IMAGE RESOURCES NL Interim / Quarterly Report 2019

Apr 29, 2019

65117_rns_2019-04-29_b380609f-26c9-405b-898f-bc3aa6e0268c.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [107 x 73] intentionally omitted <==

QUARTERLY ACTIVIQUARTERLY ACTIVITIES REPORT – for quarter ended 30 June 2018ES REPORT – for quarter ended 31 March 2019

Image Resources NL ABN 57 063 977 579

ASX Code IMA

Contact Details

Ground Floor, 23 Ventnor Avenue, West Perth WA 6005

T: +61 8 9485 2410 E: [email protected] W: imageres.com.au

Issued Capital Shares – Quoted 964,247,598 As at 31 March 2019

Board Members

Robert Besley (Non-Executive Chairman) Patrick Mutz (Managing Director) Chaodian Chen (Non-Executive Director)

Aaron Chong Veoy Soo (Non-Executive Director) Huang Cheng Li (Non-Executive Director) George Sakalidis (Executive Director) Peter Thomas (Non-Executive Director) Eddy Wu (Non-Executive Director)

HIGHLIGHTS

  • First full quarter as operational mining company at 100%-owned Boonanarring Mineral Sands Project located 80km north of Perth, WA.

  • In only the second month of production ramp-up period (January 2019) heavy mineral concentrate (HMC) production was 25,492 dry metric tonnes (DMT) or 127% of longterm, full-scale, average monthly production rate of 20,000 DMT.

  • HMC production for the quarter was 68.7K DMT or 167% of the 41.1K DMT budget.

  • Heavy mineral (HM) ore grade was 11.1% HM or 176% of 6.3% HM budgeted.

  • Ore processed was significantly lower than budgeted (664Kt vs. 762Kt) ,

  • HMC sales were 47.9K DMT or 106% of 45.0K DMT budget. HMC inventory at the end of the quarter was 38.5K DMT.

  • Revenue was $24.8M or 106% of $23.4M budget. Average revenue per DMT HMC Sold was slightly lower than budget ($517 vs. $521).

  • Project operating costs were $15.4M or 72% of $21.3M budget .

  • Project operating ‘unit’ costs per DMT HMC Sold were substantially lower than budget ($322 vs. $473) .

  • Average margin (revenue minus project operating costs) per DMT HMC Sold was substantially higher than budget ($195 vs. $48) . Similarly, EBITDA was substantially higher than budget ($9.3M vs. $2.1M).

  • ➢ March Quarter summary and annual guidance:

HMC Produced (DMT)
HMC Sold (DMT)
Revenue ($million)
Revenue/DMT HMC Sold
Project Operating Costs ($million)
Project Operating Costs/DMT HMC Sold
Project EBITDA
QTR
Actual

Annual Guidance*
Low High

Annual Guidance*
Low High
68,736 220,000 240,000
47,947 220,000 240,000
24.8 125 142
517 568 592
15.4 85 95
322 385 420
A$9.3M A$40M A$50M
  • As announced to the ASX 18 February 2019 (Image Resources CY 2019 Guidance)

  • ➢ Cash at the end of the quarter was $7.4M excluding $10M from the sale of HMC shipment No. 3 which sailed on 27 March 2019 as funds from the conversion of the letter of credit were received in early April.

  • Zero lost time accidents through construction, commissioning and four months of production.

  • ➢ The USD:AUD foreign exchange rate remained favourable ending the quarter below 0.71;

  • ➢ The market price for premium grade zircon used as a benchmark to determine the standard grade price for Image’s zircon in its HMC product remained unchanged during the quarter. However, the market price for standard grade zircon in China decreased by US$60-90/t during the quarter to US$1,425-1,475/t.

==> picture [100 x 68] intentionally omitted <==

ACTIVITIES REPORT

High Level Summary

The Company successfully completed its first full quarter as an active mining company at its 100%-owned, high-grade, zircon-rich Boonanarring mineral sands project located 80km north of Perth in the North Perth Basin in WA. This cements the Company’s position as Australia’s newest mineral sands mining company.

Overall, performance for the quarter was very positive with heavy mineral concentrate (HMC) production, product sales and revenue all higher than budgeted, while project operating costs were substantially lower than budgeted. The net result being demonstrated profitability with project operating margin and EBITDA at 400% of budget. Unfortunately, cashflow was lower than it could have been due as the receipt of AU$10M cash from the sale of the third shipment of HMC being received in the first week of April.

Another positive outcome was the identification of the likely presence of a high-grade Core in the eastern strand of the Boonanarring deposit which may not have been adequately delineated by the typical 15-20m drill spacings used to determine the current Mineral Resources and Ore Reserves. Once a close-spaced drilling programme, designed to adequately delineate the Core, is completed, the Mineral Resources and Ore Reserves will be re-estimated and could result in a positive upgrade of the overall Ore Reserve. The close-spaced drilling programme commenced on 1 April 2019.

Photo 1 – Night Operations at Boonanarring

==> picture [470 x 199] intentionally omitted <==

Details

Zero Lost Time Injuries

The Company completed its first full quarter of mining and ore processing operations with zero lost time injuries. This completes 12 months site operations, including project construction, commissioning and four months of operations, with zero lost time injuries. The Company remains committed to the promotion of a safety culture including safety programmes and procedures that encourage job safety analysis and planning as well as active incident reporting for the purpose of continual improvement of the health, safety and well-being of all employees, contractors, visitors and members of the community as well as protection of the environment.

Operating Statistics

HMC Production: January 2019 was only the second month of the production ramp-up period and HMC production of 25,492 tonnes not only exceeded budget, but also exceeded the long-term, full-scale average monthly production rate of 20,000 tonnes of HMC. This result implies the Boonanarring project ramped-up to full-scale production in only two months.

HMC production for February and March also exceeded budget (Figure 1), such that HMC production for the quarter was 167% of budget with the surplus production of 27.6K tonnes amounting to 1.4 months of production at the long-term, full-scale average monthly production rate of 20,000 tonnes.

Page 2 of 25

==> picture [100 x 68] intentionally omitted <==

Figure 1 – HMC Production

==> picture [309 x 195] intentionally omitted <==

Ore Feed Grade: The primary reason for the higher HMC production was substantially higher ore grade. The average ore grade forecast in the budget for the quarter was 6.3% heavy minerals (HM), however the actual average ore grade was 11.1% HM or 176% of budget [or a variance of 76%; (actual – budget)/budget)]. Refer Figure 2.

As announced to the ASX on 14 March 2019 (Image Resources Targeting Ore Reserve Upgrade at Boonanarring in Response to Substantially Higher than Expected Ore Grades) this higher ore grade is believed to be due to the presence of a very high-grade horizontal Core running along strike within the eastern strandline that may not have been adequately delineated using the standard 15-20 metre drill hole spacing typically used for mineral sands deposits. A close-spaced drilling programme (2.5-5m spaced holes on 50m lines) has been designed to address the high variability of ore grade in the Core.

The close-spaced drilling programme commenced on 2 April 2019 and the full programme of drilling, analysis, Mineral Resources estimate, mine modelling and Ore Reserve determination is anticipated to be complete near the end of June 2019.

Figure 2 – Ore Grade

==> picture [318 x 185] intentionally omitted <==

Zircon Grade in Ore: In addition to higher HM ore grade, analysis of HM indicates it contains a significantly higher concentration of zircon than estimated in the Ore Reserve (Figure 3). A simple comparison of Figure 2 and 3 indicates the higher the HM grade, the higher the zircon concentration in the HM. On average, the zircon grade in the ore assayed 29% higher than estimated in the ore reserve for the ore processed in this quarter. If this trend continues throughout the Ore Reserve, it has the potential to have a significant impact on overall revenue as zircon represents more than 80% of total revenue.

Page 3 of 25

==> picture [100 x 68] intentionally omitted <==

Figure 3 – Zircon Grade in Ore

==> picture [330 x 196] intentionally omitted <==

Ore Feed Rate: The ore processing rate to the feed preparation plant (FPP) was lower than budgeted in February and again in March (Figure 4). Total ore processed during the quarter was significantly lower than budgeted at 664K tonnes versus a budget of 762K tonnes. The primary contributor to the lower ore feed rates is due to the unexpected high ore grade which results in HMC production that exceeds the current capacity of the HMC cleaning and dewatering circuits, and which requires the ore feed rate to be reduced. Work is underway to identify required design changes to increase the capacity of these circuits to accommodate higher ore grades at higher ore processing rates.

The second contributor to lower ore feed rate is limited capacity of the FPP trommel when processing ore with higher clay content, generally from the western ore strand. Options to expand the trommel screening capacity, including replacement with a larger unit, are being evaluated as a matter of priority.

Figure 4 – Ore Feed Rate

==> picture [308 x 196] intentionally omitted <==

Operating Summary: With exception to the ore processing rate, all other operating statistics for the quarter exceeded budget targets. In March 2019, the HM Recovery target was decreased to 86% as a step to increase overall quality of the HMC. This change was successful as the heavy minerals not recovered are non-valuable.

Page 4 of 25

==> picture [100 x 68] intentionally omitted <==

Table 1 – Operating Statistics

March 2019 March 2019 March 2019 Q1 2019 Q1 2019
Item Unit Actual Budget Variance Actual Budget Variance
FPP/WCP runtime hrs. 651 632 3% 1,896 1,835 3%
Availability % 87.5 85.0 3% 87.8 85.0 3%
FPP Ore Feed t 219,699 319,697 -31% 446,977 556,580 -20%
FPP Ore Feed tph 337 506 -33% 236 303 -22%
Ore HM grade % 11.9 6.1 95% 11.1 6.3 76%
HMC produced t 24,224 19,425 25% 68,736 41,130 67%
HMC HM grade % 93.0 90.0 3% 92.4 90.6 2%
HM Recovery % 85.8 90.0 -5% 86.3 80.8 7%

Notes: FPP = Ore Feed Preparation Plant WCP = Wet Concentration Plant HMC = Heavy Mineral Concentrate HM = Heavy Mineral Variance = (Actual - Budget)/Budget

Mining

Overburden removal and ore mining by contractor Piacentini & Son continued successfully throughout the reporting period. Overburden removal and ore mining is progressing according to the mine schedule. Ore was mined from both the western and eastern strandlines. Due to the extreme ore grade variability (2% to 45+% HM), ore blending continues to be a key element of mine scheduling and control. Piacentini also continues to construct solar cells for slimes disposal and more recently commenced construction of the first in-pit embankment to facilitate a transition to co-disposal of tailings sands and slimes.

Figure 5 – Mine Footprint

==> picture [274 x 290] intentionally omitted <==

Page 5 of 25

==> picture [100 x 68] intentionally omitted <==

HMC Sales

A total of three bulk shipments of HMC were completed (one per month) during the reporting period. Total dry metric tonnes (DMT) shipped were 47,947 or 106% of 45,000 DMT budget (see Table 2). All sales were completed under the existing HMC off-take agreements and reflected market pricing for the 30-day period leading up to the time of each shipment.

Table 2 – HMC Shipping Log

==> picture [390 x 102] intentionally omitted <==

----- Start of picture text -----

Q1 2019 HMC Shipping Summary
Shipment ID Ship Date Dry Tonnes Vessel ZrO2 TiO2 Budget Tonnes
IMA-NAT-001 12-Jan-19 10,026 Shanghai Spirit 15.5% 34.2% 10,000
IMA-NAT-002 16-Feb-19 20,039 Globe Explorer 17.7% 32.4% 15,000
IMA-NAT-003 27-Mar-19 17,882 Crimson Grace 20.0% 32.2% 20,000
Totals 47,947 45,000
----- End of picture text -----

Revenue

Total revenue for the first three shipments of HMC was AU$24.8M or 106% of $23.4M budget. Average revenue per DMT HMC sold was slightly lower than budget ($517 vs. $521) due to lower quality product during initial stages of operation and due to a softening of standard grade zircon prices. The quality of the HMC improved rapidly in January and February to target levels at greater than 90% HM and continued to improve in ZrO2 content throughout the quarter.

Revenue was restrained by sales but not by production, as HMC production outstripped HMC sales, leading to an inventory buildup of 38.5K tonnes HMC at the end of March. The Company is actively seeking additional buyers outside of the current off-take agreements for the surplus production, as this unanticipated extra production has taxed the current off-takers’ capacity in the short-term.

Operating Costs

Project operating costs were substantially lower than budget at $15.5M or only 72% of $21.3M budget for the quarter. Similarly, project operating ‘unit’ costs were lower than budget at $322/t HMC sold or 68% of $473/t budgeted costs. Costs including exploration and corporate were $355/t HMC sold or 67% of $526/t budget.

Operating costs were lower than budget due to lower overall costs in most categories and also due to the mining and processing of fewer ore tonnes due to the higher than anticipated HM ore grade.

Operating Margin and EBITDA

Overall average margin of $195 per DMT HMC Sold (unit revenue minus unit project operating costs) was substantially higher than budget of $48, due to lower project operating costs and favourable USD:AUD exchange rate. As a result, EBITDA for the quarter was also substantially higher at $9.3M compared to a budget of $2.1M.

Quarter Summary and Annual Guidance

Ore Tonnes Processed (million)
HMC Produced (DMT)
HMC Sold (DMT)
Revenue ($million)
Revenue/DMT HMC Sold
Project Operating Costs ($million)
Project Operating Costs/DMT HMC Sold
Project EBITDA
QTR
Actual

Annual Guidance*
Low High

Annual Guidance*
Low High
0.66 3.4 3.7
68,736 220,000 240,000
47,947 220,000 240,000
24.8 125 142
517 568 592
15.4 85 95
322 385 420
A$9.3M A$40M A$50M
  • As announced to the ASX 18 February 2019 (Image Resources CY 2019 Guidance)

Page 6 of 25

==> picture [100 x 68] intentionally omitted <==

Cash

Cash at the end of the quarter was $7.4M excluding $10M from the sale of HMC shipment No. 3 which sailed on 27 March 2019 but with receipt of funds from the letter of credit delayed until early April. Shipment No. 3 originally scheduled for mid-March was delayed to the end of the month due to ship availability.

Foreign Exchange Rate

For the second consecutive quarter the USD:AUD foreign exchange rate (FX) remained favourable ending the quarter below 0.71. The current budget is based on an assumed FX of 0.74.

Zircon Pricing

The premium grade zircon market price used as a benchmark to determine the standard grade price for Image’s zircon in its HMC product remained steady with Iluka Resources announcing it would maintain its current published pricing for six months from 31 March 2019. However, due to weaker than expected economic conditions in China, the market price for standard grade zircon decreased during the quarter by US$60-90/t to US1,425-1,475/t. The price drop is believed to be due to a softening of demand and inventory holders lowering selling prices to maintain cashflows. This situation is thought to be temporary as the underlying fundamentals of supply/demand remain positive for zircon.

Corporate

The Quarterly Activities and Cashflow Reports for the period ending 31 December 2018 were filed on 31 January 2019.

The Company approved a detailed budget for calendar year (CY) 2019 and published annual guidance for production, costs, revenue and EBITDA on 18 February 2019 (ASX announcement - Image Resources CY 2019 Guidance).

Exploration Highlights

  • Discussions are continuing with three landowners, seeking access agreements to allow drilling of the northernmost 2.6km of the Boonanarring Deposit’s Northern Extension.

  • A total of 97 aircore infill holes have now been completed for 3770m in Boonanarring Block C with results pending and forms part of a larger 208 hole 10,400m drill programme planned initially in Blocks A, B and C with average depths of 50m to allow accurate wireframing of this high-grade zone

  • The newer Boonanarring West mineralisation target area, which is only 600m west of the Boonanarring Deposit has now been enlarged to a significant 10km in length and a programme of 35 drillholes was completed this quarter. A program of 126 holes totalling 3150m is planned for 2019 mainly focused on the northern parts of the Boonanarring West target area, which will allow conversion of the northern Boonanarring West mineralisation to an Indicated JORC category.

  • At Erayinia 10 RC holes for 1200m have been completed (results pending) to follow up fire assay results on 1m splits, which identified three, high-grade anomalous gold zones not previously defined by 4m composite sample chemical assays, and include intercepts of 3m at 11.5g/t Au from 92m including 2m at 16.6g/t Au from 93m in hole EYRC03; 2m at 9.9g/t Au from 56m in hole EYRC01; and 3m at 2.4g/t Au from 47m in hole EYRC01.

Boonanarring Northern Extension

The Company is still in discussions with three landowners regarding access agreements for delineation drilling over the 2.6km northernmost section of the extension of the high-grade Boonanarring deposit announced on 13 March 2017. If access agreements are secured, 80 drillholes for 3,840m on a 200m x 40m drill grid are likely required to convert the mineralisation in this area to an Indicated Mineral Resources Category (Fig. 1).

The Boonanarring high-grade northern extension area has been confirmed from previous roadside drilling and includes very high zircon grades ranging from 16.4% to 22.2% of the heavy mineral (HM) content, which includes outstanding HM high-grade intersections of 8m @ 23.8% HM in drillhole IX00245, 8m @ 21.1% HM in IX00244 and 8m @ 16.3% HM in IX00250 (ASX release 26/06/2017). In addition, the northernmost part of the extension area has a lower strip ratio of around 3.2:1 as compared to a higher strip ratio for the currently planned Boonanarring mine area. This extension area is deemed to be within economic pumping distance of the planned location of the Boonanarring wet concentration plant.

The grade is similar to Block A (double the average grade at half the strip ratio. Drilling of the Boonanarring Northern extension to Indicated Status would consist of 78 drillholes for 3500m on a 200m x 40m drill grid covering a 2.6km stretch, which is subject to access on three properties.

Page 7 of 25

==> picture [100 x 68] intentionally omitted <==

==> picture [297 x 423] intentionally omitted <==

Figure 1. Boonanarring North Extension Target area showing proposed drilling subject to access

Boonanarring Mine Drilling

An infill programme on a 5m x 50m spacing has started with a corroborating detailed ground magnetic programme which will measure every 0.5m x 25m and help resolve the various highest-grade zones and map them in more detail and potentially discriminate more than one zone.

This very high-grade core zone is continuous through Blocks A, B and the northern part of C and resembles a horizontal cylinder in shape and is defined by the greater than 150GT contour. A large 10,400m drill programme is planned initially in Block B and C, comprising 206 AC holes for 10400m with an average depth of 50m. This will allow accurate wireframing of this high-grade zone.

So far 97 holes have now been completed for 3770m in Block C (Figure 2) and results are pending from the laboratory.

Another consideration is for more detailed zircon assays and composite work down the hole. This is important as the zircon gives 75% of the value of the project and all detailed variations should evaluated. Often mining companies with higher zircon content deposits take Zircon assays every metre down the hole. An XRF logger has been ordered and will be trialled on some of the HM sachets and compared to the Qemscan analyses.

Page 8 of 25

==> picture [100 x 68] intentionally omitted <==

This very high-grade core zone is continuous through Blocks A, B and the northern part of C and resembles a horizontal cylinder in shape and is defined by the greater than 150GT contour (grade x thickness) as shown in Figure 2 and this infill programme is almost half completed.

==> picture [356 x 571] intentionally omitted <==

Figure 2 Proposed infill high grade core drilling within Blocks A, B, C and D within the Boonanarring Deposit.

Boonanarring West

Page 9 of 25

==> picture [100 x 68] intentionally omitted <==

After recent drilling at Boonanarring West and further ground magnetic interpretation a much larger target is outlined being 10000m x 300m, only is only 600m west of the Boonanarring Resource. The overall grade appears strongest in the northern parts of the Boonanarring West target after several drilling programmes. For this reason, most of the proposed drilling will be focused on the northern area.

To convert the northern Boonanarring West mineralisation to an Indicated JORC category, a 126 drillhole programme is planned for 2019 (Fig. 3). Of these 20 aircore holes have been drilled for 614m in the March 2019 quarter and assays are pending. Composite test work will be carried out to work out the percentage of zircon within the HM suite. The mineralisation is open to the SSE and is at a lower RL of 50–55 ASL compared to 65–70 ASL for the Boonanarring Resource.

==> picture [273 x 380] intentionally omitted <==

Figure 3. Boonanarring West Target Area showing proposed drilling in 2019

Bidaminna Mineral Resources and Northern Extension

The Bidaminna Project is unusual as the heavy mineral assemblage contains significant quantities of higher value leucoxene. The pricing of leucoxene can vary and can be 3 to 4 times the value of ilmenite. The leucoxene content in the current Mineral Resources (JORC 2004) area over 3 separate lines varies from 28% leucoxene in the HM in the southernmost part of the Mineral Resources area, up to 69% in the northernmost part of the Mineral Resources area.

Recent Qemscan and mini bulk testing suggest a lowering of the Leucoxene content moving north of the resource with increased altered Ilmenite. This variation can only be accurately defined by more drilling and bulk composite test work. The two mineralised zones are up to 35m thick and below the water table.

The Historical Resource of 44Mt at 3% HM @ 1% cut off is over a 6km length and our Exploration Target is 125–150Mt at 2– 3%HM with a 0.5% cut off.

Page 10 of 25

==> picture [100 x 68] intentionally omitted <==

A 106-hole programme totalling 5618m is planned mainly north and south of the Moore River to outline the detailed variation in the leucoxene contents, which appears critical for the economics of this deposit (Fig. 5) following an extensive 30km environmental survey (botanical, banksia, dieback and heritage) completed in early October 2018. Of these 5 aircore holes have been drilled for 260m in the March 2019 quarter and results are pending.

==> picture [289 x 412] intentionally omitted <==

Figure 5. Bidaminna Deposit and potential northern extension showing holes planned in 2019

Page 11 of 25

==> picture [100 x 68] intentionally omitted <==

Atlas Southern Extension drilling at Munbinia and Munbinia West and dredge target drilling at Woolka

The Woolka Dredge Target area is very large being 10km[2] and has potential for a very large resource. A 13-hole drilling programme was completed in the December Quarter. The results were encouraging, allowing Image to focus on the next major drilling programme in 2019. A major drilling programme of 94 holes totalling 3760m in 2019 is designed to locate a strategic world-class dredgeable deposit adjacent to Tronox’s Cooljarloo 2000t/h dredging operation. This drilling will permit an Inferred/Indicated Resource to be calculated. Mineralisation is adjacent to and on direct strike with Tronox’s Cooljarloo West dredging proposal area.

At Munbinia the southern extension of the Atlas Deposit (6.5km) will be tested by a 160-hole programme totalling 3200m over a potential 3km southern extension.

An 18-hole programme at Munbinia West was completed to test for new mineralisation over a km-long target area, which is only 3km west of the Atlas Deposit (Fig. 6). Only low-grade mineralisation was detected.

==> picture [343 x 464] intentionally omitted <==

Figure 6. Atlas South Extension drilling at Munbinia and Munbinia West and dredge drilling at Woolka

Page 12 of 25

==> picture [100 x 68] intentionally omitted <==

Erayinia Gold Drilling

High-grade gold results were obtained from fire assay analysis of 1m splits (Figs 7 and 8) at Image’s 100%-owned Erayinia prospect (E28/1845 and E28/2742 totalling 106.7km[2] located 130km ESE of Kalgoorlie where there are numerous operating gold mines. The drill programme has been successful in identifying strike continuity of the King mineralisation, which starts 350m to the south. A prospective shear zone is interpreted to extend the King mineralisation within the excised Prospecting Licences (P28/1320–21) to the north within Image Resource’s tenement (E28/1895). The mineralisation within the adjoining P28/1320– 21 is over 1km in length and is within a 150m-wide zone with maximum 1m gold intervals projected to surface.

==> picture [278 x 270] intentionally omitted <==

Figure 7. Ground Magnetics merged with Aeromagnetics with planned RC drilling, previous RC holes and historical AC holes

==> picture [411 x 249] intentionally omitted <==

Figure 8. Cross section showing EYRC01,2,3 RC Intercepts from 1m assays and historical aircore drilling and planned RC drilling that will test the down dip potential.

Page 13 of 25

==> picture [100 x 68] intentionally omitted <==

The fire assay results (see IMA ASX Release 28 February 2019 show high grade gold intersections including 3m at 11.5g/t, which were much higher than the preliminary wet chemistry assays conducted on 4m composites, analysed by the aqua regia method (see IMA ASX Release 19 September 2018 for preliminary results).

The fire assay results on the 1m composites compared to the 4m composites analysed by aqua regia can be summarized as follows:

  • 3m at 11.5g/t Au from 92m including 2m at 16.6g/t Au from 93m (fire assays) compared to the 4m composite at 0.63g/t Au (aqua regia assays) from 92m in hole EYRC03;

  • 2m at 9.9g/t Au from 56m (fire assays) compared to the 4m composite at 1.04g/t Au (aqua regia assays) from 56m in hole EYRC01; and

  • 3m at 2.4g/t Au from 47m (fire assays) compared to the 4m composite at 0.40g/t Au (aqua regia assays) from 44m in hole EYRC01.

As a result of these upgraded gold results, more anomalous zones will be analysed by fire assay over the 1m split intervals and a follow-up programme of 10 RC holes for 1200m has just finished and samples are being sent to the laboratory for analysis. This drill programme is designed to test the extent of the above high-grade zones (Figures 8 and 9) and includes 4 additional drill lines over a 500m strike length, to test for the potential NNW extent of this high-grade gold mineralisation.

The recently completed RC drilling programme of 7 RC holes (EYRC07 to EYRC13) totalling 337m is now considered of limited effectiveness as some of the holes drilled only went to a vertical depth of around 45m, which is too shallow to pick up the above high-grade gold zones, which start around 50m and are expected to deepen going to the north. The next drill programme will be to an average depth of 136m. The most southern drill line will start adjacent to the King mineralisation to the south ( Figure 8 ) which was drilled by WMC in 1998–99 and Integra in 2003–07.

The intersections in EYRC01 are within a sheared, bleached and silicified mafic unit. The mineralisation is interpreted to occur as west-dipping, stacked pyrite, quartz, and carbonate lodes within a package of Archean mafic and sedimentary rocks.

Page 14 of 25

==> picture [100 x 68] intentionally omitted <==

COMPETENT PERSON’S STATEMENTS – EXPLORATION RESULTS, MINERAL RESOURCES AND ORE RESERVES

Information in this report that relates to Exploration Results, Mineral Resources and Ore Reserves (other than Boonanarring and Atlas Mineral Resources and Ore Reserves) is based on information compiled by George Sakalidis BSc (Hons) who is a member of the Australasian Institute of Mining and Metallurgy. At the time that the Exploration Results, Mineral Resources and Ore Reserves were compiled, George Sakalidis was a director of Image Resources NL. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. George Sakalidis consents to the inclusion of this information in the form and context in which it appears in this report.

The information in this report that relates to the estimation of Mineral Resources for the Boonanarring and Atlas Projects is based on information compiled by Mrs Christine Standing, who is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM) and the Australian Institute of Geoscientists (AIG). Mrs Standing is a full-time employee of Optiro Pty Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mrs Standing consents to the inclusion in this report of the matters based on her information in the form and context in which it appears.

The information in this report that relates to the estimation of Ore Reserves for the Boonanarring and Atlas Projects has been compiled in accordance with the guidelines of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code – 2012 Edition). The Ore Reserves have been compiled by Jarrod Pye, Mining Engineer and previously a full-time employee of Image Resources, under the direction of Andrew Law of Optiro, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Law has sufficient experience in Ore Reserves estimation relevant to the style of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Law consents to the inclusion in the report of the matters compiled by him in the form and context in which it appears."

FORWARD LOOKING STATEMENTS

Certain statements made during or in connection with this communication, including, without limitation, those concerning the economic outlook for the mining industry, expectations regarding prices, exploration or development costs and other operating results, growth prospects and the outlook of Image’s operations contain or comprise certain forward-looking statements regarding Image’s operations, economic performance and financial condition. Although Image believes that the expectations reflected in such forward-looking statements are reasonable, no assurance can be given that such expectations will prove to have been correct.

Accordingly, results could differ materially from those set out in the forward looking statements as a result of, among other factors, changes in economic and market conditions, success of business and operating initiatives, changes that could result from future acquisitions of new exploration properties, the risks and hazards inherent in the mining business (including industrial accidents, environmental hazards or geologically related conditions), changes in the regulatory environment and other government actions, risks inherent in the ownership, exploration and operation of or investment in mining properties, fluctuations in prices and exchange rates and business and operations risks management, as well as generally those additional factors set forth in our periodic filings with ASX. Image undertakes no obligation to update publicly or release any revisions to these forwardlooking statements to reflect events or circumstances after today’s date or to reflect the occurrence of unanticipated events.

Attachments: Table 2. Tenement Schedule in accordance with ASX Listing Rule 5.3.3 Table 3. Mineral Resources and Ore Reserves as at 3 August 2017

Page 15 of 25

==> picture [100 x 68] intentionally omitted <==

Table 2 – Tenement Schedule

Tenement Schedule in accordance with ASX Listing Rule 5.3.3

Location Tenement Nature of
Interest
Project Equity (%) held at
start of Quarter
Equity (%) held at
end of Quarter
WA E28/1895 Granted ERAYINIA 100% 100%
WA E70/2636 Granted COOLJARLOO 100% 100%
WA E70/2844 Granted BIDAMINNA NTH 100% 100%
WA E70/2898 Granted COOLJARLOO 100% 100%
WA E70/3032 Granted GINGIN 100% 100%
WA E70/3041 Granted REGANSFORDSOUTH 100% 100%
WA E70/3100 Granted QUINNSHILL 100% 100%
WA E70/3192 Granted BOOTINE 100% 100%
WA E70/3298 Granted BIDAMINNA -PARK 90% 90%
WA E70/3411 Granted REGANSFORD 100% 100%
WA E70/3494 Granted BRYALANA 100% 100%
WA E70/3720 Granted BLUE LAKE 100% 100%
WA E70/3892 Granted CHAPMAN HILL 100% 100%
WA E70/3997 Granted MUNBINIA 100% 100%
WA E70/4077 Granted DARLINGRANGE 100% 100%
WA E70/4244 Granted WOOLKA 100% 100%
WA E70/4245 Granted WINOOKA 100% 100%
WA M70/0448 Granted GINGINSOUTH 100% 100%
WA M70/1192 Granted REDGULLY 100% 100%
WA M70/1194 Granted BOONANARRING 100% 100%
WA P70/1516 Granted COOLJARLOO 100% 100%
WA M70/1311 Granted BOONANARRINGNORTH 100% 100%
WA G70/0250 Granted BOONANARRING 100% 100%
WA R70/0051 Granted COOLJARLOONORTH 100% 100%
WA M70/1305 Application ATLAS 100% pending grant 100% pending grant
WA P70/1520 Application COOLJARLOO 100% pending grant 100% pending grant
WA E70/4631 Granted MUNBINIA WEST 100% 100%
WA E70/4656 Granted WINOOKA NORTH 100% 100%
WA E70/4663 Granted BIBBYSPRINGS 100% 100%
WA E70/4689 Granted BOONANARRINGWEST 100% 100%
WA E70/4779 Granted MIMEGARRA 100% 100%
WA E70/4794 Granted REGANSFORD NORTH 100% 100%
WA E70/4795 Application BIDAMINNASOUTH 100% pending grant 100% pending grant
WA E70/4919 Granted ORANGESPRINGS 100% 100%
WA E70/4946 Granted REDGULLY NORTH 100% 100%
WA E70/4949 Granted NAMMEGARRA 100% 100%
WA E28/2742 Granted MADOONIA DOWNS 100% 100%

Page 16 of 25

==> picture [100 x 68] intentionally omitted <==

WA E70/5192 Application WINOOKASOUTH 100% pending grant 100% pending grant
WA E70/5193 Granted CHAPMAN HILL NORTH 100% 100%
WA E70/5213 Application GINGINUP HILL 100% pending grant 100% pending grant
Mining Tenements acquired during the Quarter
Mining Tenements disposed during the Quarter

Page 17 of 25

==> picture [100 x 68] intentionally omitted <==

Table 3 – Mineral Resources and Ore Reserves as at 3 August 2017

High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012)
Project/Deposit Category Volume Tonnes % HM **% Slimes ** HM Tonnes VHM Ilmenite Leucoxen Rutile Zircon
(%) (%) (%) (%) (%)
Boonanarring1 Proved 5,008,000 9,344,000 8.6 14.3 803,771 76.081 48.9 1.8 2.2 23.2
Boonanarring1 Probable 5,565,000 10,514,000 5.9 17.6 622,429 78.653 52.3 1.8 2.7 21.9
Total Boonanarring 10,573,000 19,858,000 7.2 16.1 1,426,200 77.203 50.4 1.8 2.4 22.7
Atlas1 Probable 5,000,000 9,477,000 8.1 15.5 767,637 73.3 50.7 4.5 7.5 10.6
Total Atlas 5,000,000 9,477,000 8.1 15.5 767,637 73.3 50.7 4.5 7.5 10.6
Total Ore Reserves 15,573,000 29,335,000 7.5 15.9 2,193,837 75.8 50.5 2.7 4.2 18.4
High Grade Mineral Resources - Strand Deposits; in accordance with the JORC Code (2012) @ 2.0% HM Cut-off
Project/Deposit Category Volume Tonnes % HM **% Slimes ** HM Tonnes VHM Ilmenite Leucoxen Rutile Zircon
(%) (%) (%) (%) (%)
Boonanarring2 Measured 6,359,359 11,799,213 8.0 14 942,167 74.3 48.3 1.7 2.2 22.0
Boonanarring2 Indicated 11,802,047 22,265,400 4.9 18.3 1,081,208 71.7 49.2 2.2 2.5 17.8
Boonanarring2 Inferred 4,987,703 9,420,449 4.5 21 422,507 68.8 50.0 3.5 3.4 11.9
Boonanarring Total 22,886,875 43,485,062 5.6 18 2,445,882 72.2 49.0 2.2 2.6 18.4
Atlas2 Measured 5,210,526 9,900,000 7.9 16.1 782,000 71.0 49.1 4.2 7.2 10.5
Atlas2 Indicated 3,368,421 6,400,000 3.7 17.3 237,000 56.5 41.6 3.4 4.7 6.8
Atlas2 Inferred 947,368 1,800,000 4.0 19.9 72,000 41.5 29.0 3.3 4.4 4.8
Atlas Total 9,526,316 18,100,000 6.0 16.9 1,091,000 65.9 46.1 4.0 6.5 9.3
Sub-Total Atlas/Boonanarring 32,413,191 61,585,062 5.7 17.7 3,536,882 70.3 48.1 2.8 3.8 15.6
Previously Reported Mineral Resources - Strand Deposits; in accordance with JORC Code (2004) @ 2.5% HM Cut-off
Project/Deposit Category Volume Tonnes % HM **% Slimes ** HM Tonnes VHM Ilmenite Leucoxen Rutile Zircon
(%) (%) (%) (%) (%)
Gingin Nth3 Indicated 680,175 1,318,642 5.7 15.7 75,163 75.4 57.4 9.3 3.2 5.5
Gingin Nth3 Inferred 580,000 1,090,000 5.2 14.0 57,116 78.4 57.3 11.3 3.7 6.0
Gingin Nth Total
Gingin Sth3
1,260,175 2,408,642 5.5 15.0 132,279 76.7 57.3 10.2 3.4 5.7
7.8
Measured 872,830 1,526,122 4.4 7.2 67,149 79.4 50.7 15.3 5.6
Gingin Sth3 Indicated 3,241,835 5,820,480 6.5 7.1 377,167 90.6 67.6 9.8 5.1 8.1
Gingin Sth3 Inferred 398,573 732,912 6.5 8.4 47,566 91.6 67.4 7.5 5.8 10.9
Gingin Sth Total 4,513,238 8,079,514 6.1 7.3 491,882 89.2 65.3 10.3 5.2 8.3
Helene3 Indicated 5,568,110 11,466,106 4.6 18.6 522,854 88.7 74.6 0.0 3.6 10.5
Hyperion3 Indicated 1,786,781 3,742,471 7.7 19.3 286,673 69.4 55.8 0.0 6.3 7.3
Cooljarloo Nth Total 7,354,891 15,208,577 5.3 18.8 809,528 81.9 67.9 0.0 4.6 9.4
Red Gully3 Indicated 1,930,000 3,409,768 7.8 11.5 265,962 89.7 66.0 8.3 3.1 12.4
Red Gully3 Inferred 1,455,000 2,565,631 7.5 10.7 192,422 89.0 65.4 8.2 3.0 12.3
Red Gully Total 3,385,000 5,975,399 7.7 11.2 458,384 89.4 65.7 8.2 3.1 12.4
Sub-Total Other 16,513,304 31,672,132 6.0 14.1 1,892,073 85.2 66.0 5.4 4.3 9.6
Historic Deposit - Strand deposit; in accordance with JORC Code (2004)
Project/Deposit Category Volume Tonnes % HM **% Slimes ** HM Tonnes VHM Ilmenite Leucoxen
e
Rutile Zircon
(%) (%) (%) (%) (%)
Regans Ford4 Indicated 4,505,285 9,024,226 9.9 16.8 893,398 94.3 70.0 10.0 4.3 10.0
Regans Ford4 Inferred 455,933 918,536 6.5 18.5 59,705 90.5 68.3 7.7 4.4 10.1
Regans Ford Total 4,961,218 9,942,762 9.6 17.0 953,103 94.1 69.9 9.9 4.3 10.0

Page 18 of 25

==> picture [100 x 68] intentionally omitted <==

1. COMPLIANCE STATEMENT - Boonanarring/Atlas Ore Reserves

The Ore Reserves statement has been compiled in accordance with the guidelines of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code – 2012 Edition). The Ore Reserves have been compiled by Jarrod Pye, Mining Engineer and full-time employee of Image Resources, under the direction of Andrew Law of Optiro, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Law has sufficient experience in Ore Reserves estimation relevant to the style of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Law consents to the inclusion in the report of the matters compiled by him in the form and context in which it appears.

2. COMPLIANCE STATEMENT - Boonanarring/Atlas Mineral Resources

The information in this report that relates to the estimation of Mineral Resources is based on information compiled by Mrs Christine Standing, who is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM) and the Australian Institute of Geoscientists (AIG). Mrs Standing is a full-time employee of Optiro Pty Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mrs Standing consents to the inclusion in this report of the matters based on her information in the form and context in which it appears.

3. COMPETENT PERSON’S STATEMENT – MINERAL RESOURCE ESTIMATES

The information in this presentation that relates to Mineral Resources is based on information compiled by Lynn Widenbar BSc, MSc, DIC MAusIMM MAIG employed by Widenbar & Associates who is a consultant to the Company. Lynn Widenbar has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the ‘Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Lynn Widenbar consents to the inclusion of this information in the form and context in which it appears.

4. HISTORIC INFORMATION - REGANS FORD DEPOSIT

The information in this presentation that relates to tonnes, grades and mineral assemblage is based on historic information published by Iluka Resources Limited and indicating the mineral resources were compiled in accordance with the JORC Code (2004).

==> picture [530 x 130] intentionally omitted <==

----- Start of picture text -----

Previously Reported Mineral Resources - Dredge deposits; in accordance with JORC Code (2004) @ 1.0% HM Cut-off
Project/Deposit Category Volume Tonnes % HM % Slimes HM Tonnes VHM Ilmenite e Rutile Zircon Ilmenite Leucoxen Rutile Zircon VHM
(%) (%) (%) (%) (%)
Titan3 Indicated 10,335,053 21,163,741 1.8 22.1 378,831 86.0 71.9 1.5 3.1 9.5 272,493 5,720 11,782 35,875 325,870
Titan3 Inferred 58,517,775 115,445,391 1.9 18.9 2,205,007 85.9 71.8 1.5 3.1 9.5 1,583,857 33,737 67,253 208,814 1,893,660
Total Titan Total 68,852,828 136,609,132 1.9 19.4 2,583,838 85.9 71.8 1.5 3.1 9.5 1,856,350 39,457 79,034 244,689 2,219,530
Telesto3 Indicated 1,716,328 3,512,204 3.8 18.4 134,499 83.3 67.5 0.7 5.6 9.5 90,776 968 7,519 12,791 112,054
Calypso 3 Inferred 27,113,647 51,457,008 1.7 13.7 854,186 85.6 68.1 1.6 5.1 10.8 581,701 13,667 43,564 92,252 731,184
Bidaminna3 Inferred 26,260,000 44,642,000 3.0 3.6 1,339,260 96.8 83.11 7.2 1.0 5.5 1,113,000 97,000 13,000 73,000 1,296,000
Total Dredge 123,942,803 236,220,344 2.1 15.2 4,911,783 88.7 74.1 3.1 2.9 8.6 3,641,826 151,092 143,116 422,732 4,358,767
----- End of picture text -----

3. COMPETENT PERSON’S STATEMENT – RESOURCE ESTIMATES

The information in this presentation that relates to Mineral Resources is based on information compiled by Lynn Widenbar BSc, MSc, DIC MAusIMM MAIG employed by Widenbar & Associates who is a consultant to the Company. Lynn Widenbar has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the ‘Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Lynn Widenbar consents to the inclusion of this information in the form and context in which it appears.

Page 19 of 25

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

+Rule 5.5

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

Name of entity

IMAGE RESOURCES NL

ABN Quarter ended (“current quarter”) 57 063 977 579 31/03/2019

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
1.
Cash flows from operating activities
1.
1
Receipts from customers1
1.
2
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
1.
3
Dividends received (see note 3)
1.
4
Interest received
1.
5
Interest and other costs of finance paid
1.
6
Income taxes paid
1.
7
Research and development refunds
14,761
(318)
-
(15,785)
(724)
(377)
-
11
(3)
-
-
14,761
(318)
-
(15,785)
(724)
(377)
-
11
(3)
-
-

+ See chapter 19 for defined terms

1 September 2016

Page 20 of 25

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
1.
8
Other (provide details if material)
1.
9
Net cash from / (used in) operating
activities
- -
(2,435) (2,435)
2.
Cash flows from investing activities
2.1
Payments to acquire:
(a) property, plant and equipment
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
2.2
Proceeds from the disposal of:
(a) property, plant and equipment
(b) tenements (see item 10)
(c) investments
(d) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
Term Deposits greater than 90 days
matured
2.6
Net cash from / (used in) investing
activities
(3,960)
-
-
-
-
-
-
-
-
-
-
(3,960)
-
-
-
-
-
-
-
-
-
-
(3,960) (3,960)
3.
Cash flows from financing activities
3.1
Proceeds from issues of shares
3.2
Proceeds from issue of convertible notes
3.3
Proceeds from exercise of share options
3.4
Transaction costs related to issues of
shares, convertible notes or options
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
1,534
-
-
(21)
566
(229)
1,534
-
-
(21)
566
(229)

+ See chapter 19 for defined terms

1 September 2016

Page 21 of 25

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

Consolidated statement of cash flows Current quarter
$A’000
Year to date
(3 months)
$A’000
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.1
0
Net cash from / (used in) financing
activities
-
-
-
-
-
-
1,850 1,850
4.
Net increase / (decrease) in cash and cash
equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
4.3
Net cash from / (used in) investing
activities (item 2.6 above)
4.4
Net cash from / (used in) financing
activities (item 3.10 above)
4.5
Effect of movement in exchange rates on
cash held
4.6
Cash and cash equivalents at end of
period1
11,886
(2,435)
(3,960)
1,850
60
11,886
(2,435)
(3,960)
1,850
60
7,401 7,401
5.
Reconciliation
of
cash
and
cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to
the related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)1
7,386
15
-
-
11,871
15
-
-
7,401 11,886

1 Excludes A$ 10 million received in early April for a shipment completed in March.

+ See chapter 19 for defined terms

1 September 2016

Page 22 of 25

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

6. Payments to directors of the entity and their associates Current quarter
$A'000
6.1 Aggregate amount of payments to these parties included in item 1.2 303
6.2 Aggregate amount of cash flow from loans to these parties included
in item 2.3 -
6.3 Include below any explanation necessary to understand the transactions included in
items 6.1 and 6.2
7. Payments to related entities of the entity and their associates Current quarter
$A'000
7.1 Aggregate amount of payments to these parties included in item 1.2 -
7.2 Aggregate amount of cash flow from loans to these parties included
in item 2.3 -
7.3 Include below any explanation necessary to understand the transactions included in
items 7.1 and 7.2

+ See chapter 19 for defined terms

1 September 2016

Page 23 of 25

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

8.
Financing facilities available
Add
notes
as
necessary
for
an
understanding of the position
8.1
Loan facilities
8.2
Credit standby arrangements
8.3
Other – Insurance Premium Funding Loan
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
65,085 57,815
55 55
337 -
  • 8.4 Include below a description of each facility above, including the lender, interest rate and whether it is secured or unsecured. If any additional facilities have been entered into or are proposed to be entered into after quarter end, include details of those facilities as well.

  • 2 Loans are held as follows:

  • Murray Zircon Pty Ltd – A$4,000,000. Interest rate is 5% paid six monthly in arrears.

  • A senior secured debt facility with Pala Investments Limited (“Pala”), Castelake IV, L.P. and CL V Investment Solutions LLC of US$38,850,000 + capitalised interest of US$4,897,362 (A$61,085,046 at 31 December 2018). Interest rate is 14% for the first fifteen months following draw down and 13% thereafter for the balance of the loan. Interest for the first fifteen months is added to the loan amount and thereafter paid quarterly in arrears. Further details can be found in the announcement lodged with the ASX on 8 March 2018.

9.
Estimated cash outflows for next quarter
$A’000
9.1
Exploration and evaluation
9.2
Development
9.3
Production
9.4
Staff costs
9.5
Administration and corporate costs
9.6
Other – Capital
9.7
Total estimated cash outflows2
1,000
-
17,000
600
500
400
19,500

2 Cash outflows exclude forecast sales receipts.

+ See chapter 19 for defined terms

1 September 2016

Page 24 of 25

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

10.
Changes in tenements
(items 2.1(b) and 2.2(b)
above)
Tenement
reference and
location
Nature of
interest
Interest at
beginning
of quarter
Interest
at end of
quarter
10.
1
Interests
in
mining
tenements
and
petroleum
tenements
lapsed, relinquished or
reduced
Refer Quarterly
Report
10.
2
Interests
in
mining
tenements
and
petroleum
tenements
acquired or increased
Refer Quarterly
Report

Compliance statement

  • 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.

  • 2 This statement gives a true and fair view of the matters disclosed.

Sign here:

............................................................ (Director/Company secretary)

Date: .............................................

Print name: .........................................................

Notes

  1. The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity that wishes to disclose additional information is encouraged to do so, in a note or notes included in or attached to this report.

  2. If this quarterly report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.

  3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

+ See chapter 19 for defined terms

1 September 2016

Page 25 of 25