Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

IGO LIMITED Interim / Quarterly Report 2018

Jan 30, 2018

65111_rns_2018-01-30_0ab4651c-73d3-4a49-a7c9-4d1888d29e4f.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [594 x 127] intentionally omitted <==

----- Start of picture text -----

For the period ending
31 December 2017 For the period ending
Quarterly Report 30 September 2017
Quarterly Report
----- End of picture text -----

NOVA AND TROPICANA UNDERPIN STRONG QUARTERLY RESULT

HIGHLIGHTS

  • Nova nickel production and costs within guidance range, benefiting from better than nameplate ore mined and milled tonnages in December and improved metallurgical recoveries.

  • Bollinger ore stoping commenced in December 2017.

  • Tropicana gold production, cash costs and All-in Sustaining Costs significantly better than guidance.

  • Primary metal production from Long and Jaguar remain within guidance year to date.

  • Unaudited underlying EBITDA in line with previous quarter at A$65M, while cash from operating activities was lower due to A$27M of receipts for December 2017 shipments being delayed to January.

  • Balance sheet continued to strengthen with net debt reduced from A$164M at the start of FY18 to A$120M.

  • Stockman divestment transaction successfully completed.

“IGO enjoyed another strong quarter, with Nova and Tropicana both delivering production and costs within or better than guidance. This result, combined with robust commodity prices, has resulted in our balance sheet continuing to strengthen, and net debt reduced to A$120M.

With the benefit of two quarters of commercial production behind us and having demonstrated the ability to meet design on a consistent basis, the Nova team have commenced the process of fine tuning the Operation.

In parallel, we continue to build our exploration team and ramp up our exploration activities across the business. A large part of our effort is focused on Nova and the Fraser Range; to understand the belt in a drive to unlocking the next significant discovery there.”

PETER BRADFORD MANAGING DIRECTOR & CEO Independence Group NL

PRODUCTION SUMMARY

UOM 1Q18 2Q18 YTD YTD Guidance3
Nova nickel t 4,500 4,454 8,954 7,500 to 9,000
Nova copper t 1,832 2,011 3,843 4,000 to 4,500
Nova Cash Costs1 A$/lb Ni 3.98 3.84 3.91 3.70 to 4.50
Tropicanagold2 oz 114,060 135,224 249,284 220,000 to 245,000
Tropicana AISC A$/oz 1,167 939 1,040 1,060 to 1,170
Jaguar zinc t 8,105 6,885 14,990 14,500 to 16,500
Jaguar copper t 530 591 1,121 1,300 to 1,500
Jaguar Cash Costs1 A$/lb Zn 1.03 1.37 1.19 0.85 to 1.05
Longnickel t 1,572 1,374 2,946 2,700 to 3,000
Long Cash Costs1 A$/lb Ni 4.80 5.47 5.10 4.40 to 4.90
  1. Cash Costs reported as per pound of payable metal inclusive of royalties and net of by-product credits.

  2. 100% attributable Tropicana production.

  3. Implied YTD guidance (For Nova; First Half FY18 guidance, for other assets; FY18 guidance divided by two).

==> picture [560 x 60] intentionally omitted <==

Quarterly Report

EXECUTIVE SUMMARY

Independence Group NL (ASX: IGO) (“IGO” or “the Company”) has backed up a strong September 2017 quarter (1Q18) with Nova delivering a second quarter (2Q18) of commercial production with nickel production and cash costs within guidance. At Tropicana, as guided, production was up 19% on the previous quarter resulting in YTD production, cash costs and All-In-Sustaining-Costs (AISC) being better than our pro-rata full year guidance.

At Nova, better than nameplate production rates from the underground mine and processing plant in the month of December 2017 compensated for a softer start to the Quarter. Jaguar production was lower due to scheduled lower grades mined during the Quarter.

Group underlying EBITDA and Net Cash from Operating Activities for the Quarter were A$64.5M and A$50.8M respectively, replicating the strong performance of 1Q18.

UOM 1Q18 2Q18 YTD
Financials(unaudited)
Revenue and Other Income A$M 147.5 207.3 354.8
UnderlyingEBITDA A$M 68.9 64.5 133.4
Profit(Loss)After Tax A$M 4.7 (1.5) 3.2
Net Cash from OperatingActivities A$M 60.6 50.8 111.4
UnderlyingFree Cash Flow A$M 28.9 11.6 40.6
Cash A$M 29.1 51.3 51.3
Debt A$M 171.4 171.4 171.4

SUSTAINABILITY

Safety

IGO managed activities resulted in no lost time injuries during the Quarter. The 12-month rolling lost time injury frequency per million hours worked (LTIFR) to 31 December 2017 was 2.09, down from 2.83 at 30 September 2017.

Note: in the 1Q18 Quarterly Report, a LTIFR of 2.75 was reported for that quarter. This was subsequently revised to 2.83 as a result of the reclassification of a single injury from 29 July 2017.

Environment

IGO continued its program of proactive remedial environmental works at Jaguar and Long to address various legacy issues. There were no material environmental incidents across the Company’s managed activities during the Quarter.

Community & Governance

During the Quarter, IGO was one of nine finalists vying for the Department of Mines, Industry Regulation and Safety’s Community Partnership Resources Sector Award. Even though IGO didn’t win, it was a great honour for the Company’s ongoing work in the community to be recognised.

In November 2017, IGO released its third Sustainability Report which can be found on the Company’s website at www.igo.com.au.

Also during the Quarter, IGO established a heritage agreement with the Ngadju people, providing a framework for future land access arrangements across the Ngadju Native Title Determination Area.

PAGE 2

Quarterly Report

NOVA OPERATION

Underground nickel, copper, cobalt mine located on the Fraser Range, WA: IGO 100%

Nova Operation UOM 1Q18 2Q18 YTD YTD Guidance1
Nickel in concentrate t 4,500 4,454 8,954 7,500 to 9,000
Copper in concentrate t 1,832 2,011 3,843 4,000 to 4,500
Cobalt in concentrate t 142 146 290 250 to 350
Cash cost(payable) A$/Ib Ni 3.98 3.84 3.91 3.70 to 4.50
  1. YTD guidance (First Half FY18 guidance).

Mining and Development

Underground development advancements for the Quarter of 3,210m was a record. The primary focus was on ore production areas within Nova and development of Bollinger. Ore stoping at Bollinger commenced in December. Barminco’s contract was extended by 12 months to January 2019.

Production drilling, charging, loading and trucking activities all maintained rates consistent with Nova’s nameplate production capacity during the Quarter.

The number of mining fronts increased during the Quarter resulting in increased production flexibility and a record monthly ore mining rate in the month of December. Higher production in the back end of the Quarter compensated for lower production in the first half of the Quarter attributable to a Barminco remote control loader being damaged during stoping operations and not being available.

Mine design and scheduling continue to be optimised to reflect the increased understanding

of the orebody resulting from ongoing mining activity and grade control drilling programs.

The Nova paste plant operated in line with requirements. As part of the stoping sequence, paste fill has now been exposed on multiple stope walls and a stope crown with no detectable failures or paste dilution of the ore.

Processing & Production

The Nova process plant milled 329kt of ore at a nickel grade of 1.58% for the Quarter.

With improved availability of ore in the second half of the Quarter, the process plant was operated at a rate above the nameplate 1.5Mtpa annualised rate for the month of December.

December metallurgical recoveries improved and were performing in-line with, or better than design recoveries.

Production in 3Q18 is expected to increase relative to 2Q18, with a strong finish expected in 4Q18 for FY18 metal production within our full year guidance range.

==> picture [364 x 200] intentionally omitted <==

PAGE 3

Quarterly Report

Financial

Nova’s sales revenue for the Quarter was A$78.3M, compared to the 1Q18 result of A$46.5M. Offshore shipments comprised 22.4kt of nickel concentrate, and 5.5kt of copper concentrate, while deliveries to BHP Billiton Nickel West (BHP) totalled 16.4kt of nickel concentrate.

Operating Cash Flow lagged EBITDA due to receipt of provisional payments following the Quarter end of US$14.0M for the sale of 10.2kt of nickel concentrate.

A full breakdown of production and financials are provided in Table 3 in Appendix 2.

==> picture [366 x 197] intentionally omitted <==

Nova-Bollinger Underground Drilling

Underground grade control drilling of the NovaBollinger orebodies continued in the Quarter with a total of 43,913m drilled (235,022m drilled project to date). The focus of this underground drilling in the Quarter was to convert Nova, Bollinger and Conductor 5 (C5) Inferred resource to Indicated and Measured resource categories.

As at 31 December 2017, grade control drilling of the Nova Main orebody is complete.

Bollinger drilling at 25mx25m spacing, (Inferred to Indicated resource) was 87% complete, and Bollinger 12.5mx12.5m (Indicated to Measured resource) was 12% complete, with 3,245m and 25,349m of grade control drilling remaining respectively.

C5 drilling at 25mx25m was 55% complete, with 5,640m remaining. Drilling at Nova Upper is expected to commence in 3Q18.

Nova Resource Model

Work continued with the Mineral Resource and Ore Reserve estimate updates with database close-off in mid-January 2018. Targeted completion of this work is scheduled for July 2018.

Nova Mining Lease Exploration

Surface exploration on the mining lease has focused on preparation activities associated with significant work programs to commence in 3Q18.

The extensive, 58km[2] , 3D seismic survey to be completed by HiSeis has commenced. Data collection will begin in 3Q18 with the program expected to take three to four months.

A 2,100m Reverse Circulation (RC) and Diamond (DDH) drilling program will commence in 3Q18, designed to test a number of targets including follow-up of previously intersected nickel and copper anomalism at the Phoenix Prospect.

Nova Downstream Processing

A Scoping study to investigate the potential for downstream processing of Ni/Co concentrates to produce Ni/Co sulphates is expected to be completed in 3Q18. Results to date are promising. The next step is to carry out metallurgical testwork commencing in 3Q18 to be followed by feasibility studies.

PAGE 4

Quarterly Report

TROPICANA JOINT VENTURE (TJV)

Open pit gold, north-east of Kalgoorlie, WA: IGO 30%, AngloGold Ashanti 70% (Manager)

Tropicana UOM 1Q18 2Q18 YTD YTD Guidance1
Goldproduction(100% basis) ounces 114,060 135,224 249,284 220,000 to 245,000
Cash Cost A$/oz 737 628 678 680 to 750
All-in SustainingCosts A$/oz 1,167 939 1,040 1,060 to 1,170
  1. Implied YTD guidance (FY18 guidance divided by two).

Mining

Mining productivity rates were maintained at elevated levels with a total of 8.1M bank cubic metres of material mined for the Quarter.

Ore Mined for the Quarter was 40% higher than the preceding quarter, with 3.3Mt of ore mined at a grade of 1.97g/t. This ore was sourced primarily from the Tropicana Pit (2.6Mt).

Processing & Production

In the process plant, both throughput and grade increased relative to the prior quarter. A total of

1.97Mt of ore, at an average grade of 2.45g/t Au, was processed. Average metallurgical recovery was also up at 89.1%, compared to 88.8% in 1Q18. As a result, gold produced was 135,224oz, compared to 114,060oz in the prior quarter. This is the second highest quarterly gold production to date.

Gold production in 2H18 is expected to be softer with production for the full year expected to be within guidance.

A full breakdown of production statistics is provided in Table 4 in Appendix 3.

==> picture [364 x 222] intentionally omitted <==

Financial

Gold revenue to IGO’s account was A$70.9M, A$14.7M higher than the previous quarter, in line with the higher production. Cash costs of A$628/oz were lower for the Quarter, positively impacted by the higher production which led to

lower unit costs. A similar trend can be seen in AISC, with the current Quarter’s result of A$939/oz being well below guidance levels, despite higher sustaining capital expenditure during the Quarter.

Tropicana’s free cash flow was A$29.1M for the Quarter and A$45.1M YTD.

PAGE 5

Quarterly Report

==> picture [364 x 216] intentionally omitted <==

Tropicana Exploration

A total of 13,686m of resource development drilling and 7,634m of exploration drilling was completed during the Quarter on the Tropicana Joint Venture.

Focus for the Quarter was on the acceleration of the 100mx100m drilling program on Boston Shaker to test the high-grade ore-shoots as part of the underground scoping study. Encouraging results have been received. The drilling program is scheduled for completion 3Q18.

Value Enhancement Studies

The Tropicana Joint Venture has approved Phase One of the Long Island strategy, increasing production from the mine in the medium term and extending mine life.

The full Long Island strategy adds 2.1Moz to Tropicana’s business plan, extending mine life by approximately seven years to 2027.

The project value has been further enhanced by the decision to install a second, 6MW, ball mill in the process plant, enabling throughput to be matched to the increased mining rate as well as improving gold recovery by up to 3% to approximately 92%. The installation of the second ball mill is expected to be completed by end-CY18.

Grade streaming, which prioritises the processing of higher-grade ore and stockpiling lower-grade material for processing at a later date, has resumed at Tropicana and will continue through CY18 and CY19. Gold production (100%) is forecast to be between 478,000oz – 492,000oz in CY18 and between 530,000oz – 548,000oz in CY19.

PAGE 6

Quarterly Report

JAGUAR OPERATION

Underground copper, zinc mine located 300km north of Kalgoorlie, WA: IGO 100%

Jaguar UOM 1Q18 2Q18 YTD YTD Guidance1
Zinc in concentrate t 8,105 6,885 14,990 14,500 to 16,500
Copper in concentrate t 530 591 1,121 1,300 to 1,500
Cash cost(payable) A$/Ib Zn 1.03 1.37 1.19 0.85 to 1.05
  1. Implied YTD guidance (FY18 guidance divided by two).

Mining

During the Quarter, mining delivered 113,823t of ore at an average grade of 6.48% zinc, 0.65% copper, 116.2g/t silver and 0.50g/t gold.

Ore production decreased slightly relative to 1Q18 and was marginally below the planned level. Development advance during the Quarter totalled 1,148m, in line with the previous quarter and above the planned rate.

Processing & Production

Processing plant production was 119,763t of ore milled at head grades of 6.52% zinc and 0.69%

copper, which resulted in metal in concentrates of 6,885t zinc and 591t copper.

Lower zinc in concentrate reflects the expected lower scheduled zinc grades mined during the Quarter, together with marginally lower tonnes mined. Directionally, metal in concentrate is expected to increase during 2H18 to achieve end of year production guidance.

The processing plant produced 14,672t of zinc concentrate and 2,427t of copper concentrate. Concentrates sold during the Quarter were 21,471t of zinc in two shipments and 2,896t of copper by way of a holding certificate sale.

==> picture [364 x 230] intentionally omitted <==

PAGE 7

Quarterly Report

Financial

Jaguar’s sales revenue increased by 44% compared to the prior quarter to A$42.7M as a result of one additional zinc shipment partially offset by lower copper sales.

Operating cash flow was lower than 1Q18 due to timing of receipts with the December 2017 copper sale receipt of US$7.1M being received in

January. Furthermore, the 1Q18 result included a payment for a June 2017 zinc concentrate shipment.

C1 cash costs and royalties were A$1.37 per payable pound.

Full details of Jaguar operating and financial results for the Quarter are provided in Table 5 in Appendix 4.

==> picture [364 x 205] intentionally omitted <==

Jaguar Exploration

A total of 7,073m of underground diamond grade control drilling was completed to refine the geometry and extent of known economic mineralisation in readiness for development and mining. The bulk of this drilling was targeting between the 3,700m and 3,650m RL (base of reserves).

A single 858m hole was drilled from underground to test for stratigraphic repetition of the host sequence east of the Bentley deposit, as interpreted from shallow surface Aircore (AC) drilling and structural work. The hole intersected felsic and intermediate rocks further to the east of Bentley that require further investigation as to their exploration potential for VMS deposits.

Four surface diamond drill holes for a total of 2,941m were drilled to test for extensions of the known lenses of zinc-rich mineralisation at Triumph. Assays and DHEM results and analysis are still pending.

On the Jaguar regional exploration program, a total of 3,045m of surface RC and DDH drilling was completed at two gold and base metal targets during the Quarter. The drilling was designed to follow-up anomalous base and precious metal values intersected in previous bedrock drilling and to further test beneath historic RAB/AC regolith anomalies. The results have confirmed the previous anomalies, with the two mineralised systems still open.

A full Jaguar geological review was undertaken which identified a number of prospective near mine targets that are being evaluated.

Value Enhancement

The development of Life of Mine scheduling scenarios, including Bentley deeps, the proposed Triumph project, potential re-entry at Jaguar and depth potential at Teutonic Bore continued in the Quarter.

PAGE 8

Quarterly Report

LONG OPERATION

Underground nickel mine located in Kambalda, WA: IGO 100%

Long UOM 1Q18 2Q18 YTD YTD Guidance1
Contained nickelproduced t 1,572 1,374 2,946 2,700 to 3,000
Cash Costs A$/lb 4.80 5.47 5.10 4.40 to 4.90
  1. Implied YTD guidance (FY18 guidance divided by two).

Mining

Long Operation achieved 43,954t at an average nickel grade of 2.97% for 1,374t of contained nickel and 86t of contained copper. A total of 355m was advanced by jumbo development during the Quarter.

Care and Maintenance

Planning for cessation of mining at 31 May 2018 and commencement of care and maintenance was progressed.

The majority of ore (59%) was sourced from the Moran orebody, with smaller ore contribution from the Long (12%) and McLeay (31%) orebodies.

==> picture [364 x 243] intentionally omitted <==

Financial

C1 cash cost (including royalties) was A$5.47/lb of payable nickel for the Quarter and A$5.10/lb of payable nickel for the year to date. Free cash flow was A$4.3M for the Quarter.

Exploration

The planned surface Electromagnetic (EM) survey at Long North to test for potential extensions of the Gibb and Long deposits commenced late in the Quarter and was still ongoing at Quarter-end.

Full details of Long’s operating and financial results for the Quarter are provided in Table 6 in Appendix 5.

PAGE 9

Quarterly Report

==> picture [364 x 216] intentionally omitted <==

GREENFIELDS EXPLORATION

Fraser Range

Regional exploration activities across the Albany Fraser Orogen (AFO) continued during the Quarter, included:

  • A 2,230m RC/DDH drill program testing numerous geochemical and geophysical targets throughout the AFO.

  • Completion of 30,450m AC drilling (88,183m since May 2017) in the northern AFO. A significant number of mafic/ultramafic intrusions and geochemical anomalies have been identified which will require followup.

  • Extensive EM surveys, using ground, airborne (Spectrem) and downhole EM, which have identified conductors that warrant drill testing. These conductors are in addition to those reported in 1Q18.

  • Ongoing regional gravity surveying in the northern AFO has continued (now 75% complete) to provide improved mapping of mafic and ultramafic intrusives.

  • Heritage surveys, both on-ground and helicopter-supported, to facilitate proposed drilling programs.

A 1,600m RC/DDH drill program is scheduled for 3Q18 and is designed to test a range of EM conductors, geochemical anomalies and other targets on the regional exploration portfolio.

Lake Mackay

During the Quarter, analytical results were received for the remaining five holes from the DDH drilling completed during the previous quarter at the Grapple Prospect. Narrow intervals of breccia and stringer vein sulphide mineralisation were intersected in all holes (see ASX Release by ABM Resources - Lake Mackay JV – Final Grapple Diamond Drilling Results dated 15 November 2017).

During the Quarter, a soil sampling survey was completed over areas of residual soils and shallow aeolian cover on licences surrounding EL24915, with results pending.

The Joint Venture applied for six new licences, bringing the total contiguous ground holding for the Project to over 12,800km[2] .

PAGE 10

Quarterly Report

FINANCIAL AND CORPORATE

Stockman Transaction

During the Quarter, the Company announced completion of the divestment of the Stockman Project to CopperChem Limited; a subsidiary of Washington H. Soul Pattinson and Company Limited. Proceeds of A$11.2M were received at completion and further cash payments are scheduled to be received during the twelve months following completion. The A$11.2M cash proceeds have been excluded from Underlying Free Cash Flow reported elsewhere in this Report. Refer ASX announcement 8 December 2017.

Financials

Total revenue for the Quarter was A$207.3M, a 40% increase on the prior quarter, and an 82% increase over 4Q17. Nova continues to contribute a greater proportion of revenue, achieving A$78.3M for the Quarter. In addition, both Tropicana and Jaguar achieved strong revenue results for the Quarter, with total revenues of A$71.1M and A$42.7M respectively.

For a second consecutive quarter, the Group generated a solid underlying EBITDA of A$64.5M, supported by commencement of commercial production at Nova on 1 July 2017 and strong base metal prices. Unaudited net loss after tax was A$1.5M for the Quarter.

Net IGO cash inflow for the Quarter, as shown in the chart below, was A$22.2M as a result of a strong free cash flow result from Tropicana. In addition, the following comments should be noted:

  • Sales receipts for $26.5M of Nova and Jaguar concentrate shipments, shipped in December 2017, were not received until January 2018, which contributed to a A$9.8M reduction in Cash from operating activities for the Quarter to A$50.8M.

  • Capital expenditure included A$32.3M in mine development of which A$13.5M was at Nova and A$15.2M at Tropicana.

==> picture [446 x 244] intentionally omitted <==

PAGE 11

Quarterly Report

Cash Flow 1Q18
(A$M)
2Q18
(A$M)
Cash at beginning of Quarter 35.8 29.1
Nova Operations Free Cash Flow 9.6 (6.9)
Tropicana Operations Free Cash Flow 16.1 29.1
Jaguar Operations Free Cash Flow 11.1 4.5
LongOperations Free Cash Flow 9.6 4.3
New Business and Exploration(greenfields & brownfields) (10.5) (12.9)
Corporate and Other Cash Flow (5.8) (4.5)
Net Proceeds from Sale of Investments and Other Assets - 10.7
Payments for Other Investments/Mineral Interests - (0.2)
Net Finance/BorrowingCosts (2.3) (1.9)
Repayment of Debt (28.6) -
Dividends Paid (5.9) -
Cash at end of Quarter 29.1 51.3

The Company has hedge positions with a total in-the-money mark-to-market value of A$12.5M as at 31 December 2017. These hedges are set out below:

Hedging as at date of this Report Units FY18 FY19 TOTAL
Gold
Par Forwards oz 30,000 47,988 77,988
Price A$/oz 1,796 1,859 1,835
Copper
Swaps - Jaguar t 1,020 - 1,020
Price A$/t 7,651 - 7,651
Diesel
Par Forwards L(000's) 16,560 8,640 25,200
Price A$/L 0.49 0.51 0.50

Further information relating to the performance of the operations of IGO can be found in the Appendices of this report. In addition, the Company has uploaded onto its website a Supplementary Information Excel spreadsheet, under Financial Reports, outlining summaries in Appendices 2, 3 4, and 5.

Executive Management

As foreshadowed in October 2017, a number of changes to the executive management team will take effect from 1 February 2018, as follows:

  • Matt Dusci (previously Chief Growth Officer) appointed Chief Operating Officer; and

  • Rob Dennis (previously Chief Operating Officer) appointed to the new position of Chief Transformation Officer.

The recruitment process to appoint a new Chief Growth Officer is currently ongoing. Until such appointment is made, Andrew Eddowes and Ian Sandl who head up Business Development and Exploration respectively, will report to the Chief Executive Officer and be part of the Executive Management team.

PAGE 12

Quarterly Report

FORWARD-LOOKING STATEMENTS

This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning Independence Group NL’s planned exploration program and other statements that are not historical facts. When used in this document, the words such as "could", "plan", "estimate", "expect", "intend", "may", "potential", "should", and similar expressions are forward-looking statements. Although Independence Group NL believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking statements.

INVESTOR AND MEDIA ENQUIRIES:

Andrew Eddowes Business Development Manager

T: +61 8 9238 8300 E: [email protected]

Jill Thomas Communications Manager

T: +61 8 9238 8373 E: [email protected]

PAGE 13

Quarterly Report

INVESTOR CALL AND WEBCAST

An investor call and webcast has been scheduled for 8.00am Perth time, Wednesday 31 January 2018. Dial-in details for the call and the webcast link can be found below.

Meeting title:

Independence Group Conference Call

Date: Conference ID: 511559

31 January 2018

Audio Access Dial in numbers:

Australia Toll Free

1 800 558 698

Alternate Australia Toll Free 1 800 809 971

Australia Local Number 61 2 9007 3187

China Wide 4001 200 659 New Zealand 0800 453 055 Belgium 0800 72 111 Norway 800 69 950 Canada 1855 8811 339 Philippines 1800 1110 1462 France 0800 913 848 Singapore 800 101 2785 Germany 0800 182 7617 South Korea 00 798 142 063 275 Hong Kong 800 966 806 Sweden 020 791 959 India 0008 0010 08443 South Africa 800999976 Indonesia 001 803 019 3275 Switzerland 800820030 Ireland 1800 948 625 Taiwan 008 0112 7397 Italy 800 793 500 Thailand 001800 156 206 3275 Japan 0053 116 1281 UAE 8000 3570 2705 Malaysia 1800 816 294 United Kingdom 0800 051 8245 Netherlands 0800 020 0715 United States 1855 8811 339

Details of the webcast are set out below.

To listen in live, please click on the link below and register your details:

http://webcasting.boardroom.media/broadcast/5a529c0db8b33f20bc41f42d

Please note it is best to log on at least 5 minutes before 11am AEDT (8am WST) on Wednesday morning, 31 January 2018 to ensure you are registered in time for the start of the presentation.

Investors are advised that, in addition to the live webcast, a recording of the presentation will be available on the IGO website www.igo.com.au approximately one hour after the conclusion of the webcast.

PAGE 14

Quarterly Report

APPENDICES

Financial Summary

Appendix 1

Table 1: Financial Summary

FINANCIAL SUMMARY (unaudited) 1Q18
(A$M)
2Q18
(A$M)
FY18
(A$M)
Revenue and Other Income 147.5
207.3

354.8
Underlying EBITDA 68.9
64.5

133.4
Profit(Loss) After Tax 4.7
(1.5)
3.2
Net Cash Flow from Operating Activities 60.6
50.8

111.4
Cash Flows included in the above:
Net interest income(expense) (1.3) (1.9) (3.2)
Exploration expenditure expensed (9.3) (10.8) (20.1)
Net Cash Flow from Investing Activities (31.6) (28.6) (60.3)
Cash Flows included in the above:
Capitalised borrowingcosts (1.0) -
(1.0)
Mine and infrastructure development (24.6) (32.3) (56.9)
Proceeds from sale of investments -
10.7

10.7
Payments for investments/mineral interests -
(0.2)
(0.2)
Exploration expenditure capitalised (0.6) (0.6) (1.2)
Plant and equipment (5.5) (6.3) (11.8)
Underlying Free Cash Flow 28.9
11.6

40.6
Net Cash Flow from Financing Activities (34.4) - (34.4)
Cash Flows included in the above:
Repayment of borrowings (28.6) -
(28.6)
Dividendspaid (5.9) -
(5.9)
Balance Sheet Items
Total Assets 2,195.8
2,181.1

2,181.1
Cash 29.1
51.3

51.3
Refined Bullion -
1.2

1.2
Marketable Securities 18.6
14.8

14.8
Total Debt 171.4
171.4

171.4
Total Liabilities 462.2
448.2

448.2
Shareholders’ Equity 1,733.6
1,732.9

1,732.9
Net tangible assetsper share(A$ per share) 2.95 2.95 2.95

PAGE 15

Quarterly Report

Table 2: Segment Summary for the December 2017 Quarter

FINANCIAL SUMMARY (unaudited) 1Q18
(A$M)
2Q18
(A$M)
FY18
(A$M)
Nova
Revenue and Other Income 46.5
78.3

124.9
UnderlyingEBITDA 31.1
28.6

59.7
Cash Flow from OperatingActivities 18.2
7.5

25.8
UnderlyingFree Cash Flow 9.6
(6.9)
2.8
Tropicana
Revenue and Other Income 56.4
71.1

127.5
UnderlyingEBITDA 32.1
44.2

76.3
Cash Flow from OperatingActivities 31.6
46.5

78.0
UnderlyingFree Cash Flow 16.1
29.1

45.1
Jaguar
Revenue and Other Income 29.6
42.7

72.3
UnderlyingEBITDA 13.1
6.2

19.2
Cash Flow from OperatingActivities 16.8
10.8

27.6
UnderlyingFree Cash Flow 11.1
4.5

15.5
Long
Revenue and Other Income 15.0
15.1

30.0
UnderlyingEBITDA 4.5
4.4

8.9
Cash Flow from OperatingActivities 9.7
4.4

14.1
UnderlyingFree Cash Flow 9.6
4.3

13.9
New Business
UnderlyingEBITDA (9.8) (10.2) (20.0)
Cash Flow from OperatingActivities (10.0) (12.3) (22.2)
UnderlyingFree Cash Flow (10.5) (12.9) (23.4)
Corporate & Other
Revenue and Other Income 0.1
0.0

0.1
UnderlyingEBITDA (2.0) (8.6) (10.7)
Cash Flow from OperatingActivities (5.8) (6.1) (11.9)
UnderlyingFree Cash Flow (7.0) (6.4) (13.4)

PAGE 16

Quarterly Report

Nova Production Summary

Appendix 2

Table 3: Nova Production Summary for the December 2017 Quarter

Nova Operation Notes Units 2Q18 YTD FY18
Safety:
Lost Time Injuries(No.) 0 1
Lost Time InjuryFrequency (LTIF) 1 0.97
Production Details:
Ore Mined 2 dmt 344,833 678,641
Ore Milled dmt 328,784 666,841
Nickel Grade % 1.58 1.61
Copper Grade % 0.67 0.65
Cobalt grade % 0.05 0.05
Concentrate Production
Nickel concentrate dmt 32,155 65,161
Copper concentrate dmt 6,471 12,191
Nickel Recovery % 85.6 83.6
Copper recovery % 85.3 81.7
Metal in Concentrate: 3
Nickel t 4,454 8,954
Copper t 2,011 3,843
Cobalt t 146 290
Metal Payable in Concentrate: 3
Nickel t 3,096 6,205
Copper t 1,941 3,594
Cobalt t 47 93
Metal Payable in Concentrates Sold:
Nickel t 3,457 5,657
Copper t 1,456 2,966
Cobalt t 54 86
Revenue/Expense Summary:
Sales Revenue (incl. hedging TC’s/ RC’s) $'000 78,306 124,792
Cash Mining Costs $'000 (25,158) (49,820)
Cash Processing Costs $'000 (9,856) (18,232)
Other Site Costs $'000 (4,550) (9,174)
Product inventory adjustments $'000 (4,827) 21,865
Trucking $'000 (811) (1,920)
Shipping & Wharfage $'000 (1,134) (2,053)
Royalties $'000 (3,932) (6,151)
Exploration $'000 (1,505) (3,103)
Mine Development $'000 (13,303) (27,968)
Plant & Equipment $'000 (2,454) (2,514)
Depreciation/Amortisation $'000 (35,607) (69,939)
Notional Cost /lb Total Ni Metal Payable
Mining Costs $/lb 3.69 3.64
Processing Costs $/lb 1.44 1.33
Other Cash Costs 4 $/lb 1.70 1.65
Copper, Cobalt credits $/lb (2.99) (2.71)
Ni C1 Costs & Royalties 5 $/lb 3.84 3.91
Exploration, Development, P&E $/lb 2.53 2.46
Depreciation/Amortisation $/lb 5.22 5.11
Note 1: LTIF is a 12-month moving average and is quoted as injuries per million hours worked
Note 2: Total mined ore, from inside and outside of reserves.
Note 3: Payable metal is a function of recovery from concentrate, smelting and refinery, controlled by sales contracts.
Note 4: Other Cash Costs include, site administration, notional trucking, notional TCs & RCs, notional wharfage, shipping and notional royal
Note 5: C1 Costs include credits for copper and cobalt notionally priced at US$3.09/lb US$30.1/lb for the Quarter respectively.

Note 1: LTIF is a 12-month moving average and is quoted as injuries per million hours worked Note 2: Total mined ore, from inside and outside of reserves. Note 3: Payable metal is a function of recovery from concentrate, smelting and refinery, controlled by sales contracts. Note 4: Other Cash Costs include, site administration, notional trucking, notional TCs & RCs, notional wharfage, shipping and notional royal Note 5: C1 Costs include credits for copper and cobalt notionally priced at US$3.09/lb US$30.1/lb for the Quarter respectively.

PAGE 17

Quarterly Report

Tropicana Production Summary

Appendix 3

Table 4: Tropicana Production Summary for the December 2017 Quarter

TROPICANA JV OPERATION Notes Units 2Q18 YTD FY18 2Q17
Safety:
Lost Time Injuries(No.) 1 1 1 0
Lost Time InjuryFrequency (LTIF) 0.47 0.90
Production Details:100% JV Operation
Waste mined ‘000 dmt 18,479 38,484 17,407
Ore Mined(>0.4 and <0.6g/t Au) ‘000 dmt 220 536 332
Ore Mined(>0.6g/t Au) ‘000 dmt 3,344 5,738 2,164
Au Grade Mined(>0.6g/t Au) g/t 1.97 1.94 2.00
Ore Milled ‘000 dmt 1,970 3,912 1,896
Au Grade Milled g/t 2.45 2.27 2.24
Average metallurgical recovery % 89.1 89.0 89.2
Gold recovered oz 138,302 254,389 121,781
Gold-in-circuit adjustment oz (3,078) (5,106) (586)
Goldproduced oz 135,224 249,284 121,195
IGO 30% attributable share
Gold refined & sold 2 oz 41,438 74,470 38,888
Revenue/Expense Summary:IGO 30% share
Gold Sales Revenue A$'000 70,850 127,042 63,108
Cash MiningCosts A$'000 (12,352) (21,793) (10,627)
Cash ProcessingCosts A$'000 (12,032) (23,352) (12,496)
Goldproduction inventoryadjustments A$'000 3,960 4,523 65
Gold sales inventoryadjustments A$'000 (1,158) (25) (3,439)
Other Cash Costs 3 A$'000 (3,550) (7,437) (3,132)
Stategovernment royalties A$'000 (1,753) (3,062) (1,604)
Silver credits A$'000 260 433 425
Exploration & feasibilitycosts(non-sustaining) A$'000 (1,319) (2,337) (1,800)
Exploration & feasibilitycosts(sustaining) A$'000 (8) (106) (13)
SustainingCapital A$'000 (1,738) (2,748) (688)
Improvement Capital A$'000 (4,296) (5,709) (2,142)
Capitalised strippingasset A$'000 (9,961) (22,878) (8,634)
Rehabilitation – accretion & amortisation A$'000 (588) (1,039) (718)
Depreciation/Amortisation A$'000 (18,235) (30,914) (14,142)
Unit Cash Costs Summary: IGO 30% share
Mining& ProcessingCosts A$/oz 601 604 636
Goldproduction inventoryadjustments A$/oz (98) (60) (2)
Other Cash Costs A$/oz 131 140 130
By-product credits A$/oz (6) (6) (12)
Cash costs A$/oz 628 678 753
Unit AISC Summary:IGO 30% share
Cash costs A$/oz 643 681 792
SustainingCapital A$/oz 42 37 18
Capitalised sustainingstripping& other mine costs A$/oz 240 307 222
Exploration & feasibilitycosts(sustaining) A$/oz 0 1 0
Rehabilitation – accretion & amortisation A$/oz 14 14 18
All-in Sustaining Costs 4 A$/oz 939 1,040 1,051
Note 1: LTIF is a 12-month moving average per million hours worked.
Note 2: Attributable share includes sales on a revenue basis, excludes gold-in-transit to refinery.
Note 3: Other Cash Costs include costs relating to site management, administration and support services, environmental & sustainability costs.
Note 4: The World Gold Council encourages gold mining companies to report an All-in Sustaining Costs metric. The publication was released via
press release on 27th June 2013 and is available from the Council’s website.
  • Note 1: LTIF is a 12-month moving average per million hours worked.

Note 2: Attributable share includes sales on a revenue basis, excludes gold-in-transit to refinery.

Note 3: Other Cash Costs include costs relating to site management, administration and support services, environmental & sustainability costs. Note 4: The World Gold Council encourages gold mining companies to report an All-in Sustaining Costs metric. The publication was released via press release on 27th June 2013 and is available from the Council’s website.

PAGE 18

Quarterly Report

Jaguar Operation Production Summary

Appendix 4

Table 5: Jaguar Operation Production Summary for the December 2017 Quarter

JAGUAR OPERATION Notes Units 2Q18 YTD FY18 2Q17
Safety:
Lost Time Injuries(No.) 0 1 0
Lost Time InjuryFrequency (LTIF) 1 4.99 1.82
Production Details:
Ore Mined 2 dmt 113,823 235,455 99,822
Ore Milled dmt 119,763 239,941 109,558
Zinc Grade % 6.52 7.01 8.49
Copper Grade % 0.69 0.68 1.07
Silver Grade g/t 116 118 128
Gold Grade g/t 0.50 0.48 0.58
Concentrate Production
Copper concentrate dmt 2,427 4,601 3,666
Zinc concentrate dmt 14,672 31,657 17,934
Zinc recovery % 88.2
89.1 89.6
Copper recovery % 72.0 65.6 76.1
Metal in Concentrate: 3
Copper t 591 1,121 869
Zinc t 6,885 14,990 8,331
Silver oz 282,128 596,989 301,645
Gold oz 344 689 470
Metal Payable in Concentrate: 3
Copper t 567 1,075 832
Zinc t 5,712 12,458 6,896
Silver oz 181,236 409,682 191,568
Gold oz 318 637 432
Metal Payable in Concentrates Sold:
Copper t 707 1,939 1,237
Zinc t 8,524 12,546 12,197
Revenue/Expense Summary:
Sales Revenue(incl. TC’s/ RC’s,credits) A$'000 42,632 72,208 46,009
Cash MiningCosts A$'000 (9,434) (17,475) (7,092)
Cash ProcessingCosts A$'000 (5,293) (9,577) (5,042)
Other Site Costs A$'000 (6,560) (13,109) (4,805)
Product inventoryadjustments A$'000 (10,115) (3,623) (11,572)
Trucking& Wharfage A$'000 (2,383) (4,232) (2,973)
Shipping A$'000 (890) (1,268) (936)
Royalties A$'000 (1,920) (1,268) (2,219)
Exploration 4 A$'000 (1,327) (2,329) (364)
Mine Development A$'000 (3,573) (6,238) (2,531)
Plant & Equipment A$'000 (2,849) (6,019) (2,100)
Depreciation/Amortisation A$'000 (3,513) (8,177) (3,614)
Notional Cost /lb Total Zn Metal Payable
MiningCosts A$/lb 0.75 0.64 0.47
ProcessingCosts A$/lb 0.42 0.35 0.33
Other Cash Costs 5 A$/lb 0.98 0.89 1.00
Copper,Silver and Gold credits A$/lb (0.78) (0.69) (0.71)
Zn C1 Cash Costs & Royalties 6 A$/lb 1.37 1.19 1.08
Exploration,Development,P&E A$/lb 0.62 0.53 0.33
Depreciation/Amortisation A$/lb 0.28 0.30 0.24
Note 1: LTIF is a 12-month moving average per million hours worked.
Note 2:
Total mined ore, from inside and outside of reserves.
Note 3:
Payable metal is a function of recovery from concentrate, smelting and refinery, controlled by sales contracts.
Note 4:
Exploration includes exploration expenditure capitalised and expensed.
Note 5:
Other Cash Costs include actual maintenance & site administration costs, notional trucking, notional TCs & RCs, notional wharfage, shipping and
notional royalties.
Note 6:
C1 Cash Costs include credits for copper, silver and gold notionally priced at US$3.09/lb, US$16.69/oz and US$1,274/oz for the Quarter respectively.
  • Note 1: LTIF is a 12-month moving average per million hours worked. Note 2: Total mined ore, from inside and outside of reserves. Note 3: Payable metal is a function of recovery from concentrate, smelting and refinery, controlled by sales contracts. Note 4: Exploration includes exploration expenditure capitalised and expensed. Note 5: Other Cash Costs include actual maintenance & site administration costs, notional trucking, notional TCs & RCs, notional wharfage, shipping and notional royalties.

Note 6: C1 Cash Costs include credits for copper, silver and gold notionally priced at US$3.09/lb, US$16.69/oz and US$1,274/oz for the Quarter respectively.

PAGE 19

Quarterly Report

Long Operation Production Summary

Appendix 5

Table 6: Long Operation Production Summary for the December 2017 Quarter

LONG OPERATION **Notes ** Units 2Q18 YTD FY18 2Q17
Safety:
Lost Time Injuries(No.) # 0 0 1
Lost Time InjuryFrequency (LTIF) 1 0.00 7.76
Production:
Ore Mined 2 dmt 43,954 89,590 51,884
Ore Milled dmt 43,954 89,590 51,884
Nickel Grade % 2.97 3.29 4.00
Copper Grade % 0.20 0.23 0.28
Metal in Ore Production
Nickel t 1,374 2,946 2,063
Copper t 86 204 144
Metal Payable in Ore Sold:
Nickel 3 t 812 1,759 1,250
Copper 3 t 35 82 58
Revenue/Expense Summary:
Nickel Sales Revenue A$'000 14,683 29,187 17,887
Cash MiningCosts A$'000 (6,338) (12,680) (5,131)
Other Cash Costs 4 A$'000 (3,845) (7,961) (4,161)
Copper credits A$'000 390 836 491
Exploration A$'000 0 0 (61)
Mine Development A$'000 0 0 (152)
Plant & Equipment A$'000 (97) (244) (603)
Depreciation/Amortisation A$'000 (5,417) (12,055) (5,554)
Cost /lb Total Ni Metal Payable
Cash MiningCosts A$/lb 3.54 3.27 1.86
Other Cash Costs 4 A$/lb 2.15 2.05 1.51
Copper Credit A$/lb (0.22) (0.22) (0.18)
Ni C1 Cash Costs & Royalties 5 A$/lb 5.47 5.10 3.19
Exploration,Development,P&E A$/lb 0.05 0.06 0.30
Depreciation/Amortisation A$/lb 3.03 3.11 2.02
Note 1: LTIF is a 12-month moving average per million hours worked.
Note 2. Production is sourced from both inside and outside reserve.
Note 3: Payable metal is a function of recovery from concentrate smelting and refinery and is costed under a BHPB Nickel West contract.
Note 4: Other Cash Costs include milling, royalties and site administration costs.
Note 5: C1 Cash Costs include the costs of mining, milling, onsite general administration expenses and royalties, less the net value of copper by-product
creditsfor the Quarter.

Note 1: LTIF is a 12-month moving average per million hours worked. Note 2. Production is sourced from both inside and outside reserve. Note 3: Payable metal is a function of recovery from concentrate smelting and refinery and is costed under a BHPB Nickel West contract. Note 4: Other Cash Costs include milling, royalties and site administration costs. Note 5: C1 Cash Costs include the costs of mining, milling, onsite general administration expenses and royalties, less the net value of copper by-product credits for the Quarter.

PAGE 20