Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

ILUKA RESOURCES LIMITED Interim / Quarterly Report 2021

Jul 21, 2021

65116_rns_2021-07-21_e4faf580-102c-430c-9180-dc8205ceed0c.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

ILUKA RESOURCES LIMITED (ASX:ILU) AUSTRALIAN SECURITIES EXCHANGE NOTICE

==> picture [60 x 43] intentionally omitted <==

QUARTERLY REVIEW TO 30 JUNE 2021

22 July 2021

KEY FEATURES

  • Zircon/Rutile/Synthetic Rutile (Z/R/SR) production of 175kt, up 40% from Q1

    • Synthetic rutile production higher due to the return to full production at SR2 following the planned suspension in Q1

    • Zircon production of 72kt was in line with Q1, with the Narngulu mineral separation plant operating at full capacity

    • Rutile production up 20% to 44kt, as a result of higher assemblage and higher recovery of HMC produced at Sierra Rutile

  • Z/R/SR sales, up 89% from H1 2020

    • Zircon sales of 177kt, reflecting a return to pre-pandemic production levels among Chinese tile manufacturers

    • Synthetic rutile sales were 191kt, up 116% with already strong demand amplified by increased concern around the future supply of high grade feedstocks and the settlement of the contractual dispute with major synthetic rutile customer, Chemours

  • Weighted average zircon price achieved in H1 2021 for premium and standard sand was US$1,321 per tonne

  • Zircon prices increased by US$70 per tonne in Q2 with a further US$125 per tonne effective 1 July

  • H1 rutile price up 2% to US$1,224 per tonne

  • Rare earths (Eneabba development)

  • Phase 1 – monazite concentrate sales of 10kt, in line with offtake agreement

  • Phase 2 – site works commenced (project currently in execute)

  • Phase 3 – letter of support received from Australian Government (feasibility study progressing)

  • Net cash at 30 June was $220 million, reflecting free cash flow of $180 million and capital expenditure of $17 million

PHYSICAL AND
FINANCIAL
SUMMARY
Q2 20
Q1 21
Q2 21
H1 20
H1 21
H1 21
vs
H1 20
PRODUCTION
kt
%
Zircon
Rutile1
Synthetic Rutile
Z/R/SR
Production
Ilmenite
Monazite
concentrate
SALES
kt
42.1
70.1
34.8
36.2
58.3
19.0
71.8
92.2
141.9
53.9
43.6
84.0
79.9
(4.9)
59.9
111.6
78.9
(29.3)
135.2
125.3
175.3
287.8
300.7
4.5
106.7
75.3
9.7
16.2
160.0
215.4
235.3
9.2
10 .0
9.7
26.2
170.1
Zircon
53.4
86.5
Rutile1
27.5
53.5
Synthetic Rutile
37.5
75.5
Z/R/SR sales
118.4
215.5
Ilmenite
73.5
49.5
Monazite
concentrate
10.0
10.5
REVENUE & CASH COSTS
$ million
53.4
86.5
27.5
53.5
37.5
75.5
90.8
78.4
177.2
126.0
35.6
74.7
89.0
19.1
115.9
88.5
191.4
116.3
118.4
215.5
242.3
241.6
457.6
89.4
73.5
49.5
10.0
10.5
80.9
107.1
130.4
21.8
10.2
10.0
20.7
107.0
Z/R/SR revenue
Ilmenite and
other revenue
Mineral Sands
Revenue
Production cash
costs of Z/R/SR
Ilmenite
concentrate &
by product costs
Total cash costs
of production
$ per tonne
198.4
320.1
26.0
24.4
224.4
344.5
359.9
408.1
680.0
66.6
31.2
48.5
55.6
14.6
391.1
456.6
735.6
61.1
283.0
242.2
(14.4)
10.2
11.4
11.8
293.2
253.6
(13.5)
Unit cash
production costs
Z/R/SR
produced
Unit cost of
goods sold
Z/R/SR sold
Revenue
Z/R/SR sold
AUD:USD cents
983
805
(18.1)
961
915
(4.8)
1,676
1,485
1,485
1,689
1,486
(12.0)
65.7
77.3
77.0
65.8
77.2
17.3

1 Rutile sales and production volumes include the lower value titanium dioxide product, HYTI, that typically has a titanium dioxide content of 70-90%. This product sells at a lower price than rutile, which typically has a titanium dioxide content of 95%.

Iluka Resources Limited • ABN 34 008 675 018 • Level 17 240 St Georges Terrace Perth WA 6000 GPO Box U1988 Perth WA 6845 • T +61 8 9360 4700 • F +61 8 9360 4777 • www.iluka.com

PRODUCTION COMMENTARY

==> picture [87 x 63] intentionally omitted <==

Australian Operations

Mining at Jacinth-Ambrosia in South Australia, produced 58 thousand tonnes of heavy mineral concentrate (HMC), down from 71 thousand tonnes in Q1. The lower HMC production was the result of reduced ore grades, with throughput volumes in line with Q1. Mining at the lower grade part of the Jacinth North deposit will occur over the next 12 months.

In Western Australia, the Cataby operation produced 108 thousand tonnes of HMC, down from 126 thousand tonnes in the previous quarter. Reduced HMC production was a result of lower runtime due to the impact of lower ore grades in line with the mining sequence and the impact of Tropical Cyclone Seroja.

The Narngulu mineral separation plant (MSP) operated at full capacity and processed 142 thousand tonnes of HMC, up from 135 thousand tonnes in Q1. The plant processed both Cataby and Jacinth-Ambrosia material to produce a total of 72 thousand tonnes of zircon and 14 thousand tonnes of rutile.

Production of synthetic rutile from SR2 at Capel was 60 thousand tonnes, up from 19 thousand tonnes in the previous quarter, with SR2 returning to full production on 1 April following the planned suspension in Q1.

Eneabba Phase 1 produced 10 thousand tonnes of monazite-zircon concentrate, in line with planned shipment requirements and the offtake agreement in place to underpin this initial phase of rare earths operations.

Sierra Leone Operations

HMC production was 65 thousand tonnes, compared to Q1 production of 72 thousand tonnes. Lower production was a result of lower run time and feed rates.

MINERAL SANDS
PRODUCTION
Q2 20
Q1 21
Q2 21
H1 20
H1 21
H1 21
vs
H1 20
ZIRCON2
Jacinth-Ambrosia/
Mid west WA
Cataby/South west
WA
Sierra Leone
Total Zircon
RUTILE
Jacinth-Ambrosia/
Mid west WA
Cataby/South west
WA
Sierra Leone
Total Rutile
Synthetic Rutile
(WA)
TOTAL Z/R/SR
ILMENITE
Jacinth-Ambrosia/
Mid west WA
Cataby/South west
WA
Sierra Leone
Total Ilmenite
MONAZITE
Jacinth Ambrosia/
Mid west WA
kt
kt
29.3
70.1
12.8
-
-
-
kt
kt
kt
%
60.9
68.8
131.0
90.4

10.9
23.4
10.9
(53.4)

-
-
-
n/a
42.1
70.1
71.8
92.2
141.9
53.9
4.0
10.4
5.0
-
25.8
25.8
6.4
10.4
16.8
61.5

7.6
11.8
7.6
(35.6)
29.6
61.8
55.5
(10.2)
34.8
36.2
43.6
84.0
79.9
(4.9)
58.3
19.0
59.9
111.6
78.9
(29.3)
135.2
125.3
175.3
287.8
300.7
4.5
15.8
38.1
82.1
26.7
8.8
10.5
27.1
41.1
65.2
58.6
123.2
150.4
149.9
(0.3)
9.7
23.9
20.2
(15.5)
106.7
75.3
160.0
215.4
235.3
9.2
9.7
16.2
10.0
9.7
26.2
170.1

Rutile production was 30 thousand tonnes, compared to 26 thousand tonnes in Q1. This was due to higher rutile assemblage within the HMC treated and higher recovery.

In May, Iluka provided the Government of Sierra Leone six months’ notice of its intention to temporarily suspend operations at Sierra Rutile, effective 19 November 2021. The company is currently exploring ways to reset the cost base of these operations and attract new investors to pursue the Sembehun development.

2 Iluka’s zircon production figures include volumes of zircon attributable to external processing arrangements.

2

MINERAL SANDS MARKET CONDITIONS

==> picture [87 x 63] intentionally omitted <==

Zircon

Demand for zircon remained strong throughout H1 2021. Zircon sales were 177 thousand tonnes, including zircon in concentrate (ZIC).

Chinese tile production has returned to pre-pandemic levels, despite significant financial pressure caused by increased raw material costs and challenges associated with increasing tile prices to real estate developers. Tile production may have been stronger but for regions in Guangdong, Guangxi, and Yunnan experiencing power supply restrictions, limiting production.

India's second wave of COVID-19 cases has stalled plans of ceramic tile makers as they look to commence production at a number of newly constructed plants. Tile production lines in Spain, Italy, Brazil, and Turkey are reported to be operating at 90% capacity.

Chinese fused zirconia producers continue to report favourable market conditions, with demand for refractory from domestic glass producers responding to strong growth in the photovoltaic industry. Exports of refractory materials with alumina-zirconiasilica remain subdued. In the United States, fused zirconia producers are running at full capacity.

Production of zirconium chemicals in China has been stable, with exports of zirconium based chemicals to the US and Japan increasing during the quarter.

The weighted average zircon price achieved in H1 2021 for premium and standard sand was US$1,321 per tonne, following a US$70 per tonne price increase effective 1 April.

The company announced a minimum price increase of US$125 per tonne effective 1 July.

Titanium Dioxide Feedstocks

Demand from the titanium dioxide market was again robust, with numerous requests received during the quarter for additional volumes of high grade feedstock. Sales of rutile and synthetic rutile were 280 thousand tonnes in H1 2021, up 72% compared to H1 2020.

Chlorine supply in the US was constrained following outages from the winter storm season, along with spring flooding and planned permanent shutdowns of sub economic capacity by certain producers. As a result pigment producers have sought ways to boost head grades in order to minimise chlorine consumption and maximise throughput. The pull forward of volume in Q2 has reduced available inventory; and spot volumes appear to be scarce across the industry.

Pigment prices continue to move higher, with a new round of increases announced for 1 July. Chinese prices have moved higher in each of the last eight months and appear to be stabilising ahead of the summer holidays. Pigment consumers in China appear to be willing to wait until September to reassess their needs and determine how demand looks heading into the Northern Hemisphere autumn.

The announcement of the potential suspension of operations at Sierra Rutile, coupled with violence at a major feedstock producer in South Africa, has created additional concern around future supply of feedstocks heading into the second half and beyond. As a result, pigment producers are seeking additional volumes ahead of any potential disruptions to supply.

The welding market continues to perform well, with demand outstripping supply of feedstocks. Iluka announced a 9% price increase in this market for Q3 and is allocating volumes to welding customers.

With inventory normalised, Iluka’s sales of high-grade feedstocks will likely be production constrained in H2 2021.

Iluka and Chemours have settled the previously disclosed contractual dispute. The terms are commercial in confidence but include Chemours taking all of the synthetic rutile not taken in 2020.

3

PROJECT UPDATES

==> picture [87 x 63] intentionally omitted <==

Updates on selected projects for the June quarter are detailed below.

==> picture [74 x 69] intentionally omitted <==

Eneabba, Western Australia

The Eneabba project in Western Australia involves the reclaiming, processing and sale of a strategic stockpile rich in monazite (a mineral containing rare earth elements) and zircon. Eneabba is currently the highest grade rare earths operation globally. Phase 1 of operations is producing a mixed monazite-zircon concentrate, with the monazite fraction at approximately 20%.

Phase 2 of the project is currently in execute. Once commissioned, this will see the production of two separate concentrates: a dedicated monazite concentrate at approximately 90%, suitable as a direct feed to a downstream rare earths refinery; and a zircon-ilmenite concentrate, which will be processed into finished products (zircon and ilmenite) at Narngulu. Site works have commenced and the upgraded high voltage infrastructure has been commissioned. Fabrication of third-party vendor packages continues off-site. Completion remains on-track for H1 2022.

The feasibility study for Phase 3 at Eneabba, a fully integrated rare earths refinery, is progressing. In May, Iluka received a letter of support from the Australian Government setting out the alignment of Iluka’s development plans and the Government’s policy objectives regarding critical minerals and modern manufacturing (disclosed to market). Engagement with Commonwealth and State governments is ongoing.

==> picture [76 x 76] intentionally omitted <==

Balranald, New South Wales

Balranald and Nepean are two rutile-rich deposits in the northern Murray Basin, New South Wales. Owing to their relative depth, Iluka is assessing the potential to develop these deposits via a novel, internally developed, underground mining technology.

Iluka completed the third trial (T3) of the underground mining method late in 2020. The trial confirmed the effectiveness of the underground mining method and validated key elements of the mining unit design. With confidence growing in the application of the underground mining technology, Iluka is focused on scoping the development pathway for Balranald. A decision on whether to proceed with the Definitive Feasibility Study (DFS) is likely be made in Q3 2021.

==> picture [77 x 74] intentionally omitted <==

Wimmera, Victoria

The Wimmera project involves the mining and beneficiation of a fine grained heavy mineral sands ore body in the Victorian Murray Basin for the potential long term supply of zircon and rare earths. One characteristic shared by the fine grained mineral sands deposits located in Western Victoria (those held by Iluka and other project proponents) is higher levels of impurities in their zircon. Absent a processing solution to remove these impurities, the zircon is ineligible for sale into the ceramics market.

The study work for Wimmera is focussed on validating Iluka’s zircon processing solution and on progressing baseline environmental studies. The rare-earth bearing minerals within the Wimmera deposit are very similar to the stockpiled minerals at Eneabba; and could supplement feed to Iluka’s potential downstream refining activities at Eneabba in future years.

Results from Iluka’s testing of a novel zircon processing solution continue to be pleasing. Equipment to pilot this solution on a larger scale is expected to be commissioned in Q4 2021. The processing of Wimmera’s rare earth minerals through a potential Eneabba refinery would serve to simplify the Wimmera development.

==> picture [73 x 77] intentionally omitted <==

Sembehun, Sierra Leone

The Sembehun group of deposits are situated 20 to 30 kilometres north-west of the existing Sierra Rutile operations. Sembehun is one of the largest and highest quality known rutile deposits in the world. Iluka is focused on determining an approach which balances the risk and reward associated with the development of Sembehun and has commenced a process to identify third parties willing to invest in the next phase of Sierra Rutile’s growth. The hydraulic mining trial at site has been completed and assessment of the trial data is now underway.

For more detail on projects please refer to Iluka’s website iluka.com/operations-resource-development/resource-development

4

EXPLORATION

==> picture [87 x 63] intentionally omitted <==

Expenditure on exploration and evaluation in Q2 2021 was $2.1 million. H1 2021 expenditure was $4.5 million.

US exploration activities shifted to drill testing of regional targets on the eastern seaboard late in the quarter. A total of 16 holes for 734 metres have been completed.

Exploration activity within Australia has been impacted by challenges relating to COVID 19 restrictions. The majority of the activities were focussed on securing land access through Native Title and land owner negotiations for drilling in H2 2021.

OTHER UPDATES

2021 Half Year Results

Iluka is scheduled to release its 2021 half year results on 25 August 2021.

A teleconference with management will be hosted on the day. Dial in details will be released closer to the date.

This document was approved and authorised for release to the market by Iluka’s Managing Director.

Investment market and media enquiries:

Luke Woodgate Group Manager, Investor Relations and Corporate Affairs Mobile: +61 (0) 477 749 942 Email: [email protected]

5

APPENDIX 1 – MINING AND PRODUCTION PHYSICAL DATA

==> picture [87 x 63] intentionally omitted <==

Physical Data
6 months to June 21
Jacinth-
Ambrosia/
Mid west
Cataby/
South west
Australia
Total


Sierra Leone
Group Total
Mining
Overburden Moved kbcm 1,048 3,259 4,307
-

4,307
Ore Mined kt 5,272 4,539 9,811
5,484
15,295
Ore Treated Grade HM % 3.1% 5.6% 4.2%
2.1%
3.6%
VHM Treated Grade % 2.7% 4.9% 3.7%
2.1%
3.2%
Concentrating
HMC Produced kt 129 234 363
138
501
VHM Produced kt 113 207 320
89
409
VHM in HMC Assemblage % 87.7% 88.3% 88.1%
64.6%
81.6%
Zircon 40.1% 10.5% 21.0%
3.7%
16.3%
Rutile 7.1% 7.0% 7.0%
40.5%
16.2%
Ilmenite 40.5% 70.8% 60.0%
20.4%
49.1%
HMC Processed kt 232 182 414
148
562
Finished Product3 kt
Zircon 131.0 10.9 141.9
-

141.9
Rutile 16.8 7.6 24.4
55.5
79.9
Ilmenite (saleable/upgradeable) 65.2 149.9 215.1
20.2
235.3
Monazite concentrate kt 26.2 - 26.2
-

26.2
Synthetic Rutile kt -
78.9
78.9
-

78.9

3 Finished product includes material from heavy mineral concentrate (HMC) initially processed in prior periods.

6

==> picture [87 x 63] intentionally omitted <==

Physical Data
3 months to June 21
Jacinth-
Ambrosia/
Mid west
Cataby/
South west
Australia
Total


Sierra Leone

Group Total
Mining
Overburden Moved kbcm 769 1,134 1,904
-

1,904
Ore Mined kt 2,665 2,222 4,647
2,896

7,543
Ore Treated Grade HM % 2.7% 5.4% 3.9%
2.2%

3.4%
VHM Treated Grade % 2.4% 4.7% 3.4%
2.2%

3.0%
Concentrating
HMC Produced kt 57.6 108.2 165.8
65.4

231.2
VHM Produced kt 50.0 95.6 145.6
47.6

193.2
VHM in HMC Assemblage % 86.9% 88.3% 87.8%
72.8%

83.6%
Zircon 37.6% 10.3% 19.8%
4.2%

15.3%
Rutile 7.2% 6.8% 7.0%
51.5%

17.8%
Ilmenite 42.1% 71.1% 61.0%
23.7%

50.5%
HMC Processed kt 97.4 163.7 261.1
69.7

330.8
Finished Product4 kt
Zircon 60.8 10.9 71.8
-

71.8
Rutile 6.4 7.6 14.0
29.6

43.6
Ilmenite (saleable/upgradeable) 27.1 123.2 150.4
9.7

160.0
Monazite concentrate kt 10.0 - 10.0
-

10.0
Synthetic Rutile kt -
59.9
59.9
-

59.9

Explanatory comments on terminology

Overburden moved (bank cubic metres) refers to material moved to enable mining of an ore body.

Ore mined (thousands of tonnes) refers to material moved containing heavy mineral ore. For Cataby/ South West this refers to ore treated.

Ore Treated Grade HM % refers to percentage of heavy mineral (HM).

VHM Treated Grade % refers to percentage of valuable heavy mineral (VHM) - titanium dioxide (rutile and ilmenite), and zircon found in a deposit.

Concentrating refers to the production of heavy mineral concentrate (HMC) through a wet concentrating process at the mine site, which is then transported for final processing into finished product at the company's Australian mineral processing plant, or the Sierra Leone mineral processing plant.

HMC produced refers to HMC, which includes the valuable heavy mineral concentrate (zircon, rutile, ilmenite) as well as other non-valuable heavy minerals (gangue).

VHM produced refers to an estimate of valuable heavy mineral in heavy mineral concentrate expected to be processed.

VHM produced and the VHM assemblage - provided to enable an indication of the valuable heavy mineral component in HMC.

HMC processed provides an indication of material emanating from each mining operation to be processed.

Finished product is provided as an indication of the finished production (zircon, rutile, ilmenite) attributable to the VHM in HMC production streams from the various mining operations. Finished product levels are subject to recovery factors which can vary. The difference between the VHM produced and finished product reflects the recovery level by operation, as well as processing of finished material/concentrate in inventory. Ultimate finished product production (rutile, ilmenite, and zircon) is subject to recovery loss at the processing stage – this may be in the order of 10 per cent.

Ilmenite is produced for sale or as a feedstock for synthetic rutile production.

Typically, 1 tonne of upgradeable ilmenite will produce between 0.56 to 0.60 tonnes of SR. Iluka also purchases external ilmenite for its synthetic rutile production process.

4 Finished product includes material from heavy mineral concentrate (HMC) initially processed in prior periods.

7

APPENDIX 2 – WEIGHTED AVERAGE RECEIVED PRICES

==> picture [87 x 63] intentionally omitted <==

The following table provides weighted average received prices for Iluka’s main products over the last three half year periods. Iluka’s Annual Report, available at www.iluka.com contains further historical mineral sands price information.

H1 20 H2 20 H1 21
US$/tonne FOB
Zircon Premium and Standard 1,354 1,301 1,321
Zircon
(all products, including zircon in concentrate)1
1,265 1,194 1,254
Rutile
(excluding HYTI)2
1,246 1,197 1,224
Synthetic rutile Refer Note 3 Refer Note 3 Refer Note 3

Notes:

  1. Zircon prices reflect the weighted average price for zircon premium, zircon standard and zircon-in-concentrate. The prices for each product vary considerably, as does the mix of such products sold period to period. In the first half of 2021 the split of zircon sand and concentrate by zircon sandequivalent was approximately: 85%:15% (2020 full year: 78%:22%).

  2. Excluded from rutile sales prices is a lower value titanium dioxide product, HYTI, that typically has a titanium dioxide content of 70 to 90%. This product sells at a lower price than rutile, which typically has a titanium dioxide content of 95%.

  3. Iluka’s synthetic rutile sales are underpinned by commercial offtake arrangements. The terms of these arrangements, including the pricing arrangements are commercial in confidence and as such not disclosed by Iluka. Synthetic rutile, due to its lower titanium dioxide content than rutile, is priced lower than natural rutile.

8

APPENDIX 3 – PRODUCTION SUMMARIES

==> picture [87 x 63] intentionally omitted <==

==> picture [500 x 180] intentionally omitted <==

----- Start of picture text -----

Zircon Zircon
Quarterly Production (kt) Annual Production (kt)
100 400
50 200
0 0
Q2 20 Q3 20 Q4 20 Q1 21 Q2 21 2017 2018 2019 2020 2021 ytd
Idle Sierra Leone Idle Sierra Leone
Cataby/Southwest WA Jacinth-Ambrosia/Midwest WA Cataby/Southwest WA Jacinth-Ambrosia/Midwest WA
----- End of picture text -----

==> picture [245 x 180] intentionally omitted <==

----- Start of picture text -----

Rutile
Quarterly Production (kt)
60
40
20
0
Q2 20 Q3 20 Q4 20 Q1 21 Q2 21
Idle Sierra Leone
Cataby/Southwest WA Jacinth-Ambrosia/Midwest WA
----- End of picture text -----

==> picture [244 x 180] intentionally omitted <==

----- Start of picture text -----

Rutile
Annual Production (kt)
400
200
0
2017 2018 2019 2020 2021 ytd
Idle Sierra Leone
Cataby/Southwest WA Jacinth-Ambrosia/Midwest WA
----- End of picture text -----

==> picture [245 x 180] intentionally omitted <==

----- Start of picture text -----

Synthetic Rutile
Quarterly Production (kt)
100
50
0
Q2 20 Q3 20 Q4 20 Q1 21 Q2 21
Idle Sierra Leone
Cataby/Southwest WA Jacinth-Ambrosia/Midwest WA
----- End of picture text -----

Synthetic Rutile Annual Production (kt) 300

==> picture [237 x 115] intentionally omitted <==

----- Start of picture text -----

200
100
0
2017 2018 2019 2020 2021 ytd
Idle Sierra Leone
Cataby/Southwest WA Jacinth-Ambrosia/Midwest WA
----- End of picture text -----

==> picture [245 x 180] intentionally omitted <==

----- Start of picture text -----

Ilmenite
Quarterly Production (kt)
200
100
0
Q2 20 Q3 20 Q4 20 Q1 21 Q2 21
Idle Sierra Leone
Cataby/Southwest WA Jacinth-Ambrosia/Midwest WA
----- End of picture text -----

==> picture [244 x 180] intentionally omitted <==

----- Start of picture text -----

Ilmenite
Annual Production (kt)
600
400
200
0
2017 2018 2019 2020 2021 ytd
Idle Sierra Leone
Cataby/Southwest WA Jacinth-Ambrosia/Midwest WA
----- End of picture text -----

9