AI assistant
IMAGE RESOURCES NL — Interim / Quarterly Report 2008
Oct 30, 2008
65117_rns_2008-10-30_fec03601-655a-466b-a650-3507bc7898bd.pdf
Interim / Quarterly Report
Open in viewerOpens in your device viewer

QUARTERLY REPORT
For the Quarter Ended 30 September 2008
HIGHLIGHTS
- The scoping study on Image's initial 6.4Mt North Perth Basin resources due for completion during the December quarter.
- 45km of new HM targets at Gingin, increasing the total cumulative North Perth Basin target length to 292km, with more than 60% of Image's 2,230 sq km holding yet to be surveyed.
- A new joint venture at Cooljarloo covering potential extensions to the Calypso inferred resource.
- Early encouraging drilling results from the Eucla Basin with indications of widespread mineralisation.
- . Drilling of gold anomalies in progress at the Woodline joint venture.
- A new joint venture at Bronco Plains (AngloGold and Independence earning 72%) covering gold anomalies on the Tropicana-Beachcomber gold trend.
- Cash reserves of \$5.8 million.
ť
NORTH PERTH BASIN MINERAL SANDS
Activities during the quarter comprised continuation of the scoping study, assessment of drilling results completed during the previous quarter, geophysical surveying and negotiations with landowners regarding access. Image has increased the total cumulative length of identified targets on its North Perth Basin project to 292km (up from 247km, ASX release 24 April 2008). This number is expected to grow as geophysical surveys are progressively carried out on the remaining 66% of Image's 2,230sq km of tenements which have not yet been surveyed - see Figure 1.

Figure 1 North Perth Basin Project
From previous experience significant proportions of these targets are expected to be mineralised, providing substantial upside for the project. These geophysical targets are interpreted to comprise a combination of both strand and channel style mineralisation. Initially, first pass drilling will be carried out to check the validity of each target prior to selective infill drilling to define resources.
COOLJARLOO NORTH (Image 100%)
The resource estimate for the Helene Indicated Resource is currently being updated to take into account the drilling results reported in the previous quarter.
Drilling and sample processing during the quarter were limited to 8 audit drill holes at Helene. The holes were twinned with historical holes drilled by Iluka Resources with the aim of testing the reliability of Image's sampling method and comparing grade estimates with the previous drilling. The results indicate that Image's sampling method using a rotary splitter is working well. Grade comparisons with the historical drilling indicate that further drilling is required to provide a larger sample base for comparison purposes.
COOLJARLOO EXTENSION (Image earning 70%)
As recently reported (ASX release 24 September 2008) Image has entered into a joint venture with Matilda Minerals (in Voluntary Administration) on an exploration licence application adjoining Image's Cooliarloo joint venture tenements - see Figure 2.

Figure 2 E70/3292 in relation to Calypso Resource and Magnetic Targets T
The Matilda tenement is situated along strike from parts of Image's Calvpso deposits and is considered to have potential for extensions to this thick channel-style mineralisation.
Under the terms of the joint venture Image may earn a 70% interest in the tenement by expenditure of \$400,000 within five years of grant of the tenement.
Exploration will comprise geophysical surveys and drilling upon completion of the necessary permits and access agreements.
GINGIN (Image 100%)
As recently reported (ASX release 21 October 2008), a 95sq km tenement has been granted just south of Gingin townsite - see Figure 1. Several land access agreements have been signed, paving the way for a drilling programme to begin in December. Geophysical surveys carried out by Image have already identified at least 45km of new targets, one of which is more than 8.6km long and 350m wide.
Significantly, these targets are in close proximity to existing mineral separation and synthetic rutile processing plants at Muchea and within trucking distance of other facilities at Bunbury. It is noted that the existing mineral sand mine at Gingin is high grade, averaging 16.7%HM and contains more than 1.1Mt HM. The mineral sand orebody at the Gingin mine is only 2.5km in length which is significantly smaller than the targets recently identified within Image's Gingin tenement.
SCOPING STUDY
As previously reported, Image has commissioned a scoping study to identify the potential mining options for the North Perth Basin resources identified so far. The study will include both dry mining and dredging options and was anticipated to be completed by the end of the September quarter. However recent exchange rate movements have necessitated a re-evaluation of the scope of the study to include options that were previously discounted as being sub-economic. The revised date for completion of the study is before the end of the December quarter.
PHOSPHATE PROJECT (Image 100%)
No field work was completed during the quarter pending grant of the more prospective exploration licences.
EUCLA BASIN
First pass aircore drilling commenced during the quarter on Image's 100%-owned Serpentine Lakes tenements, situated along strike from the zircon-rich Cyclone prospect discovered by Diatreme Resources (DRX ASX release 15 February 2008; Inferred Resource 60Mt at 3.1%HM containing 1.8Mt HM). By the end of the quarter. 55 holes totalling 2,937 metres had been completed as part of an estimated 8,000m programme. The drilling is aimed at determining the local stratigraphy of the Barton shoreline and testing for strike extensions of the Cyclone mineralisation.
Initial laboratory results from this wide-spaced drilling indicate that significant mineralisation has been intersected as summarised in Table 1 and Figure 3.
$\tilde{t}$
| Hole Number |
MGA East |
MGA North |
From m |
To m |
Interval m |
HM % |
|---|---|---|---|---|---|---|
| SLOO2 | 474310 | 6810153 | 4 | 28 | 24 | 3.0 |
| SL082 | 475629 | 6810419 | 20 | 30 | 10 | 5.0 |
| SL014 | 474771 | 6808770 | 8 | 24 | 16 | 2.7 |
| SL094 | 474729 | 6808753 | 10 | 22 | 12 | 3.2 |
| SL015 | 474845 | 6808790 | 10 | 22 | 12 | 2.7 |
| SL087 | 474427 | 6810216 | 17 | 22 | 5 | 5.4 |
| SL001 | 474001 | 6810048 | 10 | 20 | 10 | 2.6 |
| SL017 | 476437 | 6809056 | 18 | 26 | 8 | 2.3 |
| SL095 | 474692 | 6808746 | 17 | 24 | 7 | 2.2 |
| SLO89 | 474890 | 6808797 | 18 | 23 | 5 | 2.9 |
| SLO88 | 474126 | 6810104 | 18 | 21 | 3 | 3.4 |
| SL056 | 497548 | 6804549 | 16 | 20 | 4 | 3.1 |
| SL043 | 481031 | 6805736 | 16 | 20 | 4 | 3.0 |
| SL048 | 485973 | 6805909 | 22 | 24 | $\overline{2}$ | 5.5 |
| SL076 | 477317 | 6810573 | 10 | 16 | 6 | 1.5 |
| SL044 | 481903 | 6805695 | 22 | 26 | 4 | 2.3 |
| SLO86 | 474592 | 6810358 | 19 | 22 | 3 | 2.8 |
| SL090 | 474934 | 6808799 | 18 | 21 | 3 | 2.5 |
| SL091 | 474971 | 6808796 | 19 | 22 | $\overline{\mathbf{3}}$ | 2.3 |
| SL092 | 475008 | 6808796 | 18 | 21 | 3 | 2.1 |
Table 1 Serpentine Lakes Drilling Results
1m or 2m samples, HM grades determined by TBE heavy liquid separation
Mineralisation has been intersected up to 2.5 km along strike from Cyclone indicating potential for a continuation of this resource into Image's tenement with best intercepts of 10m @ 2.3%HM from Xm and 16m @ 2.7%HM from 8m.
Significantly, mineralisation has been intersected a further 6km and 22km east of the possible Cyclone extension, suggesting potential for widespread mineralisation within the tenement. Visual examination of the drill samples indicates a high proportion of contained zircon, however this is currently being checked in the laboratory.
Image's tenement holding within the Eucla Basin now totals 2,580sq km. The company is most encouraged by these early drill results and is looking to make the Eucla Basin project a second front in its quest to build a world-class heavy mineral resource base.
$\tilde{t}$

Figure 3 Serpentine Lakes, Eucla Basin
WOODLINE JV (Image 100%, diluting)
ĩ
Geological and regolith mapping of the joint venture tenements continued during the quarter. A drilling programme to test geochemical anomalies and aeromagnetic targets on all three joint venture tenements (E28/1328, E28/1400 and E28/1496) is in progress following receipt of the necessary permits.
BRONCO PLAINS JV (Image 100%, diluting)
As previously reported (ASX release 20 August 2008), has entered into a joint venture agreement on its 230sq km 100%-owned Bronco Plains project situated 140 km east The Image tenements occur on the 300km-long Tropicanaof Kalgoorlie. Beachcomber trend where AngloGold Ashanti Australia Ltd (AGA) and Independence Group NL (IGO) discovered the 4Moz Tropicana-Havana gold deposits (IGO ASX release 3 December 2007) - see Figure 4.

Figure 4 Bronco Plains Joint Venture
Under the terms of the agreement AGA and IGO may earn a combined 72% interest in two contiguous exploration licences by sole funding \$2million of expenditure within four years. A programme of auger soil sampling and aircore drilling of geochemical anomalies has been proposed subject to obtaining the necessary permits for the Coonana Timber Reserve. Image has been encouraged by the identification of extensive gold anomalies adjacent to its tenements (IGO ASX release 15 October 2008) and by the opportunity to participate in exploration of this emerging gold province. Ť
MT HAYS (Image 90%)
Geochemical soil sampling (482 samples) has been carried out over a 10km strike length adjacent or along strike from gold mineralisation previously identified by Image's drilling (best intersection 2m at 52.1g/t Au from 92m (ASX release 5 August 2008). The geochemical survey covered interpreted structural targets along strike from Millenium Minerals' (formerly Wedgetail Mining) Nullagine gold project. Sample analyses are in progress.
CORPORATE
ASX code; IMA Cash position; \$5.8million Issued capital; 79,644,246 fully paid ordinary shares
1,214,604 options exercisable at 39 cents by 26 November 2009 2,000,000 options exercisable at 37 cents by 21 November 2010 2,500,000 options exercisable at \$1.80 by 16 November 2011 1,000,000 employee options exercisable at \$2.38 by 26 March 2012 2,200,000 options exercisable at \$2.12 by 20 November 2012
For more information on the company visit www.imageres.com.au Please direct enquiries to:
Roger Thomson Executive Director Phone (08) 9485 2410 Mobile 0419 969 183 Email [email protected]
George Sakalidis Managing Director Phone (08) 9485 2410 Mobile 0411 640 337 Email [email protected]
The information in this report that relates to exploration results is based on information compiled by Scott Carruthers BSc, MSc. Scott Carruthers is a full time employee of Image Resources NL. Scott Carruthers has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Persons as defined in the 2004 edition of the 'Australasian Code of Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Scott Carruthers consents to the inclusion of this information in the form and context in which it appears in this report.
Ť