ASX Code: IMA 25 March 2015

Suite 4a, 5 Mumford Place Balcatta WA 6021 PO Box 1075 Balcatta WA 6914 Telephone 08 9485 2410 Facsimile 08 9240 7845 www.imageres.com.au Image Resources NL ABN 57 063 977 579

First pass extension drilling 1.3km north of the Boonanarring deposit intersects a high grade zone of 14m at 17.9% HM from 40m

Since November 2014 185 holes totalling 7261 metres have been completed which are mainly testing for the both the northern and south western extension of the Boonanarring deposit and also includes 39 holes totalling 1646m testing for metallurgical/infill drilling within Block B of the Boonanarring Deposit (Fig. 1).

Boonanarring northern extension discovery

The very high grade HM and high grade zircon eastern strand at Boonanarring has now been intersected for the first time some 1.3km north of the northernmost part of the Boonanarring deposit and similar high grade of [email protected]% HM from 40m has been intersected on the same RL (Fig. 5 and Table 2). This northern extension is very significant as it potentially links into the Indicated Mineral Resource[1] within the Boonanarring deposit (Block A 210 East strand) which has an average grade of 19.2% HM and 26.4% Zircon. This is very exciting for the company and further infill drilling to the north is currently being planned.

Furthermore, a number of historical drill lines previously completed which are 2.5km and 5km from the northern most part of Boonanarring Resource show high grade zones up to 6m at 6.7% HM in historic drilling (Iluka drill hole RG0045 from 27m) which correlate with the predicted NNW extension of Boonanarring. Some of the previous drilling did not drill to the target RL (65m) and further infill and deeper holes are warranted to ascertain the grade, thickness and potential extension in detail. Note in some cases these planned holes are very close to the Brand Highway and permission for access will be required.

Boonanarring new south western strand

The East Gingin North strand which is west of the western Boonanarring strand was delineated by initial drilling over a 1.5km length and has now been extended up to 2.4km in length and further infill drilling and extensional drilling north and south of this 2.4km zone (Fig. 2) is planned.

The aim of the drilling and the drilling north of Boonanarring is to have a long life standalone operation and concurrently expand other projects into potential parallel operations for Image and or other producers (Fig. 1). All holes drilled in this current programme are within the Red Gully-BoonanarringGingin North-Gingin South-Chandala region and all assay results are shown in Table 2 and a drilling summary in Table 1.

1 Refer to the 31 May 2013 release http://www.asx.com.au/asxpdf/20130531/pdf/42g6v9v0jxn3hg.pdf for full details of the Boonanarring Mineral Resource/Reserve Estimate for full details of the Boonanarring Mineral Resource/Reserve Estimate

Boonanarring Block B metallurgical/infill drilling

Block B drilling of 39 holes totalling 1646 metres have been completed principally for a metallurgical test work currently being carried out by Allied Mineral Laboratory for an interested potential off take and toll treatment partner. These samples have been combined with existing samples from previous drilling and will be representative of the first 3 years of production (Fig. 1).

The metallurgical drilling of 10 infill lines is also relevant to upgrade the resource category within Block B especially over the highest grade eastern strand. The eastern strand within Block B is now covered with 100m spaced lines and will assist in upgrading the resource category in this area. The high grade nature of this eastern strand is shown in sections Figures 6 and 7 and suggest this eastern strand has continuous high grade zones including:

9m @ 25% HM from 43m in hole IX00103 5m @ 21.0% HM from 42m in hole IX00102 12m @ 16.7% HM from 32m in hole IM00036 including 4m @ 37.5% HM from 33m 15m @ 10.0% HM from 25m in hole IM00037

18m @ 12% HM from 22m in hole IM00065 inc. [email protected]% HM from 30m & [email protected]% HM from 35m 4m @ 55.0% HM from 35m in hole IM00066

Other areas drilled in this campaign include Red Gully, Chandala, Bidaminna and some infill drilling within the Boonanarring Resource. These assay results are listed in Table 2.

The Director of Exploration George Sakalidis commented:

“I am very excited with the success of the drilling programme outlining potential high grade extensions to the north and southwest of Boonanarring which will allow the company to potentially increase the mine life to 10 years production. The ensuing drilling programmes will be predominately concentrating and following up these encouraging results and is due to start in early April 2015.

All the drilling component of the 257 holes planned for this stage 1 programme have been pre payed by a placement to a major WA drilling company. The drilling programme started on the 14[th] November 2014 and is ongoing.

==> picture [452 x 606] intentionally omitted <==

==> picture [444 x 24] intentionally omitted <==

----- Start of picture text -----

Figure 1 Drilling programmes completed on Image Resources Gingin to Red Gully region in the North
Perth Basin
----- End of picture text -----

==> picture [397 x 622] intentionally omitted <==

Figure 2 Boonanarring to Gingin North Strand Interpretations

==> picture [398 x 622] intentionally omitted <==

==> picture [196 x 13] intentionally omitted <==

----- Start of picture text -----

Figure 3 Gingin South Strand Interpretations
----- End of picture text -----

==> picture [398 x 622] intentionally omitted <==

Figure 4 Boonanarring North to Red Gully Strand Interpretations

==> picture [452 x 310] intentionally omitted <==

Figure 5 Boonanarring North Extensional Drilling

==> picture [452 x 310] intentionally omitted <==

Figure 6 Boonanarring Block B Metallurgical/ Infill Drilling

==> picture [452 x 310] intentionally omitted <==

Figure 7 Boonanarring Block B Metallurgical/ Infill Drilling

Table 1 Drilling Summary Red Gully-Boonanarring-Gingin South Region Nov-Feb 2015

Project No Holes **Number of assays ** Metres Drilled
Boonanarring 50 877 2111
BoonanarringNorth 25 294 1109
Boonanarring South 57 848 2045
Chandala 12 138 344
GinginSouth 21 134 812
Red Gully 16 240 622
Bidaminna 4 198 218
Total 185 2729 7261

Table 2 Red Gully-Boonanarring-Gingin South Region

Post January 27[th] 2015 ASX Release New Boonanarring strand Delineated by First Pass Drilling Significant intercepts 2.5%HM over 2m (1m samples) with no internal dilution**


Project

Hole_ID

NORTH*

EAST*

From

To

Width

OS_Lab

SL_Lab
HM_Lab
MGA MGA m m m % % %
Boonanarring IM00022 6548658 387075 31 33 2 4.97 9.63 4.5
Boonanarring IM00023 6548309 387258 33 37 4 2.3 5.97 5.69
Boonanarring IM00024 6548338 387324 13 15 2 27.31 12.42 5.44
Boonanarring IM00024 6548338 387324 29 32 3 12.36 19.75 2.77
Boonanarring IM00032 6549458 386979 5 7 2 12.63 34.52 4.34
Boonanarring IM00032 6549458 386979 14 21 7 13.18 30.29 6
Boonanarring IM00032 6549458 386979 30 37 7 21.74 25.18 15.13
Boonanarring IM00033 6549464 386949 22 37 15 7.68 20.42 9.13
Boonanarring IM00034 6549452 386927 19 23 4 2.27 19.44 5.5
Boonanarring IM00034 6549452 386927 24 28 4 1.18 15.7 9.06
Boonanarring IM00034 6549452 386927 29 36 7 16.43 20.32 4.05
Boonanarring IM00035 6549446 386905 9 11 2 18.96 25.19 8.21
Boonanarring IM00035 6549446 386905 33 35 2 11.6 24.79 4.22
Boonanarring IM00036 6549614 386902 32 44 12 15.02 19.53 16.7
Boonanarring IM00037 6549624 386870 25 42 17 11.51 16.01 9.19
Boonanarring IM00037 6549624 386870 43 45 2 8.84 31.47 5.29
Boonanarring IM00038 6549615 386847 24 26 2 3.98 13.87 4.46
Boonanarring IM00038 6549615 386847 28 35 7 9.57 13.84 7.42
Boonanarring IM00038 6549615 386847 36 39 3 18.11 19 4.87
Boonanarring IM00040 6549816 386805 30 41 11 6.06 27.03 16.83
Boonanarring IM00041 6549809 386776 23 28 5 4.32 19.99 7.93
Boonanarring IM00041 6549809 386776 29 35 6 2.14 15.99 11.82
Boonanarring IM00041 6549809 386776 36 42 6 14.15 40.8 4.25
Project Hole_ID NORTH EAST From To Width OS_Lab SL_Lab HM_Lab
MGA MGA m m m % % %
Boonanarring IM00042 6549792 386761 23 32 9 4.16 13.57 6.69
Boonanarring IM00042 6549792 386761 34 39 5 13.91 20.23 6.47
Boonanarring IM00043 6549781 386737 14 17 3 13.19 30.71 3.77
Boonanarring IM00043 6549781 386737 22 24 2 0.38 18.62 6.24
Boonanarring IM00043 6549781 386737 25 27 2 4.58 19.32 3.9
Boonanarring IM00043 6549781 386737 34 38 4 15.87 15.28 2.97
Boonanarring IM00044 6549982 386692 31 40 9 5.81 18.46 19.57
Boonanarring IM00045 6549971 386670 26 33 7 3.55 16.69 8.52
Boonanarring IM00045 6549971 386670 35 41 6 12.42 20.45 4.81
Boonanarring IM00046 6549962 386649 37 40 3 17.02 28.62 9.67
Boonanarring IM00048 6550170 386625 34 40 6 3.25 23.88 34.3
Boonanarring IM00049 6550162 386603 22 26 4 6.49 19.59 4.85
Boonanarring IM00049 6550162 386603 30 35 5 1.57 9.3 9.67
Boonanarring IM00049 6550162 386603 36 40 4 6.86 32.91 6.53
Boonanarring IM00050 6550148 386577 24 27 3 3.91 18.42 7.24
Boonanarring IM00050 6550148 386577 28 31 3 0.12 11.75 4.01
Boonanarring IM00050 6550148 386577 32 34 2 1.04 11.67 3.96
Boonanarring IM00050 6550148 386577 36 38 2 16.75 23.99 3.3
Boonanarring IM00051 6550141 386560 22 25 3 4.04 17.77 4.48
Boonanarring IM00051 6550141 386560 36 43 7 18.96 23.38 5.16
Boonanarring IM00052 6550348 386539 31 39 8 7.74 36.55 22.06
Boonanarring IM00053 6550333 386518 28 37 9 14.04 17.13 9.1
Boonanarring IM00054 6550329 386493 20 24 4 0.58 16.06 21.12
Boonanarring IM00054 6550329 386493 27 37 10 7.39 19.16 6.16
Boonanarring IM00055 6550316 386470 21 25 4 1.49 18.5 5.24
Boonanarring IM00055 6550316 386470 33 38 5 8.57 33.71 3.02
Boonanarring IM00056 6550532 386448 30 39 9 6.93 34.4 16.43
Boonanarring IM00057 6550525 386425 7 11 4 20.5 28.16 5.09
Boonanarring IM00057 6550525 386425 25 37 12 5.82 17.5 10.97
Boonanarring IM00058 6550512 386403 31 36 5 9.41 26.4 3.44
Boonanarring IM00059 6550502 386381 20 22 2 3.1 19.65 10.73
Boonanarring IM00060 6550706 386347 27 39 12 8.11 25.53 14.33
Boonanarring IM00061 6550696 386326 26 39 13 4.74 23.85 11.21
Boonanarring IM00063 6550716 386371 31 38 7 7.58 23.72 23.85
Boonanarring IM00064 6550878 386245 21 24 3 18.07 25.35 6.27
Boonanarring IM00064 6550878 386245 30 32 2 0.24 13.1 5.57
Boonanarring IM00064 6550878 386245 33 42 9 16.36 23.4 9.72
Boonanarring IM00065 6550888 386268 22 34 12 4.17 22 8.39
Boonanarring IM00065 6550888 386268 35 40 5 5.98 19.66 22.62
Boonanarring IM00066 6550901 386292 34 40 6 3.24 36.32 37.67
Boonanarring IM00067 6551065 386171 29 41 12 10.8 18.83 11.88
Boonanarring IM00068 6551076 386196 35 40 5 9.29 16.75 41.42
Boonanarring IM00069 6551051 386152 32 39 7 16.42 16.46 8.08
Boonanarring IM00069 6551051 386152 41 44 3 9 38.31 3.76
Boonanarring IM00070 6550865 386224 33 35 2 7.01 13.71 4.63
Boonanarring IM00070 6550865 386224 36 39 3 13.64 17.61 4.63
Project Project Hole_ID NORTH **EAST ** **EAST ** From From **To ** **To ** Width OS_Lab OS_Lab **SL_Lab ** **SL_Lab ** HM_Lab
MGA MGA m m m % % %
Boonanarring South IX00069 6540859 390516 4 6 2 2.96 16.43 3.04
Boonanarring South IX00072 6541500 390185 20 23 3 3.36 16.46 6.48
Boonanarring South IX00074 6541849 389970 15 18 3 13.33 22.36 4.6
Boonanarring South IX00075 6541870 390005 15 17 2 12.86 23.16 4.22
Boonanarring South IX00076 6541894 390078 25 27 2 0.07 14.79 3.5
Boonanarring South IX00077 6542282 389937 16 20 4 6.68 23.94 2.89
Boonanarring South IX00105 6542617 389718 25 27 2 0.04 12.51 3.58
Boonanarring South IX00105 6542617 389718 28 30 2 9.76 10.26 5.01
Boonanarring South IX00108 6543035 389632 25 27 2 6.13 8.37 3.51
Boonanarring South IX00110 6543046 389664 24 27 3 2.25 10.35 4.86
Boonanarring South IX00112 6543404 389476 27 31 4 2.28 14.07 4.53
Project
Hole_ID
NORTH
EAST From
To Width
OS_Lab
SL_Lab
HM_Lab
MGA
MGA
m
m
m
%
%
%
Chandala
IX00079
6512021
403599
6
8
2
42.16
6.62
5.34
Chandala
IX00079
6512021
403599
14
20
6
25.28
20.96
4.55
Chandala
IX00079
6512021
403599
23
26
3
31.64
15.5
5.06
Chandala
IX00080
6512003
403558
15
17
2
26.87
20.95
4.02
Chandala
IX00081
6511812
403656
17
21
4
33.27
17.88
3.57
Chandala
IX00082
6511856
403712
19
22
3
28.02
21.72
3.56
Chandala
IX00083
6511542
403998
7
9
2
30.9
13.96
3.34
Chandala
IX00083
6511542
403998
11
18
7
25.26
21.56
3.74
Chandala
IX00084
6511559
404030
11
18
7
25.39
19.75
4.86
Chandala
IX00084
6511559
404030
19
21
2
33.36
12.77
5.36
Chandala
IX00086
6512566
403335
21
23
2
28.23
19.53
3.17
Chandala
IX00087
6512538
403292
25
27
2
17.6
15.64
3.13
Chandala
IX00089
6512799
403376
15
19
4
22.19
21.88
4.82
Chandala
IX00090
6512965
403253
5
9
4
41.75
14.7
3.09
Project Hole_ID NORTH **EAST ** From **To ** Width OS_Lab SL_Lab HM_Lab
MGA MGA m m m % % %
Chandala IX00079 6512021 403599 6 8 2 42.16 6.62 5.34
Chandala IX00079 6512021 403599 14 20 6 25.28 20.96 4.55
Chandala IX00079 6512021 403599 23 26 3 31.64 15.5 5.06
Chandala IX00080 6512003 403558 15 17 2 26.87 20.95 4.02
Chandala IX00081 6511812 403656 17 21 4 33.27 17.88 3.57
Chandala IX00082 6511856 403712 19 22 3 28.02 21.72 3.56
Chandala IX00083 6511542 403998 7 9 2 30.9 13.96 3.34
Chandala IX00083 6511542 403998 11 18 7 25.26 21.56 3.74
Chandala IX00084 6511559 404030 11 18 7 25.39 19.75 4.86
Chandala IX00084 6511559 404030 19 21 2 33.36 12.77 5.36
Chandala IX00086 6512566 403335 21 23 2 28.23 19.53 3.17
Chandala IX00087 6512538 403292 25 27 2 17.6 15.64 3.13
Chandala IX00089 6512799 403376 15 19 4 22.19 21.88 4.82
Chandala IX00090 6512965 403253 5 9 4 41.75 14.7 3.09
Project Hole_ID NORTH EAST From **To ** Width OS_Lab SL_Lab HM_Lab
MGA MGA m m m % % %
Red Gully IM00007 6568079 377828 20 22 2 0.13 16.38 2.55
Red Gully IM00007 6568079 377828 25 28 3 11.89 16.09 2.82
Red Gully IM00008 6567910 377918 22 26 4 1.05 13.85 7.46
Red Gully IM00009 6567713 378030 20 22 2 0 16.97 2.99
Red Gully IM00010 6567544 378076 18 21 3 0.14 13.66 5.09
Red Gully IM00012 6567370 378162 20 24 4 3.51 14.7 5.39
Red Gully IM00013 6567312 378192 21 26 5 1.91 12.22 4.98
Red Gully IM00014 6567302 378201 20 24 4 0.92 13.03 5.99
Red Gully IM00018 6567024 378321 19 28 9 0.68 13.21 8.92
Red Gully IM00019 6568446 377613 19 21 2 0.01 14.12 3.49
Project Hole_ID NORTH EAST From To Width OS_Lab SL_Lab HM_Lab
MGA MGA m m m % % %
Bidaminna IM00001 6558060 366969 16 21 5 0.02 3.54 5.81
Bidaminna IM00001 6558060 366969 46 54 8 2.71 2.59 4.14
Bidaminna IM00002 6558023 366903 18 28 10 0.02 4.37 4.16
Bidaminna IM00002 6558023 366903 30 34 4 0.02 1.83 3.87
Bidaminna IM00002 6558023 366903 37 40 3 0.01 0.87 3.58
Bidaminna IM00002 6558023 366903 43 45 2 11.11 3.58 4.94
Bidaminna IM00002 6558023 366903 46 54 8 1.87 4.89 4.43
Bidaminna IM00003 6557997 366831 40 44 4 0.06 1.23 5.83
Bidaminna IM00003 6557997 366831 45 53 8 0.63 2.53 4.61
Bidaminna IM00004 6557963 366755 45 51 6 5.8 5.56 5.2

Notes

*Coordinates are in Datum GDA 94 Projection MGA zone 50

** The data aggregation of reported intercepts is computed using Micromine software algorithms by compositing 1 m sample intervals using criteria of a ≥ 2.5% HM threshold, minimum length of 2m, and internal dilution set to zero

For more information visit imageres.com.au Please direct enquiries to:

George Sakalidis Exploration Director M: +61 411 640 337 E: [email protected]

Collis Thorp Chief Executive Officer M: +61 413 705 075 E: [email protected]

COMPETENT PERSON’S STATEMENT – EXPLORATION RESULTS AND MINERAL RESOURCES AND RESERVES

Information in this report that relates to Exploration Results, Mineral Resources is based on information compiled by George Sakalidis BSc (Hons) who is a member of the Australasian Institute of Mining and Metallurgy. At the time that the Exploration Results, Mineral Resources and Mineral Reserves were compiled, George Sakalidis was a director of Image Resources NL. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. George Sakalidis consents to the inclusion of this information in the form and context in which it appears in this report.

COMPETENT PERSON’S STATEMENT – RESOURCE ESTIMATES

The information in this report that relates to mineral resources and is based on information compiled by Lynn Widenbar BSc, MSc, DIC MAIG, MAusIMM employed by Widenbar & Associates who is a consultant to the Company. Lynn Widenbar has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Lynn Widenbar consents to the inclusion of this information in the form and context in which it appears in.

FORWARD LOOKING STATEMENTS

Certain statements made during or in connection with this communication, including, without limitation, those concerning the economic outlook for the mining industry, expectations regarding prices, exploration or development costs and other operating results, growth prospects and the outlook of Image’s operations contain or comprise certain forward looking statements regarding Image’s operations, economic performance and financial condition. Although Image believes that the expectations reflected in such forward-looking statements are reasonable, no assurance can be given that such expectations will prove to have been correct.

Accordingly, results could differ materially from those set out in the forward looking statements as a result of, among other factors, changes in economic and market conditions, success of business and operating initiatives, changes that could result from future acquisitions of new exploration properties, the risks and hazards inherent in the mining business (including industrial accidents, environmental hazards or geologically related conditions), changes in the regulatory environment and other government actions, risks inherent in the ownership, exploration and operation of or investment in mining properties, fluctuations in prices and exchange rates and business and operations risks management, as well as generally those additional factors set forth in our periodic filings with ASX. Image undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today’s date or to reflect the occurrence of unanticipated events.

Reserve Summary
Project Area HM Tonnes
Category
Volume
Tonnes
% HM
% SLIMES
VHM
Ilmenite
Leucoxene
Rutile
Zircon
(%)
(%)
(%)
(%)
(%)
Boonanarring
Atlas
Probable
7,160,000
14,420,000
8.3%
17.0%
1,190,000
80.3%
46.9%
5.5%
3.3%
24.5%
Probable
4,760,000
9,600,000
8.1%
15.5%
780,000
74.1%
55.0%
1.0%
7.0%
11.0%
Total NPB Reserve 11,920,000
24,020,000
8.2%
16.4%
1,970,000
77.8%
50.1%
3.7%
4.8%
19.1%
Mining Inventory (incl Inferred) 13,330,000
26,880,000
8.0%
16.5%
2,135,000
78.3%
50.1%
4.2%
5.1%
19.0%
High Grade Resources @ 2.5% HM Cut-off
Resource VHM
Ilmenite
Leucoxene
Rutile
Zircon
(%)
(%)
(%)
(%)
(%)
% SLIMES
HM TONNES
Resource Category
BCM
TONNES
% HM
Atlas
Atlas
Measured
Indicated
4,810,000
520,000
9,700,000
1,080,000
8.5
3.2
15.3
19.2
820,000
34,000
76
74
52
53
5
8
8
7
11
6
Atlas Total 5,330,000 10,780,000 7.9 15.7 854,000 76 52 5 8 10
Boonanarring
Boonanarring
Measured 1,680,000 3,000,000 7.8 10.1 230,000 70 49 1 3 17
Indicated 7,000,000 14,300,000 9 17.2 1,270,000 80 49 6 3 22
Boonanarring Inferred 2,100,000 4,200,000 6.5 17.4 270,000 83 51 8 7 18
Boonanarring Total 10,780,000 21,500,000 8.3 16.2 1,770,000 79 49 6 4 21
Gingin Nth Indicated 680,000 1,320,000 5.7 15.7 80,000 75 57 9 3 5
Gingin Nth Inferred 580,000 1,090,000 5.2 14 60,000 78 57 11 4 6
Gingin Nth Total 1,260,000 2,410,000 5.5 15 140,000 77 57 10 3 6
Gingin Sth Measured 870,000 1,530,000 4.4 7.2 67,000 79 51 15 6 8
Gingin Sth Indicated 3,240,000 5,820,000 6.5 7.1 380,000 91 68 10 5 8
Gingin Sth Inferred 400,000 730,000 6.5 8.4 48,000 92 67 8 6 11
Gingin Sth Total 4,510,000 8,080,000 6.1 7.3 495,000 89 65 10 5 8
Helene Indicated 5,600,000 11,500,000 4.6 18.6 520,000 84 70 1 3 11
Hyperion Indicated 1,800,000 3,700,000 7.8 19.3 290,000 71 56 0 6 9
Cooljarloo Nth Total 7,400,000 15,200,000 5.3 18.7 810,000 79 64 0 4 9
Red Gully Indicated 1,930,000 3,410,000 7.8 11.5 270,000 90 66 8 3 12
Red Gully Inferred 1,455,000 2,570,000 7.5 10.7 190,000 90 66 8 3 12
Red Gully Total 3,385,000 5,980,000 7.7 11.2 460,000 90 66 8 3 12
Grand Total 32,665,000
63,950,000
7.1%
13.9%
4,529,000
80
57
6
5
13
Dredge Resources at 1.0% HM cut-off
Project Area
Resource Category
Volume
TONNES
%
HM
%
Slime
HM
TONNES
VHM
%
Ilmenite % Leucoxene %
Rutile
%
Zircon
%
Ilmenite
Leucoxene
Rutile
Zircon
VHM Tonnes
Titan
Indicated
10,300,000
21,200,000
1.8
Titan
Inferred
58,500,000 115,400,000
1.9
22.1
380,000
84.4
18.9
2,210,000
84.3
71.9
2.0
1.0
9.5
270,000
7,000
5,000
36,000
318,000
71.8
2.0
1.0
9.5
1,592,000
45,000
22,000
210,000
1,869,000
Titan
Total
68,800,000 136,600,000
1.9
19.4
2,590,000
84.4
71.9
2.0
1.0
9.5
1,862,000
52,000
27,000
246,000
2,187,000
Telesto
Indicated
1,700,000
3,500,000
3.8
Calypso
Inferred
27,100,000
51,500,000
1.7
Sub Total
Indicated
12,000,000
24,700,000
2.1
18.4
130,000
82.6
13.7
850,000
84.6
21.6
510,000
86.1
67.5
3.4
2.2
9.5
100,000
5,000
3,000
13,000
121,000
68.8
3.5
1.6
10.6
585,000
30,000
14,000
90,000
719,000
72.5
2.4
1.6
9.6
370,000
12,000
8,000
49,000
439,000
Sub Total
Inferred
85,600,000 166,900,000
1.8
17.3
3,060,000
84.6
71.1
2.5
1.2
9.8
2,177,000
75,000
36,000
300,000
2,588,000
Cooljarloo Total
97,600,000 191,600,000
1.9
17.8
3,570,000
84.8
71.3
2.4
1.2
9.8
2,547,000
87,000
44,000
349,000
3,027,000
Bidaminna
Inferred
26,300,000
44,600,000
3.0
3.6
1,350,000
96.0
82.4
7.2
1.0
5.4
1,113,000
97,000
13,000
73,000
1,296,000
Total Dredge
123,900,000 236,200,000
2.1
15.1
4,920,000
84.3
65.6
4.6
2.9
11.3
3,660,000
184,000
57,000
422,000
4,323,000

1 Refer to the 31 May 2013 release http://www.asx.com.au/asxpdf/20130531/pdf/42g6v9v0jxn3hg.pdf for full details of the Boonanarring Mineral Resource/Reserve Estimate for full details of the Boonanarring Mineral Resource/Reserve Estimate

Section 1 Sampling Techniques and Data

Criteria JORC Code explanation Commentary
Sampling
techniques

Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.

Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.

Aspects of the determination of
mineralisation that are Material to the
Public Report.

In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailedinformation.

All drill holes reported in this release are vertically oriented, reverse-
circulation air-core (RCAC) drill holes.
Drilling techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).

All RCAC drill holes are drilled vertically using an NQ-sized (63.5 mm
diameter) drill bit.

Water injection is used to convert the sample to a slurry so it can be
incrementally sampled by a rotary splitter.

16

Criteria JORC Code explanation Commentary
Drill sample
recovery

Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.

Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.

Aspects of the determination of
mineralisation that are Material to the
Public Report.

In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine
nodules) may warrant disclosure of
detailedinformation.

At the drill site, Image’s geologist estimates sample recovery
qualitatively (as good, moderate or poor) for each 1 m down hole
sampling interval. Specifically, the supervising geologist visually
estimates the volume recovered to sample and reject bags based on
prior experience as to what constitutes good recovery.

Image found that of the 157 samples (that have a grade ≥ 2.5% HM)
that are the subject of this release, 144 (92%) have good recovery, 3
have moderately good recovery and 10 have poor recovery.

Image also monitors recovery through the mass of the laboratory
sample, which is recorded prior to despatch and again on delivery to
the laboratory. The mass variation in the laboratory samples can then
be correlated back to the original total sample.
Logging
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies.

Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.

The total length and percentage of the
relevant intersections logged.

Image’s supervising geologist logs the sample reject material at the rig
and pans a small sub sample of the reject, to visually estimate the
proportions of sands, heavy mineral sands, ‘slimes’ (clays), and
oversize (rock chips) in each sample, in a semi-quantitative manner.

The geologist also logs colour, grainsize, an estimate of induration (a
hardness estimate) and sample ‘washability’ (ease of separation of
slimes from sands by manual attrition).

To preclude data entry and transcription errors, the logging data is
captured into a digital data logger at the rig, which contains pre-set
logging codes. No photographs of samples are taken.

The digital logs are downloaded daily and emailed to Image’s head
office for data security and compilation into the main database server.

Samples visually estimated by the geologist to contain more than 0.5%
HM (by weight) are despatched for analysis along with the 1 m
intervals above and below the mineralised interval.

The level and detail of logging is of sufficient quality to support any
potential future Mineral Resource Estimates.

All (100%) of the drilling is logged.

Geotechnical logging is not possible for the style of drilling used,
however the logging is acceptable for metallurgical sample selection if
required.

17

Criteria JORC Code explanation Commentary
Sub-sampling
techniques and
sample
preparation

If core, whether cut or sawn and
whether quarter, half or all core taken.

If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.

For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.

Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.

Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.

Whether sample sizes are appropriate
to the grain size of the material being
sampled.

All drilling samples are collected over 1 m down hole intervals, with
sample lengths determined by 1 m marks on the rig mast.

The sample from the internal RC rods is directed to a cyclone and then
through a ‘rotating-chute’ custom-built splitting device. This device
allows different fraction splits from the cyclone sample stream to be
directed to either 25 cm by 35 cm calico bags (as the laboratory
despatch samples) or to large plastic polyweave bags for the sample
rejects. The rotary splitter directs≈10 increments from the stream to
the laboratory despatch samples, for a 1 m long down hole sampling
interval.

Two (replicate) 1/8 mass splits (each≈1.25 kg) are collected from the
rotary splitter into two pre-numbered calico bags for each 1 m down
hole interval. A selection of the replicate samples are later collected
and analysed to quantify field sampling precision, or as samples
contributing to potential future metallurgical composites.

To monitor sample representation and sample number correctness,
Image weighs the laboratory despatch samples prior to despatch. The
laboratory then weighs the received sample and reports the mass to
Image. This quality control ensures no mix up of sample numbers and
is also a proxy for sample recovery.

Image considers the nature, quality and size of the sub samples
collected are consistent with best industry practices of mineral sands
explorers in the Perth Basin region.

18

Criteria JORC Code explanation Commentary
Quality of assay
data and
laboratory tests

The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.

For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.

Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.

The laboratory despatch samples are prepared by Western Geolabs (in
Bellevue Western Australia) by first, wet weighing, then drying the
sample for 5 to 8 hrs in an oven at 110°C. The dry weight is then
recorded using a laboratory digital scale.

The dried sample is then crushed (using manual pummelling) until all
clay and sand materials in the sample pass through a 3.3 mm screen.
In samples where (>3.3 mm) rock fragments are found after
pummelling and screening, the mass of the fragments is recorded and
the material discarded.

The <3.3 mm sample is then hand mixed prior to splitting through a
single tier riffle splitter (16 chutes each with 8 mm aperture), as many
times as required to prepare a 100 g ± 5 g sub sample. The actual
mass retained is recorded using a laboratory digital scale.

The riffle splitter sub sample is then wetted, undergoes further manual
attrition to break up clays, before the <63µm clays (slimes) are
washed from the sample (de-sliming) using a jet wash and 63µm
screen.

The <63µm slimes (clays) are discarded and the >63µm sub sample
is placed in a metal tray and oven dried. When dry, the >63µm sub
sample is put through a 1 mm sieve and the mass of the screen
oversize (>1 mm) is recorded on a digital balance. The oversize is then
discarded.

The de-slimed sand fraction (>63µm & < 1mm) sub sample is then
weighed on a digital scale before being separated into two fractions by
mixing the sample in a glass separation funnel with a heavy liquid
(TBE) of density 2.95 g/cm3.

Once sufficient time has passed to allow the sample to separate and
settle, the <2.95 g/cm3, ‘floats’ fraction is collected and discarded.

The <2.95 g/cm3, ‘sinks’ fraction is collected from the funnel into a filter
paper, then washed with acetone to remove the TBE. The sinks are
then dried and the mass recorded on a digital scale.

From the process above the laboratory reports the wet mass received,
dry received mass, the mass of (>3.3 mm) rock fragments or coarse
oversize (if any), the mass of the 100 g± 5 g, sub sample, and the
mass of the (HM) sink fraction.

The procedure can be considered a total analysis for mass
concentration of heavy minerals in each sample. The method is also
consistent with best industry practices employed by mineral sands
explorers in the Perth Basin region.

For quality control the laboratory:

Uses certified masses to verify daily the accuracy of all laboratory
mass scales.

Prepares a replicate sample at a frequency of 2 for every 25 routine
samples analysed.

Uses a hydrometer to test daily the density of the TBE used for HM
separation

For each laboratory despatch (ranging from≈150 to≈350 samples)
Image includes blind standard reference samples (SRMs) that contain
known (to Image) concentrations of heavy and valuable heavy
minerals. Image inserts the SRMs, at a frequency of 1 in 30 sample
submitted to the laboratory.

Image is yet select and analyse field-replicate samples from field-
sample replicates collected to quantify field sampling precision. This
work will be completed at the end of the current field programme along
with external laboratory checks. Laboratory replicate sample results are
being reviewed.

Blanks samples for testing of cross contamination are not deemed
necessary for the style of mineralisation under consideration.

19

Criteria JORC Code explanation Commentary
Verification of
sampling and
assaying

The verification of significant
intersections by either independent or
alternative company personnel.

The use of twinned holes.

Documentation of primary data, data
entry procedures, data verification, data
storage (physical and electronic)
protocols.

Discuss any adjustment to assay data.

The logging of significant intersections reported in this release has
been verified by alternative company personnel.

No twin holes have been drilled in the current programme.

Logging is captured at the rig using a data recorder, downloaded daily
and emailed to head office data services for incorporation into the main
database.

Assay results from the laboratory are received by email in standard
spreadsheet templates and merged with logging results in-house.

There are no adjustments to original laboratory results.
Location of data
points

Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation.

Specification of the grid system used.

Quality and adequacy of topographic
control.

The drill hole collar locations are captured by one of Image’s rig team
following the completion of each drill hole, using a hand held GPS with
nominal accuracy of≈±15 m. Elevations have also been determined
with hand-held GPS. More accurate locations will be determined in
future by a registered surveyor using DGPS equipment.

The grid system for reporting results is the MGA Zone 50 projection
and the GDA94 elevation datum.

No topographic control has been considered at this time.
Data spacing and
distribution

Data spacing for reporting of Exploration
Results.

Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications applied.

Whether sample compositing has been
applied.

The drill holes reported in this release are located on≈200 m spaced
drill lines along the strike of mineralised strands, and at≈20 m
intervals across strike intervals.

No mineral resources have been estimated from the reported drilling
but the spacing is commensurate with that used to define Inferred
Mineral Resources in Image’s other projects in the region.

No sample compositing has been applied – all results are from 1 m
long down hole sample intervals.
Orientation of data
in relation to
geological
structure

Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.

If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.

All drill holes are vertical and intersect sub-horizontal strata. As such
Image considers that it is highly unlikely that the orientation of drilling
relative to the well understood structure of minerals sands strands,
would result in a sampling bias.
Sample security
The measures taken to ensure sample
security.

All samples are collected from site by Image’s staff as soon as
practicable once drilling is completed and then delivered to Image’s
locked storage sheds.

Image’s staff also deliver samples to the laboratory and collect heavy
mineral floats from the laboratory, which are also stored in Images
locked storage

Image considers there is negligible risk of deliberate or accidental
contamination of samples. Occasional sample mix-ups are usually
corrected using Images checking and quality control procedures.
Audits or reviews
The results of any audits or reviews of
sampling techniques and data.

The results and logging have been reviewed internally by Images
senior exploration personnel including checking of masses despatched
and delivered, checking of SRM results, and verification logging of
significant intercepts.

20

Section 2 Reporting of Exploration Results

Criteria JORC Code explanation

Commentary

Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status

Type, reference name/number, location and ownership
including agreements or material issues with third parties
such as joint ventures, partnerships, overriding royalties,
native title interests, historical sites, wilderness or
national park and environmental settings.

The security of the tenure held at the time of reporting
along with any known impediments to obtaining a licence
to operate in the area.

The 181 drill holes that are the subject of this public
report are drilled within following prospect area
tenements. Tenure details are given in each case:
o Boonanarring:

100% Image Resources NL

Exploration licences:
• 57 holes within E70/3041 (expiry 9/6/2018)
• 25 holes in E70/3720 (expiry 29/12/2015)

Mining Leases:
• 4 holes within M70/1194 (expiry 15/12/2026)
• 46 holes within M70/1311 (expiry 11/03/2034)
o Chandala:

80% Image Resources NL (manager) and 20%
Derby Mines Pty Ltd. Image entered into a farm-
in agreement with Derby on 18 November 2008
whereby Image earned 60% interest by spending
$80,000 within 2 years and a further 20% interest
by spending $350,000 within 6 years.

Exploration Licence:
• 12 holes within E70/2742 (expiry 1/05/2015)
o Gingin South:

100% Image Resources NL

Exploration Licence
• 9 holes within E70/3032 (expiry 14/10/2018)

Mining Lease:
• 12 holes within M70/0448 (expiry 06/05/2032)
o Red Gully

100% Image Resources NL

Mining Lease
• 16 holes within M70/1192 (expiry 19/05/2030)
o Bidaminna Park:

90% Image Resources NL

Exploration Licence
• 4 holes within E70/3298 (expiry 25/03/2019)

All drilling publicly reported is on freehold land, with no
known native title interests, historical sites, wilderness
parks or national parks, or environmental settings
effected.

At the time of this public report, Image has security of
tenure for all tenements drilled, and is not aware of any
material impediments to obtaining a licence to operate in
the area.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by other
parties.

No work has been completed by other parties for this
public report.

21

Criteria JORC Code explanation Commentary
Geology
Deposit type, geological setting and style of
mineralisation.

Image is targeting discovery of heavy mineral sands
strand deposits that have formed on ancient shore lines
on the eastern margin of the Swan Coastal Plain in
sediments Pleistocene to Holocene age in the north of
the Perth Basin.

The Boonanarring deposit occurs in the Yoganup
Formation and is interpreted to have formed during
periods of sea level stability within a cycle of shoreline
regression. The high grade strands in Boonanarring are
interpreted to have formed against a notch in the local
basement, possibly an ancient sea cliff.

The current programme of drilling is targeting possible
new strands, and extensions of known strands between
the Boonanarring and Gingin Mineral Resources and
also north of Boonanarring, to the Red Gully region.
Drill hole
Information

A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material drill
holes:
o easting and northing of the drill hole collar
o elevation or RL (Reduced Level – elevation above
sea level in metres) of the drill hole collar
o dip and azimuth of the hole
o down hole length and interception depth
o hole length.

If the exclusion of this information is justified on the basis
that the information is not Material and this exclusion
does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the
case.

In this public report, Image has reported only the drill
holes with significant intercepts that confirm the
discovery of new strand lines or possible extensions of
known strand lines.

The Competent Person does not consider a full listing of
the barren and low grade mineralisation is material for
the drill holes that are the subject of this public report.
However, the figures attached to the public report do
give the context of the significant intercepts with respect
to results reported by Image in previous public reports.
Data
aggregation
methods

In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade truncations
(eg cutting of high grades) and cut-off grades are usually
Material and should be stated.

Where aggregate intercepts incorporate short lengths of
high grade results and longer lengths of low grade
results, the procedure used for such aggregation should
be stated and some typical examples of such
aggregations should be shown in detail.

The assumptions used for any reporting of metal
equivalent values should be clearly stated.

Image prepared the lists of significant intercepts in this
public report using the data aggregation algorithms
available in Micromine software. The criteria for
reporting included compositing criteria for 1 m
intercepts of:
o A starting threshold of ≥ 2.5% HM
o Minimum down hole composite length of ≥ 2 m
o No internal dilution (no 1 m intervals included if
grades are < 2.5% HM).

Generally the grades of individual results contributing to
significant intercepts are of similar tenor.

There are no metal equivalent assumptions relevant to
the style of mineralisation under consideration.
Relationship
between
mineralisation
widths and
intercept
lengths

These relationships are particularly important in the
reporting of Exploration Results.

If the geometry of the mineralisation with respect to the
drill hole angle is known, its nature should be reported.

If it is not known and only the down hole lengths are
reported, there should be a clear statement to this effect
(eg‘down holelength, truewidth notknown’).

All holes are drilled vertically through a horizontal
stratigraphy. There is low risk of grade bias due to the
angle of intersection and geometry of the style of
mineralisation under consideration.
Diagrams
Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.

Refer to the figures in the public report.
Balanced
reporting

Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.

The Competent Person does not consider a full listing of
the barren and low grade mineralisation is material for
the drill holes that are the subject of this public report.
However, the figures attached to the public report do
give the context of the significant intercepts with respect
to results reported by Image in previous public reports.

22

Criteria JORC Code explanation Commentary
Other
substantive
exploration
data

Other exploration data, if meaningful and material, should
be reported including (but not limited to): geological
observations; geophysical survey results; geochemical
survey results; bulk samples – size and method of
treatment; metallurgical test results; bulk density,
groundwater, geotechnical and rock characteristics;
potentialdeleterious orcontaminating substances.

Not applicable for this release.
Further work
The nature and scale of planned further work (eg tests for
lateral extensions or depth extensions or large-scale
step-out drilling).

Diagrams clearly highlighting the areas of possible
extensions, including the main geological interpretations
and future drilling areas, provided this information is not
commercially sensitive.

At the time of this public report, Image has planned
further holes but actual locations may vary depending
on results received as the Stage 1 programme
progresses.

Refer to the maps and diagrams in the ASX release
where extents and new targets are identified.

23