Australia’s newest mineral sands miner Emerging mid-tier prospect
==> picture [241 x 271] intentionally omitted <==
==> picture [241 x 271] intentionally omitted <==
==> picture [243 x 271] intentionally omitted <==
1
1
Disclaimer and Forward-looking Statements
==> picture [76 x 53] intentionally omitted <==
This presentation/document has been prepared by the management of Image Resources NL ("Image”, “IMA“, or “the Company”). By accessing this presentation you acknowledge that you have read and understood the following statements.
This presentation contains certain forward-looking statements and forecasts, including, without limitation, possible or assumed reserves and resources, production levels and rates, costs, prices, future performance or potential growth of Image, industry growth or other trend projections. Where Image expresses or implies an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and on a reasonable basis. However, such statements are not a guarantee of future performance and involve unknown risks and uncertainties, as well as other factors which are beyond the control of Image. Actual results and developments may differ materially from those expressed or implied by these forward-looking statements depending on a variety of factors. Nothing in this presentation should be construed as either an offer to sell or a solicitation of an offer to buy or sell securities.
Image cannot and does not give any assurance that the results, performance or achievements expressed or implied by the forward-looking statements contained in this presentation will occur and investors are cautioned not to place any reliance on these forward-looking statements. Image does not undertake to update or revise forward-looking statements, or to publish prospective financial information in the future, regardless of whether new information, future events or any other factors affect the information contained in this presentation, except where required by applicable law and stock exchange listing requirements.
This document has been prepared in accordance with the requirements of Australian securities laws, which may differ from the requirements of United States and other countries’ securities laws. Unless otherwise indicated, all ore reserve and mineral resource estimates included or incorporated by reference in this document have been, and will be, prepared in accordance with the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.
Information regarding the calculation of ore reserves and mineral resources in this presentation (if any), and the consents provided by the respective Competent Persons is presented at the end of this presentation. For additional information and details on the content of this presentation, please refer to the ASX releases on the Company’s website.
2
Corporate Snapshot
==> picture [76 x 53] intentionally omitted <==
==> picture [216 x 220] intentionally omitted <==
Diverse and Experienced Board and Management
ASX Code Share Price 12-Month Price Range Shares on Issue Market Cap Cash on hand Debt Enterprise Value Top 20 Shareholders:
Board of Directors
IMA
A$0.17* A$0.12-0.30 980m
Bob Besley – Independent Chairman Patrick Mutz – Managing Director Chaodian Chen - Non-Executive Director Aaron Chong Veoy Soo – Non-Executive Dir Peter Thomas – Non-Executive Director Fei (Eddy) Wu – Non-Executive Director Huangcheng Li – Non-Executive Director
A$170m A$50m A$28m ~ A$192m* 70%
==> picture [216 x 222] intentionally omitted <==
----- Start of picture text -----
3
----- End of picture text -----
Key Management
==> picture [415 x 165] intentionally omitted <==
Patrick Mutz – MD & CEO John McEvoy – Chief Financial Officer Todd Colton – Chief Operating Officer George Sakalidis – Head of Exploration Rodney Burns – Operations Manager
* - as at 30 Sep 2020
Image Resources
Boonanarring Project
A uniquely rich and valuable mineral sands project
Social License
Integrated into the local community with an environmentally friendly legacy
==> picture [76 x 53] intentionally omitted <==
==> picture [216 x 220] intentionally omitted <==
Operational Performance
Demonstrating a solid track record of operational performance
Growth
Exciting exploration upside and an enviable portfolio of development projects
4 4
Boonanarring Mineral Sands Project
==> picture [76 x 53] intentionally omitted <==
==> picture [216 x 220] intentionally omitted <==
STRONG PROJECT FUNDAMENTALS
STRONG PROJECT DELIVERY
High Grade Ore Zircon Rich Construction Period Capital Cost 8.9% HM 27.5% of HM 6 months A$52m Coarse Grained High Recoveries On Time On Budget D50 ~180µm 98% of zircon High Quality HMC CY2019 Revenue CY2019 EBITDA 90%+ HM A$146m A$73m
==> picture [216 x 220] intentionally omitted <==
----- Start of picture text -----
5
----- End of picture text -----
-
➢ Established, profitable mining company focused exclusively on mineral sands
-
➢ Excellent location: 80km north of Perth in Western Australia. Major players (Iluka and Tronox) operating nearby.
-
➢ Transitioned from advanced explorer to active mining company in December 2018 with strong project delivery
Boonanarring Project – Simple Business Model
==> picture [217 x 219] intentionally omitted <==
Mining Classic dry, open-cut mining utilising standard truck and shovel fleet.
Processing
- 3.7Mtpa conventional wet concentrate plant to produce a high-quality HMC.
Trucking
==> picture [217 x 220] intentionally omitted <==
HMC trucked to Bunbury port.
Shipping Bulk shipments to China under life-of-mine off-take contracts based on market prices.
==> picture [76 x 53] intentionally omitted <==
==> picture [217 x 219] intentionally omitted <==
==> picture [217 x 220] intentionally omitted <==
----- Start of picture text -----
6
----- End of picture text -----
Corporate Video
==> picture [76 x 53] intentionally omitted <==
Video can be viewed at www.imageres.com.au
7
Rehabilitation: Before Mining
==> picture [76 x 53] intentionally omitted <==
==> picture [660 x 451] intentionally omitted <==
8
Rehabilitation: During Mining
==> picture [76 x 53] intentionally omitted <==
==> picture [660 x 451] intentionally omitted <==
9
Rehabilitation: Backfilled
==> picture [76 x 53] intentionally omitted <==
==> picture [660 x 451] intentionally omitted <==
10
Rehabilitation: Work-In-Progress
==> picture [76 x 53] intentionally omitted <==
==> picture [660 x 451] intentionally omitted <==
11
Solar Farm at Boonanarring
==> picture [76 x 53] intentionally omitted <==
Sunrise Energy Group Pty Ltd constructing 2.3 MWAC solar farm
-
➢ Construction and operation by Sunrise Energy;
-
➢ Located on Image owned land adjacent to Boonanarring processing plant
-
➢ Recently commissioned and now providing up to 25% of electricity requirements for mining/processing operations.
12
Additional information regarding Heads of Agreement announced to ASX on 23 April 2018 .
Community Engagement Program
==> picture [110 x 63] intentionally omitted <==
- ➢ Image is proud of its active and varied community support and engagement program including significant local employment.
==> picture [72 x 54] intentionally omitted <==
-
➢ At 30 Sep 2020 53% of the site workforce lives locally to the operation or within regional shires.
-
➢ Image Grand Opening was held on 19 September 2019 with 250 attendees.
==> picture [69 x 49] intentionally omitted <==
==> picture [76 x 53] intentionally omitted <==
==> picture [174 x 29] intentionally omitted <==
==> picture [85 x 40] intentionally omitted <==
==> picture [132 x 22] intentionally omitted <==
==> picture [97 x 33] intentionally omitted <==
==> picture [70 x 39] intentionally omitted <==
==> picture [162 x 27] intentionally omitted <==
==> picture [58 x 57] intentionally omitted <==
==> picture [100 x 50] intentionally omitted <==
13
Mineral Sand Markets
==> picture [76 x 53] intentionally omitted <==
==> picture [217 x 220] intentionally omitted <==
-
➢ Zircon – approximately 80% of revenue
-
➢ Mainly used in ceramics
-
➢ Market softened as COVID-19 pandemic impacted downstream demand and international exports
-
➢ TiO2 – approximately 20% of revenue
-
➢ Mainly used in paint, paper and plastics
-
➢ Demand for titanium concentrate and ilmenite remains relatively strong
Rutile / Ilmenite Price
Zircon Price
==> picture [355 x 244] intentionally omitted <==
==> picture [355 x 241] intentionally omitted <==
==> picture [217 x 220] intentionally omitted <==
----- Start of picture text -----
14
----- End of picture text -----
Source; FerroAlloy.net
Operational Performance – Track Record
==> picture [76 x 53] intentionally omitted <==
==> picture [216 x 220] intentionally omitted <==
-
➢ Project commissioned in Dec-18.
-
➢ Wet concentration plant operating above design capacity in 2020 following low cost capital improvements in 2020.
-
➢ September Quarter 2020 tonnes processed only marginally below record setting March Quarter 2020
-
➢ Q3 HMC production lower primarily due to lower average ore grades.
-
➢ CY2020 sales and production guidance unchanged.
Wet Concentrate Plant Ore Processed (kt)
HMC Production and Sales (kt)
==> picture [356 x 228] intentionally omitted <==
==> picture [355 x 237] intentionally omitted <==
==> picture [216 x 220] intentionally omitted <==
----- Start of picture text -----
15
----- End of picture text -----
Operational Performance – Cost Control
➢ Improved operating rates and higher ore grades during H1 2020 are supporting high HMC production rates which in conjunction with continued cost discipline are reflected in falling unit costs.
Unit Cash Costs (A$/t HMC Produced), HMC Production (kt HMC), Average Realised Price (A$/t HMC)
==> picture [487 x 316] intentionally omitted <==
==> picture [76 x 53] intentionally omitted <==
==> picture [216 x 219] intentionally omitted <==
==> picture [216 x 219] intentionally omitted <==
----- Start of picture text -----
16
----- End of picture text -----
Operational Performance – Guidance & Forecasts
| Item | Units | 2019 Results |
2020’1H Results |
2020 Guidance |
2021 Forecast |
|---|---|---|---|---|---|
| HMC Produced | DMT 000s | 270 | 167 | 300-330 | 300-330 |
| HMC Sold* | DMT 000s | 238 | 109 | 300-330 | 300-330 |
| C1 Cash Costsper tonne HMC sold | A$/DMT | 327 | 330 | 290-320 | 260-290 |
| AISC Cash Costsper tonne HMC sold | A$/DMT | 390 | 381 | 340-370 | 315-345 |
| HMC Sales Receipts* | A$m | 145 | 65 | N/A | N/A |
| Payments to Suppliers / Other | A$m | (79) | (48) | N/A | N/A |
| Net Operating Cashflows | A$m | 63 | 17 | N/A | N/A |
- 1H 2020 sales impacted by COVID & shipping delays but shipping rates now improving. Target for 2H 2020 of 190-200Kt (refer 27 July 2020 and 12 October 2020 announcements).
Image has made no change to 2020 guidance following the emergence of COVID-19 at the end of the March Quarter. Following the increasingly volatile economic landscape Image would like to emphasise there are a number of factors outside of its control that may impact downstream demand for its end products and therefore sales guidance. Image is continually reassessing its guidance position and will update the market if required and at a minimum will comment on guidance as part of its quarterly reporting.
==> picture [76 x 53] intentionally omitted <==
==> picture [216 x 219] intentionally omitted <==
==> picture [216 x 219] intentionally omitted <==
----- Start of picture text -----
17
----- End of picture text -----
Mine Life Summary
Exploration Budget expanded with focus on increasing Ore Reserves and mine life
-
➢ Mine-life from Dec 2019 Ore Reserve estimated at 6 years
-
➢ Ore Reserves at Boonanarring expandable
-
Drill results indicate potential extension of the deposit to south, north and west
-
Project ‘MORE’ formalised to focus on adding new Ore Reserves within economic pumping or hauling distance from current processing plant
-
Project ‘MORE’ goal to add 2 more years of Ore Reserves by end of Dec 2020
-
➢ Ore Reserves in Atlas area have potential to double
-
Existing Mineral Resources at 100%-owned Helene and Hyperion deposits deemed to be within economic pumping distance of Atlas
==> picture [76 x 53] intentionally omitted <==
==> picture [216 x 219] intentionally omitted <==
==> picture [216 x 219] intentionally omitted <==
----- Start of picture text -----
18
----- End of picture text -----
Multiple Extension Areas at Boonanarring
- ➢ Initially focused on areas within 10km of current location of Boonanarring Wet Concentration Plant (WCP)
➢ Northern Extension Area (NEA)
-
Previously reported; 2017
-
High grades, high zircon
-
Infrastructure and access challenges
➢ Southern Extension Area
-
Access available; within current environmental footprint
-
Lower grades than NEA implies lower potential to add mine life
➢ New 50mRL Strandline
-
Announced December 2019
-
Includes Northwest Extension Area, Blue Lake, Boonanarring West and Gingin North and South
-
Potential of up to 40km of parallel beach strandline west of Boonanarring deposit
==> picture [76 x 53] intentionally omitted <==
==> picture [389 x 460] intentionally omitted <==
----- Start of picture text -----
Northern
Extension
Area
Northwest
Extension
Area
WCP
Blue Lake
Southern
Extension
Area
Boonanarring
West
Gingin North
19 19
----- End of picture text -----
Growth – Our Portfolio
Established resources in the North Perth Basin
- ➢ Dry Mining Mineral Resources of 93Mt; 6.3% HM and 17% Zircon+Rutile in the HM ➢ Dredge Mining Mineral Resources of 236Mt; 2.1% HM and 11.5% Zircon+Rutile in the HM
JORC Mineral Resources
==> picture [606 x 259] intentionally omitted <==
----- Start of picture text -----
12% Dry Mining Dredge Mining
Regans Ford
Bubble size represents
10% Hyperion
contained heavy mineral
Red Gully
8% Gingin Sth
Boonanarring
6%
4% Atlas Bidaminna
Helene Titan
Calypso
2% Gingin Nth
Telesto
0%
0 20 40 60 80 100 120 140 160
Resource Tonne (Mt)
HM Grade (%)
----- End of picture text -----
Notes: Boonanarring, Atlas, Helene, Hyperion, Titan-Telesto and Calypso per JORC Code (2012). All others per JORC Code (2004) and have not been updated to comply with JORC Code 2012 on the basis that the information has not materially changed since it was last reported.
==> picture [76 x 53] intentionally omitted <==
==> picture [217 x 219] intentionally omitted <==
==> picture [217 x 219] intentionally omitted <==
----- Start of picture text -----
20
----- End of picture text -----
Projects Pyramid – Strand Deposits – Dry Mining
Mineral Resources – Accessible by Dry Open-Cut Mining Projects ranked by combined zircon plus rutile (Z+R) contained in the HM Tonnes and grades are for Mineral Resources; Boonanarring, Atlas, Helene & Hyperion per JORC Code (2012); All others historic per JORC Code (2004).
Launched into production with existing Ore Reserves starting at Boonanarring. Atlas to be mined following exhaustion of existing and any new Ore Reserves at Boonanarring. Likely future WCP location
==> picture [150 x 223] intentionally omitted <==
Boonanarring 30.3Mt; 6.0%HM; 23.1% Z+R Atlas 18.1Mt; 6.0%HM; 15.8% Z+R Red Gully 6.0Mt; 7.7% HM; 15.5% Z+R Regans Ford 9.9Mt; 9.6%HM; 14.3% Z+R Helene/Hyperion 18.2Mt; 4.8%HM; 14.0% Z+R Gingin South 8.1Mt; 6.1%HM; 13.5% Z+R Gingin North 2.4Mt; 5.5%HM; 9.1% Z+R Total 93Mt; 6.3%HM; 17% Z+R
==> picture [76 x 53] intentionally omitted <==
==> picture [217 x 219] intentionally omitted <==
==> picture [217 x 219] intentionally omitted <==
----- Start of picture text -----
21
----- End of picture text -----
Projects Pyramid – Dredge Mining Prospects
Mineral Resources – Accessible by Dredge Mining Projects ranked by HM Grade and include combined zircon plus rutile (Z+R) contained in the HM
==> picture [676 x 297] intentionally omitted <==
----- Start of picture text -----
Positive attributes
• 90+%VHM;
• <5% slimes;
Bidaminna
Bidaminna Mineral Resources currently • 25-67% Leucoxene;
45Mt; 3.0%HM; •
being updated to JORC (2012). 100Mt exploration
6.5% Z+R
target.
Titan-Telesto and Calypso tonnes-
Potential focus for
grades are Mineral Resources per
2 [nd] operating centre.
JORC Code (2012).
Titan-Telesto 140Mt; 1.9%HM; 12.8% Z+R
Closely associated;
May connected
Calypso 51Mt; 1.7% HM; 15.9% Z+R
Total 236Mt; 2.1%HM; 11.5% Z+R
----- End of picture text -----
==> picture [76 x 53] intentionally omitted <==
==> picture [216 x 219] intentionally omitted <==
22
Forward Looking Plans
Summary
-
➢ Continue with profitable operations at Boonanarring; CY2020-2021 expected to be stronger than calendar year 2019
-
➢ Increase Ore Reserves under Project ‘MORE’ at Boonanarring
-
➢ Ensure Atlas development / construction ready as next dry mining operation post Boonanarring
-
➢ Continue to look to diversify geographical HMC sales base and evaluate value-add options for separation of HMC in Australia
-
➢ Advance studies for potential second operating centre
-
➢ Consider timing for retirement of debt given strong cash build
-
➢ Advance consideration of inaugural dividend payment
-
➢ Evaluate opportunities outside of current portfolio
==> picture [76 x 53] intentionally omitted <==
==> picture [216 x 219] intentionally omitted <==
==> picture [216 x 219] intentionally omitted <==
----- Start of picture text -----
23
----- End of picture text -----
For further information
==> picture [130 x 89] intentionally omitted <==
Image Resources NL [email protected] Office: +61 8 9485 2410
Ground Floor, 23 Ventnor Avenue West Perth, WA 6005 PO Box 469, West Perth, WA 6872 www.imageres.com.au
==> picture [514 x 343] intentionally omitted <==
==> picture [76 x 53] intentionally omitted <==
24
Ore Reserves – Updated Dec 2019
==> picture [76 x 53] intentionally omitted <==
HIGH-QUALITY ORE RESERVES
➢ Very High HM ore grade; exceptionally high zircon grade at Boonanarring ➢ Atlas to be mined in series following Boonanarring
==> picture [656 x 145] intentionally omitted <==
----- Start of picture text -----
Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012)
Project/Deposit Category Tonnes % HM % Slimes HM Tonnes VHM Ilmenite Leucoxene Rutile Zircon
(million) (million) (%) (%) (%) (%) (%)
Boonanarring Proved 3.5 13.9 16.0 0.5 82.7 44 4.6 2.2 31.9
Boonanarring Probable 7.1 6.4 16.0 0.5 76.6 49 1.7 2.8 23.1
Total Boonanarring 10.7 8.9 16.0 0.9 79.6 46 3.2 2.5 27.5
Atlas Probable 9.5 8.1 15.5 0.8 73.3 50.7 4.5 7.5 10.6
Total Atlas 9.5 8.1 15.5 0.8 73.3 50.7 4.5 7.5 10.6
Total Ore Reserves 20.2 8.5 15.8 1.7 76.8 48.3 3.8 4.7 19.9
----- End of picture text -----
25
Mineral Resources
| Mineral Resources - Strand Deposits; in accordance with the JORC Code (2012) @ 2.0% HM Cut-off | Mineral Resources - Strand Deposits; in accordance with the JORC Code (2012) @ 2.0% HM Cut-off | Mineral Resources - Strand Deposits; in accordance with the JORC Code (2012) @ 2.0% HM Cut-off | Mineral Resources - Strand Deposits; in accordance with the JORC Code (2012) @ 2.0% HM Cut-off | Mineral Resources - Strand Deposits; in accordance with the JORC Code (2012) @ 2.0% HM Cut-off | Mineral Resources - Strand Deposits; in accordance with the JORC Code (2012) @ 2.0% HM Cut-off | Mineral Resources - Strand Deposits; in accordance with the JORC Code (2012) @ 2.0% HM Cut-off | Mineral Resources - Strand Deposits; in accordance with the JORC Code (2012) @ 2.0% HM Cut-off | Mineral Resources - Strand Deposits; in accordance with the JORC Code (2012) @ 2.0% HM Cut-off | Mineral Resources - Strand Deposits; in accordance with the JORC Code (2012) @ 2.0% HM Cut-off | Mineral Resources - Strand Deposits; in accordance with the JORC Code (2012) @ 2.0% HM Cut-off | Mineral Resources - Strand Deposits; in accordance with the JORC Code (2012) @ 2.0% HM Cut-off |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Project/Deposit | Category | Tonnes | % HM | **% Slimes ** | HM Tonnes | VHM | **Ilmenite ** | Leucoxene | Rutile | Zircon | |
| (million) | (million) | (%) | (%) | (%) | (%) | (%) | |||||
| Boonanarring | Measured | 8.8 | 10.3 | 14 | 0.9 | 78.1 | 46 | 3.8 | 2.3 | 26.0 | |
| Boonanarring | Indicated | 14.6 | 4.6 | 17 | 0.7 | 71.2 | 48 | 2.6 | 2.7 | 17.9 | |
| Boonanarring | Inferred | 6.9 | 3.5 | 20 | 0.2 | 59.4 | 45 | 4.9 | 3.9 | 5.6 | |
| Boonanarring Total | 30.3 | 6.0 | 17.0 | 1.8 | 72.7 | 46 | 3.6 | 2.7 | 20.4 | ||
| Atlas | Measured | 9.9 | 7.9 | 16.1 | 0.8 | 71.0 | 49.1 | 4.2 | 7.2 | 10.5 | |
| Atlas | Indicated | 6.4 | 3.7 | 17.3 | 0.2 | 56.5 | 41.6 | 3.4 | 4.7 | 6.8 | |
| Atlas | Inferred | 1.8 | 4.0 | 19.9 | 0.1 | 41.5 | 29.0 | 3.3 | 4.4 | 4.8 | |
| Atlas Total | 18.1 | 6.0 | 16.9 | 1.1 | 65.9 | 46.1 | 4.0 | 6.5 | 9.3 | ||
| Sub-Total Atlas/Boonanarring | 48.4 | 6.0 | 17.0 | 2.9 | 70.1 | 46.1 | 3.7 | 4.1 | 16.2 | ||
| Mineral Resources - Strand Deposits; in accordance with JORC Code (2012) @ 2.0% H | M Cut-off | ||||||||||
| Project/Deposit | Category | Volume | Tonnes | % HM | **% Slimes ** | HM Tonnes | VHM | **Ilmenite ** | Leucoxene | Rutile | Zircon |
| (million) | (million) | (million) | (%) | (%) | (%) | (%) | (%) | ||||
| Helene | Indicated | 6.4 | 13.2 | 4.3 | 18.6 | 0.57 | 88.7 | 74.6 | 0.0 | 3.6 | 10.5 |
| Hyperion | Indicated | 2.4 | 5.0 | 6.3 | 19.0 | 0.32 | 69.4 | 55.8 | 0.0 | 6.3 | 7.3 |
| Sub-Total Cooljarloo Nth Total | 8.8 | 18.2 | 4.8 | 18.7 | 0.88 | 81.8 | 67.9 | 0.0 | 4.6 | 9.4 | |
| Mineral Resources - Strand Deposits; in accordance with JORC Code (2004) @ 2.5% H | M Cut-off | ||||||||||
| Project/Deposit | Category | Volume | Tonnes | % HM | **% Slimes ** | HM Tonnes | VHM | **Ilmenite ** | Leucoxene | Rutile | Zircon |
| (million) | (million) | (million) | (%) | (%) | (%) | (%) | (%) | ||||
| Gingin Nth | Indicated | 0.7 | 1.3 | 5.7 | 15.71 | 0.08 | 75.4 | 57.4 | 9.3 | 3.2 | 5.5 |
| Gingin Nth | Inferred | 0.6 | 1.1 | 5.2 | 14.0 | 0.06 | 78.4 | 57.3 | 11.3 | 3.7 | 6.0 |
| Gingin Nth Total | 1.3 | 2.4 | 5.5 | 15.0 | 0.13 | 76.7 | 57.3 | 10.2 | 3.4 | 5.7 | |
| Gingin Sth | Measured | 0.9 | 1.5 | 4.4 | 7.22 | 0.07 | 79.4 | 50.7 | 15.3 | 5.6 | 7.8 |
| Gingin Sth | Indicated | 3.2 | 5.8 | 6.5 | 7.1 | 0.38 | 90.6 | 67.6 | 9.8 | 5.1 | 8.1 |
| Gingin Sth | Inferred | 0.4 | 0.7 | 6.5 | 8.4 | 0.05 | 91.6 | 67.4 | 7.5 | 5.8 | 10.9 |
| Gingin Sth Total | 4.5 | 8.1 | 6.1 | 7.3 | 0.49 | 89.2 | 65.3 | 10.3 | 5.2 | 8.3 | |
| Red Gully | Indicated | 1.9 | 3.4 | 7.8 | 11.5 | 0.3 | 89.7 | 66.0 | 8.3 | 3.1 | 12.4 |
| Red Gully | Inferred | 1.5 | 2.6 | 7.5 | 10.7 | 0.2 | 89.0 | 65.4 | 8.2 | 3.0 | 12.3 |
| Red Gully Total | 3.4 | 6.0 | 7.7 | 11.2 | 0.5 | 89.4 | 65.7 | 8.2 | 3.1 | 12.4 | |
| Sub-Total Gingin & Red Gully | 9.2 | 16.5 | 6.6 | 9.8 | 1.08 | 87.8 | 64.5 | 9.4 | 4.1 | 9.7 | |
| Mineral Resources - Strand deposit; in accordance with JORC Code (2004) @ 2.5% HM | Cut-off | ||||||||||
| Project/Deposit | Category | Volume | Tonnes | % HM | **% Slimes ** | HM Tonnes | VHM | **Ilmenite ** | Leucoxene | Rutile | Zircon |
| (million) | (million) | (million) | (%) | (%) | (%) | (%) | (%) | ||||
| Regans Ford | Indicated | 4.5 | 9.0 | 9.9 | 16.8 | 0.89 | 94.3 | 70.0 | 10.0 | 4.3 | 10.0 |
| Regans Ford | Inferred | 0.5 | 0.9 | 6.5 | 18.5 | 0.06 | 90.5 | 68.3 | 7.7 | 4.4 | 10.1 |
| Sub-Total Regans Ford Total | 5.0 | 9.9 | 9.6 | 17.0 | 0.95 | 94.1 | 69.9 | 9.9 | 4.3 | 10.0 | |
| Grand Totals | 22.9 | 93.0 | 6.3 | 5.8 | 79.1 | 56.7 | 5.2 | 4.2 | 13.0 |
==> picture [76 x 53] intentionally omitted <==
| Mineral Resources - Dredge deposits; in accordance with JORC Code(2012) @ 1.0% H | Mineral Resources - Dredge deposits; in accordance with JORC Code(2012) @ 1.0% H | Mineral Resources - Dredge deposits; in accordance with JORC Code(2012) @ 1.0% H | Mineral Resources - Dredge deposits; in accordance with JORC Code(2012) @ 1.0% H | Mineral Resources - Dredge deposits; in accordance with JORC Code(2012) @ 1.0% H | Mineral Resources - Dredge deposits; in accordance with JORC Code(2012) @ 1.0% H | Mineral Resources - Dredge deposits; in accordance with JORC Code(2012) @ 1.0% H | M Cut-off | M Cut-off | M Cut-off | M Cut-off | M Cut-off |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Project/Deposit | Category | Volume | Tonnes | % HM | % Slimes | HM Tonnes | VHM | Ilmenite | Leucoxene | Rutile | Zircon |
| (million) | (million) | (million) |
(%) | (%) |
(%) |
(%) | (%) | ||||
| Titan | Indicated | 10.3 | 21.2 | 1.8 | 22.07 | 0.38 | 86.0 | 71.9 | 1.5 | 3.1 | 9.5 |
| Titan | Inferred | 58.5 | 115.4 | 1.9 | 18.9 | 2.21 | 85.9 | 71.8 | 1.5 | 3.1 | 9.5 |
| Total Titan | Total | 68.8 | 136.6 | 1.9 | 19.4 | 2.58 | 85.9 | 71.8 | 1.5 | 3.1 | 9.5 |
| Telesto | Indicated | 1.7 | 3.5 | 3.8 | 18.41633 | 0.13 | 83.3 | 67.5 | 0.7 | 5.6 | 9.5 |
| Calypso | Inferred | 27.1 | 51.5 | 1.7 | 13.7 | 0.85 | 85.6 | 68.1 | 1.6 | 5.1 | 10.8 |
| Mineral Resources - Dredge deposits; in accordance with JORC Code(2004) @ 1.0% H | M Cut-off | ||||||||||
| Project/Deposit | Category | Volume | Tonnes | % HM | **% Slimes ** | HM Tonnes | VHM | **Ilmenite ** | Leucoxene | Rutile | Zircon |
| (million) | (million) | (million) | (%) | (%) | (%) | (%) | (%) | ||||
| Bidaminna | Inferred | 26.3 | 44.6 | 3.0 | 3.6 | 1.34 | 96.8 | 83.1 | 7.2 | 1.0 | 5.5 |
| Total Dredge | 123.9 | 236.2 | 2.1 | 15.2 | 4.91 | 87.8 | 73.1 | 2.6 | 3.2 | 9.0 |
This presentation includes inf ormation that relates to Ore Reserv es and Mineral Resources which were prepared and f irst disclosed under JORC Code 2012. The inf ormation was extracted f rom the Company ’s prev ious ASX announcements as f ollows:
-
Boonanarring Mineral Resources and Ore Reserv es: 20 December 2019
-
Atlas Ore Reserv es: 30 May 2017
-
Atlas Mineral Resources: 8 May 2017
-
Helene Mineral Resources: 31 Oct 2019
-
Hy perion Mineral Resources: 31 Oct 2019
-
Titan Mineral Resources: 31 Oct 2019
-
Telesto South Mineral Resources: 31 Oct 2019
-
Caly pso Mineral Resources: 31 Oct 2019
The Company conf irms that, other than mining depletion, it is not aware of any new inf ormation or data that materially aff ects the inf ormation included in the original market announcements and, in the case of reporting of Ore Reserv es and Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relev ant market announcements continue to apply and hav e not materially changed. The Company conf irms that the f orm and context in which any Competent Person’s f indings are presented hav e not been materially modif ied f rom the original market announcement.
This presentation includes inf ormation that relates to Ore Reserv es and Mineral Resources f or non-material mining projects of the Company which were prepared and f irst disclosed under JORC Code 2004. The inf ormation was extracted f rom the Company ’s prev ious ASX announcements as f ollows:
-
Gingin North Mineral Resources: 31 Mar 2011
-
Gingin South Mineral Resources: 21 Jul 2011
-
Red Gully Mineral Resources: 9 Mar 2011
-
Bidaminna Mineral Resources: 23 Jun 2008
The Company conf irms it is not aware of any new inf ormation or data that materially affects the inf ormation included in the original market announcements and, in the case of reporting of Ore Reserv es and Mineral Resources, that all material assumptions and technical parameters underpinning the estimates in the relev ant market announcements continue to apply and hav e not materially changed. The Company conf irms that the f orm and context in which any Competent Person’s f indings are presented hav e not been materially modif ied f rom the original market announcement. This information was prepared and first disclosed under the JORC Code 2004. It has not been updated since to comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last reported
26