IMAGE RESOURCES NL Interim / Quarterly Report 2017

Apr 30, 2017

65117_rns_2017-04-30_54932552-6048-4f34-876f-186300a346af.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

IMAGE RESOURCES NL Ground Floor, 23 Ventnor Ave West Perth WA 6005 PO Box 469 West Perth WA 6872 Telephone 08 9485 2410 www.imageres.com.au ABN 57 063 977 579

==> picture [280 x 45] intentionally omitted <==

Quarterly Report – for the quarter ended 31 March 2017

Image Resources NL ABN 57 063 977 579

ASX Code IMA

Contact Details

Ground Floor, 23 Ventnor Avenue, West Perth WA 6005

T: +61 8 9485 2410 E: [email protected] W: imageres.com.au

Issued Capital Shares – Quoted 537,641,631 As at 31 March 2017

Boonanarring/Atlas Feasibility Study

The Company’s primary focus during this past quarter continued to be advancing work on the feasibility study (FS) on its 100%-owned, high-grade Boonanarring and Atlas mineral sands projects in the North Perth Basin in WA. Boonanarring is located 80 kilometres north-northwest of Perth.

The FS is being conducted to a bankable standard. The vast majority of the work on the FS was completed by the end of March and compilation of the final report is underway. Reporting of results has been delayed into May due to finalisation of the details for an opportunity to secure 100% of project revenue under off-take agreements.

The basis of design for production is an ore throughput rate of 500 dry tonnes per hour (DTPH), compared to the 2013 feasibility study which was based on a rate of 350DTPH. The FS is key to facilitating the Company’s principal objective of transitioning from advanced exploration to production on an accelerated timeline, with first production currently targeted for early 2018.

  • Detailed mine planning work has been completed;

  • All metallurgical testing, and process design and engineering has been completed;

  • Capital and operating cost updates for Boonanarring are complete and being reviewed for optimisation;

  • The pre-qualification process for selection of a mining contract has been completed;

Cash at end of quarter $5,535,000

  • An independent third party has provided forecast mineral sands pricing for Boonanarring products;

  • Detailed financial modelling has advanced to final optimisation phase;

Board Members

Robert Besley (NED Chairman) Patrick Mutz (Managing Director) Peter Thomas (Non-Executive Director)

George Sakalidis (Exploration Director) Chaodian Chen (Non-Executive Director) Eddy Wu (Non-Executive Director) Aaron Chong Veoy Soo (Non-Executive Director)

  • Preliminary discussions with debt providers is underway; and

  • The FS report is currently being compiled.

In addition, the mineral resources at Atlas are being updated to comply with the JORC Code (2012) with an announcement on the update expected in early May, followed shortly thereafter by an announcement on the update of the ore reserves. The advancement of Atlas to reserve status, combined with the potential for an extension to the Boonanarring mine life and the improving outlook from mineral sands commodity prices generally, and zircon in particular, is expected to significantly improve the bankability of the project.

Exercise of Land Purchase Option

On 10 January 2017, the Company announced the decision to exercise a land purchase option over a 550-hectare section of land at Boonanarring that will encompass the initial box-cut for open pit mining operations and will provide ore for two and a half years of processing operations. The wet concentration plant, offices, warehouse and all associated services including mining contractor operations centre will also be situated on this block. Completion of the purchase was finalised on 21 April 2017.

Boonanarring Mineral Resources and Ore Reserves

On 13 January 2017, the Company announced the update of Mineral Resources for Boonanarring in accordance with the JORC Code (2012) which resulted in a doubling of total tonnes of resources, albeit at lower heavy mineral grade and mineral assemblage. Updated mineral resources reported were 43.7M tonnes at 5.6% heavy mineral (HM) content and 18.1%

Page 1 of 17

IMAGE RESOURCES NL

zircon in the HM.

On 10 April 2017, the Company announced an update of the Ore Reserves for Boonanarring in accordance with the JORC Code (2012), which resulted in a 39% increase in the total tonnes of ore. Updated ore reserves reported were 20M tonnes at 7.2% HM and 22.4% zircon in the HM.

Potential Boonanarring Extension

On 13 March 2017, the Company announced some outstanding drill results which confirm the potential for a 5.6km northern extension of high-grade Boonanarring mineralisation that will be within pumping distance of the planned location of the wet concentration plant.

New High-Grade Deposit

On 20 February 2017, the Company announced the application for a new exploration licence (ELA70/4946) that will include 100% of the existing Regans Ford high-grade heavy mineral deposit which contains 9.9M tonnes of mineral resources at 9.7% HM per JORC Code (2004). Once granted, the Regans Ford deposit will become the highest grade deposit in Image’s portfolio and has significant upside potential as indicated by magnetic surveys with an additional 14km of interpreted targets.

Fund Raising During the Quarter

On 14 December 2016, the Company announced plans to conduct a non-renounceable, fully underwritten rights issue to offer 5 new shares for every 12 shares held on 19 December 2016 (record date). The shares were offered at $0.04 per share to raise a total of $6.325M before costs. The offer was scheduled to close on 12 January 2017 but was subsequently extended and closed on 19 January 2017.

Results of the successful offer were announced to the ASX on 24 January 2017, with an uptake of 84% of total new shares on offer from existing shareholder entitlements including top-up requests. The balance of new shares was placed with the underwriter (existing shareholder Million Up Ltd) and sub-underwriters.

Corporate

  • An application to ASIC to change the Company’s reporting period for accounting and reporting purposes from a fiscal year to a calendar year was approved by ASIC in December 2016. The Company has also aligned its tax reporting period;

  • The Annual Report for the 6 month period ended 31 December 2016 was filed on 28 March 2017;

  • the company’s next Annual General Meeting of Shareholders is scheduled to be held on 31 May 2017;

  • the Company has been advised that its major shareholder, Murray Zircon, does not intend to distribute its currently held shares in Image received as part of completion of the Asset Sale and Purchase Agreement on 8 June 2016. However, Murray Zircon retains the right to do so in the future. These Completion Shares remain escrowed until the earlier of 8 June 2018 or the Company reaching a decision to mine.

Boonanarring and Boonanarring Extensions

Quinns Hill (E70/3100)

Image Resources announced the results of a recent drill programme confirming a 5.6km extension of high-grade mineralisation associated with the Boonanarring mineral sands deposit . Assay results from this drilling programme are outstanding.

Boonanarring is arguably the highest grade, high-zircon undeveloped mineral sand deposit in Australia. In addition, the Company is in the final stages of completing a bankable feasibility study and is planning to develop the project

Page 2 of 17

IMAGE RESOURCES NL

with a goal of first production in early 2018. The indication of a significant extension of high-grade mineralisation for this deposit adds to the upside potential of the project.

The Boonanarring deposit has estimated mineral resources of 43.8M tonnes at 5.6% heavy minerals (HM) with 18.1% of the HM as high value zircon and with 72% of the HM as valuable heavy minerals (VHM) (ASX release 13/01/2017). The area containing the current mineral resources at Boonanarring stretches 13.2km to the south on the east side of Brand highway. The new drilling results confirm the high-grade mineralisation extends to the north on the west side of the Brand highway for an additional 5.6km.

The recent drill program was located within a road reserve on the Quinns Hill tenement (E70/3100). Ten drill holes for a total of 468m were completed in a programme designed to test the extension of the high-grade eastern strand of the Boonanarring mineral sand deposit, adjacent to and to the west of the Brand Highway. The design of the programme was based on an extrapolation of previous drilling by Image and limited historic drilling by Iluka.

Previous reported drilling by Image (ASX release 13/07/2015) on the southwest side of the Brand highway included results of 8m @ 21.6% HM from 38m in drill hole IM0083 and 14m @ 17.9% HM from 40m in drill hole IX00103. The new drilling results (Table 1 and 4) represent a continuation of the high-grade eastern strand for another 3.5km northwards beyond the location of drill holes IM0083 and IX00103.

Hole IX00250 of the current programme starts on the eastern edge of the Brand Highway and contains 8m @ 16.3% HM and moving north, the high-grade mineralisation is present on the western edge of the Brand Highway and drill hole IX00244 contains 8m @ 21.1% HM from 23m and IX00245 contains 8m @ 23.8% HM from 27m (Figures 1 and 2). Whereas the northernmost intersection of mineralisation was intersected by an historic drill hole RG45 by Iluka which contains 6m @ 6.7% HM from 31m and is open at depth as some of the holes drilled by Iluka did not reach the bottom of mineralisation.

Even though this limited 10-hole drilling programme has demonstrated that the high-grade eastern strand is present over 5.6km, further drilling is required to outline a resource as in some cases only 1 to 2 holes were drilled every 200–400m. Land access is currently being sought and further infill and extension drilling will be included in future drilling budgets.

It is not possible to decide at this time regarding the methodology or potential economics of mining in this extended area due to the location of the Brand highway and gas pipelines. However, there is precedent regarding approvals to allow mining in areas near transportation and other infrastructure.

The Company has also shown that the Boonanarring deposit is significant in size, as this drilling shows potential to be larger than 18.8km in length, with further upside potential both to the north and south. The additional highgrade mineralisation is within pumping distance of the planned location of the wet concentrator plant at Boonanarring, which could add significant value to the project.

==> picture [411 x 231] intentionally omitted <==

Figure 1. Drill sample containing 60% HM from drill hole IX00251 from 49-50m

Page 3 of 17

IMAGE RESOURCES NL

==> picture [422 x 584] intentionally omitted <==

Figure 2 Boonanarring northern extension February 2017 drilling intercepts.

Page 4 of 17

IMAGE RESOURCES NL

Table 1 Drilling Summary with Significant HM Intercepts

HoleID East North RL Dip HM Intercept From To
(MGA) (MGA) (m) (Lab Assay %) (m) (m)
IX00242 383988 6555562 106 Vertical 3m @ 7.24% HM, and 32 35
2m @ 10.74% HM 39 41
IX00243 383641 6556341 99 Vertical 11m @ 10.93% HM 24 35
including 8m @ 13.6% HM 25 33
IX00244 383467 6556697 97 Vertical 8m @ 21.14% HM 23 31
IX00245 383328 6557005 98 Vertical 8m @ 23.84% HM 27 35
including 6m @30.3% HM 27 33
IX00246 383261 6557174 97 Vertical No significant intercept
IX00247 383246 6557161 96 Vertical 7m @ 10.72% HM 21 28
including 3m @18.6%HM 25 28
IX00248 382943 6557850 99 Vertical No significant intercept
IX00249 382926 6557859 99 Vertical No significant intercept
IX00250 384241 6555088 118 Vertical 8m @ 16.31% HM 45 53
IX00251 384239 6555143 119 Vertical [email protected]% HM 49 52

Regans Ford Deposit (ELA70/4946)

A new tenement application over ELA70/4946 (83 sq. km) was made which includes the Regans Ford heavy mineral sands deposit. It contains Mineral Resources of 9.9Mt @ 9.7% HM In accordance with the JORC Code (2004) . This deposit is at the northern end of a 60km strip of the Gingin Scarp held by Image that includes five significant HM deposits; Regans Ford, Red Gully, Boonanarring, Gingin North and Gingin South (Figures 3 and 4).

Comparatively, the Regans Ford Strand is a significant deposit and has 894,397 tonnes of contained HM which is slightly larger than Image’s Atlas deposit which contains 854,000 tonnes of contained HM (Tables 1, 2 and 3). Once granted, Regans Ford will be the highest grade of the eight high grade deposits held by Image within the North Perth Basin.

Regans Ford is 6km north of the Red Gully deposit and 24km north of the Boonanarring deposit. It is relatively shallow and is split into 3 separate strands totalling 8.5km in length. The base of the western strand is at 45m RL and starts between 10-15m from surface. The bases of the middle and eastern strands are at the 65-70m RL and both start from 10-15m from surface.

A review of previous drilling indicates that many drill holes within the three strands at Regans Ford need to be deepened and infill drilling needs to be completed to adequately define the extent of the mineralisation. Also, and more significantly, there are 14km of accessible parallel strands and extensions interpreted from aeromagnetic surveys . The grant of the EL over the Regans Ford Deposit will add a significant high grade deposit to Image’s already substantial portfolio of high grade mineral sand deposits in the North Perth Basin. Future drilling and ground magnetic surveys will be considered for implementation after grant of the exploration licence and securing successful land access.

For information on the HM grade distribution, zircon grade distribution and TiO2 distribution throughout the Regans Ford deposit, refer to Figures 5, 6 and 7. The resource information and mineral assemblages are summarised in the Resource Tables 2 and 3. The relevant references are from Iluka Reports Iluka Resources Limited, 2007, Annual Report on Group C107/2002 Tenements for the period 1/3/2006 to 28/2/2007, South Gingin, Boonanarring, Red Gully, Regans Ford and Cataby; Iluka Technical Report ILUKA-TR-T15138: Geological Survey of Western Australia, WAMEX Report A74900 and Iluka Resources Limited, 2006, 2005 Regans Ford Resource Model Estimation; Iluka Technical Report ILUKA-TR-T15039.

Page 5 of 17

IMAGE RESOURCES NL

==> picture [374 x 572] intentionally omitted <==

Figure 3. Regans Ford Deposit Location

Page 6 of 17

IMAGE RESOURCES NL

==> picture [383 x 560] intentionally omitted <==

Figure 4. Regans Ford Deposit Interpreted Magnetic Strands

.

Page 7 of 17

IMAGE RESOURCES NL

==> picture [375 x 556] intentionally omitted <==

Figure 5. Plan of HM Grade Distribution for Regans Ford

Page 8 of 17

IMAGE RESOURCES NL

==> picture [375 x 578] intentionally omitted <==

Figure 6. Plan of Zircon Grade Distribution for Regans Ford

Page 9 of 17

IMAGE RESOURCES NL

==> picture [373 x 573] intentionally omitted <==

Figure 7. Plan of TiO2 Grade Distribution for Regans Ford

Page 10 of 17

IMAGE RESOURCES NL

Table 2. Regans Ford 2006 estimated Mineral Resources (tonnes and HM grade)M*

==> picture [349 x 155] intentionally omitted <==

Table 3. Regans Ford 2006 estimated Mineral Resources (mineral assemblage in HM)*

==> picture [366 x 154] intentionally omitted <==

  • From Iluka Reports Iluka Resources Limited, 2007, Annual Report on Group C107/2002 Tenements for the period 1/3/2006 to 28/2/2007, South Gingin, Boonanarring, Red Gully, Regans Ford and Cataby; Iluka Technical Report ILUKA-TR-T15138: Geological Survey of Western Australia, WAMEX Report A74900 and Iluka Resources Limited, 2006, 2005 Regans Ford Resource Model Estimation; Iluka Technical Report ILUKA-TRT15039.

Bidaminna (E70/3298), Bidaminna North (E70/2844), Mimegarra (E70/4779), Regans Ford (E70/3411)

The Bidaminna Region (Figure 8) was signalled as an unusually high leucoxene province after composites were taken across the Bidaminna Resource (refer to the 24[th] November 2015 ASX release). The accessible part of the Bidaminna Project is significant in size being 30km in length. This is comparable to the Gingin Scarp, which now contains the Regans Ford, Red Gully, Boonanarring, Gingin North and Gingin South Resources.

The leucoxene concentration range of 28 to 69% of the HM from the seven composites, within the Bidaminna Mineral Resource area, is much higher than any of the eight deposits between Gingin South and the Cooljarloo Mine where the leucoxene range is between 1 to 10% of the HM. This makes the Bidaminna Resource very unusual and potentially valuable as the leucoxene price is often 2-3 times the ilmenite price.

A 27-hole programme was completed and results are awaited. A 33-hole programme will take place in April-May 2017 (Table 4). This 60-hole programme will more importantly test the veracity of the wireframes used for an Exploration Target of 100-110Mt ranging between 3-4% HM. Also, an important aspect of the drilling is to test the northern parts of the Exploration Target, north of the existing historic Mineral Resource, as this is where the total leucoxene grade of

Page 11 of 17

IMAGE RESOURCES NL

both High Ti and Low Ti are around 69% versus 28% at the southern end of the Resource. The drilling programme will provide enough sample to complete a mini bulk test by AML. The aim of this work is to determine what sort of wet plant recoveries are possible and final leucoxene products.

The mineral assemblage values for the leucoxene-rich Bidaminna Mineral Resource and Exploration Target will be compared with other leucoxene-rich deposits and nearby dredging operations.

The Bidaminna Mineral Resource and Exploration Target, differs from the Boonanarring deposit in that they are amenable to large-scale dredge mining with a very low slime content of around 3-4%, the mineralised horizon is below the water table and has two zones of mineralisation up to 35 metres in combined thickness.

Given the potential significance of the Bidaminna Project, a new more detailed 100m spaced ground magnetic survey was interpreted and numerous strands were defined. Most strands trend NNW and appear to extend the Bidaminna Resources northwards. There are some unusual NW strands, which will be investigated in the 60-hole drilling programme (Figure 8) as well. The drilling will help outline the shallow and lower mineralised layers with a low strip ratio of 0.5-1.0, assisting the wireframing of the new Exploration Target.

A small 13-hole drilling programme has tested several strands within the Regans Ford area and results are being compiled (Figure 8).

Page 12 of 17

IMAGE RESOURCES NL

==> picture [428 x 586] intentionally omitted <==

Figure 8 Bidaminna Park, Bidaminna North, Mimegarra 60-hole programme and 13 holes completed in Regans Ford

Page 13 of 17

IMAGE RESOURCES NL

Table 4. Drilling programmes completed and future drilling.

Drilling programme Completed February 2017

Prospect No. Holes Total Metres
Bidaminna 27 1604
RegansFord (Baker&Reinke) 13 515
QuinnsHill(Roadside) 10 468
Woolka heritage survey

Drilling programme Completed March 2017

Prospect No. Holes Total Metres
BoonanarringResource Definition 108 4572

Drilling Programme April 2017

Prospect No. Holes Total Metres
Bidaminna 33 1650
Woolka 13 550
Winooka 8 300
Bibby Springs 5 150
BoonanarringWest 13 400
Bryalana 3 100
Bootine 15 540

For more information visit our website at www.imageres.com.au.

Please direct enquiries to:

Patrick Mutz

Managing Director +61 8 9485 2410 [email protected]

Page 14 of 17

IMAGE RESOURCES NL

COMPETENT PERSON’S STATEMENT – EXPLORATION RESULTS, MINERAL RESOURCES AND ORE RESERVES

Information in this report that relates to Exploration Results, Mineral Resources and Ore Reserves (other than Boonanarring Mineral Resources) is based on information compiled by George Sakalidis BSc (Hons) who is a member of the Australasian Institute of Mining and Metallurgy. At the time that the Exploration Results, Mineral Resources and Ore Reserves were compiled, George Sakalidis was a director of Image Resources NL. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. George Sakalidis consents to the inclusion of this information in the form and context in which it appears in this report.

The information in this report that relates to the estimation of Mineral Resources for the Boonanarring Project is based on information compiled by Mrs Christine Standing, who is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM) and the Australian Institute of Geoscientists (AIG). Mrs Standing is a full-time employee of Optiro Pty Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mrs Standing consents to the inclusion in this report of the matters based on her information in the form and context in which it appears.

COMPETENT PERSON’S STATEMENT – EXPLORATION RESULTS, MINERAL RESOURCES AND ORE RESERVES

Information in this report that relates to Exploration Results, Mineral Resources and Ore Reserves (other than Boonanarring Mineral Resources) is based on information compiled by George Sakalidis BSc (Hons) who is a member of the Australasian Institute of Mining and Metallurgy. At the time that the Exploration Results, Mineral Resources and Ore Reserves were compiled, George Sakalidis was a director of Image Resources NL. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. George Sakalidis consents to the inclusion of this information in the form and context in which it appears in this report.

The information in this report that relates to the estimation of Mineral Resources for the Boonanarring Project is based on information compiled by Mrs Christine Standing, who is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM) and the Australian Institute of Geoscientists (AIG). Mrs Standing is a full-time employee of Optiro Pty Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mrs Standing consents to the inclusion in this report of the matters based on her information in the form and context in which it appears.

FORWARD LOOKING STATEMENTS

Certain statements made during or in connection with this communication, including, without limitation, those concerning the economic outlook for the mining industry, expectations regarding prices, exploration or development costs and other operating results, growth prospects and the outlook of Image’s operations contain or comprise certain forward looking statements regarding Image’s operations, economic performance and financial condition. Although Image believes that the expectations reflected in such forward-looking statements are reasonable, no assurance can be given that such expectations will prove to have been correct.

Accordingly, results could differ materially from those set out in the forward looking statements as a result of, among other factors, changes in economic and market conditions, success of business and operating initiatives, changes that could result from future acquisitions of new exploration properties, the risks and hazards inherent in the mining business (including industrial accidents, environmental hazards or geologically related conditions), changes in the regulatory environment and other government actions, risks inherent in the ownership, exploration and operation of or investment in mining properties, fluctuations in prices and exchange rates and business and operations risks management, as well as generally those additional factors set forth in our periodic filings with ASX. Image undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today’s date or to reflect the occurrence of unanticipated events.

Page 15 of 17

IMAGE RESOURCES NL

Table 5 - Tenement Schedule in accordance with ASX Listing Rule 5.3.3

Tenements held at the end of the Quarter Tenements held at the end of the Quarter Tenements held at the end of the Quarter Tenements held at the end of the Quarter
Location Tenement Nature of
Interest
Project Equity (%) held at
start of Quarter
Equity (%) held at
end of Quarter
WA E28/1895 Granted ERAYINIA 100% 100%
WA E28/2071 Granted TALC LAKE 100% 100%
WA E70/2636 Granted COOLJARLOO 100% 100%
WA E70/2844 Granted BIDAMINNA NTH 100% 100%
WA E70/2898 Granted COOLJARLOO 100% 100%
WA E70/3032 Granted GINGIN 100% 100%
WA E70/3041 Granted REGANS FORD SOUTH 100% 100%
WA E70/3100 Granted QUINNS HILL 100% 100%
WA E70/3192 Granted BOOTINE 100% 100%
WA E70/3298 Granted BIDAMINNA -PARK 90% 90%
WA E70/3411 Granted REGANS FORD 100% 100%
WA E70/3494 Granted BRYALANA 100% 100%
WA E70/3720 Granted BLUE LAKE 100% 100%
WA E70/3892 Granted CHAPMAN HILL 100% 100%
WA E70/3997 Granted MUNBINIA 100% 100%
WA E70/4077 Granted DARLING RANGE 100% 100%
WA E70/4244 Granted WOOLKA 100% 100%
WA E70/4245 Granted WINOOKA 100% 100%
WA M70/0448 Granted GINGIN SOUTH 100% 100%
WA M70/1192 Granted RED GULLY 100% 100%
WA M70/1193 Granted GINGIN NORTH 100% 100%
WA M70/1194 Granted BOONANARRING 100% 100%
WA P70/1516 Granted COOLJARLOO 100% 100%
WA M70/1311 Granted BOONANARRING 100% 100%
WA G70/0250 Granted BOONANARRING 100% 100%
WA R70/0051 Granted COOLJARLOO NORTH 100% 100%
WA M70/1305 Application ATLAS 100%pending grant 100%pending grant
WA P70/1520 Application COOLJARLOO 100%pending grant 100%pending grant
WA E70/4631 Granted MUNBINIA WEST 100% 100%
WA E70/4656 Granted WINOOKA NORTH 100% 100%
WA E70/4663 Granted BIBBY SPRINGS 100% 100%
WA E70/4689 Granted BOONANARRING 100% 100%
WA E70/4779 Granted MIMEGARRA 100% 100%
WA E70/4794 Granted REGANS FORD NORTH 100% 100%
WA E70/4795 Application BIDAMINNA SOUTH 100%pending grant 100%pending grant
WA E70/4919 Application ORANGE SPRINGS 100%pending grant 100%pending grant
WA E70/4946 Application REGANS FORD - 100%pending grant
WA E70/4949 Application GINGIN - 100%pending grant
Mining Tenements acquired during the
Quarter
WA E70/4946 Application REGANS FORD - 100%pending grant
WA E70/4949 Application GINGIN - 100%pending grant
Mining Tenements disposed during the
Quarter
WA E70/4796 Surrendered CALADENIA 100% -
WA E70/4921 Withdrawn RED GULLY NORTH 100% pending grant -
WA E70/4932 Withdrawn NAMMING 100% pending grant -

Page 16 of 17

IMAGE RESOURCES NL

Table 6 – North Perth Basin Resources and Reserves as at 31 March 2017

==> picture [452 x 331] intentionally omitted <==

Dredge Resources at 1.0% HM cut-off Dredge Resources at 1.0% HM cut-off
Project Area Resource Category Volume TONNES % % HM VHM Ilmenite % Leucoxene % Rutile Zircon Ilmenite Leucoxene Rutile Zircon VHM Tonnes
HM Slime TONNES % % %
Titan Indicated 10,300,000 21,200,000 1.8 22.1 380,000 84.4 71.9 2.0 1.0 9.5 270,000 7,000 5,000 36,000 318,000
Titan Inferred 58,500,000 115,400,000 1.9 18.9 2,210,000 84.3 71.8 2.0 1.0 9.5 1,592,000 45,000 22,000 210,000 1,869,000
Titan Total **68,800,000 ** 136,600,000 1.9 19.4 2,590,000 84.4 71.9 2.0 1.0 9.5 1,862,000 52,000 27,000 246,000 2,187,000
Telesto Indicated 1,700,000 3,500,000 3.8 18.4 130,000 82.6 67.5 3.4 2.2 9.5 100,000 5,000 3,000 13,000 121,000
Calypso Inferred 27,100,000 51,500,000 1.7 13.7 850,000 84.6 68.8 3.5 1.6 10.6 585,000 30,000 14,000 90,000 719,000
Sub Total Indicated **12,000,000 ** 24,700,000 2.1 21.6 510,000 86.1 72.5 2.4 1.6 9.6 370,000 12,000 8,000 49,000 439,000
Sub Total Inferred **85,600,000 ** **166,900,000 ** 1.8 17.3 3,060,000 84.6 71.1 2.5 1.2 9.8 2,177,000 75,000 36,000 300,000 2,588,000
Cooljarloo Total **97,600,000 ** **191,600,000 ** 1.9 17.8 3,570,000 84.8 71.3 2.4 1.2 9.8 2,547,000 87,000 44,000 349,000 3,027,000
Bidaminna Inferred 26,300,000 44,600,000 3.0 3.6 1,350,000 96.0 82.4 7.2 1.0 5.4 1,113,000 97,000 13,000 73,000 1,296,000
Total Dredge **123,900,000 ** **236,200,000 ** 2.1 15.1 4,920,000 84.3 65.6 4.6 2.9 11.3 3,660,000 184,000 57,000 422,000 4,323,000

Page 17 of 17

Appendix 5B Mining exploration entity quarterly report

Rule 5.3

Appendix 5B

Mining exploration entity quarterly report

Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10

Name of entity

IMAGE RESOURCES NL

==> picture [452 x 455] intentionally omitted <==

----- Start of picture text -----

ABN Quarter ended (“current quarter”)
57 063 977 579 31/03/2017
Consolidated statement of cash flows
Year to date
Current quarter
Cash flows related to operating activities (3.months)
$A’000
$A’000
1.1 Receipts from product sales and related debtors - -
1.2 Payments for
(a) exploration & evaluation (924) (924)
(b) development - -
(c) production - -
(d) administration (429) (429)
1.3 Dividends received - -
1.4 Interest and other items of a similar nature received 5 5
1.5 Interest and other costs of finance paid - -
1.6 Income taxes paid/R&D refund received - -
1.7 Other (provide details if material) - -
Net operating cash flows (1,348) (1,348)
Cash flows related to investing activities
1.8 Payment for purchases of:
(a) prospects - -
(b) equity investments - -
(c) other fixed assets (93) (93)
1.9 Proceeds from sale of:
(a) prospects - -
(b) equity investments - -
(c) other fixed assets - -
1.10 Loans to other entities
1.11 Loans repaid by other entities
1.12 Other – deposit at call proceeds - -
Other – security deposit payments - -
Net investing cash flows (93) (93)
1.13 Total operating and investing cash flows (carried
(1,441) (1,441)
forward)
----- End of picture text -----

  • See chapter 19 for defined terms.

17/12/2010

Appendix 5B Page 1

Appendix 5B Mining exploration entity quarterly report

1.13
Total operating and investing cash flows (brought
forward)
(1,441) (1,441)
Cash flows related to financing activities
1.14
Proceeds from issues of shares, options, etc.
1.15
Proceeds from sale of forfeited shares
1.16
Proceeds from borrowings
1.17
Repayment of borrowings
1.18
Dividends paid
1.19
Other (provide details if material) – share issue
expenses
1.20
Other – borrowings transaction expenses
6,325
-
-
-
-
(457)
-
6,325
-
-
-
-
(457)
-
Net financing cash flows 5,868 5,868
Net increase (decrease) in cash held
1.20
Cash at beginning of quarter/year to date
1.21
Exchange rate adjustments to item 1.20
1.22
Cash at end ofquarter
4,427
1,108
-
4,427
1,108
-
5,535 5,535

Payments to directors of the entity and associates of the directors Payments to related entities of the entity and associates of the related entities

1.23
1.24
Aggregate amount of payments to the parties included in item 1.2
Aggregate amount of loans to the parties included in item 1.10
Current quarter
$A'000
143
-
1.25 Explanation necessaryfor an understandingof the transactions
-

Non-cash financing and investing activities

  • 2.1 Details of financing and investing transactions which have had a material effect on consolidated assets and liabilities but did not involve cash flows

  • 2.2 Details of outlays made by other entities to establish or increase their share in projects in which the reporting entity has an interest

Financing facilities available

Add notes as necessary for an understanding of the position.

3.1
Loan facilities
3.2
Credit standby arrangements – bankguarantees
Amount available
$A’000
Amount used
$A’000
4,000
4,000
55
55
  • See chapter 19 for defined terms.

Appendix 5B Page 2

17/12/2010

Appendix 5B Mining exploration entity quarterly report

Estimated cash outflows for next quarter

Estimated cash outflows for next quarter
4.1
Exploration and evaluation
4.2
Development
4.3
Production
4.4
Administration
$A’000
2,320
-
-
520
Total 2,840

Reconciliation of cash

Reconciliation of cash
Reconciliation of cash at the end of the quarter (as shown in
the consolidated statement of cash flows) to the related items
in the accounts is as follows.
Current quarter
$A’000
Previous quarter
$A’000
5.1
Cash on hand and at bank
5.2
Deposits at call
5.3
Bank overdraft
5.4
Other (provide details)
4,263 590
1,272 518
- -
- -
Total: cash at end of quarter(item 1.22) 5,535 1,108

Changes in interests in mining tenements

6.1
Interests in mining
tenements relinquished,
reduced or lapsed
6.2
Interests in mining
tenements acquired or
increased
Tenement reference
and location
Nature of interest
(note (2))
Interest at
beginning of
quarter
Interest at
end of
quarter
Refer Quarterly Report
Refer Quarterly Report
  • See chapter 19 for defined terms.

17/12/2010

Appendix 5B Page 3

Appendix 5B Mining exploration entity quarterly report

Issued and quoted securities at end of current quarter

Description includes rate of interest and any redemption or conversion rights together with prices and dates.

Total number Number quoted Issue price per
security
(seenote 3)
Amount paid up
per security
(seenote 3)
7.1
Preference+securities
(description)
7.2
Changes during quarter:
N/A
(a) Increases through issues
(b) Decreases through
returns of capital, buy-backs,
redemptions
7.3
+Ordinary securities
Fully paid
7.4
Changes during quarter:
537,641,631 537,641,631
(a) Increases through issues
- Placement
158,129,891 158,129,891 4 cents 4 cents
(b) Decreases through
returns of capital,buy-backs
7.5
+Convertible debt securities
(description)
7.6
Changes during quarter:
N/A
(a)Increases through issues
(b) Decreases through
securities matured,converted
7.7
Options
(description and conversion
factor)
Over fully paid shares
Over fully paid shares
Over fully paid shares
Over fully paid shares
Over fully paid shares
Over fully paid shares
7.8
Issued during quarter
7.9
Exercised during quarter
7.10
Expired during quarter
Exercise price Expiry date
1,500,000 Notquoted 8.5 cents 4/12/2018
1,500,000 Notquoted 10.0 cents 4/12/2018
N/A
N/A
N/A
7.11
Debentures
(totals only)
N/A
7.12
Unsecured notes(totals
only)
N/A
  • See chapter 19 for defined terms.

Appendix 5B Page 4

17/12/2010

Appendix 5B Mining exploration entity quarterly report

Compliance statement

  1. This statement has been prepared under accounting policies which comply with accounting standards as defined in the Corporations Act or other standards acceptable to ASX (see note 5).

  2. This statement does give a true and fair view of the matters disclosed.

Sign here: ................... ....................................... Date: 28 April 2017 Print name: Dennis Wilkins (Company Secretary)

Notes:

  1. The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity wanting to disclose additional information is encouraged to do so, in a note or notes attached to this report.

  2. The “Nature of interest” (items 6.1 and 6.2) includes options in respect of interests in mining tenements acquired, exercised or lapsed during the reporting period. If the entity is involved in a joint venture agreement and there are conditions precedent which will change its percentage interest in a mining tenement, it should disclose the change of percentage interest and conditions precedent in the list required for items 6.1 and 6.2.

  3. Issued and quoted securities The issue price and amount paid up is not required in items 7.1 and 7.3 for fully paid securities .

  4. The definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report.

  5. Accounting Standards

  6. ASX will accept, for example, the use of International Financial Reporting Standards for foreign entities. If the standards used do not address a topic, the Australian standard on that topic (if any) must be complied with.

== == == == ==

  • See chapter 19 for defined terms.

17/12/2010

Appendix 5B Page 5