pulp sample
split using aqua regia digest with an inductively coupled
plasma – optical emission spectroscopy (ICP-OES) finish
(Intertek method AR005/OE01).
Silver was analysed as part of the multi-element aqua-regia
digest ICP-OES (method AR005/OE01), with an upper
detection limit 200g/t Ag. Samples returning a result above
200g/t Ag were re-analysed to ore-grade using Four Acid
Digestion and AAS (method 4AH2/AA) with a lower detection
limit of 5g/t Ag.
Copper, lead and zinc were analysed as part of the multi-
element aqua-regia digest ICP-AES (method AR005/OE01),
with an upper detection limit of 1%. Samples returning a
result above 1% were re-analysed to ore-grade with Four Acid
Digestion and OES (method 4AH2/OE201) with a lower
detection limit of 2ppm.
Soil samples were analysed using the same methods as the
drilling.
The nature of the laboratory assay sampling techniques is
considered ‘industry standard’ and appropriate.
For any historical KORES, where mentioned, drill core and
underground channel samples,the nature, qualityand

-12-

Criteria JORC Code explanation Commentary
appropriateness of the sample assaying procedures are
unknown.
For geophysical tools, spectrometers, handheld
XRF instruments, etc., the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Magnetic susceptibility measurements were completed on all
drill core using a TERRA KT-10R V2 hand-held magnetic
susceptibility meter. Scanning mode and full core mode were
used.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of accuracy
(i.e. lack of bias) and precision have been
established.
For reconnaissance rock samples, lab duplicates analysis and
standard analysis (laboratory checks) are investigated to
check for potential errors. If a potential error is discovered, it
is investigated, and the samples are potentially re-run with
another laboratory.
Drilling QAQC samples involved 1 blank and 1 certified ore-
grade epithermal reference standard, as well as one pulp
duplicate and one coarse split duplicate submitted per every
20 samples (i.e. 16 samples and 4 QAQC samples) selectively
inserted in the sequence. These were reviewed to ensure
testing was accurate. In addition, lab duplicates and lab
standard analysis (laboratory checks) are investigated to
check for potential errors. If a potential error is discovered, it
is investigated and the samples are potentially re-run with
another laboratory.
Verification of
sampling and
assaying
The verification of significant intersections by
either independent or alternative company
personnel.
Assay data has been verified by the geologist in charge of the
program and a second Southern Gold employee.
Significant intersections/results in this ASX Release have been
verified by the Competent Person.
Where referenced, any historical KORES data cannot be
independentlyverified.
The use of twinned holes. No twinned holes have been completed as part of this ASX
Release,as theprogram is at an earlystage.
Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Primary SAU data is recorded into digital spreadsheets or
hand-written documents. All original hardcopy logs and
sample reference sheets are kept for reference. Digital data
entry is validated through the application of database
validation rules and is also visually verified by the responsible
geologist through GIS and other software. Any failures are
sent back to the responsible geologist for correction and re-
submission. Data is stored in a SQL database managed
through an external consultant with proprietary software.
The extracted database is backed up as part of the Company
server backup protocol.
Historical data exists as digital copy format of original Korean
logs and transcripts but cannot be validated. It has been
transcribed into SAU databases where applicable, and
appropriatelytagged as such.
Discuss any adjustment to assay data. No adjustments are made to the assay data.
Location of
data points
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
SAU surface reconnaissance rock sample XYZ locations are
determined with a handheld Garmin 64s GPS producing levels
of accuracy +/- 3m.
Drill collar XYZ locations are surveyed before hole closure
with a DGPS producing levels of accuracy +/- 10mm.
Specification of the grid system used. The grid system used is Universal Transverse Mercator
(WGS84), Zone 52 S (Northern Hemisphere).
Quality and adequacy of topographic control. South Korean Government 5m contour data is available and
deemed suitable for topographic control on early-stage

-13-

Criteria JORC Code explanation Commentary
exploration campaigns.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results. SAU surface rock chip and grab sampling intervals were based
on geological boundary and veining where possible. On
occasion multiple intervals within a single vein have also been
taken to identify internal variability.
Holes are normally designed nominally at 50m spacing along
strike and 50-100m down dip on section. In this case, the
drilling was more scout in nature.
Whether the data spacing and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource
and
Ore
Reserve
estimation
procedure(s) and classifications applied.
No Mineral Resource or Ore Reserve have been estimated in
this ASX Release.
Whether sample compositing has been applied. No sample compositing has been applied.
Orientation of
data in
relation to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
Rock chip, grab and soil sampling has been conducted in a
selective manner targeting mineralised structures. Given the
early stage of exploration, chip and representative grab
samples across veins are considered appropriate and
unbiased at this stage of the project.
Drill holes are generally designed to be as perpendicular as
possible across targets. In cases where this was not possible,
true widths have been stated.
If the relationship between the drilling orientation
and the orientation of key mineralised structures
is considered to have introduced a sampling bias,
this should be assessed and reported if material.
The relationship between sampling orientation and the
orientation of key mineralised structures in rock sampling is
not considered to have introduced any material sample bias,
as discussed above. No sample bias is expected in the drilling.
Sample
security
The measures taken to ensure sample security. From the point of sample generation to laboratory, samples
(and reject returns) are under the full security and Chain of
Custody of the Company. This is done by the following
procedures:
Post on-site logging and processing, samples are transported
to the Company’s shed facilities under the direct supervision
of a Company representative.
Samples are further processed for dispatch by Company
representatives under guidance of the Competent Person.
Bagged samples are secured by ties and delivered by a
Company representative to the sample preparation
laboratory. The preparation laboratory sends pulp samples
directly to the assay laboratory for analysis via registered
courier (DHL). The samples are received at the assay
laboratory by a laboratory representative. All rejects are
returned under courier service and stored in the Company’s
secure lock-uplong-term core storage facility.
Audits or
reviews
The results of any audits or reviews of sampling
techniques and data.
No external or independent reviews have been undertaken.
Southern Gold’s sampling procedure conforms to industry
standard practice and each assay program is reviewed
internally for any discrepancies.

-14-

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and
ownership including agreements or material
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The granted tenements Jeonju 60, 70 and 80 at the Deokon
Project are held by Southern Gold Korea, a fully owned
subsidiary of Southern Gold. No known material issues exist
with third parties at this time. There are no native title
interests in Korea. It is a generally accepted requirement that
mineral title holders gain the consent of local landowners and
residents before undertaking any major exploration activity,
such as drilling.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a license to operate in the area.
Upon successful conversion to an Exploration Right, the
holder has 3 years to submit Exploration Results and have an
Extraction Plan authorised. An application can be made to
extend this period by 1 year. The Extraction Plan is submitted
to the Local Government and requires approvals from a
number of stakeholders. The term of an Extraction Right is 20
years. This can be extended upon application, provided all
statutory requirements have been met over the life of the
mine. From the date the Extraction Plan is approved, the title
holder has a 3-year period in which mine production must
commence. During this 3-year period, the title holder must
make a minimum level of investment on plant and mine
infrastructure
in
the
amount
of
KRW100
million
(~AUD$120,000) and meet certain minimum annual
production levels, which are dependent on the commodity
being mined.
There are no known impediments to obtaining a license to
operate.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by
other parties.
The Deokon Project has historically had small scale mining
and adits excavated by the Deokon Mining Company from
1958 to 1980. An unknown party held the license and
sporadically operated the mine from 1997 to ~2010.
Historical records are not extensive and considered
unreliable. The Korean government agency KORES and its
predecessor KMPC conducted diamond drilling at Deokon
from 1977 to 1979 with a final round in 1982. 14 holes were
drilled at the Main Adit and 2 holes at the Shin Adit. During
1981, the KMPC conducted a Self-Potential (SP) geophysical
survey with original data no located. KMPC conducted an
underground sampling program along the drives in 1983
Historical records in general are not extensive and considered
unreliable.
In the 1990’s, Ivanhoe Mines conducted brief field
reconnaissance in each area. No other details of previous
work in the vicinity is known to the best of our knowledge.
Geology Deposit type, geological setting and style of
mineralisation.
Exploration is targeting low- to high-sulphidation style
epithermal precious metal (Au, Ag) mineralisation in
Cretaceous volcanic rocks of the Korean Peninsula.
Drill hole
Information
A summary of all information material to the
understanding of the exploration results including
a tabulation of the following information for all
Material drill holes:

easting and northing of the drill hole collar

elevation or RL (Reduced Level – elevation
A summary of significant drill results are summarized in the
tables in the body of the text.
A summary of significant surface results are summarized in
the tables in the body of the text.

-15-

Criteria JORC Code explanation Commentary
above sea level in meters) of the drill hole
collar

dip and azimuth of the hole

down hole length and interception depth

hole length.
If the exclusion of this information is justified on
the basis that the information is not Material and
this exclusion does not detract from the
understanding of the report, the Competent
Person should clearly explain why this is the case.
No information has been excluded from this release to the
best of Southern Gold’s knowledge.
Data
aggregation
methods
In reporting Exploration Results, weighting
averaging
techniques,
maximum
and/or
minimum grade truncations (e.g. cutting of high
grades) and cut-off grades are usually Material
and should be stated.
No weighting averaging techniques, maximum and/or
minimum grade truncations, or cut-off grades were used
within this release for rock sampling. The results reported are
reconnaissance rock samples and the above techniques do
not apply to these early-stage exploration samples.
The cut-off grade for reporting of drill results was 0.1g/t Au
Where aggregate intercepts incorporate short
lengths of high-grade results and longer lengths of
low-grade results, the procedure used for such
aggregation should be stated and some typical
examples of such aggregations should be shown
in detail.
All rock sample assay values reported are raw assays and
none of the reported data has been cut or adjusted.
All aggregate drill intercepts are length weighted and the
maximum internal dilution was <0.6m at <0.1g/t Au and
>0.05g/t Au
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
No metal equivalent values have been reported in this ASX
Release.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly important in
the reporting of Exploration Results.
No mineralisation widths or intercepts are reported in this
report as the sampling reported is early-stage reconnaissance
exploration grab sampling.
Estimated true widths have been reported for the drilling.
If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
With regard to surface sampling it is not necessarily known
what the relationship between mineralisation widths is as no
drilling was undertaken.
For the drilling, it was designed to be perpendicular across the
target and intercepts are interpreted to be true width.
If it is not known and only the down hole lengths
are reported, there should be a clear statement to
this effect (e.g. ‘down hole length, true width not
known’).
No downhole widths for surface sampling have been reported
in this release as the sampling reported is early-stage
reconnaissance exploration grab sampling.
Estimated True widths have been reported for the drilling in
the significant intercept tables in the body of the text.
Diagrams Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for
any significant discovery being reported These
should include, but not be limited to a plan view of
drill hole collar locations and appropriate
Appropriate maps, sections, and tables for new results have
been included in this ASX Release.

-16-

Criteria JORC Code explanation Commentary
sectional views.
Balanced
reporting
Where comprehensive reporting of all Exploration
Results
is
not
practicable,
representative
reporting of both low and high grades and/or
widths should be practiced to avoid misleading
reporting of Exploration Results.
Not all sample assay data has been included in this report as
it is not considered material beyond the representatively
reported high- and low- grade results presented in the main
body of this ASX Release. Gold results reported range from
<0.01g/t to 16.6g/t Au.
Previous information is also referenced in the company’s ASX
reports with details provided in this report.
Other
substantive
exploration
data
Other exploration data, if meaningful and
material, should be reported including (but not
limited to): geological observations; geophysical
survey results; geochemical survey results; bulk
samples – size and method of treatment;
metallurgical
test
results;
bulk
density,
groundwater,
geotechnical
and
rock
characteristics;
potential
deleterious
or
contaminating substances.
To the best of our knowledge, no meaningful and material
exploration data has been omitted from this ASX Release.
Further work The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or
large-scale step-out drilling).
No further drilling is being planned at the Nettle Prospect at
Deokon, but more might be completed on the Deokon
Project. Further surface sampling, soil sampling and\or
trenching is being planned at Dokcheon NW, Geum Mar,
Janghwal and Yeongdong District and possibly drilling at the
Daeam Project.
Diagrams clearly highlighting the areas of
possible extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.
Refer to the Figures and tables in the main body of this ASX
Report that show where new drilling and sampling has been
conducted.

-17-

Rule 5.5

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Name of entity SOUTHERN GOLD LIMITED ABN Quarter ended (“current quarter”) 30 107 424 519 30 SEPTEMBER 2021

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (short term lease payments)
1.9
Net cash from / (used in) operating
activities
(208)
(352)
(213)
-
(1)
(6)
(208)
(352)
(213)
-
(1)
(6)
(780) (780)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
(2)
(153)
(2)
(153)

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 1

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
2.2
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments – JV disposal transaction
costs
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (loans to 50% owned JV’s)
2.6
Net cash from / (used in) investing
activities
(2)
-
(2)
-
(157) (157)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (repayment of lease liability)
3.10
Net cash from / (used in) financing
activities
-
-
-
(18)
-
-
-
(18)
(18) (18)
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
7,999
(780)
(157)
(18)
7,999
(780)
(157)
(18)

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 2

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period
(1) (1)
7,043 7,043
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
133
6,910
204
7,795
7,043 7,999
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
210
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
210

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 3

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

7.
7.1
7.2
7.3
7.4
7.5
7.6
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
Loan facilities
Credit standby arrangements
Other (please specify)
Total financing facilities
Unused financing facilities available at quarter end
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
8. Estimated cash available for future operating activities $A’000
8.1
8.2
8.3
8.4
8.5
8.6
8.7
8.8
Net cash from / (used in) operating activities (item 1.9)
(780)
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(153)
Total relevant outgoings (item 8.1 + item 8.2)
(933)
Cash and cash equivalents at quarter end (item 4.6)
7,043
Unused finance facilities available at quarter end (item 7.5)
-
Total available funding (item 8.4 + item 8.5)
7,043
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
7.6
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
(780)
(153)
(933)
7,043
-
7,043
Answer:
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 4

Appendix 5B

Mining exploration entity or oil and gas exploration entity quarterly cash flow report

8.8.3 Does the entity expect to be able to continue its operations and to meet its business objectives and, if so, on what basis?

Answer:

Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.

Compliance statement

  • 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.

  • 2 This statement gives a true and fair view of the matters disclosed.

Date: .......25 October 2021.................................................

Authorised by: .......The Board of Directors........................................

(Name of body or officer authorising release – see note 4)

Notes

  1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.

  2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.

  3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

  4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [ name of board committeeeg Audit and Risk Committee ]”. If it has been authorised for release to the market by a disclosure committee, you can insert here: “By the Disclosure Committee”.

  5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and Recommendations , the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.

ASX Listing Rules Appendix 5B (17/07/20) + See chapter 19 of the ASX Listing Rules for defined terms.

Page 5