QUARTERLY ACTIVITIES REPORT – for quarter ended 30 September 2018QUARTERLY ACTIVITIES REPORT – for quarter ended 30 June 2018

Image Resources NL ABN 57 063 977 579

ASX Code IMA

Contact Details

Ground Floor, 23 Ventnor Avenue, West Perth WA 6005

T: +61 8 9485 2410 E: [email protected] W: imageres.com.au

Issued Capital

Shares – Quoted 952,743,446 As at 30 September 2018

Board Members

Robert Besley (Non-Executive Chairman) Patrick Mutz (Managing Director) Peter Thomas (Non-Executive Director) George Sakalidis (Executive Director) Chaodian Chen (Non-Executive Director) Eddy Wu (Non-Executive Director) Aaron Chong Veoy Soo (Non-Executive Director) Huang Cheng Li (Non-Executive Director)

HIGHLIGHTS

  • Ø Substantial progress on construction of Boonanarring Project with initial mine box-cut and processing facilities advancing to 88% complete at end of September while remaining on budget and on schedule with wet commissioning commencing in late October 2018;

  • Ø Recruitment of site-based personnel was well-advanced by the end of the quarter and the remaining positions were filled in October;

  • Ø A second HMC Off-Take Agreement was negotiated with Hainan Wensheng of China on the same terms, conditions and pricing as the original agreement;

  • Ø Benchmark zircon price for pricing Image heavy mineral concentrate (HMC) product increased a further 12% on 1 October 2018 to US$1,625 per tonne; and

  • Ø The USD:AUD foreign exchange rate has further softened to below 0.71 in October compared to 0.75 used in the latest BFS update in June 2018.

Substantial Construction Progress at Boonanarring Project

During the reporting period, construction activities at the Boonanarring Project were substantially advanced in accordance with the fast-track project development schedule and wet commissioning commenced in October 2018 (refer ASX announcement dated 25 October 2018 confirming commencement of commissioning).

Construction of the processing plant advanced from 50% complete at the end of June to 88% complete at the end of September. Overall, project development costs remain in line with the approved project development budget.

At the end of September, re-assembly of the wet concentration plant (WCP), relocated from South Australia, was structurally complete and construction of the slimes thickener was complete. Assembly of the ore feed preparation plant (FPP) and other aspects of the project were well-advanced.

Overburden removal for the initial box cut for open-cut mining operations continued to ramp up through September. Mining contractor Piacentini and Son continued to add additional mining equipment and personnel throughout the quarter and first low-grade ore was exposed in September.

Recruitment of Site-based Personnel

Recruitment of site-based personnel advanced in accordance with the schedule and budget with 19 new permanent Image employees added during the reporting period. The required balance of 14 personnel were added by the middle of October.

Second HMC Off-Take Agreement

While 100% of HMC production from the Boonanarring Project has already been secured under an HMC Off-Take Agreement with SHANTOU NATFORT ZIRCONIUM AND TITANIUM CO., LTD (Natfort), Natfort agreed to allow HAINAN WENSHENG HIGH-TECH MATERIALS CO., LTD (Wensheng) to purchase 50% of HMC production from Image under a separate off-take agreement. The new agreement with Wensheng contains the same terms and conditions and pricing as the original agreement.

Benchmark Zircon Price Continues to Rise

Effective 1 October 2018, Iluka Resources increased its Zircon Reference Price by 12% to US$1,580 per tonne (middle of range). Similarly, Image’s benchmark zircon price ( Zircon

==> picture [100 x 69] intentionally omitted <==

Benchmark Price ) to be used to price its HMC product, being the price quoted in China for Iluka premium grade zircon, increased by 12% to US$1,625 per tonne (middle of range).

USD:AUD Foreign Exchange Rate

On 28 June 2018, the Company announced further enhanced project economics for the Boonanarring/Atlas Project based on an update of the project Bankable Feasibility Study (BFS) to include higher mineral sand commodity prices and a flat rate USD:AUD foreign exchange rate of 0.75. Since that announcement, the spot price of zircon increased on 1 October 2018 and in October the USD:AUD foreign exchange rate decreased to below 0.71. While the BFS has not been updated to reflect these recent developments, on a spot market basis the changes provide further improvement in the BFS project financial metrics.

Exploration

The newer Boonanarring West mineralisation target area, which is only 600m west of the Boonanarring Deposit has now been enlarged to a significant length of 10km and a programme of 48 additional holes is planned in the December Quarter.

Discussions are continuing with two landowners to allow drilling of the northernmost 2.6km of the Boonanarring Deposit Northern Extension.

The southern extension of the Atlas Deposit is being tested by a 34-hole programme looking for a potential 3km extension. Also, a 22-hole programme at Munbinia West is designed to test for new mineralisation over a 5km-long target area, and which is only 3km west of the Atlas Deposit.

At Erayinia, a 6-hole RC drilling programme totalling 625m was completed in August, testing for the northern extensions of the wide and extensive King gold mineralisation. The best gold intersection was 20m @ 0.7g/t Au from 40m including 4m @ 1.2g/t from 48 and 4m @ 1.0g/t. from 56m. A follow-up programme of 30 RC holes are planned to map out a gold-enhanced supergene zone prior to deeper RC drilling.

A large drill programme is planned in the December 2018 Quarter comprising 216 holes totalling 8,975m to follow-up numerous promising targets over a number of projects. Image remains primarily focussed on exploration activities aimed at adding to the mineral sands mineral resources and ore reserves to increase the overall life-of-mine around the Boonanarring and Atlas Deposits.

Corporate

The Quarterly Activities and Cashflow Reports for the period ending 30 June 2018 were filed on 31 July 2018.

The Company is in the process of preparing detailed budgets for calendar year 2019 and is planning to provide Q1 2019 production, revenue and costs guidance in December 2018.

ACTIVITIES REPORT

Boonanarring Project Development

The Company made substantial progress during this reporting period, fast-tracking the development of its 100%-owned, highgrade, zircon-rich Boonanarring mineral sands project located 80km north of Perth in the North Perth Basin in WA. The project is fully funded to positive cash flow, including corporate overhead and exploration, and construction is considered 88% complete as at the end of September 2018. Construction is advancing on budget and on schedule with project commissioning starting in October and first production on-track for 4[th] QTR 2018.

Boonanarring Project Construction

During the reporting period, construction activities at the Boonanarring Project were substantially advanced in accordance with the fast-track project development schedule, and despite numerous days lost to wet weather during the winter months, wet

Page 2 of 24

==> picture [100 x 69] intentionally omitted <==

commissioning commenced in October 2018 (refer ASX announcement dated 25 October 2018 confirming commencement of commissioning).

Construction of the processing plant, managed by ProjX and undertaken by LGM Industries, advanced from 50% complete at the end of June to 88% complete at the end of September. Overall, project development costs remain in line with the approved project development budget.

At the end of September, re-assembly of the wet concentration plant ( Photo 1 ) relocated from South Australia, was structurally complete and construction of the slimes thickener was complete. Assembly of the ore feed preparation plant ( Photo 2 ) and construction of the tailings disposal facilities, water storage ponds, HMC storage pad and a second water supply bore were all well-advanced.

Photo 1: Wet Concentration Plant Construction – 22 October 2018

==> picture [596 x 243] intentionally omitted <==

Page 3 of 24

==> picture [100 x 69] intentionally omitted <==

Photo 2: Feed Preparation Plant – Wobbler installation – 28 September 2018

==> picture [596 x 161] intentionally omitted <==

Overburden removal for the initial box cut for open-cut mining operations continued to ramp up through September. Mining contractor Piacentini and Son continued to ramp up with additional mining equipment and personnel, including maintenance services, throughout the quarter. A second Hitachi 3600 excavator and additional CAT 785 and 777 haul trucks were added in July/August and first low-grade ore was exposed in September.

Other project construction and related activities include installation of permanent site administration offices; commencement of construction of the maintenance shop/warehouse/lab building; delivery of final long-lead equipment to enhance process effectiveness (e.g. Photo 3 ); and significant progress on construction of the Brand Highway upgrade.

Photo 3: Tails Stacker being moved into Position – 19 October 2018

==> picture [596 x 260] intentionally omitted <==

Other Boonanarring Project Related Activities

In addition to the progress on construction related activities, significant progress was made on other project related activities including the following:

  • § A strategy for ore blending and feeding to control heavy mineral grade and a plan to feed up to 100,000 tonnes of lower grade ore during the plant commissioning phase;

  • § Selection and executing agreements with Braemar as ship broker and Mercantile Marine as shipping agent for the export of HMC;

Page 4 of 24

==> picture [100 x 69] intentionally omitted <==

  • § Construction by Qube Logistics of an HMC storage facility at Qube’s Picton facilities;

  • § Settlement of the purchase of two parcels of land over the Boonanarring ore reserves being the Dewar Property and the Yukich Property, both to the north of the Boonanarring processing plant; and

  • § Installation of high voltage electricity grid connection to the Boonanarring site.

Recruitment of Personnel

Recruitment of suitably qualified site-based personnel advanced in accordance with the schedule and budget with 19 new permanent Image employees added during the reporting period. The required balance of 14 personnel were added by the middle of October. This brings the full complement of site-based full-time Image employees to 40 ( Photo 4 ).

Over 40% of site-based positions have been recruited from within the shire of Gingin and surrounding areas and the Company has been successful in attracting a great team of experienced people capable of successfully taking the Boonanarring project through the commissioning process to full production.

Photo 4: Image Personnel at the Wet Concentration Plant – 2 October 2018

==> picture [596 x 228] intentionally omitted <==

Second HMC Off-Take Agreement

While 100% of HMC production from the Boonanarring Project has already been secured under an HMC Off-Take Agreement with SHANTOU NATFORT ZIRCONIUM AND TITANIUM CO., LTD (Natfort), Natfort agreed to allow HAINAN WENSHENG HIGH-TECH MATERIALS CO., LTD (Wensheng) to purchase 50% of HMC production from Image under a separate off-take agreement. The new agreement with Wensheng contains the same terms and conditions and pricing as the original agreement with Natfort and both Wensheng and Natfort must take up to 100% of HMC production in the event the other is unwilling or unable to purchase any or all of its 50% portion of production. This dual arrangement serves to reduce Image’s risk of any delays in the receipt of revenue.

Zircon Price Continues to Rise

Effective 1 October 2018, Iluka Resources increased its Zircon Reference Price by 12% to US$1,580 per tonne. Similarly, Image’s benchmark zircon price (Zircon Benchmark Price) to be used to price Image’s Heavy Mineral Concentrate product being the price quoted in China for Iluka premium grade zircon increased by 12% to US$1,625 per tonne (middle of range).The price in China for Tronox Limited’s premium grade zircon price is even higher at US$1,645 per tonne (middle of range).

Due to decreasing zircon production across the past year from existing producers, mineral sands industry experts predict a shortfall in the zircon supply out to at least 2022 underpinning predictions of strong zircon prices at current levels or higher for the foreseeable future.

Page 5 of 24

==> picture [100 x 69] intentionally omitted <==

Exploration Update

  • § Discussions are continuing with landowners, seeking access agreements to allow drilling of the northernmost 2.6km of the Boonanarring Deposit’s Northern Extension.

  • § The newer Boonanarring West mineralisation target area, which is only 600m west of the Boonanarring Deposit has now been enlarged to a significant 10km in length and a programme of 48 holes is planned in the December Quarter.

  • § At Bidaminna, a 100kg bulk sample of drill cuttings from the mineralised zone across two lines of drill holes across the deposit, was composited and processed through wet and dry mineral separation testing, to determine the preliminary quality of potential Leucoxene products. Results are pending further analysis. A large 30km environmental survey is being carried out in October to allow further drilling mainly to the north of the existing Bidaminna Deposit and to assist in upgrading and increasing the JORC Resource.

  • § The southern extension of the Atlas Deposit (6.5km) is being tested by a 34-hole programme looking for a potential 3km extension. Also, a 22-hole programme at Munbinia West is designed to test for new mineralisation over a 5km-long target area, which is only 3km west of the Atlas Deposit.

  • § The Woolka dredge target area is very large being 10km[2] in size and has potential for a very large resource. A 7km environmental survey is being carried out to allow future infill drilling on a 400m spacing which will be sufficient to calculate a JORC Resource. This will be followed with a 20-hole 900m drilling programme in the December Quarter.

  • § At Erayinia, a 6-hole RC programme totalling 625m was completed in August, testing for the northern extensions of the wide and extensive King gold mineralisation. The best gold intersection was 20m @ 0.7g/t Au from 40m including 4m @ 1.2g/t from 48 and 4m @ 1.0g/t. from 56m. A follow-up programme of 30 RC holes are planned to map out gold-enhanced supergene zone prior to deeper RC drilling.

  • § Overall, a large drill programme is planned in the December 2018 Quarter comprising 216 holes totalling 8,975m to followup numerous promising targets over numerous projects. (Table 1). Image remains primarily focussed on exploration activities aimed at adding to the mineral sand’s mineral resources and ore reserves to increase the overall life-of-mine around the Boonanarring and Atlas Deposits.

Table 1. Drilling programme proposed November 2018

Tenement
Project
# Holes
Metres
Tenement
Project
# Holes
Metres
Tenement
Project
# Holes
Metres
Tenement
Project
# Holes
Metres
E28/1895 Erayinia 30 1800
E70/3032 Gingin 20 600
E70/3100 Quinns Hill 40 1920
E70/3298 Bidaminna
Park
5 250
E70/3494 Bryalana 8 260
E70/3720 Blue Lake 14 670
E70/3892 Chapman Hill 15 585
E70/3997 Munbinia 40 1440
E70/4244 Woolka 20 900
E70/4631 Munbinia West 18 320
E70/4656 Winooka North 6 230
Total: 216 8975

Page 6 of 24

==> picture [100 x 69] intentionally omitted <==

Boonanarring Northern Extension

The Company is in discussions with two landowners regarding access agreements for delineation drilling over the 2.6km northernmost section of the extension of the high-grade Boonanarring deposit announced on 13 March 2017. If access agreements are secured, 80 drill holes for 3,840m on a 200m x 40m drill grid are likely required to convert the mineralisation in this area to an Indicated Mineral Resources Category (Fig. 1).

The Boonanarring high-grade northern extension area has been confirmed from previous roadside drilling and includes very high zircon grades ranging from 16.4% to 22.2% of the heavy mineral (HM) content, which includes outstanding HM high-grade intersections of 8m @ 23.8% HM in drill hole IX00245, 8m @ 21.1% HM in IX00244 and 8m @ 16.3% HM in IX00250 (ASX release 26/06/2017). In addition, the northernmost part of the extension area has a lower strip ratio of around 3.2:1 as compared to a higher strip ratio for the currently planned Boonanarring mine area. This extension area is deemed to be within economic pumping distance of the planned location of the Boonanarring wet concentration plant.

==> picture [359 x 510] intentionally omitted <==

Figure 1. Boonanarring North Extension Target area showing proposed drilling subject to access

Page 7 of 24

==> picture [100 x 69] intentionally omitted <==

Boonanarring West

After drilling at Boonanarring West and further ground magnetic interpretation, a much larger target is outlined being 10,000m x 300m and is only 600m west of the Boonanarring Resource . This has positive ramifications for the mine life of the Boonanarring Deposit. A further 44 holes are planned in the December Quarter mainly on the southern part of the Boonanarring West mineralisation extension. The mineralisation intersected is open to the south and is at a lower RL of 50–55 ASL compared to 65–70 ASL for the Boonanarring deposit (Fig. 2).

==> picture [392 x 553] intentionally omitted <==

Figure 2. Boonanarring West Target Area showing proposed drilling in the December Quarter

Page 8 of 24

==> picture [100 x 69] intentionally omitted <==

Bidaminna Mineral Resources and Northern Extension

The Bidaminna Project is unusual as the heavy mineral assemblage contains significant quantities of higher value Leucoxene. The pricing of Leucoxene can vary and can be 3 to 4 times the value of Ilmenite. The Leucoxene content in the current Mineral Resources (JORC 2004) area over 3 separate lines varies from 28% Leucoxene in the HM in the southernmost part of the Mineral Resources area, up to 69% in the northernmost part of the Mineral Resources area.

A bulk sample of 100kg of drill cuttings from the mineralised section of the deposit was composited and processed through wet and dry mineral separation testing to determine a preliminary determination of the quality of potential Leucoxene products. The bulk sample was composited from two lines of drilling located just north of the Bidaminna Mineral Resources area. Results of the testing is pending further analysis. Large drilling programmes are planned in 2019 (Fig. 3) following an extensive 30km environmental survey (botanical, banksia, dieback and heritage) completed in early October 2018.

==> picture [348 x 491] intentionally omitted <==

Figure 3. Bidaminna Deposit and potential northern extension showing holes planned in 2019

Page 9 of 24

==> picture [100 x 69] intentionally omitted <==

Atlas Southern Extension drilling at Munbinia and Munbinia West and dredge target drilling at Woolka

The southern extension of the Atlas Deposit (6.5km) is being tested by a 34-hole programme over a potential 3km extension. Also, a 22-hole programme at Munbinia West is designed to test for new mineralisation over a 5km-long target area, which is only 3km west of the Atlas Deposit (Fig. 4).

The Woolka Dredge Target area is very large being 10km[2] and has potential for a very large resource. A 20-hole 900m drilling programme is planned in the December Quarter. A 7km environmental survey is being carried out to allow future infill drilling on a 400m spacing, which will be sufficient for a JORC Resource. Mineralisation is in a favourable position underneath clay layers in low slimes and is below the water table. Mineralisation is adjacent to and on direct strike with Tronox’s Cooljarloo West dredging proposal area. It also has similar depth and mineralisation grade.

==> picture [350 x 496] intentionally omitted <==

Figure 4. Atlas South Extension drilling at Munbinea and Munbinea West and dredge drilling at Woolka

Page 10 of 24

==> picture [100 x 69] intentionally omitted <==

Erayinia Initial Gold Drilling

Encouraging results were obtained from first-pass drilling of 6 reverse circulation (RC) drill holes totalling 650m at Image’s 100%owned Erayinia prospect (E28/1845 and E28/2742 totalling 106.7km[2] ), located 130km ESE of Kalgoorlie where there are numerous operating gold mines (Fig. 5) The drill programme has been successful in identifying strike continuity of the King mineralisation), which starts 350m to the south.

==> picture [308 x 435] intentionally omitted <==

Figure 5. Location of Erayinia and operating gold mines in the Kalgoorlie region

Image Resources’ drilling (Figs 6 to 8) show a number of gold mineralised zones within the first 3 southern RC holes (EYRC001, 2 and 3). The best intersection is 20m at 0.7g/t Au from 40m (Tables 2 and 3) within a sheared, bleached and silicified mafic unit. The mineralisation is interpreted to occur as west-dipping stacked pyrite, quartz, and carbonate lodes within a package of Archean mafic and sedimentary rocks.

A 7km strike length to the north of the King mineralisation remains virtually untested with only 3 deep RC holes (EYRC004, 6 and 7) completed 400m to the north by Image Resources, which intersected siliceous metasediments. Hole EYRC05 intersected a 16m zone of semi-massive sulphides from 47m in a brecciated cherty quartzite. However, preliminary analyses are low in gold content and are being checked by a more rigorous fire assay method. This area shows a complex sigmoidal-shaped magnetic

Page 11 of 24

==> picture [100 x 69] intentionally omitted <==

feature, interpreted to be a dolerite. Further air core (AC) drilling is proposed to outline the extent of the mineralisation prior to deeper RC drilling.

==> picture [375 x 529] intentionally omitted <==

Figure 6. Ground Magnetic & Aeromagnetic Image with current RC drilling and historical AC and RC holes

Future work will include 30 RC drill holes spaced 50m on 200m spaced lines and to a depth of 60m, to help identify and map the anomalous Au within the clay/bedrock interface where the supergene gold is present, prior to deeper RC drilling. The King mineralisation to the south is similar in style and all the RC drilling was sited on a supergene-enhanced layer that was first identified by shallow AC drilling.

Page 12 of 24

==> picture [100 x 69] intentionally omitted <==

Further work is also required elsewhere on the tenements to follow up on very encouraging positive results from shallow drilling and in some cases deeper RC. There are 16 anomalous Au zones identified mainly from previous AC drilling that will require follow up to ascertain potential Au extensions. These targets vary from 100ppb to 2860ppb Au (2.86g/t Au) as shown in Table 4.

==> picture [350 x 371] intentionally omitted <==

Figure 7. Ground Magnetic & Aeromagnetic image with current RC drilling and historical AC and RC holes

Page 13 of 24

==> picture [100 x 69] intentionally omitted <==

==> picture [416 x 252] intentionally omitted <==

Figure 8. Cross section showing Image RC and historical (Integra 2004) air core drilling

Table 2. RC Drillhole Locations

HoleID Easting Northing Depth(m) Dip Azimuth
MGAz51 MGAz51 Metres Degrees Degrees
EYRC01 471965 6526902 120 -58 98
EYRC02 471880 6526907 120 -60 94
EYRC03 471799 6526904 120 -60 96
EYRC04 471743 6527301 109 -60 88
EYRC05 471658 6527309 99 -60 94
EYRC06 471831 6527305 57 -60 94

Table 3. RC Drilling Assays > 0.2g/t Gold

HoleID From To Width Gold
Metres Metres Metres **ppm **
EYRC01 40 44 4 0.694
EYRC01 44 48 4 0.398
EYRC01 48 52 4 1.152
EYRC01 56 60 4 1.04
EYRC01 76 80 4 0.203
EYRC02 68 72 4 0.567
EYRC02 104 108 4 0.43
EYRC02 112 116 4 0.541
EYRC03 92 96 4 0.633
EYRC03 96 100 4 0.338

Page 14 of 24

==> picture [100 x 69] intentionally omitted <==

Table 4. Follow up – Untested with Deep Drilling Anomalous Gold Intercepts

Hole_ID Hole Type EOH Depth Easting Northing From To Max
Gold
Metres MGAz51 MGAz51 Metres Metres **ppm **
SISC1466 AC 56 468844 6540483 55 56 0.13
SISC1483 AC 49 468750 6539840 32 36 0.25
ISRC1029 RC 184 468669 6539513 106 107 1.76
SISC1235 AC 52 469031 6538991 48 51 0.23
SISC1236 AC 42 468975 6538937 32 36 0.24
ROE0968 AC 54 469641 6538647 32 34 0.35
SISC1581 AC 24 469074 6537465 16 20 0.1
ROE1234 AC 30 469240 6534300 24 26 1.28
ROE0339 AC 40 471697 6526757 34 36 0.61
KRR019 RAB 10 473837 6526157 7 8 0.84
KRR071 RAB 37 474357 6525157 18 22 0.96
ROE0345 AC 57 474677 6525157 22 24 0.19
ROE0346 AC 45 474757 6525157 40 42 0.34
ROE0347 AC 49 474837 6525157 22 24 0.23
ROE0700 AC 51 473637 6524557 28 30 2.86
KRR136 RAB 37 474737 6524357 24 30 0.39
ROE0356 AC 47 473097 6524037 30 32 1.36

Page 15 of 24

==> picture [100 x 69] intentionally omitted <==

COMPETENT PERSON’S STATEMENTS – EXPLORATION RESULTS, MINERAL RESOURCES AND ORE RESERVES

Information in this report that relates to Exploration Results, Mineral Resources and Ore Reserves (other than Boonanarring and Atlas Mineral Resources and Ore Reserves) is based on information compiled by George Sakalidis BSc (Hons) who is a member of the Australasian Institute of Mining and Metallurgy. At the time that the Exploration Results, Mineral Resources and Ore Reserves were compiled, George Sakalidis was a director of Image Resources NL. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. George Sakalidis consents to the inclusion of this information in the form and context in which it appears in this report.

The information in this report that relates to the estimation of Mineral Resources for the Boonanarring and Atlas Projects is based on information compiled by Mrs Christine Standing, who is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM) and the Australian Institute of Geoscientists (AIG). Mrs Standing is a full-time employee of Optiro Pty Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mrs Standing consents to the inclusion in this report of the matters based on her information in the form and context in which it appears.

The information in this report that relates to the estimation of Ore Reserves for the Boonanarring and Atlas Projects has been compiled in accordance with the guidelines of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code – 2012 Edition). The Ore Reserves have been compiled by Jarrod Pye, Mining Engineer and previously a full-time employee of Image Resources, under the direction of Andrew Law of Optiro, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Law has sufficient experience in Ore Reserves estimation relevant to the style of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Law consents to the inclusion in the report of the matters compiled by him in the form and context in which it appears."

FORWARD LOOKING STATEMENTS

Certain statements made during or in connection with this communication, including, without limitation, those concerning the economic outlook for the mining industry, expectations regarding prices, exploration or development costs and other operating results, growth prospects and the outlook of Image’s operations contain or comprise certain forward-looking statements regarding Image’s operations, economic performance and financial condition. Although Image believes that the expectations reflected in such forward-looking statements are reasonable, no assurance can be given that such expectations will prove to have been correct.

Accordingly, results could differ materially from those set out in the forward looking statements as a result of, among other factors, changes in economic and market conditions, success of business and operating initiatives, changes that could result from future acquisitions of new exploration properties, the risks and hazards inherent in the mining business (including industrial accidents, environmental hazards or geologically related conditions), changes in the regulatory environment and other government actions, risks inherent in the ownership, exploration and operation of or investment in mining properties, fluctuations in prices and exchange rates and business and operations risks management, as well as generally those additional factors set forth in our periodic filings with ASX. Image undertakes no obligation to update publicly or release any revisions to these forward-looking statements to reflect events or circumstances after today’s date or to reflect the occurrence of unanticipated events.

Attachments:

Table 5. Tenement Schedule in accordance with ASX Listing Rule 5.3.3 Table 6. Mineral Resources and Ore Reserves as at 3 August 2017

Page 16 of 24

==> picture [100 x 69] intentionally omitted <==

Table 5 – Tenement Schedule

Tenement Schedule in accordance with ASX Listing Rule 5.3.3

Tenement Schedule in accordance with ASX Listing Rule 5.3.3 Tenement Schedule in accordance with ASX Listing Rule 5.3.3 Tenement Schedule in accordance with ASX Listing Rule 5.3.3 Tenement Schedule in accordance with ASX Listing Rule 5.3.3 Tenement Schedule in accordance with ASX Listing Rule 5.3.3 Tenement Schedule in accordance with ASX Listing Rule 5.3.3
Tenements held at the end of theQuarter
Location Tenement Nature of
Interest
Project Equity (%) held at start
of Quarter
Equity (%) held at end
of Quarter
WA E28/1895 Granted ERAYINIA 100% 100%
WA E70/2636 Granted COOLJARLOO 100% 100%
WA E70/2844 Granted BIDAMINNA NTH 100% 100%
WA E70/2898 Granted COOLJARLOO 100% 100%
WA E70/3032 Granted GINGIN 100% 100%
WA E70/3041 Granted REGANS FORD SOUTH 100% 100%
WA E70/3100 Granted QUINNS HILL 100% 100%
WA E70/3192 Granted BOOTINE 100% 100%
WA E70/3298 Granted BIDAMINNA -PARK 90% 90%
WA E70/3411 Granted REGANS FORD 100% 100%
WA E70/3494 Granted BRYALANA 100% 100%
WA E70/3720 Granted BLUE LAKE 100% 100%
WA E70/3892 Granted CHAPMAN HILL 100% 100%
WA E70/3997 Granted MUNBINIA 100% 100%
WA E70/4077 Granted DARLING RANGE 100% 100%
WA E70/4244 Granted WOOLKA 100% 100%
WA E70/4245 Granted WINOOKA 100% 100%
WA M70/0448 Granted GINGIN SOUTH 100% 100%
WA M70/1192 Granted RED GULLY 100% 100%
WA M70/1194 Granted BOONANARRING 100% 100%
WA P70/1516 Granted COOLJARLOO 100% 100%
WA M70/1311 Granted BOONANARRING NORTH 100% 100%
WA G70/0250 Granted BOONANARRING 100% 100%
WA R70/0051 Granted COOLJARLOO NORTH 100% 100%
WA M70/1305 Application ATLAS 100%pending grant 100%pending grant
WA P70/1520 Application COOLJARLOO 100%pending grant 100%pending grant
WA E70/4631 Granted MUNBINIA WEST 100% 100%
WA E70/4656 Granted WINOOKA NORTH 100% 100%
WA E70/4663 Granted BIBBY SPRINGS 100% 100%
WA E70/4689 Granted BOONANARRING WEST 100% 100%
WA E70/4779 Granted MIMEGARRA 100% 100%
WA E70/4794 Granted REGANS FORD NORTH 100% 100%
WA E70/4795 Application BIDAMINNA SOUTH 100%pending grant 100%pending grant
WA E70/4919 Granted ORANGE SPRINGS 100% 100%
WA E70/4946 Granted RED GULLY NORTH 100% 100%
WA E70/4949 Granted NAMMEGARRA 100%pending grant 100%
WA E28/2742 Application MADOONIA DOWNS 100%pending grant 100%pending grant
WA E70/5192 Application WINOOKA SOUTH - 100%pending grant
WA E70/5193 Application CHAPMAN HILL NORTH - 100%pending grant
WA E70/5213 Application GINGINUP HILL - 100%pending grant
MiningTenements acquired duringthe Quarter
WA E70/5192 Application WINOOKA SOUTH - 100%pending grant
WA E70/5193 Application CHAPMAN HILL NORTH - 100%pending grant
WA E70/5213 Application GINGINUP HILL - 100%pending grant
MiningTenements disposed duringthe Quarter
WA E70/5186 Application CHAPMAN HILL 100% pending grant Application Withdrawn

Page 17 of 24

==> picture [100 x 69] intentionally omitted <==

Table 6 – Mineral Resources and Ore Reserves as at 3 August 2017

High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012) High Grade Ore Reserves - Strand Deposits; in accordance with the JORC Code (2012)
Project/Deposit Category Volume Tonnes % HM **% Slimes ** HM Tonnes VHM Ilmenite Leucoxen Rutile Zircon
(%) (%) (%) (%) (%)
Boonanarring1 Proved 5,008,000 9,344,000 8.6 14.3 803,771 76.081 48.9 1.8 2.2 23.2
Boonanarring1 Probable 5,565,000 10,514,000 5.9 17.6 622,429 78.653 52.3 1.8 2.7 21.9
Total Boonanarring 10,573,000 19,858,000 7.2 16.1 1,426,200 77.203 50.4 1.8 2.4 22.7
Atlas1 Probable 5,000,000 9,477,000 8.1 15.5 767,637 73.3 50.7 4.5 7.5 10.6
Total Atlas 5,000,000 9,477,000 8.1 15.5 767,637 73.3 50.7 4.5 7.5 10.6
Total Ore Reserves 15,573,000 29,335,000 7.5 15.9 2,193,837 75.8 50.5 2.7 4.2 18.4
High Grade Mineral Resources - Strand Deposits; in accordance with the JORC Code (2012) @ 2.0% HM Cut-off
Project/Deposit Category Volume Tonnes % HM **% Slimes ** HM Tonnes VHM Ilmenite Leucoxen Rutile Zircon
(%) (%) (%) (%) (%)
Boonanarring2 Measured 6,359,359 11,799,213 8.0 14 942,167 74.3 48.3 1.7 2.2 22.0
Boonanarring2 Indicated 11,802,047 22,265,400 4.9 18.3 1,081,208 71.7 49.2 2.2 2.5 17.8
Boonanarring2 Inferred 4,987,703 9,420,449 4.5 21 422,507 68.8 50.0 3.5 3.4 11.9
Boonanarring Total 22,886,875 43,485,062 5.6 18 2,445,882 72.2 49.0 2.2 2.6 18.4
Atlas2 Measured 5,210,526 9,900,000 7.9 16.1 782,000 71.0 49.1 4.2 7.2 10.5
Atlas2 Indicated 3,368,421 6,400,000 3.7 17.3 237,000 56.5 41.6 3.4 4.7 6.8
Atlas2 Inferred 947,368 1,800,000 4.0 19.9 72,000 41.5 29.0 3.3 4.4 4.8
Atlas Total 9,526,316 18,100,000 6.0 16.9 1,091,000 65.9 46.1 4.0 6.5 9.3
Sub-Total Atlas/Boonanarring 32,413,191 61,585,062 5.7 17.7 3,536,882 70.3 48.1 2.8 3.8 15.6
Previously Reported Mineral Resources - Strand Deposits; in accordance with JORC Code (2004) @ 2.5% HM Cut-off
Project/Deposit Category Volume Tonnes % HM **% Slimes ** HM Tonnes VHM Ilmenite Leucoxen Rutile Zircon
(%) (%) (%) (%) (%)
Gingin Nth3 Indicated 680,175 1,318,642 5.7 15.7 75,163 75.4 57.4 9.3 3.2 5.5
Gingin Nth3 Inferred 580,000 1,090,000 5.2 14.0 57,116 78.4 57.3 11.3 3.7 6.0
Gingin Nth Total 1,260,175 2,408,642 5.5 15.0 132,279 76.7 57.3 10.2 3.4 5.7
Gingin Sth3 Measured 872,830 1,526,122 4.4 7.2 67,149 79.4 50.7 15.3 5.6 7.8
Gingin Sth3 Indicated 3,241,835 5,820,480 6.5 7.1 377,167 90.6 67.6 9.8 5.1 8.1
Gingin Sth3 Inferred 398,573 732,912 6.5 8.4 47,566 91.6 67.4 7.5 5.8 10.9
Gingin Sth Total 4,513,238 8,079,514 6.1 7.3 491,882 89.2 65.3 10.3 5.2 8.3
Helene3 Indicated 5,568,110 11,466,106 4.6 18.6 522,854 88.7 74.6 0.0 3.6 10.5
Hyperion3 Indicated 1,786,781 3,742,471 7.7 19.3 286,673 69.4 55.8 0.0 6.3 7.3
Cooljarloo Nth Total 7,354,891 15,208,577 5.3 18.8 809,528 81.9 67.9 0.0 4.6 9.4
Red Gully3 Indicated 1,930,000 3,409,768 7.8 11.5 265,962 89.7 66.0 8.3 3.1 12.4
Red Gully3 Inferred 1,455,000 2,565,631 7.5 10.7 192,422 89.0 65.4 8.2 3.0 12.3
Red Gully Total 3,385,000 5,975,399 7.7 11.2 458,384 89.4 65.7 8.2 3.1 12.4
Sub-Total Other 16,513,304 31,672,132 6.0 14.1 1,892,073 85.2 66.0 5.4 4.3 9.6
Historic Deposit - Strand deposit; in accordance with JORC Code (2004)
Project/Deposit Category Volume Tonnes % HM **% Slimes ** HM Tonnes VHM Ilmenite Leucoxen
e
Rutile Zircon
(%) (%) (%) (%) (%)
Regans Ford4 Indicated 4,505,285 9,024,226 9.9 16.8 893,398 94.3 70.0 10.0 4.3 10.0
Regans Ford4 Inferred 455,933 918,536 6.5 18.5 59,705 90.5 68.3 7.7 4.4 10.1
Regans Ford Total 4,961,218 9,942,762 9.6 17.0 953,103 94.1 69.9 9.9 4.3 10.0

Page 18 of 24

==> picture [100 x 69] intentionally omitted <==

1. COMPLIANCE STATEMENT - Boonanarring/Atlas Ore Reserves

The Ore Reserves statement has been compiled in accordance with the guidelines of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code – 2012 Edition). The Ore Reserves have been compiled by Jarrod Pye, Mining Engineer and full-time employee of Image Resources, under the direction of Andrew Law of Optiro, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Law has sufficient experience in Ore Reserves estimation relevant to the style of mineralisation and type of deposit under consideration to qualify as a Competent Person as defined in the 2012 Edition of the “Australasian Code for Reporting of Mineral Resources and Ore Reserves”. Mr Law consents to the inclusion in the report of the matters compiled by him in the form and context in which it appears.

2. COMPLIANCE STATEMENT - Boonanarring/Atlas Mineral Resources

The information in this report that relates to the estimation of Mineral Resources is based on information compiled by Mrs Christine Standing, who is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM) and the Australian Institute of Geoscientists (AIG). Mrs Standing is a full-time employee of Optiro Pty Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which she is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mrs Standing consents to the inclusion in this report of the matters based on her information in the form and context in which it appears.

3. COMPETENT PERSON’S STATEMENT – MINERAL RESOURCE ESTIMATES

The information in this presentation that relates to Mineral Resources is based on information compiled by Lynn Widenbar BSc, MSc, DIC MAusIMM MAIG employed by Widenbar & Associates who is a consultant to the Company. Lynn Widenbar has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the ‘Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Lynn Widenbar consents to the inclusion of this information in the form and context in which it appears.

The information in this presentation that relates to tonnes, grades and mineral assemblage is based on historic information published by Iluka Resources Limited and indicating the mineral resources were compiled in accordance with the JORC Code (2004).

Grand Totals
53,887,713
103,199,956
6.2
6,382,058
78.3
Grand Totals
53,887,713
103,199,956
6.2
6,382,058
78.3
Grand Totals
53,887,713
103,199,956
6.2
6,382,058
78.3
Grand Totals
53,887,713
103,199,956
6.2
6,382,058
78.3
Grand Totals
53,887,713
103,199,956
6.2
6,382,058
78.3
Grand Totals
53,887,713
103,199,956
6.2
6,382,058
78.3
Grand Totals
53,887,713
103,199,956
6.2
6,382,058
78.3
Grand Totals
53,887,713
103,199,956
6.2
6,382,058
78.3
Grand Totals
53,887,713
103,199,956
6.2
6,382,058
78.3
Grand Totals
53,887,713
103,199,956
6.2
6,382,058
78.3
Grand Totals
53,887,713
103,199,956
6.2
6,382,058
78.3
Grand Totals
53,887,713
103,199,956
6.2
6,382,058
78.3
56.7
4.6
4.0
13.0
56.7
4.6
4.0
13.0
56.7
4.6
4.0
13.0
56.7
4.6
4.0
13.0
56.7
4.6
4.0
13.0
Previously Reported Mineral Resources - Dredge deposits; in accordance with JORC Code (2004) @ 1.0% HM Cut-off
Project/Deposit Category Volume Tonnes % HM % Slimes HM Tonnes **VHM ** Ilmenite e **Rutile ** Zircon Ilmenite
Leucoxen
Rutile
Zircon
VHM
(%) (%) (%) (%) (%)
Titan
3
Indicated 10,335,053 21,163,741 1.8 22.1 378,831 86.0 71.9 1.5 3.1 9.5 272,493 5,720 11,782 35,875 325,870
Titan
3
Inferred 58,517,775 115,445,391 1.9 18.9 2,205,007 85.9 71.8 1.5 3.1 9.5 1,583,857 33,737 67,253 208,814 1,893,660
Total Titan Total 68,852,828 136,609,132 1.9 19.4 2,583,838 85.9 71.8 1.5 3.1 9.5 1,856,350 39,457 79,034 244,689 2,219,530
Telesto
3
Indicated 1,716,328 3,512,204 3.8 18.4 134,499 83.3 67.5 0.7 5.6 9.5 90,776 968 7,519 12,791 112,054
Calypso
~~3~~
Inferred 27,113,647 51,457,008 1.7 13.7 854,186 85.6 68.1 1.6 5.1 10.8 581,701 13,667 43,564 92,252 731,184
Bidaminna
3
Inferred 26,260,000 44,642,000 3.0 3.6 1,339,260 96.8 83.11 7.2 1.0 5.5 1,113,000 97,000 13,000 73,000 1,296,000
Total Dredge **123,942,803 ** 236,220,344 2.1 15.2 4,911,783 88.7 74.1 3.1 2.9 8.6 3,641,826 151,092 143,116 **422,732 ** 4,358,767

3. COMPETENT PERSON’S STATEMENT – RESOURCE ESTIMATES

The information in this presentation that relates to Mineral Resources is based on information compiled by Lynn Widenbar BSc, MSc, DIC MAusIMM MAIG employed by Widenbar & Associates who is a consultant to the Company. Lynn Widenbar has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 edition of the ‘Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Lynn Widenbar consents to the inclusion of this information in the form and context in which it appears.

Page 19 of 24

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

+Rule 5.5

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

Introduced 01/07/96 Origin Appendix 8 Amended 01/07/97, 01/07/98, 30/09/01, 01/06/10, 17/12/10, 01/05/13, 01/09/16

Name of entity

IMAGE RESOURCES NL

ABN Quarter ended (“current quarter”)

57 063 977 579 30/09/2018

Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(9 months)
$A’000
1.
Cash flows from operating activities
-
7
1.1
Receipts from customers
1.2
Payments for
(409)
(1,120)
(a)
exploration & evaluation
(b)
development
-
-
(c)
production
-
-
(d)
staff costs
(439)
(1,426)
(e)
administration and corporate costs
(282)
(1,154)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
191
268
1.5
Interest and other costs of finance paid
-
(100)
1.6
Income taxes paid
-
-
1.7
Research and development refunds
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating activities
(939)
(3,525)
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(9 months)
$A’000
1.
Cash flows from operating activities
-
7
1.1
Receipts from customers
1.2
Payments for
(409)
(1,120)
(a)
exploration & evaluation
(b)
development
-
-
(c)
production
-
-
(d)
staff costs
(439)
(1,426)
(e)
administration and corporate costs
(282)
(1,154)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
191
268
1.5
Interest and other costs of finance paid
-
(100)
1.6
Income taxes paid
-
-
1.7
Research and development refunds
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating activities
(939)
(3,525)
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(9 months)
$A’000
1.
Cash flows from operating activities
-
7
1.1
Receipts from customers
1.2
Payments for
(409)
(1,120)
(a)
exploration & evaluation
(b)
development
-
-
(c)
production
-
-
(d)
staff costs
(439)
(1,426)
(e)
administration and corporate costs
(282)
(1,154)
1.3
Dividends received (see note 3)
-
-
1.4
Interest received
191
268
1.5
Interest and other costs of finance paid
-
(100)
1.6
Income taxes paid
-
-
1.7
Research and development refunds
-
-
1.8
Other (provide details if material)
-
-
1.9
Net cash from / (used in) operating activities
(939)
(3,525)
2.
Cash flows from investing activities
(27,087)
(47,004)
2.1
Payments to acquire:
(a)
property, plant and equipment
(b)
tenements (see item 10)
-
-
(c)
investments
-
-

+ See chapter 19 for defined terms

1 September 2016

Page 1

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(9 months)
$A’000
(d)
other non-current assets
-
-
2.2
Proceeds from the disposal of:
-
2
(a)
property, plant and equipment
(b)
tenements (see item 10)
-
-
(c)
investments
-
15
(d)
other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
Term Deposits greater than 90 days matured
10,176
-
2.6
Net cash from / (used in) investing activities
(16,911)
(46,987)
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(9 months)
$A’000
(d)
other non-current assets
-
-
2.2
Proceeds from the disposal of:
-
2
(a)
property, plant and equipment
(b)
tenements (see item 10)
-
-
(c)
investments
-
15
(d)
other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
Term Deposits greater than 90 days matured
10,176
-
2.6
Net cash from / (used in) investing activities
(16,911)
(46,987)
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(9 months)
$A’000
(d)
other non-current assets
-
-
2.2
Proceeds from the disposal of:
-
2
(a)
property, plant and equipment
(b)
tenements (see item 10)
-
-
(c)
investments
-
15
(d)
other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
Term Deposits greater than 90 days matured
10,176
-
2.6
Net cash from / (used in) investing activities
(16,911)
(46,987)
3.
Cash flows from financing activities
-
25,000
3.1
Proceeds from issues of shares
3.2
Proceeds from issue of convertible notes
-
-
3.3
Proceeds from exercise of share options
-
-
3.4
Transaction costs related to issues of shares,
convertible notes or options
(12)
(1,471)
3.5
Proceeds from borrowings
-
52,018
3.6
Repayment of borrowings
-
(47)
3.7
Transaction costs related to loans and borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing activities
(12)
75,500
4.
Net increase / (decrease) in cash and cash
equivalents for the period
47,273
4,423
4.1
Cash and cash equivalents at beginning of period
4.2
Net cash from / (used in) operating activities
(item 1.9 above)
(939)
(3,525)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(16,911)
(46,987)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
(12)
75,500
4.5
Effect of movement in exchange rates on cash
held
526
526
4.6
Cash and cash equivalents at end of period
29,937
29,937

+ See chapter 19 for defined terms

1 September 2016

Page 2

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

5.
Reconciliation
of
cash
and
cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
19,273
10,764
5.2
Call deposits
10,664
36,509
5.3
Bank overdrafts
-
-
5.4
Other (provide details)
-
-
5.5
Cash and cash equivalents at end of quarter
(should equal item 4.6 above)
29,937
47,273
6.
Payments to directors of the entity and their associates
Current quarter
$A'000
6.1
Aggregate amount of payments to these parties included in item 1.2
189
6.2
Aggregate amount of cash flow from loans to these parties included in item 2.3
-
6.3
Include below any explanation necessary to understand the transactions included in items 6.1 and 6.2
Previous quarter
$A’000
10,764
36,509
-
-
47,273
Current quarter
$A'000
189
-
7.
Payments to related entities of the entity and their associates
Current quarter
$A'000
7.1
Aggregate amount of payments to these parties included in item 1.2
-
7.2
Aggregate amount of cash flow from loans to these parties included in item 2.3
-
7.3
Include below any explanation necessary to understand the transactions included in items 7.1 and 7.2
Current quarter
$A'000
-
-

+ See chapter 19 for defined terms

1 September 2016

Page 3

Appendix 5B Mining exploration entity and oil and gas exploration entity quarterly report

**8. ** Financing facilities available Total facility amount Amount drawn at
Add notes as necessary for an understanding of at quarter end quarter end
the position $A’000 $A’000
8.1 Loan facilities 57,815 57,815
8.2 Credit standby arrangements 55 55
8.3 Other (please specify) - -
8.4 Include below a description of each facility above, including the lender, interest rate and whether it is secured
or unsecured. If any additional facilities have been entered into or are proposed to be entered into after
quarter end, include details of those facilities as well.

2 Loans are held as follows: • Murray Zircon Pty Ltd – A$4,000,000. Interest rate is 5% paid six monthly in arrears.

• A senior secured debt facility with Pala Investments Limited (“Pala”), Castelake IV, L.P. and CL V Investment Solutions LLC - US$38,850,000 (A$53,814,733 at 30 September 2018). Interest rate is 14% for the first fifteen months following draw down and 13% thereafter for the balance of the loan. Interest for the first fifteen months is added to the loan amount and thereafter paid quarterly in arrears. Further details can be found in the announcement lodged with the ASX on 8 March 2018.

9.
Estimated cash outflows for next quarter
$A’000
9.1
Exploration and evaluation
500
9.2
Development
12,200
9.3
Production
3,200
9.4
Staff costs
500
9.5
Administration and corporate costs
300
9.6
Other – Project Insurances
-
9.7
Total estimated cash outflows
16,700
9.
Estimated cash outflows for next quarter
$A’000
9.1
Exploration and evaluation
500
9.2
Development
12,200
9.3
Production
3,200
9.4
Staff costs
500
9.5
Administration and corporate costs
300
9.6
Other – Project Insurances
-
9.7
Total estimated cash outflows
16,700
9.
Estimated cash outflows for next quarter
$A’000
9.1
Exploration and evaluation
500
9.2
Development
12,200
9.3
Production
3,200
9.4
Staff costs
500
9.5
Administration and corporate costs
300
9.6
Other – Project Insurances
-
9.7
Total estimated cash outflows
16,700
10.
Changes in tenements
(items 2.1(b) and 2.2(b)
above)
Tenement
reference
and location
Nature
of
interest
Interest at
beginning
of quarter
Interest
at end of
quarter
10.1
Interests
in
mining
tenements
and
petroleum
tenements
lapsed, relinquished or
reduced
Refer Quarterly Report
10.2
Interests
in
mining
tenements
and
petroleum
tenements
acquired or increased
Refer Quarterly Report

+ See chapter 19 for defined terms

1 September 2016

Page 4

Appendix 5B

Mining exploration entity and oil and gas exploration entity quarterly report

Compliance statement

  • 1 This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.

  • 2 This statement gives a true and fair view of the matters disclosed.

31 October 2018

Sign here: ............................................................ Date: ............................................. (Director/Company secretary)

Print name: Dennis Wilkins - Company Secretary .........................................................

Notes

  1. The quarterly report provides a basis for informing the market how the entity’s activities have been financed for the past quarter and the effect on its cash position. An entity that wishes to disclose additional information is encouraged to do so, in a note or notes included in or attached to this report.

  2. If this quarterly report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.

  3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

+ See chapter 19 for defined terms

1 September 2016

Page 5