ASX ANNOUNCEMENT

Date: 26 May 2016 Number: 471/260516

EXPLORATION UPDATE AND PLACEMENT

A major drill programme is underway at Impact Minerals Limited’s (ASX:IPT) 100% owned Commonwealth Project 95 km north of Orange in New South Wales (Figure 1).

The programme, which will comprise up to 3,000 m of reverse circulation (RC) and diamond drilling, will test a significant number of targets that have been identified by Impact at four prospects: the Commonwealth deposit, Silica Hill, Welcome Jack and Doughnut (Figure 1).

The targets were identified in geological, geochemical and geophysical data sets collected and compiled over the past 12 to 18 months and in particular as areas of variably overlapping gravity, Induced Polarisation (IP) and soil geochemistry anomalies. The targets are described in detail in announcements dated 5 April, 18 April, 26 April and 5 May 2016.

One diamond hole has been completed to test a small EM conductor at the southern end of the Commonwealth deposit. Vein and disseminated mineralisation has been intersected over a 6 metre width at the upper contact of the main rhyolite unit and is visually similar to the base metal mineralisation seen in many other holes at Commonwealth South. Assays are expected in four to six weeks.

Massive sulphides were not intersected in the hole and the source of the EM conductor has not been found and a down hole EM survey will be required. The survey will be completed together with other holes towards the end of the drill programme.

A second diamond drill hole is in progress to test the down dip extension of the centre of the Commonwealth deposit.

Placement

The Company is also pleased to announce that it has raised $250,000 via a Placement ( Placement ) of 10,416,667 shares at 2.4 cents per share to a sophisticated investor arranged by Patersons Securities Limited. This follows on from the recent successful Share Purchase Plan and associated placement completed on 13 May 2016.

26 Richardson Street West Perth Western Australia 6005 Tel +61 (8) 6454 6666 Facsimile +61 (8) 6454 6667 Email [email protected] www.impactminerals.com.au

==> picture [584 x 102] intentionally omitted <==

==> picture [450 x 478] intentionally omitted <==

Figure 1. Geology and location of the four priority prospects at the Commonwealth Project: Commonwealth, Silica Hill, Welcome Jack and Doughnut.

Investment by Squadron Resources Pty Limited

The Commonwealth gold-silver-zinc-lead project and also Impact’s Broken Hill platinumcopper-nickel project are part of the investment agreement between Impact Minerals and Squadron Resources Pty Ltd, part of the Minderoo Group which represents the philanthropic and business interests of Andrew and Nicola Forrest (see announcement 17 July 2015).

==> picture [584 x 102] intentionally omitted <==

As part of the investment agreement, Squadron at its sole discretion, can invest a further A$1 million into either or both of the projects to earn a 19.9% interest after Impact has spent a combined total of $2.5 million on them.

It is anticipated that Impact will meet the $2.5 million expenditure target in the September Quarter 2016.

Dr Michael G Jones Managing Director

The review of exploration activities and results contained in this report is based on information compiled by Dr Mike Jones, a Member of the Australian Institute of Geoscientists. He is a director of the company and works for Impact Minerals Limited. He has sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Mike Jones has consented to the inclusion in the report of the matters based on his information in the form and context in which it appears.

==> picture [830 x 99] intentionally omitted <==

APPENDIX 1 - SECTION 1 SAMPLING TECHNIQUES AND DATA

Criteria JORC Code explanation Commentary
Sampling techniques Nature and quality of sampling (e.g. cut channels, random chips,
or specific specialised industry standard measurement tools
appropriate to the minerals under investigation, such as down
hole gamma sondes, or handheld XRF instruments, etc). These
examples should not be taken as limiting the broad meaning of
sampling.
Rock chip samples
Random grab samples were taken at surface which represented favourable geology and alteration to known mineralisation in the
region. Samples are variably weathered.
Soil Samples
About 250g of soil was taken from 15-20cm below surface and sieved to - 2mm size. Samples put in plastic snap seal bags.
Samples were subsequently sieved to -250 micron at SGS Laboratories for assay by aqua regia digest.
RC Drilling
Reverse Circulation (RC) percussion drilling was used to produce a 1m bulk sample (~25kg) which was collected in plastic bags and
representative 1m split samples (12.5%, or nominally 3kg) were collected using a riffle splitter and placed in a calico bag. The
cyclone was cleaned out with compressed air at the end of each hole and periodically during the drilling. Holes were drilled to
optimally intercept interpreted mineralised zones.
Diamond Drilling
Diamond drilling was used to produce drill core either with a diameter of 63.5 mm (HQ) or 47.6 mm (NQ).
Include reference to measures taken to ensure sample
representivity
and
the
appropriate
calibration
of
any
measurement tools or systems used
Rock chip samples
Representative samples at each sample site weigh between 0.8 and 1.2 kg. Sample sites were chosen due to historic rock and soil
assay results and the geophysical surveys conducted on the Commonwealth Project. Historic rock sample methods are unknown
but are considered immaterial.
Soil Samples and Drill Samples
Sample representivity was ensured by a combination of Company Procedures regarding quality control (QC) and quality assurance
/ testing (QA).
Examples of QC include (but are not limited to), daily workplace and equipment inspections, as well as drilling and sampling
procedures.
Examples of QA include (but are not limited to) collection of “field duplicates”, the use of certified standards and blank samples
approximately every 50 samples

==> picture [830 x 99] intentionally omitted <==

Criteria JORC Code explanation Commentary
Aspects of the determination of mineralisation that are Material
to the Public Report. In cases where ‘industry standard’ work has
been done this would be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other cases
more explanation may be required, such as where there is coarse
gold that has inherent sampling problems. Unusual commodities
or mineralisation types (e.g. submarine nodules) may warrant
disclosure of detailed information
Rock chip samples
Rock samples were sent to SGS Perth where they were crushed, dried and pulverised (total prep) to produce a 25-30 g sub-
samples for analysis initially by Aqua Regia digest with ICP-MS finish for base metals then by four acid digest with an ICP/AES
finish for ore grade base metal samples and lead collection fire assay with AAS finish for gold.
Soil Samples
Soil samples were sent to ACME Laboratories in Vancouver for analysis by aqua regia digest or to SGS Laboratories in Perth for
analysis by the MMI digest.
RC and diamond drill samples
RC samples and cut samples of core were submitted to ALS in Orange, NSW. Laboratory sample preparation involved: sample
crushed to 70% less than 2mm, riffle/rotary split off 1 kg, pulverise split to >85% passing 75 microns.
RC samples analysed by MEICP41 or MEOG46 for ore grade samples, aqua regia digest with ICP OES analysis and AA24 fire assay
with AAS finish.
Historical diamond and RC samples were sent to Fox Anamet, Brookvale NSW where gold was determined by fire assay, base
metals by DCP and AAS methods.
Weathered samples contained gossanous sulphide material and fresh samples containing visible pyrite, galena, sphalerite and
chalcopyrite.
Drilling techniques Drill type (e.g. core, reverse circulation, open-hole hammer, rotary
air blast, auger, Bangka, sonic, etc) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is oriented and if so, by
what method, etc).
Diamond drilling accounts for about 50 % of the drilling and comprises NQ (47.6 mm diameter) and HQ (63.5 mm diameter) sized
core. Impact diamond core is triple tube and is oriented. Historical diamond core was not oriented.
RC drilling accounts for about 50% of the drilling and comprises 4 inch hammer.
Drill sample recovery Method of recording and assessing core and chip sample
recoveries and results assessed
Diamond core recoveries for all holes are logged and recorded. Recoveries are estimated to be approximately >97% for the
Commonwealth Project. No significant core loss or sample recovery problems are observed in the drill core or historic reports. RC
samples were visually checked for recovery, moisture and contamination.
Measures taken to maximise sample recovery and ensure
representative nature of the samples
Diamond core is reconstructed into continuous runs on an angle iron cradle for orientation marking. Depths are checked against
the depth given on the core blocks and rod counts are routinely carried out by the driller.
The RC samples are collected by plastic bag directly from the rig-mounted cyclone and laid directly on the ground in rows of 10.
The drill cyclone and sample buckets are cleaned between rod-changes and after each hole to minimise down-hole and/or cross
contamination.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
No sample bias has been established.

==> picture [830 x 99] intentionally omitted <==

Criteria JORC Code explanation Commentary
Logging Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
Mineral Resource estimation, mining studies and metallurgical
studies.
Geological logging of samples followed company and industry common practice. Qualitative logging of samples included (but not
limited to); lithology, mineralogy, alteration, veining and weathering. Diamond core logging included additional fields such as
structure and geotechnical parameters.
Magnetic Susceptibility measurements were taken for each 1m RC sample and each 1m diamond core interval.
For diamond core, information on structure type, dip, dip direction, texture, shape and fill material has been recorded in the logs.
RQD data has been recorded on selected diamond holes. Handheld XRF analysis was completed at 50 cm and 1 m intervals on
diamond core and for every metre for RC samples.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc) photography.
All logging is quantitative, based on visual field estimates. Systematic photography of the diamond core in the wet and dry form
was completed.
Chip trays with representative 1m RC samples were collected and photographed then stored for future reference.
The total length and percentage of the relevant intersections
logged
All diamond drill holes were logged in full.
All RC chips samples were geologically logged by Impact’s on-site geologist on a 1m basis, with digital capture in the field.
Detailed diamond core logging, with digital capture was conducted for 100% of the core by Impact’s on-site geologist.
Sub-sampling
techniques and
sample preparation
If core, whether cut or sawn and whether quarter, half or all core
taken.
All core samples were sampled by half core. Selected intervals of quarter core will be selected for check assays if required.
If non-core, whether riffled, tube sampled, rotary split, etc and
whether sampled wet or dry.
RC samples were split using a riffle splitter.
For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
Company procedures were followed to ensure sub-sampling adequacy and consistency. These included (but were not limited to),
daily work place inspections of sampling equipment and practices, as well as sub-sample duplicates (“field duplicates”).
Quality control procedures adopted for all sub-sampling stages to
maximise representivity of samples.
Laboratory QC procedures for rock sample assays involve the use of internal certified reference material as assay standards, along
with blanks, duplicates and replicates.
The QC procedure for historical diamond and RC samples is unknown but is assumed to have been minimal; however, the impact
of historical samples has been somewhat mitigated by recent drilling.
Measures taken to ensure that the sampling is representative of
the in situ material collected, including for instance results for
field duplicate/second-half sampling.
Sample duplicates from the historical drilling were taken from selected intervals and compared to the original assay. Quarter core
was taken for diamond samples and riffle resplits for RC samples.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The samples sizes at Commonwealth are considered appropriate since gold has been identified as predominantly fine-grained by
thin section analysis which would indicate the nugget effect is minimal.

==> picture [830 x 99] intentionally omitted <==

Criteria JORC Code explanation Commentary
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
An industry standard fire assay technique for samples using lead collection with an Atomic Absorption Spectrometry (AAS) finish
was used for gold and aqua regia digest for base metals and silver.
The quality of historical drill sample assays is unknown; however it is reasonable to assume that core samples were
representative of the mineralisation.
For geophysical tools, spectrometers, handheld XRF instruments,
etc, the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
No geophysical tools were used to determine material element concentrations. A handheld XRF was used for qualitative analysis
only.
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision have
been established.
For the rock chips, quality control procedures for assays were followed via internal laboratory protocols. Accuracy and precision
are within acceptable limits.
Reference standards and blanks are routinely inserted into every batch of samples at a rate of 1 in every 25 samples in the Impact
drilling. Impact’s inserted standards in general showed results within expected ranges. The calculated means for Lab standards
are very close to expected for the majority of standards and are within industry expectations.
Laboratoy repeat checks and original samples correlated very well.
There is minimal quality control of historical drill sample assays. Twin holes have been drilled to verify historical drilling.
The QAQC results indicate that the assays used for resource estimation are a fair representation of the material that has been
sampled.
Verification of
sampling and assaying
The verification of significant intersections by either independent
or alternative company personnel.
Significant intersections from drilling have not been verified by independent or alternative companies or by Impact.
The use of twinned holes. Two twin diamond holes versus historic RC holes have been drilled at Commonwealth South and Main Shaft.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Primary assay data for rock chips has been entered into standard Excel templates for plotting in Mapinfo and Target. All historical
drill data has been entered digitally by previous explorers and verified internally by Impact.
Discuss any adjustment to assay data. No significant adjustments have been required.
Location of data
points
Accuracy and quality of surveys used to locate drillholes (collar
and down-hole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
Recent drill holes have been located by DGPS. Historical drill holes and mine shafts have been verified by DGPS.
Specification of the grid system used. The grid system for Commonwealth is MGA_GDA94, Zone 55.

==> picture [830 x 99] intentionally omitted <==

Criteria JORC Code explanation Commentary
Quality and adequacy of topographic control. Standard government topographic maps have been used for topographic validation. The DGPS is considered sufficiently accurate
for elevation data.
For the diamond holes, down-hole single shot surveys were conducted by the drilling contractor. Surveys were conducted at 6m,
18, 30m and then approximately every 30m down-hole.
For the RC drill holes, downhole dip surveys were taken at approximately 30m intervals and at the bottom of the hole.
Data spacing and
distribution
Data spacing for reporting of Exploration Results. Drill spacing of drill holes ranges between 10 and 30 m which is considered adequate for Exploration Results.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
Spacing of drill holes ranges between 10 m and 50 m on section and are considered adequate for Mineral Resource estimation
procedures.
Whether sample compositing has been applied. Sample compositing has been applied for quoting drill composite results only.
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves unbiased sampling
of possible structures and the extent to which this is known,
considering the deposit type.
Drilling is oriented sub-perpendicular to the mineralised trend and stratigraphic contacts as determined by field data and cross
section interpretation.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and reported
if material.
No significant sample bias has been identified from drilling due to the optimum drill orientation described above. Where present,
sample bias will be reported.
Sample security The measures taken to ensure sample security. For rock samples, chain of custody is managed by Impact Minerals Ltd. Samples for Commonwealth are delivered by Impact
Minerals Ltd personnel to ALS in Orange, NSW or to SGS Perth for prep and assay. Whilst in storage, they are kept in a locked
yard. Tracking sheets have been set up to track the progress of batches of samples.
Security of historic drill samples is unknown however is considered immaterial.
Audits or reviews The results of any audits or reviews of sampling techniques and
data.
A review of the sampling techniques and data both of historic drill holes and of Impact’s procedures has been completed by
Optiro Consultants of Perth, WA.

==> picture [830 x 99] intentionally omitted <==

SECTION 2 REPORTING OF EXPLORATION RESULTS

Criteria JORC Code explanation Commentary
Mineral
tenement
and
land
tenure
status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
The Commonwealth Project currently comprises 3 exploration licences covering 315 km2. The tenements are held 100% by
Endeavour Minerals Pty Ltd, a subsidiary company of Impact Minerals Limited. No aboriginal sites or places have been
declared or recorded in areas where Impact is currently exploring. There are no national parks over the license area.
The security of the tenure held at the time of reporting along
with any known impediments to obtaining a licence to operate in
the area.
The tenements are in good standing with no known impediments.
Exploration done by
other parties
Acknowledgment and appraisal of exploration by other parties. A total of 66 drillholes have been completed over 300 m strike between the Commonwealth main shaft and Commonwealth
South by previous explorers to an average depth of 53 m.
Geology Deposit type, geological setting and style of mineralisation. The Commonwealth and Commonwealth South deposits are considered gold-rich volcanic hosted massive sulphide (VMS)
deposits that occur at and below the contact with a porphyritic rhyolite and overlying volcanic sedimentary rocks. The
mineralisation may have been overprinted by epithermal mineralisation.
Drill hole Information A summary of all information material to the understanding of
the exploration results including a tabulation of the following
information for all Material drill holes:

easting and northing of the drill hole collar

elevation or RL (Reduced Level – elevation above sea
level in metres) of the drill hole collar

dip and azimuth of the hole

down hole length and interception depth

hole length.
A tabulation of this information is considered not material for this inferred mineral resource.
Data aggregation
methods
In reporting Exploration Results, weighting averaging techniques,
maximum and/or minimum grade truncations (e.g. cutting of
high grades) and cut-off grades are usually Material and should
be stated.
All reported assays have been length weighted. No top cuts have been applied in the reporting of the drill assays. A nominal
cut-off of approximately 0.5 g/t Au has been applied.
Where aggregate intercepts incorporate short lengths of high
grade results and longer lengths of low grade results, the
procedure used for such aggregation should be stated and some
typical examples of such aggregations should be shown in detail.
High grade massive sulphide intervals internal to broader zones of disseminated sulphide mineralisation are reported as
included intervals.
The assumptions used for any reporting of metal equivalent
values should be clearly stated.
Gold equivalent values have been used in the long section and in the resource calculation. Australian metal prices used for
the gold equivalent were $1,580/oz gold, $22/oz silver, $2,740/t zinc, $2,396/t lead and $7,320/t copper. Given the high
grade results, it is assumed that very high recoveries will be achieved. However no metallurgical studies have been completed
to verify this. Such studies will be done as and when appropriate.

==> picture [830 x 99] intentionally omitted <==

Criteria JORC Code explanation Commentary
Relationship between
mineralisation widths
and intercept lengths
These relationships are particularly important in the reporting of
Exploration Results.
If the geometry of the mineralisation with respect to the drill hole
angle is known, its nature should be reported.
If it is not known and only the down hole lengths are reported,
there should be a clear statement to this effect (e.g. ‘down hole
length, true width not known’).
Historical drill holes to date have been sub-perpendicular to the mineralised trend and stratigraphy so intervals are close to
true width or otherwise stated.
Diagrams Appropriate maps and sections (with scales) and tabulations of
intercepts should be included for any significant discovery being
reported These should include, but not be limited to a plan view
of drill hole collar locations and appropriate sectional views.
Refer to figures in body of text.
Balanced reporting Where comprehensive reporting of all Exploration Results is not
practicable, representative reporting of both low and high grades
and/or widths should be practiced to avoid misleading reporting
of Exploration Results.
All results reported are representative
Other substantive
exploration data
Other exploration data, if meaningful and material, should be
reported including (but not limited to): geological observations;
geophysical survey results; geochemical survey results; bulk
samples – size and method of treatment; metallurgical test
results; bulk density, groundwater, geotechnical and rock
characteristics;
potential
deleterious
or
contaminating
substances.
Assessment of other substantive exploration data is not yet complete however, it is not considered material at this stage to a
Mineral Resource Estimate.
Further work The nature and scale of planned further work (e.g. tests for
lateral extensions or depth extensions or large-scale step-out
drilling).
Diagrams clearly highlighting the areas of possible extensions,
including the main geological interpretations and future drilling
areas, provided this information is not commercially sensitive
Follow up work programmes will be subject to interpretation of recent and historic results which is ongoing.

==> picture [830 x 99] intentionally omitted <==

SECTION 3 ESTIMATION AND REPORTING OF MINERAL RESOURCES

Criteria JORC Code explanation Commentary
Database integrity Measures taken to ensure that data has not been corrupted by,
for example, transcription or keying errors, between its initial
collection and its use for Mineral Resource estimation
purposes.
A visual comparison is completed between assay results and original logs (if hand drawn/logged) and detailed print outs and
down hole logs for each hole. All errors are corrected.
Data validation procedures used. Impact’s database has industry standard protocols to ensure that only valid data is accepted. For example, only geological
codes that form part of the Impact logging code system can be accepted into the database.
Site visits Comment on any site visits undertaken by the Competent
Person and the outcome of those visits.
The geology competent person, Dr Mike Jones has been with Impact since its inception and is closely involved in the
Commonwealth project. He was present during a significant part of the drill programme and helped supervise the geological
interpretation of the deposit. The majority of the work was compiled by Mr Leo Horn who is also a Competent Person for the
reporting of Exploration Results and has been responsible for all aspects of the exploration programmes at the
Commonwealth Project. The Competent Person for the Mineral Resource estimate, Mr Ian Glacken, has not visited site.
If no site visits have been undertaken indicate why this is the
case.
Geological
interpretation
Confidence in (or conversely, the uncertainty of) the geological
interpretation of the mineral deposit.
There is a high level of confidence in the geological interpretation due to the historical operating experience and the readily
identifiable stratigraphic control on mineralisation.
Wireframes are used to constrain the estimation and are based on drill hole intercepts and geological boundaries. All
wireframes are constructed to 0.5 g/t Au cut-off grades for shape consistency.
Nature of the data used and of any assumptions made. The mineralisation is generally quite consistent and drill intercepts clearly define the shape of the mineralised body with
limited options for large scale alternate interpretations.
The effect, if any, of alternative interpretations on Mineral
Resource estimation.
The controls on and interpretation of mineralisation is relatively straightforward and no alternative interpretations have been
considered.
The use of geology in guiding and controlling Mineral Resource
estimation.
Wireframes are used to constrain the estimation and are based on drill hole intercepts and geological boundaries.
The factors affecting continuity both of grade and geology. Wireframes are constructed to 0.5 g/t Au cut-off grade for shape consistency.
Dimensions The extent and variability of the Mineral Resource expressed as
length (along strike or otherwise), plan width, and depth below
surface to the upper and lower limits of the Mineral Resource
The mineral resource at Commonwealth comprises two main areas, being Main Shaft and Commonwealth South, which have a
total strike length of 400 m and extend vertically for approximately 120 m below surface. Main Shaft has been historically
mined from surface to 40 m below surface.

==> picture [830 x 99] intentionally omitted <==

Criteria JORC Code explanation Commentary
Estimation and
modelling techniques
The nature and appropriateness of the estimation technique(s)
applied and key assumptions, including treatment of extreme
grade values, domaining, interpolation parameters and
maximum distance of extrapolation from data points. If a
computer assisted estimation method was chosen include a
description of computer software and parameters used.
The availability of check estimates, previous estimates and/or
mine production records and whether the Mineral Resource
estimate takes appropriate account of such data.
Grade estimation using Ordinary Kriging (OK) was completed using Datamine software for six elements; Au, Ag, Cu, Pb, Zn and
As. Drill grid spacing was between 10 m and 30 m.
Variogram orientations were largely controlled by the strike of mineralisation and downhole variography. Variograms for
estimation were determined individually for each element.
Other estimation parameters, such as search distance, minimum and maximum sample numbers was derived from KNA.
Search distances varied depending on the element being estimated.
There has been no previous resource estimation on the Commonwealth Project, hence no comparisons are available.
The resource model has not been compared to any reconciliation data.
The assumptions made regarding recovery of by-products. No assumptions have been made regarding recovery of any by-products.
Estimation of deleterious elements or other non-grade
variables of economic significance (e.g. sulphur for acid mine
drainage characterisation).
Arsenic was the only deleterious element estimated.
In the case of block model interpolation, the block size in
relation to the average sample spacing and the search
employed.
The block model dimensions and parameters were based on the geological boundaries and average drill grid spacing. Sub-
blocks were used to ensure that the block model honoured the domain geometries and volume. Block estimates were
controlled by the original parent block dimensions.
The individual parent block dimensions were 5 mE by 15 mN by 10 mRL, with sub-blocking allowed.
Estimation into parent blocks used a discretisation of 5 (X points) by 10 (Y points) by 8 (Z points) to better represent estimated
block volumes.
Any assumptions behind modelling of selective mining units. No selective mining units were modelled in this estimate. It is assumed that the SMU is equal to the block model parent cell
or smaller.
Any assumptions about correlation between variables. Multi-element analysis was conducted on the composites. There was a strong correlation between silver and lead and
between lead and zinc.
Description of how the geological interpretation was used to
control the resource estimates.
Drillhole sample data was flagged using domain codes generated from three dimensional mineralisation domains. Sample
data was composited to a one metre downhole length.
Mineralisation domains were treated as hard boundaries in the estimation process.
Discussion of basis for using or not using grade cutting or
capping.
Top cuts were established by investigating univariate statistics and histograms of sample values. A top cut level was selected
if it affected outliers, reduced the sample variance and did not materially change the mean value.

==> picture [830 x 99] intentionally omitted <==

Criteria JORC Code explanation Commentary
The process of validation, the checking process used, the
comparison of model data to drillhole data, and use of
reconciliation data if available.
Model validation was carried out using visual comparisons between composites and estimated blocks, checks for negative or
absent grades, and statistical comparison against the input drillhole data and graphical profile (swath) plots.
Moisture Whether the tonnages are estimated on a dry basis or with
natural moisture, and the method of determination of the
moisture content.
Tonnages are estimated on a dry basis.
Cut-off parameters The basis of the adopted cut-off grade(s) or quality parameters
applied
The mineralisation is modelled to a nominal wireframe cut-off grade of 0.5 g/t Au with a minimum width of 1 m to
encapsulate the entire mineralised body. The edges of the resource shapes may be narrower than potential minimum mining
widths, which suggest that a small proportion of the shape is unlikely to be mineable; however the inclusion of these zones
adds to the orebody continuity and the ore/waste discrimination of the Reserve process.
Mining factors or
assumptions
Assumptions made regarding possible mining methods,
minimum mining dimensions and internal (or, if applicable,
external) mining dilution. It is always necessary as part of the
process of determining reasonable prospects for eventual
economic extraction to consider potential mining methods, but
the assumptions made regarding mining methods and
parameters when estimating Mineral Resources may not
always be rigorous. Where this is the case, this should be
reported with an explanation of the basis of the mining
assumptions made.
No minimum mining assumptions were made during the resource wire framing or estimation process. Mining parameters,
including minimum width assumptions, will be applied during the conversion to Ore Reserves.
Metallurgical factors or
assumptions
The
basis
for
assumptions
or
predictions
regarding
metallurgical amenability. It is always necessary as part of the
process of determining reasonable prospects for eventual
economic extraction to consider potential metallurgical
methods, but the assumptions regarding metallurgical
treatment processes and parameters made when reporting
Mineral Resources may not always be rigorous. Where this is
the case, this should be reported with an explanation of the
basis of the metallurgical assumptions made.
No metallurgical factors or assumptions are made during the resource estimation process as this will be addressed during
conversion to Ore Reserve. The resource block model has been populated with multi-element data which is required for the
metallurgical analysis during the Ore Reserve process.

==> picture [830 x 99] intentionally omitted <==

Criteria JORC Code explanation Commentary
Environmental factors
or assumptions
Assumptions made regarding possible waste and process
residue disposal options. It is always necessary as part of the
process of determining reasonable prospects for eventual
economic extraction to consider the potential environmental
impacts of the mining and processing operation. While at this
stage the determination of potential environmental impacts,
particularly for a greenfields project, may not always be well
advanced, the status of early consideration of these potential
environmental impacts should be reported. Where these
aspects have not been considered this should be reported with
an explanation of the environmental assumptions made
The Commonwealth Project is a historic brown-fields mine with a 20 year operating history. No environmental factors or
assumptions are made during the resource estimation process.
Bulk density Whether assumed or determined. If assumed, the basis for the
assumptions. If determined, the method used, whether wet or
dry, the frequency of the measurements, the nature, size and
representativeness of the samples.
Bulk density (specific gravity) measurements are taken using conventional weight in air vs weight in water methodology.
The bulk density for bulk material must have been measured by
methods that adequately account for void spaces (vugs,
porosity, etc), moisture and differences between rock and
alteration zones within the deposit,
All drill core within the mineralisation is in fresh rock and solid, so no coatings are applied to reduce water penetration.
Discuss assumptions for bulk density estimates used in the
evaluation process of the different materials.
A zinc grade vs. density regression formula was used to assign specific gravity (SG) values to the block model. The regression
formula of “SG = (0.0815*Zn%)+2.67” was used.
Classification The basis for the classification of the Mineral Resources into
varying confidence categories
Classification of the resource models is based primarily on drill density and geological understanding, in conjunction with
increased confidence from areas of historic mining.
Whether appropriate account has been taken of all relevant
factors (i.e. relative confidence in tonnage/grade estimations,
reliability of input data, confidence in continuity of geology and
metal values, quality, quantity and distribution of the data).
The classification takes into account the relative contributions of geological and data quality and confidence, as well as grade
confidence and continuity.
Whether the result appropriately reflects the Competent
Person’s view of the deposit.
The classification reflects the view of the Competent Person.
Audits or reviews The results of any audits or reviews of Mineral Resource
estimates.
This is the maiden Mineral Resource estimate, therefore no audits or reviews have been carried out.

==> picture [830 x 99] intentionally omitted <==

Criteria JORC Code explanation Commentary
Discussion of relative
accuracy/confidence
Where appropriate a statement of the relative accuracy and
confidence level in the Mineral Resource estimate using an
approach or procedure deemed appropriate by the Competent
Person. For example, the application of statistical or
geostatistical procedures to quantify the relative accuracy of
the resource within stated confidence limits, or, if such an
approach is not deemed appropriate, a qualitative discussion
of the factors that could affect the relative accuracy and
confidence of the estimate
The relative accuracy of the Mineral Resource estimate is reflected in the reporting of the Mineral Resource as per the
guidelines of the 2012 JORC Code. The statement relates to global estimates of tonnes and grade.
The statement should specify whether it relates to global or
local estimates, and, if local, state the relevant tonnages,
which should be relevant to technical and economic
evaluation. Documentation should include assumptions made
and the procedures used
The estimate is considered to be relevant to a global estimation of tonnage and grade.
These statements of relative accuracy and confidence of the
estimate should be compared with production data, where
available
The resulting estimates are supported by limited historical production.

Appendix 3B New issue announcement

Rule 2.7, 3.10.3, 3.10.4, 3.10.5

Appendix 3B

New issue announcement, application for quotation of additional securities and agreement

Information or documents not available now must be given to ASX as soon as available. Information and documents given to ASX become ASX’s property and may be made public.

Introduced 01/07/96 Origin: Appendix 5 Amended 01/07/98, 01/09/99, 01/07/00, 30/09/01, 11/03/02, 01/01/03, 24/10/05, 01/08/12, 04/03/13

Name of entity

IMPACT MINERALS LIMITED

ABN

52 119 062 261

We (the entity) give ASX the following information.

Part 1 - All issues

You must complete the relevant sections (attach sheets if there is not enough space).

1 +Class of +securities issued or to Fully Paid Ordinary Shares be issued 2 Number of[+] securities issued or 10,416,667 to be issued (if known) or maximum number which may be issued 3 Principal terms of the +securities (e.g. if options, The shares will rank equally with existing fully paid ordinary shares exercise price and expiry date; if partly paid +securities, the amount outstanding and due dates for payment; if +convertible securities, the conversion price and dates for conversion)

  • See chapter 19 for defined terms.

Appendix 3B Page 1

04/03/2013

Appendix 3B New issue announcement

4
Do the+securities rank equally
in all respects from the+issue
date with an existing+class of
quoted+securities?
If the additional+securities do
not rank equally, please state:
 the date from which they do
 the extent to which they
participate
for
the
next
dividend, (in the case of a
trust,
distribution)
or
interest payment
 the extent to which they do
not rank equally, other than
in
relation
to
the
next
dividend,
distribution
or
interest payment
5
Issue price or consideration
6
Purpose of the issue
(If issued as consideration for
the acquisition of assets, clearly
identify those assets)
6a
Is the entity an+eligible entity
that
has
obtained
security
holder approval under rule 7.1A?
If Yes, complete sections 6b – 6h
in relation to the+securities the
subject of this Appendix 3B, and
comply with section 6i
6b
The date the security holder
resolution under rule 7.1A was
passed
6c
Number of+securities issued
without security holder approval
under rule 7.1
Yes
2.4 cents per share
Funds will be used for (i) a drill programme
at the Company’s Commonwealth, Silica
Hill,
Doughnut
and
Welcome
Jack
Prospects; (ii) follow up work at the
Company’s Broken Hill Project; and (iii)
working capital.
Yes
29 September 2015
10,416,667
  • See chapter 19 for defined terms.

Appendix 3B Page 2

04/03/2013

Appendix 3B New issue announcement

6d
Number of+securities issued
with security holder approval
under rule 7.1A
6e
Number of+securities issued
with security holder approval
under rule 7.3, or another
specific security holder approval
(specify date of meeting)
6f
Number of+securities issued
under an exception in rule 7.2
6g
If+securities issued under rule
7.1A, was issue price at least 75%
of 15 day VWAP as calculated
under rule 7.1A.3? Include the
+issue date and both values.
Include the source of the VWAP
calculation.
6h
If+securities were issued under
rule
7.1A
for
non-cash
consideration, state date on
which
valuation
of
consideration was released to
ASX Market Announcements
6i
Calculate the entity’s remaining
issue capacity under rule 7.1 and
rule 7.1A – complete Annexure 1
and release to ASX Market
Announcements
7
+Issue dates
Note: The issue date may be prescribed by
ASX (refer to the definition of issue date in
rule 19.12). For example, the issue date for a
pro rata entitlement issue must comply with
the applicable timetable in Appendix 7A.
Cross reference: item 33 of Appendix 3B.
8
Number
and
+class
of
all
+securities
quoted
on
ASX
(_including_the
+securities in
section 2 if applicable)
Nil
Nil
Nil

Not Applicable
Not Applicable
See Annexure 1
26 May 2016
Number +Class
788,771,085 Fully paid ordinary shares
  • See chapter 19 for defined terms.

Appendix 3B Page 3

04/03/2013

Appendix 3B New issue announcement

9
Number
and
+class
of
all
+securities not quoted on ASX
(_including_the
+securities in
section 2 if applicable)
10
Dividend policy (in the case of a
trust, distribution policy) on the
increased capital (interests)
Number +Class
12,400,000
45,000,000
27,000,000
15,500,000
15,500,000
26,428,572
2,000,000
Options exercisable at:
$0.10 on or before 30 Nov 2016
$0.0325 on or before 7 Aug 2018
$0.0367 on or before 29 Sep 2018
$0.045 on or before 29 Sep 2019
$0.07 on or before 29 Sep 2020
$0.0325 on or before 21 Oct 2018
$1.00 Convertible Notes maturing
7 Aug 2018
No dividend policy is currently in place as
the Company is involved only in exploration

Part 2 - Pro rata issue

11 Is security holder approval Not Applicable required? 12 Is the issue renounceable or nonNot Applicable renounceable? 13 Ratio in which the[+] securities Not Applicable will be offered 14 +Class of +securities to which the Not Applicable offer relates 15 +Record date to determine Not Applicable entitlements 16 Will holdings on different Not Applicable registers (or subregisters) be aggregated for calculating entitlements? 17 Policy for deciding entitlements Not Applicable in relation to fractions

  • See chapter 19 for defined terms.

Appendix 3B Page 4

04/03/2013

Appendix 3B New issue announcement

18
Names of countries in which the
entity has security holders who
will not be sent new offer
documents
Note: Security holders must be told how their
entitlements are to be dealt with.
Cross reference: rule 7.7.
19
Closing
date
for
receipt
of
acceptances or renunciations
20
Names of any underwriters
21
Amount of any underwriting fee
or commission
22
Names of any brokers to the
issue
23
Fee or commission payable to the
broker to the issue
24
Amount of any handling fee
payable to brokers who lodge
acceptances or renunciations on
behalf of security holders
25
If the issue is contingent on
security holders’ approval, the
date of the meeting
26
Date entitlement and acceptance
form and offer documents will be
sent to persons entitled
27
If the entity has issued options,
and the terms entitle option
holders
to
participate
on
exercise, the date on which
notices will be sent to option
holders
28
Date rights trading will begin (if
applicable)
29
Date rights trading will end (if
applicable)
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
Not Applicable
  • See chapter 19 for defined terms.

Appendix 3B Page 5

04/03/2013

Appendix 3B New issue announcement

30
How do security holders sell
their entitlements_in full_through
a broker?
31
How do security holders sell_part_
of their entitlements through a
broker
and
accept
for
the
balance?
32
How do security holders dispose
of their entitlements (except by
sale through a broker)?
33
+Issue date
Not Applicable
Not Applicable
Not Applicable
Not Applicable

Part 3 - Quotation of securities

You need only complete this section if you are applying for quotation of securities

34 Type of[+] securities ( tick one ) (a) +Securities described in Part 1

(b)[All other ][+][securities ]

Example: restricted securities at the end of the escrowed period, partly paid securities that become fully paid, employee incentive share securities when restriction ends, securities issued on expiry or conversion of convertible securities

Entities that have ticked box 34(a)

Additional securities forming a new class of securities

Tick to indicate you are providing the information or Not Applicable documents 35 If the[+] securities are[+] equity securities, the names of the 20 largest holders of the additional[+] securities, and the number and percentage of additional[+] securities held by those holders 36 If the[+] securities are[+] equity securities, a distribution schedule of the additional +securities setting out the number of holders in the categories 1 - 1,000 1,001 - 5,000 5,001 - 10,000 10,001 - 100,000 100,001 and over

  • See chapter 19 for defined terms.

Appendix 3B Page 6

04/03/2013

Appendix 3B New issue announcement

37 A copy of any trust deed for the additional[+] securities

Entities that have ticked box 34(b)

38 Number of +quotation is sought[+] securities for which Not Applicable 39 +Class of +securities for which Not Applicable quotation is sought

40 Do the[+] securities rank equally in Not Applicable all respects from the[+] issue date with an existing[+] class of quoted +securities? If the additional[+] securities do not rank equally, please state:  the date from which they do  the extent to which they participate for the next dividend, (in the case of a trust, distribution) or interest payment  the extent to which they do not rank equally, other than in relation to the next dividend, distribution or interest payment 41 Reason for request for quotation Not Applicable now Example: In the case of restricted securities, end of restriction period

(if issued upon conversion of another[+] security, clearly identify that other[+] security)

42 Number and +class of all +securities quoted on ASX ( including the[+] securities in clause 38)

Number +Class Not Applicable

  • See chapter 19 for defined terms.

Appendix 3B Page 7

04/03/2013

Appendix 3B New issue announcement

Quotation agreement

  • 1 +Quotation of our additional +securities is in ASX’s absolute discretion. ASX may quote the[+] securities on any conditions it decides.

  • 2 We warrant the following to ASX.

  • The issue of the[+] securities to be quoted complies with the law and is not for an illegal purpose.

  • There is no reason why those[+] securities should not be granted +quotation.

  • An offer of the[+] securities for sale within 12 months after their issue will not require disclosure under section 707(3) or section 1012C(6) of the Corporations Act.

Note: An entity may need to obtain appropriate warranties from subscribers for the securities in order to be able to give this warranty

  • Section 724 or section 1016E of the Corporations Act does not apply to any applications received by us in relation to any[+] securities to be quoted and that no-one has any right to return any[+] securities to be quoted under sections 737, 738 or 1016F of the Corporations Act at the time that we request that the[+] securities be quoted.

  • If we are a trust, we warrant that no person has the right to return the +securities to be quoted under section 1019B of the Corporations Act at the time that we request that the[+] securities be quoted.

  • 3 We will indemnify ASX to the fullest extent permitted by law in respect of any claim, action or expense arising from or connected with any breach of the warranties in this agreement.

  • 4 We give ASX the information and documents required by this form. If any information or document is not available now, we will give it to ASX before +quotation of the +securities begins. We acknowledge that ASX is relying on the information and documents. We warrant that they are (will be) true and complete.

==> picture [91 x 36] intentionally omitted <==

Sign here: ............................................................ Date: 26 May 2016 ( ~~Director~~ /Company Secretary)

Print name: Bernard Crawford

== == == == ==

  • See chapter 19 for defined terms.

Appendix 3B Page 8

04/03/2013

Appendix 3B New issue announcement

Appendix 3B – Annexure 1

Calculation of placement capacity under rule 7.1 and rule 7.1A for eligible entities

Introduced 01/08/12 Amended 04/03/13

Part 1

Rule 7.1 – Issues exceeding 15% of capital

Step 1: Calculate “A”, the base figure from which the placement capacity is calculated

==> picture [415 x 404] intentionally omitted <==

----- Start of picture text -----

Insert number of fully paid [+] ordinary 566,339,070
securities on issue 12 months before the
+ issue date or date of agreement to issue
Add the following:
• Number of fully paid [+] ordinary securities 139,603,876
issued in that 12 month period under an
exception in rule 7.2
• Number of fully paid [+] ordinary securities 47,903,138
issued in that 12 month period with
shareholder approval
• Number of partly paid [+] ordinary Nil
securities that became fully paid in that
12 month period
Note:
• Include only ordinary securities here –
other classes of equity securities cannot
be added
• Include here (if applicable) the securities
the subject of the Appendix 3B to which
this form is annexed
• It may be useful to set out issues of
securities on different dates as separate
line items
Subtract the number of fully paid [+] ordinary Nil
securities cancelled during that 12 month
period
“A” 753,846,084
----- End of picture text -----

  • See chapter 19 for defined terms.

Appendix 3B Page 9

04/03/2013

Appendix 3B New issue announcement

Step 2: Calculate 15% of “A”

Step 2: Calculate 15% of “A” Step 2: Calculate 15% of “A”
“B” 0.15
[Note: this value cannot be changed]
Multiply“A” by 0.15 113,076,913
Step 3: Calculate “C”, the amount of placement capacity under rule
7.1 that has already been used
Insertnumber of+equity securities issued
or agreed to be issued in that 12 month
period_not counting_those issued:
• Under an exception in rule 7.2
• Under rule 7.1A
• With security holder approval under rule
7.1 or rule 7.4
Note:
• This applies to equity securities, unless
specifically excluded – not just ordinary
securities
• Include here (if applicable) the securities
the subject of the Appendix 3B to which
this form is annexed
• It may be useful to set out issues of
securities on different dates as separate
line items
Nil
Nil
34,925,001
“C” 34,925,001
Step 4: Subtract “C” from [“A” x “B”] to calculate remaining
placement capacity under rule 7.1
“A” x 0.15
Note: number must be same as shown in
Step 2
113,076,913
Subtract“C”
Note: number must be same as shown in
Step 3
34,925,001
Total[“A” x 0.15] – “C” 78,151,912
[Note: this is the remaining placement
capacity under rule 7.1]
  • See chapter 19 for defined terms.

Appendix 3B Page 10

04/03/2013

Appendix 3B New issue announcement

Part 2

Rule 7.1A – Additional placement capacity for eligible entities

Step 1: Calculate “A”, the base figure from which the placement capacity is calculated

“A” 753,846,084 Note: number must be same as shown in Step 1 of Part 1

Step 2: Calculate 10% of “A”

“D” 0.10 Note: this value cannot be changed Multiply “A” by 0.10 75,384,608

Step 3: Calculate “E”, the amount of placement capacity under rule 7.1A that has already been used

Insert number of[+] equity securities issued Nil or agreed to be issued in that 12 month period under rule 7.1A

Notes:

  • This applies to equity securities – not just ordinary securities

  • • Include here – if applicable – the securities the subject of the Appendix 3B to which this form is annexed

  • • Do not include equity securities issued under rule 7.1 (they must be dealt with in Part 1), or for which specific security holder approval has been obtained

  • • It may be useful to set out issues of securities on different dates as separate line items

  • “E” Nil

  • See chapter 19 for defined terms.

Appendix 3B Page 11

04/03/2013

Appendix 3B New issue announcement

Step 4: Subtract “E” from [“A” x “D”] to calculate remaining placement capacity under rule 7.1A

Step 4: Subtract “E” from [“A” x “D”] to calculate remaining
placement capacity under rule 7.1A
Step 4: Subtract “E” from [“A” x “D”] to calculate remaining
placement capacity under rule 7.1A
“A” x 0.10
Note: number must be same as shown in
Step 2
75,384,608
Subtract“E”
Note: number must be same as shown in
Step 3
Nil
Total[“A” x 0.10] – “E” 75,384,608
Note: this is the remaining placement
capacity under rule 7.1A