INFRATIL LIMITED. — AGM Information 2021
Aug 18, 2021
65106_rns_2021-08-18_2264f248-f729-4028-b9ea-db4be62776a9.pdf
AGM Information
Open in viewerOpens in your device viewer
Infratil Annual Meeting of Shareholders 19 August 2021
==> picture [75 x 90] intentionally omitted <==
2
==> picture [75 x 90] intentionally omitted <==
Infratil Annual Meeting
==> picture [38 x 44] intentionally omitted <==
==> picture [566 x 330] intentionally omitted <==
3
Chair’s Introduction Mark Tume
==> picture [75 x 90] intentionally omitted <==
==> picture [38 x 44] intentionally omitted <==
Mark Tume Independent Director and Chairperson of the Meeting
-
Independent Director since 2007
-
Chair since 2013
-
Chair of the Manager Engagement
-
Committee
-
Chair of Nomination and Remuneration Committee
-
Director of RetireAustralia
Up for re-election
5
==> picture [38 x 44] intentionally omitted <==
Alison Gerry Independent Director
-
Independent Director since 2014
-
Chair of Audit and Risk Committee
-
Member of the Manager
-
Engagement Committee
-
Member of Nomination and Remuneration Committee
6 6
==> picture [38 x 44] intentionally omitted <==
Jason Boyes Chief Executive Officer and Director
-
Chief Executive of Infratil and Director since 2021
-
Executive of
H.R.L. Morrison & Co Group
- Chair of Longroad Energy and Galileo Green Energy
Up for election
7 7
==> picture [38 x 44] intentionally omitted <==
Paul Gough Independent Director
-
Independent Director since 2012
-
Member of Manager Engagement
-
Committee
-
Member of Nomination and
-
Remuneration Committee
Up for re-election
8 8
==> picture [38 x 44] intentionally omitted <==
Kirsty Mactaggart Independent Director
-
Independent Director since 2019
-
Member of Audit and Risk
Committee
-
Member of Manager Engagement
-
Committee
9 9
==> picture [38 x 44] intentionally omitted <==
Catherine Savage Independent Director
-
Independent Director since 2019
-
Member of Audit and Risk
Committee
-
Member of Manager Engagement
-
Committee
10 10
==> picture [38 x 44] intentionally omitted <==
Peter Springford Independent Director
-
Independent Director since 2016
-
Member of Manager Engagement Committee
11 11
Chair’s Address Mark Tume
==> picture [75 x 90] intentionally omitted <==
Chief Executive’s Review Jason Boyes
==> picture [75 x 90] intentionally omitted <==
Full Year Overview
==> picture [239 x 473] intentionally omitted <==
-
Proportionate EBITDAF from continuing operations of $398.8 million, up from$370.2 million in the comparative period (7.7% growth)
-
Proportionate capital expenditure and investment of $1,235 million, including the initiation of a healthcare platform through the investment in Qscan Group, followed by the Pacific Radiology investment in May 2021
-
Indicative offer from Australian Super provided a real-time endorsement of the quality of Infratil’s assets and their attractiveness to sophisticated investors
-
Agreement reached to sell Infratil’s 65.5% stake in Tilt Renewables for gross proceeds of $2.0 billion
-
Strong demand for resilience in digital infrastructure continues to drive demand for highquality data centres assets, reflected in the increase in the valuation of Infratil’s investment in CDC Data Centres
-
Partially imputed dividends of 17.75 cents per share declared during the year
•
14
Portfolio Resilience and Composition
==> picture [86 x 86] intentionally omitted <==
==> picture [86 x 86] intentionally omitted <==
==> picture [86 x 86] intentionally omitted <==
==> picture [86 x 86] intentionally omitted <==
CDC Data Centres
- Installed capacity increased to 133MW with the commissioning of Eastern Creek 3 in FY2021, with a further 77MW currently under construction
Vodafone New Zealand
- Vodafone New Zealand FY2021 investment of $126 million (Infratil share) was across 5G and regional network upgrades, fixed wireless acceleration and investment in its digital transformation programme
Wellington Airport
- Growth capital projects suspended at Wellington Airport due to covid, however runway overlay brought forward given covid-related cessation of international flights
Longroad Energy
-
Completed the construction of 907MW of development projects in FY2021
-
Construction completed on the 331MW Prospero 2 solar project & 199MW Sunstream 2 solar project this financial year
-
Construction underway on the 26MW Maine Distributed Generation solar project and 294MW Muscle Shoals project
Qscan Group
- On 22 December 2020 Infratil acquired 56% of Qscan Group for A$289.6 million
Pacific Radiology
- On 31 May 2021 Infratil acquired 56% of Pacific Radiology for NZ$313.6 million
15
Portfolio Resilience and Composition
Sector
Investment
==> picture [503 x 330] intentionally omitted <==
----- Start of picture text -----
2%
4%
4% 20%
4%
33%
5%
2%
12% 53%
13%
16% 12%
20%
CDC Data Centres
Vodafone Renewable Energy
Trustpower Digital Infrastructure
Wellington Airport
Airports
Qscan Group
Social Infrastructure
Pacific Radiology
Other
RetireAustralia
Longroad Energy
Other
----- End of picture text -----
16
Tilt Renewables
==> picture [239 x 473] intentionally omitted <==
-
Through Trustpower and then Tilt Renewables, Infratil was an early investor in wind powered generation in New Zealand and Australia, resulting in $2,150 million of capital expenditure, building out 1,106MW of capacity
-
Tilt Renewables ultimately entered into a Scheme Implementation Agreement (‘SIA’) under which Tilt Renewables shareholders received $8.10 per share in cash
-
Material shareholder value recognised through the SIA, with the NZ$8.10 offer price equivalent to a 106.6% premium above the Tilt Renewables share price prior to the announcement of Infratil’s strategic review
-
On 3 August, Infratil received net proceeds of $1,958.3 million after transaction costs
-
On completion Infratil applied ~$842 million of the proceeds to fully repay its drawn bank facilities
17
Portfolio Target Returns
==> picture [536 x 284] intentionally omitted <==
----- Start of picture text -----
Infratil Expected Leverage Management Return to
Portfolio Returns Assumption Costs Shareholders
Core 8–10%
Lower Risk Per annum
Average net debt/
Core Plus / + 10–15% + total capital 30% – 1% of assets = 11–15%
Growth Per annum at 6% p.a. Per annum Per annum
interest rate
Development 15–25%
Higher Risk Per annum
----- End of picture text -----
Notes:
-
Infratil’s Absolute Return Target set 1 April 2018
-
Based on composition of existing Infratil portfolio
18
Share Price Performance
Infratil Share Price
| Period | TSR |
|---|---|
| 1 April – 18 August 2021 | 2.6% |
| 1 Year1 | 91.9% |
| 5 Year1 | 23.2% |
| 10 Year1 | 20.1% |
| Inception – 27 years1 | 18.8% |
==> picture [560 x 324] intentionally omitted <==
----- Start of picture text -----
$9.00
$8.00
$7.20
$7.00
$6.00
$5.00
$4.00
$3.00
$2.00
$1.00
$-
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021
----- End of picture text -----
1Total shareholder returns are to 31 March 2021 based on a closing share price of $7.13
19
Debt Capacity & Facilities
| 31 March ($Millions) | 31 March 2021 | 16 August 2021 |
|---|---|---|
| Net bank debt/(cash) | 328 | (1,200) |
| Infratil Infrastructure bonds | 1,155 | 1,164 |
| Infratil Perpetual bonds | 232 | 232 |
| Total net debt | 1,715 | 196 |
| Market value of equity | 5,151 | 5,205 |
| Total capital | 6,866 | 5,401 |
| Gearing2 | 25.0% | 3.6% |
| Undrawn bank facilities1 100% subsidiaries cash Liquidity available |
353 14 367 |
795 1,200 1,995 |
Debt Maturity Profile as at 16 August 2021 (NZ$millions)
==> picture [323 x 150] intentionally omitted <==
----- Start of picture text -----
1,000
800
600
194 848
400
200 450 122
65 180 100 232
- -
FY22 FY23 FY24 FY25-31 >FY31
Wholly owned bank facilities Bonds
----- End of picture text -----
==> picture [38 x 44] intentionally omitted <==
-
On 3 August 2021, Infratil announced the completion of the sale of its 65.15% stake in Tilt Renewables. On completion Infratil received net proceeds of $1,958.3 million after transaction costs
-
Prior to completion Infratil also received a fully imputed dividend from Tilt of $16.1 million
-
On completion Infratil applied
- $841.8 million of the proceeds to fully repay its existing drawn bank facilities, including the bridge facility put in place to fund the acquisition of Pacific Radiology
-
As at 16 August 2021, Infratil had cash on hand and term deposits of ~$1.2 billion and undrawn bank facilities of $795 million
-
Infratil’s next bank maturities are $65 million in February 2022
-
Infratil’s next two bond maturities are $93.7 million of IFT190 bonds (6.85%) in June 2022 and $100.0 million of IFT240 bonds (5.65%) in December 2022
-
1 Gearing calculated as total net debt / total capital based on share price 2 Undrawn Infratil Corporate facilities
20
Infratil Guidance
==> picture [239 x 473] intentionally omitted <==
-
Infratil’s FY2022 Proportionate EBITDAF guidance range from continuing operations of $505-$550 million remains unchanged
-
This assumes a full-year contribution from Trustpower’s retail business, a 10-month contribution from Pacific Radiology and no contribution from Tilt Renewables
-
Guidance is based on Infratil management’s current expectations and assumptions about the trading performance, is subject to risks and uncertainties, and dependent on prevailing market conditions continuing throughout the outlook period
-
There are a number of operational impacts at CDC Data Centres, Qscan Group, RetireAustralia and Wellington Airport as a result of the current covid situation in Australia. The implications in New Zealand are still emerging and being assessed
-
These are not currently forecast to materially impact FY2022 guidance but will continue to be evaluated
21
Portfolio Entities
==> picture [75 x 90] intentionally omitted <==
==> picture [78 x 44] intentionally omitted <==
==> picture [62 x 63] intentionally omitted <==
==> picture [84 x 43] intentionally omitted <==
==> picture [55 x 53] intentionally omitted <==
==> picture [140 x 42] intentionally omitted <==
==> picture [91 x 27] intentionally omitted <==
==> picture [124 x 23] intentionally omitted <==
==> picture [75 x 27] intentionally omitted <==
CDC Data Centres
==> picture [239 x 473] intentionally omitted <==
-
CDC recently obtained Certified Strategic Status, the highest certification under the Australian Government’s Hosting Certification Framework, reinforcing CDC’s coveted credentials across its client base
-
Recent contract wins and renewals have increased the whole of portfolio weighted average lease expiry (‘WALE’) from 8.1 years to 9.4 years and from 14.4 years to 22.4 years including options
-
Continued execution of development pipeline, with four new facilities delivering 77MW of capacity expected to be delivered in 2022
-
Auckland facilities (20MW) progressing positively, with CDC continuing to broaden its sales focus and presence in New Zealand. The impact of Auckland being in lockdown is being closely monitored
-
Development activity at Eastern Creek 4 (37MW) and Hume 5 (20MW) was on schedule leading into the lockdowns in Sydney and Canberra. Delivery timetables are being closely monitored as a result of the current covid disruptions
23
Vodafone New Zealand
==> picture [239 x 473] intentionally omitted <==
-
Targeted initiatives, especially in Post-Pay Mobile, Enterprise and ICT underpin improving quality of earnings
-
Key Enterprise and ICT partnerships established and driving results
-
Cost out and transformation programme continues to deliver significant value, allowing reinvestment in network and providing trading improvements
-
Second phase of 5G rollout and 4G improvements underway, with growth continuing to underpin Fixed Wireless Access acceleration
-
Internal IT system modernisation and IT system separation from Vodafone Group continuing
-
Operating model rewired and changes bedded in, ongoing investments in organisational health and high performance culture leading to improved productivity
24
Wellington Airport
==> picture [239 x 473] intentionally omitted <==
-
Domestic business continues to trend well with increasing capacity and passenger traffic (July 2021 capacity 94% and passengers 93% of pre-covid levels)
-
International travel currently paused with the Trans-Tasman bubble, and is a reminder of the ongoing threat of covid
-
Strong cost control across both operating and capital expenditure remains a focus
-
Baseline capital expenditure for FY2022 is $25 million and comprises committed, essential and regulatory related projects
-
Pricing consultation (PSE 4) with new aeronautical pricing was issued 1 April 2021
-
In June 2021, S&P revised Wellington Airport’s outlook from “negative” to “stable”, reflecting its strong recovery
25
Trustpower
==> picture [239 x 473] intentionally omitted <==
-
Trustpower has agreed terms with Mercury for a sale of its retail business which is expected to complete late 2021 or early 2022, subject to the conditions of the sale being satisfied
-
The sale will enable the Trustpower Board and leadership team to drive operational excellence in the generation business and focus on new generation and related opportunities
-
Work on splitting out the retail business and standing up the remaining generation business is proceeding well
-
Trustpower has, after consultation, chosen Manawa (meaning ‘heart’ or ‘breath’) Energy as its name post completion
-
Total generation production of 432GWh in Q1 FY2022 was up 2% on the on Q1 FY2021
26
Longroad Energy
==> picture [239 x 473] intentionally omitted <==
-
Longroad continues to strengthen its position as a leading U.S. renewables developer, owner & operator
-
Current operating/under construction portfolio of over 1.3GWs, a pipeline in excess of 6GWs and providing services to 3.5GWs of operating assets
-
In FY2021, 907MW of development projects were completed including El Campo (243MW), Little Bear (215MW) and Prospero I (379MW), with 50% of the equity in these projects sold
-
Construction has been completed on the 331MW Prospero 2 solar project & 199MW Sunstream 2 solar project this financial year
-
Construction is underway on the 26MW Maine Distributed Generation solar project and 294MW Muscle Shoals solar project
-
Strong tailwinds from a policy perspective with the Biden administration progressing $1 trillion bipartisan infrastructure plan, re-entering the Paris Agreement and pushing for a zero carbon power sector by 2035
27
Galileo Green Energy
==> picture [239 x 473] intentionally omitted <==
-
Galileo Green Energy (‘GGE’) is focussed on greenfield development, acquisitions and strategic co-development opportunities, aiming to achieve both geographic and technological diversification
-
Initial capital commitment is EUR220 million of which Infratil’s share is EUR88 million, with EUR8.3 million invested by Infratil to date
-
Key milestones to date include:
-
A 50% stake in an Irish wind development joint venture with a 400MW pipeline for potential development over 3 to 4 years
-
The establishment of GGE Nordics, an 80:20 joint venture with an initial focus is on wind projects in Scotland and Sweden. The target size of the pipeline is over 1,000MW
-
A development agreement with experienced wind developer TEN Project and a target pipeline of 300MW of onshore wind projects in south Italy
-
To date GGE has attracted a screening pipeline of over 7GWs across six key European territories
28
Qscan Group
==> picture [239 x 473] intentionally omitted <==
-
Qscan is tracking to the investment case, subject in the short term to prolonged covid restrictions in core markets
-
Despite lockdowns and quarantining requirements impacting some staff, Qscan has continued to serve its patients and referring doctors
-
Qscan’s value proposition has proven to be attractive to prospective recruits in an extremely tight radiologist labour market
-
Execution of the PET-CT rollout strategy continues, with three new PET-CT clinics due to open in CY2021 (2 in NSW, 1 in WA) pending covid disruptions
-
A steady pipeline of future growth options continue to present in the Australian market
29
Pacific Radiology Group
==> picture [239 x 473] intentionally omitted <==
-
Completion of the acquisition of Pacific Radiology occurred on 31 May 2021, adding immediate scale to Infratil’s healthcare platform
-
Infratil shareholding is 53.5% following strong interest in equity ownership across the radiologist cohort
-
Pacific Radiology has had a strong first quarter, with both revenue and EBITDA ahead of the investment case
-
Significant progress made towards key transition priorities within the first two months of ownership including expanding the doctor equity ownership scheme
-
Two new clinics opened in June and July in Rolleston and Wellington with continued investment in leading high-tech medical equipment
30
Retire Australia
==> picture [239 x 473] intentionally omitted <==
-
Subsequent waves of covid outbreaks have led to some disruption to operations, however RetireAustralia is well prepared and taking the necessary action to protect residents and staff
-
To date, RetireAustralia residents and staff have had no cases of covid-19
-
Favourable economic conditions, including an uplift in HPI continue to drive performance, with strong resale and development settlements across all geographies
-
The June quarter results were well ahead of budget and included 124 resales settlements and 22 development sales. The FY2022 budget is based on 367 resales and 75 development sales
-
Construction contracts have recently been entered into for two developments on the New South Wales Central Coast for Stage 3 of The Rise at Wood Glen (34 ILAs) and 22 additional ILUs at Forresters Beach
-
Construction will be commencing shortly on Stage 2 of The Verge located on the Gold Coast (66 ILAs) and for The Green Tarragindi, a 94-unit development in metropolitan Brisbane
31
Outlook
==> picture [102 x 224] intentionally omitted <==
==> picture [165 x 110] intentionally omitted <==
==> picture [165 x 110] intentionally omitted <==
==> picture [153 x 128] intentionally omitted <==
==> picture [112 x 100] intentionally omitted <==
==> picture [112 x 110] intentionally omitted <==
==> picture [153 x 82] intentionally omitted <==
-
Infratil is a high conviction investor with significant positions in our preferred sectors
-
Focus remains on maintaining a balanced portfolio of scaled platforms that can generate attractive non-correlated returns
-
The strength of the Company’s balance sheet reflects the sale of Tilt Renewables, and repayment of all bank debt
-
Infratil is uniquely positioned to redeploy this capital with a strong pipeline of opportunities within existing platforms and other adjacencies a priority
-
We have a vision for Infratil to be a leader in sustainable infrastructure investment, and we believe our current portfolio reflects this
32
Presentation of the Annual Report
==> picture [75 x 90] intentionally omitted <==
Shareholder Questions
==> picture [75 x 90] intentionally omitted <==
Resolutions
==> picture [75 x 90] intentionally omitted <==
Resolution 1
Re-election of Mark Tume: That Mark Tume be re-elected as a director of Infratil
For Against Discretionary 244,744,711 19,296,230 7,642,213 (90.09%) (7.10%) (2.81%)
36
Resolution 2
Re-election of Paul Gough: That Paul Gough be re-elected as a director of Infratil
For Against Discretionary 283,081,949 91,698 7,666,119 (97.33%) (0.03%) (2.64%)
37
Resolution 3
Election of Jason Boyes: That Jason Boyes be elected as a director of Infratil
For Against Discretionary 283,011,104 140,518 7,692,900 (97.31%) (0.05%) (2.64%)
38
Resolution 4
Payment of FY2020 Incentive Fee by Share Issue:
That Infratil be authorised to issue to Morrison & Co Infrastructure Management Limited (Morrison & Co), within the time, in the manner, and at the price, prescribed in the Management Agreement, such number of fully paid ordinary shares in Infratil (Shares) as is required to pay all or such portion of the third instalment of the 2020 Incentive Fee (if payable) as the Board elects to pay by the issue of Shares (2020 Scrip Option), and the Board be authorised to take all actions and enter into any agreements and other documents on Infratil’s behalf that the Board considers necessary to complete the 2020 Scrip Option.
For Against Discretionary 247,206,473 33,287,168 8,133,361 (85.65%) (11.53%) (2.82%)
39
Resolution 5
Payment of FY2021 Incentive Fee by Share Issue:
That Infratil be authorised to issue to Morrison & Co Infrastructure Management Limited (Morrison & Co), within the time, in the manner, and at the price, prescribed in the Management Agreement, such number of fully paid ordinary shares in Infratil (Shares) as is required to pay all or such portion of the second instalment of the 2021 Incentive Fee (if payable) as the Board elects to pay by the issue of Shares (2021 Scrip Option), and the Board be authorised to take all actions and enter into any agreements and other documents on Infratil’s behalf that the Board considers necessary to complete each of the 2020 Scrip Option and the 2021 Scrip Option.
For Against Discretionary 247,151,624 33,332,445 8,139,693 (85.63%) (11.55%) (2.82%)
40
Resolution 6
Auditor’s remuneration:
That the Board be authorised to fix the auditor’s remuneration
For Against Discretionary 277,921,490 5,194,863 7,725,963 (95.56%) (1.79%) (2.65%)
41
Thank You
==> picture [75 x 90] intentionally omitted <==
www.infratil.com
Glossary
==> picture [42 x 52] intentionally omitted <==
| 5G | Fifth generation mobile network |
|---|---|
| FWA | Fixed Wireless Access (the delivery of high-speed broadband over mobile networks) |
| GW | Gigawatt (a unit of power equivalent to 1,000MW) |
| GWh | Gigawatt hours (used as a measure of the output of large electricity power stations) |
| HPI | House Price Inflation |
| ICT | Information and Communications Technology |
| ILA | Independent living apartment |
| ILU | Independent living unit |
| MW | Megawatt (a unit of power) |
| PET-CT | A procedure that combines the pictures from a positron emission tomography (PET) scan and a computed tomography (CT) scan to provide detailed pictures of areas inside the body |
| Proportionate EBITDAF |
Proportionate EBITDAF is an unaudited non-GAAP (‘Generally Accepted Accounting Principles’) measure of financial performance, presented to provide additional insight into management’s view of the underlying business performance. |
| PSE | Price setting event |
| S&P | Standard and Poor's |
| TSR | Total Shareholder Return |
| WALE | Whole of portfolio weighted average lease expiry |
43