IGO LIMITED Interim / Quarterly Report 2011

Jan 30, 2011

65111_rns_2011-01-30_78f49bea-a776-46f2-8be4-1c3cb4e3ffc9.pdf

Interim / Quarterly Report

Open in viewer

Opens in your device viewer

==> picture [49 x 50] intentionally omitted <==

INDEPENDENCE GROUP NL

QUARTERLY REPORT FOR THE 3 MONTHS ENDED 31 DECEMBER 2010

GROUP HIGHLIGHTS

  • Estimated and unaudited NPAT for the quarter was $11.0 million (Sep $10.0 million, YTD $21.0 million).

  • $303.3 million cash and estimated net receivables (Sep $144.1 million).

  • $164.3 million placement and rights issue completed.

OPERATIONS HIGHLIGHTS

  • Production

  • Cash Costs

  • 49,544t @ 4.9% Ni for 2,409 Ni t (Budget 51,563t @ 3.9% Ni for 1,990 Ni t).

  • A$4.20/lb Ni payable (Budget A$5.34) for the quarter (including royalties). Cash costs A$3.65/lb Ni payable excluding royalties.

  • Development - Moran development on budget and on schedule.

  • Third twin boom jumbo being commissioned in January to increase the rate of exploration drill drive development in Moran South, McLeay South and Long North.

  • Drill drive to test the Moran South TEM conductor expected to be completed early in the March quarter.

  • Long North - 7m @ 4.6% Ni (true width) and new TEM anomalies north of Long continue to indicate potential for new nickel sulphide shoots.

EXPLORATION HIGHLIGHTS

GOLD

  • Tropicana JV - Bankable Feasibility Study completed. AngloGold Ashanti and Independence Group Boards approved the development of the Tropicana gold mine.

  • A$580-600/oz Au cash costs and 470,000-490,000 oz Au average annual production over the first 3 years results in rapid pay back.

  • Boston Shaker true width intercepts of 17m @ 4.6 g/t Au, 16m @ 4.9 g/t Au, 12m @ 4.3 g/t Au and 8m @ 7.1 g/t Au indicate newly identified potential for underground as well as open pit mining at Boston Shaker.

  • Havana Deeps intercepts of 16m @ 9.7 g/t Au, 14m @ 9.0 g/t Au, 15m @ 7.0 g/t Au and 15m @ 5.6 g/t Au continue to confirm potential for underground gold mining.

  • Havana gold mineralisation intersected 2.1 km down plunge of the currently proposed Havana open pit indicating potential for a very large gold system.

  • Follow up drilling at Voodoo Child prospect intersected 22m @ 2.8 g/t Au from 56m.

  • Respective maiden gold resources of 0.48 M oz Au and 0.63 M oz Au for Boston Shaker and Havana Deeps which are likely to increase with planned drilling.

  • Updated reserves of 3.45 M oz Au announced during the quarter. Updated resources of 5.28 M oz Au included in the Tropicana section of this quarterly report.

  • Karlawinda - Step out drilling intersected 32m @ 2.2 g/t Au from 73m and 29m @ 1.9 g/t Au from 98m, down dip of supergene/oxide mineralisation.

  • Supergene, oxide, transition and primary heap leach metallurgical test work has commenced.

BASE METALS

  • Duketon JV - Three infill holes completed at the Rosie massive nickel sulphide prospect and down hole TEM surveys continued to provide encouragement.

Page 1

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

CORPORATE

CAPITAL RAISING

The Company announced and successfully completed a $164.3 million capital raising to assist in funding the Tropicana Gold Project development and construction costs. The funds were raised at A$6.65 per share and resulted in the issuance of 24.7 million IGO shares.

PROFIT AND LOSS

The estimated and unaudited NPAT for the quarter is $11.0 million (Sep $10.0M). The profit figures quoted in this report are subject to finalisation of estimated nickel prices and USD/AUD exchange rates. Unhedged receivables and sales figures in this report are based on a nickel price of AU$24,817/t and are subject to subsequent final price adjustments.

ISSUED CAPITAL - CURRENT

CASH AND RECEIVABLES

138,777,305 ordinary shares and 837,500 unlisted options.

  • $300.2 million cash (Sep $137.3M).

  • $3.1 million nickel revenue in receivables net of creditors (Sep $6.8M).

  • Total cash and estimated net receivables were $303.3 million at the end of the quarter (Sep $144.1M).

  • Unhedged receivables have been valued using AU$24,817/t Ni.

CASH OUTFLOWS

Excluding operating cash costs, major cash expenditure in the quarter was:-

  • $5.7 million on Long and regional exploration, including contributions to the Tropicana JV.

  • $2.9 million capitalised development costs, including Moran development.

  • $2.8 million income tax payments.

  • $6.9 million costs relating to the capital raising.

==> picture [211 x 175] intentionally omitted <==

==> picture [211 x 175] intentionally omitted <==

==> picture [211 x 175] intentionally omitted <==

Page 2

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

DEBT The Company had no debt at the end of the quarter except for hire purchase repayments of $1.4 million for mining equipment. NICKEL SALES PRICE CALCULATION Due to the off-take agreement the Company has with BHP Billiton Nickel West Pty Ltd, nickel sales for any given month are required to be estimated. This is due to the lag-time between delivery of ore and setting of the price to be received, which is based on the average LME price prevailing in the third month after the month of delivery.

The Company is also required to estimate the USD/AUD exchange rate when calculating sales for any given month, as payment for nickel delivered is received in US dollars. Therefore, when calculating the quarter’s cash flow and profits, revenue which will be received based on future nickel prices is estimated using the most up-to-date price information available prior to the release of the quarterly report. The receivables figure used represents the estimated final USD nickel payment converted to AUD, also at an estimated exchange rate.

The effect of the changing nickel price and exchange rate on receivables is reflected in each quarter’s cash flow and profit figures. 2010/11 EXPLORATION EXPENDITURE $5.6 million exploration expenditure was incurred during the quarter which includes accruals and Tropicana JV expenditure. HEDGING During the quarter, nickel hedge contracts were placed for 100t per month for 20012/13 at A$25,000/t. Total hedged nickel metal at the date of this report is 5,760t at A$23,352/t, which is scheduled to be delivered at 200 tonnes per month from January to June 2011, 180 tonnes per month from July 2011 to June 2012 and 200 tonnes per month from July 2012 to June 2013. INVESTMENTS Subsequent to the end of the quarter, IGO signed an agreement to take up to a 19.9% interest in Argentina Mining Limited, a company with exploration interests in Argentina that is seeking to list on ASX. The agreement is subject to receiving ASX waivers and includes certain joint venture and buy-back rights.

MINING OPERATION

LONG NICKEL MINE IGO 100% SAFETY During the quarter 1 Lost Time Injury (LTI) injury was recorded due to issues relating to a previous injury which has now resulted in lost time, bringing the site Frequency Rate (LTIFR) to 6.42 for the life of the operation. The operation is proactively undergoing a site wide risk review which will be utilised to update risk matrixes, operational procedures and overall site awareness.

During the quarter 1 Lost Time Injury (LTI) injury was recorded due to issues relating to a previous injury which has now resulted in lost time, bringing the site Frequency Rate (LTIFR) to 6.42 for the life of the operation.

PRODUCTION Production for the quarter was 49,544t at 4.86% Ni for 2,409 tonnes of contained nickel, which was mined by the following methods:

Jumbo Stoping 7,915 t @ 6.56 Ni for 519 Ni t
Long-hole 20,698 t @ 5.93 Ni for 1,229 Ni t
Hand-held 3,668 t @ 4.39 Ni for 161 Ni t
JumboDevelopment 17,263 t @ 2.90 Ni for 500 Ni t
TOTAL 49,544 t @ 4.86 Ni for 2,409Nit

Production was from the following areas:

Long 5,282 t @ 3.04 Ni for 160 Ni t
McLeay 24,770 t @ 4.45 Ni for 1,104 Ni t
Victor South 13,249 t @ 6.96 Ni for 922 Ni t
Moran 6,243 t @ 3.57 Ni for 223NIt
TOTAL 49,544 t @ 4.86Ni for 2,409Nit
(See Figure 1 for location of ore bodies)

Page 3

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

Contained nickel metal was 21% higher than budget due to better than anticipated run of mine Ni grades (+1% Ni) and minimal mining dilution.

Metal during the quarter was produced at a cash cost of A$4.20 per payable pound of nickel, 21% below budget (includes A$0.56 per payable lb for royalty), versus a budget cost of A$5.34/lb. The main savings arose from less operational mine development due to a focus on increased capital development and less operational infill diamond drilling than budgeted.

Operational highlights for the quarter included:

  • Focus on improving health and safety.

  • Higher than budgeted run of mine grades.

  • Continued low cost metal production.

  • Completion of the targeted Moran capital development contract by RUC.

DEVELOPMENT

CAPITAL DEVELOPMENT

During the quarter 446 metres were advanced as capital development, of which 358m occurred in Moran and 88m in the 570 exploration drill drive.

OPERATING DEVELOPMENT

A total of 591 metres of operating development was also undertaken during the quarter, of which 80m occurred in Long (13/7 block), 396m in McLeay and 115m in Moran. Operating development costs are included in cash costs.

After a recent life of mine update and continued exploration success, Lightning Nickel has committed to purchasing another twin boom jumbo. This resource will be dedicated to advancing exploration platforms to enable enhanced shortmedium term resource extensions. It is expected that this additional resource will be fully operational next quarter.

FOCUS FOR MARCH QUARTER

The March quarter will see the operation focus on:

  • Site risks and employees’ safety

  • Construction of Moran Paste Plant

  • Continued capital development, both vertical and horizontal in Moran

  • Moran South and Long North exploration

EXPLORATION

Drill Drive Development

Development of the Moran 570 drill drive advanced 50m east over the Moran South target area, through felsic intrusives and is currently in ultramafic rock units. The drill platform is on schedule to enable drilling in the March quarter ( Figure 2) .

Aeromagnetic Survey and High Powered TEM Transmitter Mark 111

A detailed aeromagnetic survey to cover all the leases at the Long Victor nickel complex will commence in the March quarter. The additional new information will be used in conjunction with the Three Dimensional Seismic Survey results to target komatite channels outside of mined areas.

IGO is currently commissioning a new High Powered Geophysics Transmitter (HPT-Mark 111) which is designed to improve reliability and signal strength when conducting Electromagnetic surveys. The HPT-Mark 111 will have the

Page 4

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

capacity to reliably increase transmission current to greater than twice the existing transmitter . Testing is scheduled for the March quarter.

Moran Extensional Drilling

No extensional drilling was carried out this quarter, pending the development of the Moran 570 drill drive. Three holes are planned for the March quarter, designed to test the interpreted southern continuation of the prospective Moran ultramafic lava channel, including a TEM target centred 420m south-east of the June 2010 Moran reserve boundary (Figures 1 and 2) .

==> picture [447 x 94] intentionally omitted <==

==> picture [447 x 94] intentionally omitted <==

==> picture [447 x 94] intentionally omitted <==

Figure 1: Long Nickel Mine – Longitudinal Projection Showing Target Areas, TEM Conductors and Significant Intercepts

Outside June 2010 Ore Reserves

==> picture [340 x 124] intentionally omitted <==

==> picture [340 x 124] intentionally omitted <==

Figure 2: Long Nickel Mine - Moran South Schematic Cross-Section Showing Abandoned Drill-Holes, Proposed 570 Drill Drive Extension and Proposed Drill Holes to Test the Moran South TEM Target

Page 5

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

==> picture [498 x 98] intentionally omitted <==

==> picture [498 x 97] intentionally omitted <==

==> picture [498 x 97] intentionally omitted <==

Figure 3: Long Nickel Mine - Long North - Longitudinal Projection Showing Recent Drill Intercepts and TEM Conductors in Relation to the Northern End of the Long Ore Body

Long North Extensional Drilling

Seven diamond drill holes for 1,722m were completed during the quarter (Figure 3) with the best intercepts reported in:

LG137-057 with 16.3m @ 4.6% Ni (7m True width)

LG137-059 with 2.4m @ 3.0% Ni

LG137-055 with 0.9m @ 5.7% Ni

The remaining drill-holes intersected porphyry-obscured ore contacts. Thin nickel mineralisation in LG137-055 is 100m north of the Long North 2010 resource boundary limits. Four step-out drill holes are planned to test down plunge of Long North in the March quarter.

Table 3: Long Nickel Mine – Significant December Quarter Long North Results

Hole_ID **LocalNorth ** LocalEast LocalRL **EOH ** Dip **Azimuth ** **mFrom ** mTo **Interval ** **TRUE ** Grade
**Width ** % Ni
LG137-048 550758 374036 -392 203.1 -59 349 porphyry
LG137-052 550759 374034 -394 299.9 -63 321 porphyry
LG137-055 550760 374036 -394 206.8 -20 346 172.66 173.57 0.91 0.8 5.7
LG137-056 550735 374060 -395 263.8 -57 140 porphyry
LG137-057 550737 374059 -395 191.8 -77 54 126.16 142.43 16.27 7 4.6
LG137-058 550735 374060 -395 302 -67 138 porphyry
LG137-059 550760 374035 -394 254.5 -29 337 184.1 186.46 2.36 2.97

Page 6

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

LONGNICKELMINEPRODUCTIONSUMMARY
Dec ‘10
2010/11
Note
Quarter
FY to Date
Mining Reserve (Dry Tonnes)
Start of Period
1,254,765
1,315,000
- ROM Production
1
(49,5454)
(109,779)
End of Period
1,205,221
1,205,221
Production Details:
Ore Mined (Dry Tonnes)
1
49,544
109,779
Ore Milled (Dry Tonnes)
49,544
109,779
Nickel Grade (Head %)
4.86
4.66
Copper Grade (Head %)
0.34
0.32
Metal in Ore Production (Tonnes)
Nickel delivered
2
2,409
5,111
Copper delivered
2
167
351
Metal Payable IGO share (Tonnes)
Nickel
1,456
3,090
Copper
67
142
Hedging
Tonnes delivered into Hedge
600
1,200
Average Price (AU$/t)
19,013
19,013
Revenue/Cost Summary
A$'000's
A$'000's
Sales Revenue (incl. hedging)
34,905
70,093
Cash Mining/Development Costs
(7,969)
(17,546)
Other Cash Costs
3
(5,520)
(11,622)
Depreciation/Amortisation/Rehabilitation
(4,799)
(9,607)
Total Unit Cost Summary
A$/lb Total Metal
Produced
A$/lb Total Metal
Produced
Cash Mining/Development Costs
1.50
1.56
Other Cash Costs
3
1.04
1.03
Depreciation/Amortisation/Rehabilitation
0.90
0.85
Revenue/Cost Summary
A$/lb Payable
Metal
A$/lb Payable
Metal
Sales Revenue (incl. hedging)
4
10.88
10.42
Cash Mining/Development Costs
2.48
2.57
Other Cash Costs
3
1.72
1.71
Depreciation/Amortisation/Rehabilitation
1.50
1.41
Safety and Productivity
- Lost Time Injuries
1
2
- Medically Treated IFR
34.8
31.9
- Nickel Productivity Rate
5
77.7
83.8
Production/Exploration Drilling
Metres
Metres
Production
-
-
Exploration
2,478
7,756
2,478
7,756
Note 1. Production is sourced from both reserves/inventory and outside reserves.
Note 2. The Recovery Rate is fixed with BHP depending on head grade. For grades from 3.0% to 3.5%
recovery is 92%, for grades in excess of 3.5% recovery is 93%.
Note 3. Other Cash Costs include milling, royalties and site administration.
Note 4. Sales Revenue per pound includes nickel price adjustments for prior periods.
Note 5. Nickel Productivity Rate = Annualised nickel tonnes per full-time-equivalent-employee.
Prev. Corresp.
Quarter
(Dec ’09)
1,276,270
(49,448)
1,227,272
49,448
49,448
4.55
0.33
2,255
164
1,364
66
600
19,013
A$'000's
26,340
(8,349)
(4,419)
(2,726)
A$/lb Total Metal
Produced
1.68
0.89
0.55
A$/lb Payable
Metal
8.76
2.78
1.47
0.91
1
30.5
75.7
Metres
2,847
1,559
4,406

Page 7

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

REGIONAL GOLD EXPLORATION

==> picture [263 x 189] intentionally omitted <==

Figure 4: IGO Gold Project Locations

TROPICANA JV (IGO 30%, ANGLOGOLD ASHANTI AUSTRALIA LIMITED MANAGER 70%)

The Tropicana Joint Venture comprises approximately 16,000km[2] of highly prospective tenure covering a strike length of 396km ( Figure 5 ) along an emerging new gold province.

The Tropicana project was generated and pegged by IGO and subsequently joint ventured to AngloGold Ashanti Australia Limited in January 2002. The first discovery within this extensive tenement package is the Tropicana deposit, comprising the Tropicana and Havana Zones for which a Bankable Feasibility Study (“BFS”) was completed in Q4 2010. The boards of both companies have subsequently approved development of the project.

In addition to the recently completed Feasibility work at the Tropicana deposit, scoping studies were completed on the potential Boston Shaker open pit and Havana Deeps underground deposits.

Exploration is also continuing at priority regional locations throughout the joint venture area, with a focus on those within trucking distance of the planned operation at Tropicana-Havana.

Bankable Feasibility Study

During the quarter IGO announced to the ASX that the boards of both Independence Group NL and AngloGold Ashanti Limited had approved project development (refer to ASX announcement of 11[th] November for further details). The proposed plant layout is depicted on Figure 6 .

The approved project is expected to produce 3.45Moz (1.04Moz – IGO share) over a 10 year life at A$710-A$730/oz cash cost (real), including royalties. Apart from the starter pits all future cut-backs have been included in cash costs.

Subsequent to the completion of the BFS, Macmahon Holdings Ltd was selected as the Preferred Tenderer for final negotiations of the open pit mining contract, which is scheduled to be awarded in the March 2011 quarter.

Page 8

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

BFS Highlights (excludes Boston Shaker and Havana Deeps):

Open Pit Proven and Probable
Reserves:
48Mt @ 2.2 g/t Au – 3.4 Moz gold
(refer ASXannouncement11 November 2010)
Open Pit Mining Inventory
(includingInferred category):
59Mt @ 2.0 g/t Au for 3.8 Moz gold
Expected production first 3 years: 470,000–490,000 oz pa
(IGO share 141,000–147,000 oz pa)
atA$580-A$600/ozcashcostincludingroyalties
Estimated capital and working
capital:
A$690-A$740M (real); A$725-A$775 (nominal –
including escalation)
Estimated maximum cash draw
down:
A$195-A$200M (IGO 30% share at gold price of
A$1,300/oz)
Estimated payback: 2.2 years (at gold price of $A1,300/oz, USD:AUD
parity and US$85/barreloil)
Fresh ore milling rate: 5.8Mt pa
Road constructioncommencement: Early June2011Quarter
Anticipatedfirst gold production: December 2013 Quarter
Additional Upside: Boston Shaker open pit, potential underground mine
andnumerousregionalexplorationtargets

Key project parameters are tabulated below:

BFS
NOVEMBER 2010
Initial Mine Life 10 years
Potential Further Mine Life Boston Shaker
Havana Deeps
Regional Targets
Reserves 48Mt @ 2.2 g/t Au for 3.4Moz
Mining Inventory 59Mt @ 2.0 g/t Au for 3.8Moz
Expected Recovered Gold
Production
3.45Moz
Capital Cost – Plant &
Infrastructure:
-
Real
-
Nominal
A$590 – 620M
A$615 – 650M
Capitalised Pre-Commissioning
Operating Costs
-
Real
-
Nominal
A$100 – 120M
A$110 – 125M
Cash Costs, including royalties
(Real)
A$710 – 730/oz Au

Escalation Rates Applied to Capital
Costs (Nominal)
Nominal capital costs include a generous allowance
for the potential mining boom in Western Australia
duringthe constructionperiod
Gold Recovery Rate 90.4%
Annual Average Gold Production
Over 10 Year Life
330,000 – 350,000 oz
Maximum Draw Down (IGO 30%
Share)
A$195M – 200M (Real)
Strip Ratio 5.5:1
Expected First Production Second Half 2013
Estimated Average Annual
Production Years 1 – 3
470,000 – 490,000 oz
Cash cost including royalties Years
1 – 3
A$580 – 600/oz
Payback Period (based on
A$1,300/oz gold price, US$85/bbl
oil,AUD:USD 1.00)
2.2 years
Power Generation Diesel
Gas being assessed

Page 9

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

Scoping Studies

During the quarter scoping studies were completed on the near surface Boston Shaker deposit immediately north of the Tropicana deposit and Havana Deeps, which lies immediately below the proposed Havana Pit. The outcomes of the scoping studies were positive and approval has been given to advance Boston Shaker to the feasibility stage. A decision to advance Havana Deeps to prefeasibility is imminent. These studies will assess how the deposits may enhance the currently approved project economics and mine life.

Updated Resource Statement

As part of the scoping study process resource estimations were completed on Boston Shaker (open pit) and Havana Deeps (underground).

An updated Mineral Resource for the project is provided in Table 3 below:

MINERALRESOURCE
CLASSIFICATION
TONNES(M) GOLD
(T)
GRADE
(G/T AU)
OUNCES(M)
Open Pit
Measured
Indicated
Inferred
25.8
28.8
10.5
56.1
58.7
15.0
2.2
2.0
1.4
1.80
1.89
0.48
Open Pit – Tropicana & Havana 65.1 129.8 2.0 4.17
Boston Shaker
Measured
Indicated
Inferred
0.0
0.0
6.1
0.0
0.0
14.9
0.0
0.0
2.5
0.00
0.00
0.48
Open Pit - Boston Shaker 6.1 14.9 2.5 0.48
Underground
Measured
Indicated
Inferred
0.0
0.0
5.3
0.0
0.0
19.5
0.0
0.0
3.7
0.00
0.00
0.63
Underground – Havana Deeps 5.3 19.5 3.7 0.63
Total Tropicana
Measured
Indicated
Inferred
25.8
28.8
21.9
56.1
58.7
49.4
2.2
2.0
2.3
1.80
1.89
1.59
Total Project Resource 76.5 164.2 2.2 5.28

Notes to Mineral Resource statement:

1. The Tropicana, Havana and Boston Shaker Open Pit Mineral Resources have been estimated using the geostatistical technique of Uniform Conditioning.

2. Tropicana and Havana South Mineral Resources have been reported above a cut-off grade of 0.5 g/t for Oxide and Transitional material and 0.6 g/t for Fresh Material, within a US$1,025/oz optimisation shell at a A$/US$ exchange rate of 0.80 (A$1,281/oz). The resource estimate is based on contract mining costs whereas the previous resource estimate used estimated owner-operator costs. The Havana portion of the Open Pit Mineral Resource has been reported within the BFS Pit Design, with the Havana Deeps Underground Mineral Resource reported externally to the Pit Design.

3. Boston Shaker Mineral Resources have been reported above a break-even cut-off grade of 0.5g/t for Oxide and Transitional material and 0.6 g/t for Fresh material, within a US$1,100/oz optimisation shell at a A$/US$ exchange rate of 0.84 (A$1,309/oz).

4. The Havana Deeps Underground Resource has been estimated using the geostatistical technique of Direct-Block Conditional Simulation. The Havana Deeps Underground Mineral Resource is reported externally to the Havana BFS Pit Design, at a cut-off grade of 2.8 g/t Au.

Page 10

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

  • Tropicana Havana Proximal Exploration

Exploration during the quarter focussed on two key areas proximal to the Tropicana Resource:

  • continued delineation of the mineralisation at Boston Shaker 360m north-east of the Tropicana resource.

  • the Havana Deeps RC and diamond drilling program testing the extents and continuity of high grade shoots down plunge beyond the currently planned open cut.

Boston Shaker

Mineralisation at Boston Shaker has been defined over a 700m strike length. Infill drilling of the prospect to 50m x 50m spacing and selected areas of 50m x 25m within the area selected for initial resource calculations and pit optimisations is now complete. A number of very strong true width intersections were returned including ( Figure 7 and Table 4 ):

  • **17m @ 4.6 g/t Au from 75m in BSRC189 ***

  • **16m @ 4.9 g/t Au from 379min TPRC068D ***

  • **12m @ 4.3g/t Au from 95m in BSRC243 ***

  • 8m @ 7.1 g/t Au from 211m in BSRC146D

  • 11m @ 3.3 g/t Au from 48m in BSRC285

* previously reported in ASX announcement on 17 December 2010.

Havana Deeps

Drilling at Havana Deeps is being completed on a 100m x 50m spacing focussing on an area extending from the base of the feasibility pit to a maximum vertical depth of 650m. Drilling to date has confirmed that significant mineralisation continues for at least 650m down plunge beneath the proposed pit. Infill drilling completed during the quarter continued to support the potential for underground exploitation and included the following high grade true width intercepts (Figure 7 and Table 5):

  • **16m @ 9.7 g/t Au from 369m in HDD033 ***

  • **14m @ 9.0 g/t Au from 416m in HDD032 ***

  • 15m @ 7.0 g/t Au from 813m in HDD049

  • 15m @ 5.6 g/t Au from 494m in HDD044

* previously reported in ASX announcement on 17 December 2010 .

IGO’s Board has approved the Havana Deeps Pre-feasibility Study which will take approximately 2 years to complete.

A “super-deep” step-out hole (TFD204) to investigate the down dip potential a substantial distance from the high grade shoot was completed. The hole confirmed that the Havana mineralised system continues at least 2.1km down-plunge from the planned pit floor (1,000m vertically) returning 2m @ 1.9 g/t Au * within a 10m zone of pyrite-biotite alteration typical of the Tropicana/Havana gold mineralisation alteration ( Figure 8 ). See ASX announcement dated 17 December 2010 for further details.

Further drilling will be needed to determine if the discrete thicker higher grade shoots immediately beneath the planned Havana open cut also continue to these depths and beyond.

Page 11

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

Swizzler

Results have been received from three holes testing the Swizzler target, comprising a previous single diamond drill-hole intercept of 2m @ 26.2 g/t Au from 289m between Tropicana and Havana (Figure 7). Two holes returned plus 1 g/t intercepts including 6m @ 2.0 g/t Au in hole TFD419. Further work is required to determine if this is part of a potentially significant gold mineralised zone.

Regional Exploration

A total of 1 diamond hole for 142m, 52 RC holes for 7,737m and 364 aircore holes for 14,907m tested targets at a number of regional prospect areas during the quarter.

RC drilling at the Crouching Tiger prospect 250m south of the Havana South BFS pit outline returned 11m @ 5.3 g/t Au from 102m ( Figure 7 ). This result was reported in ASX release of 11 November 2010.

At Hat Trick , located 1.5km directly north east along strike from Boston Shaker, RC drilling returned a number of significant intercepts including:

  • 2m @ 6.8 g/t Au from 34m in HTRC007

  • 2m @ 3.3 g/t Au from 168m in HTRC011

  • 2m @ 2.6 g/t Au from 85m in HTRC008

Given the location of Hat Trick these results are particularly encouraging as they may represent a further faulted eastern extension of Tropicana similar to the Boston Shaker faulted offset.

Encouraging results were received from Voodoo Child 42km north east of Tropicana where RC drilling returned the following intersections:

  • 22m @ 2.8 g/t Au from 56m and 3m @ 14.9 g/t Au from 96m in VCRC023

  • 2m @ 2.0 g/t Au from 63m in VCRC026

  • 2m @ 1.6 g/t Au from 39m in VCRC017

Previous Voodoo Child intercepts include 17m @ 2.3 g/t Au from aircore drilling and further drilling is planned once a geological model to assist drill hole targeting has been finalised.

Elsewhere in the project a significant aircore intercept of 3m @ 1.4 g/t Au was returned from the Iceberg Prospect 32km south west of Tropicana. a 20km x 10km high geochemical gold anomaly has been defined approximately 80km south/ south-west of Tropicana – Havana (Figure 5) and infill sampling is planned.

A combined magnetic and radiometric over Tropicana Group Two and Three tenements (50 – 100km south of Tropicana) was completed during the quarter. Very little exploration has been completed in these tenements to date due to access constraints and this survey will be used to assist in prioritising areas for geochemical follow-up.

Page 12

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

Table 4: Significant Boston Shaker Drilling Results

**HOLENO. ** NORTHING
(M)
EASTING
(M)
RL
(MAHD)
AZI
**(DEGR) **
AZI
**(DEGR) **
DIP
(DEGR)
DIP
(DEGR)
TOTAL
DEPTH
DEPTH
FROM
DEPTH
TO
WIDTH
(M)
WIDTH
(M)
BOSTONSHAKERRC
BSRC146D 6763886 652198 346 324 -62 322.1 211 219 8 7.1
BSRC147D 6763816 652269 346 332 -63 312.3 276 287 11 2.9
295 305 10 2.0
BSRC180 6763870 651507 339 321 -58 100 59 64 5 3.2
BSRC189 6763868 651572 340 325 -59 124 65 68 3 4.3
75 92 17 4.6
BSRC195 6763940 651578 339 318 -60 90 38 43 5 4.7
BSRC196 6763906 651612 340 320 -58 110 50 69 19 1.2
BSRC198 6763871 651648 340 321 -58 142 46 56 10 2.0
94 107 13 1.8
BSRC227 6763959 651983 344 322 -59 175 82 88 6 6.5
BSRC234 6764134 651951 345 316 -60 70 21 33 12 1.5
includes 24 33 9 2.0
BSRC236 6763991 652094 345 316 -60 160 130 139 9 5.2
BSRC237A 6763921 652163 345 317 -60 214 179 182 3 3.5
BSRC243 6764083 652071 345 317 -60 136 95 107 12 4.3
BSRC244 6764062 652093 344 321 -58 140 109 126 17 7.1
BSRC245 6764274 651951 348 317 -59 70 33 46 13 3.7
BSRC246 6764257 651968 349 318 -60 70 47 56 9 2.2
BSRC247 6764221 652003 347 317 -59 88 68 75 7 3.4
BSRC248 6764203 652022 346 318 -59 112 78 83 5 4.1
BSRC249 6764187 652038 346 319 -59 115 88 94 6 2.9
BSRC252 6764062 652163 344 320 -61 196 154 165 11 2.8
BSRC255 6764293 652003 356 317 -60 94 55 57 2 3.4
BSRC259 6764189 652108 352 317 -60 148 110 115 5 3.2
BSRC276 6764163 652135 345 319 -62 172 129 138 9 3.3
BSRC285 6764113 651970 345 320 -61 150 48 59 11 3.3
BSRC286 6764082 652002 345 316 -62 160 62 78 16 2.3
BSRC295 6763890 652051 344 325 -63 168 142 145 3 3.4
includes 142 144 2 4.6
BSRC305 6763977 651470 339 322 -61 60 34 52 18 2.2
BOSTONSHAKERDIAMOND
BSD006 6763709 651809 342 321 -63 277 204 220 16 1.1
224 236 12 3.7
BSD008 6763744 651915 343 277 -61 326 242 250 8 8.1
BSD010 6763744 652340 347 321 -63 361 327 336 9 3.0
BSD015 6764134 652234 343 322 -63 282 193 201 8 2.1
BSD016 6764027 652338 345 326 -64 366 262 264 2 3.5
BSD018 6763707 651739 341 316 -64 252 206 221 15 1.5
includes 208 213 5 3.0
BSD021 6763921 652233 346 325 -63 259 224 230 6 3.4
BSD025
TPRC068D
6763888
6763743
652337
652409
352
347
321
330
-61
-60
320
462
292
379
297
395
5
16
3.5
4.9

Page 13

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

Table 5: Significant Havana Deeps Diamond Drilling Results

**HOLENO. ** **HOLENO. ** NORTHING
(M)
NORTHING
(M)
EASTING
(M)
RL
(MAHD)
RL
(MAHD)
AZI
**(DEGR) **
AZI
**(DEGR) **
DIP
(DEGR)
DIP
(DEGR)
TOTAL
DEPTH
DEPTH
FROM
DEPTH
TO
WIDTH
(M)
WIDTH
(M)
AU
(G/T)
HAVANADEEPSDIAMOND
HDD024 6761690 650295 361 320 -62 568 462 472 10 10.6
HDD028 6761621 650241 362 325 -64 535 462 485 23 2.4
HDD031 6761382 649969 368 325 -71 382 238 266 28 1.9
includes 245 260 15 2.9
330 346 16 2.8
HDD032 6761267 650115 366 323 -60 453 416 430 14 9.0
HDD033 6761396 650021 367 324 -72 421 282 299 17 2.3
300 308 8 2.5
369 385 16 9.7
HDD034 6761252 650163 366 331 -56 529 469 475 6 4.8
478 491 13 2.3
HDD036 6761492 650230 365 322 -64 582 481 498 17 2.8
HDD037 6761551 650200 364 326 -64 523 460 491 **31 ** 2.8
includes 466 490 24 3.5
HDD041 6760862 650590 362 321 -56 871 723 738 15 2.0
HDD044 6761394 650201 365 324 -61 548 494 509 15 5.6
HDD048
HDD049
6760968
6761022
650696
650713
360
360
320
318
-57
-60
859
897
804
813
816
828
12
15
2.0
7.0
RC = Reverse Circulation D = Diamond

(Down-hole widths approximate true widths except where Calculated True Widths are shown)

Proposed March Quarter Exploration Program

Exploration will focus on locating and testing additional open-cut and underground mineralisation within economic trucking distance of the proposed Tropicana plant site. Programs will include:

  • Feasibility drilling on Boston Shaker and Havana Deeps.

  • Auger drilling at Tropicana Group 2 and 3 tenements should access approvals be received.

  • Aircore drilling various regional prospects.

Page 14

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

==> picture [447 x 134] intentionally omitted <==

==> picture [447 x 133] intentionally omitted <==

Figure 5: Tropicana JV – Tenure, Tropicana and Havana Reserve Locations, Gold Geochemical Anomalies, Significant Drill Intercepts Outside Tropicana-Havana Resources and Selected Prospect Locations

==> picture [441 x 124] intentionally omitted <==

==> picture [441 x 124] intentionally omitted <==

Figure 6: Tropicana JV – Aerial View of BFS Tropicana Open Pits and Mine Infrastructure

Page 15

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

==> picture [422 x 108] intentionally omitted <==

==> picture [422 x 108] intentionally omitted <==

==> picture [422 x 107] intentionally omitted <==

==> picture [422 x 108] intentionally omitted <==

Figure 7: Tropicana JV – Proposed Tropicana and Havana BFS Open Pit Outlines, Prospect Locations, g/t Au x Thickness (m) Contours and Significant Intercepts Outside November 2010 Reserves

==> picture [453 x 125] intentionally omitted <==

==> picture [453 x 125] intentionally omitted <==

Figure 8: Tropicana JV – Havana Deeps TFD204 Cross-Section Showing Continuation of Gold Mineralised Zone Down Plunge from the Base of Proposed Havana Open Pit and Photograph of Mineralised Drill Core

Page 16

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

KARLAWINDA (IGO 100% BHPB – CLAWBACK RIGHTS)

The Karlawinda Project is located on the southern margin of the Archaean Sylvania Inlier, some 65km south-east of Newman, close to the Great Northern Highway and gas pipeline infrastructure ( Figure 9 ).

The discovery prospect, Francopan, comprises a gold mineralised system extending over a strike length of 1.1km and 0.5km down dip beneath approximately 190m of Bangemall Basin cover sediments. Previously announced intercepts include 7m @ 4.6 g/t Au, 6m @ 4.5 g/t Au and 15m @ 3.0 g/t Au. Based on the extent and style of mineralisation this project is considered to have good potential for the delineation of a significant Archaean mesothermal lode gold system.

The current focus of exploration is on the Bibra Prospect, located approximately 5km north-east of Francopan, and other regional targets north of Francopan, where Archaean bedrock is not obscured by thick Bangemall cover.

Bibra Prospect

Previous work by IGO at Bibra has defined a large gold mineralised zone extending over 1km both along strike and down dip ( Figures 10 and 11 ). Mineralisation strikes NNE and is developed in a series of shallowly WNW plunging rod-like shoots within a more continuous lower grade halo.

Supergene gold is generally well developed above the up-dip oxidised portion of the main mineralised zone.

During the quarter exploration focused on scoping the oxide potential at Bibra.

Metallurgical test work commenced, including bottle rolls, agglomeration and column leaching on samples from two dedicated PQ core holes drilled last quarter and agitated batch leaching on RC chips. Final results from this work are expected in February 2011.

A total of 45 RC holes for 4,034m were completed primarily to:

  • infill the main oxide zone to 100m x 50m RC drill spacing

  • test several magnetic features proximal to the oxide mineralisation including the two interpreted “high-grade” shoots plunging to the west

Infill drilling returned a number of significant intercepts including:

  • 7m @ 2.4 g/t Au from 8m in KBRC109

  • 5m @ 3.5 g/t Au from 8m in KBRC110

  • 5m @ 2.4 g/t Au from 7m in KBRC111

  • 19m @ 1.4 g/t Au from 45m in KBRC113

  • 26m @ 1.3 g/t Au from 9m in KBRC122

The results are consistent with previous modelling indicating the southern portion of the oxide zone is dominated by broader laterite hosted supergene mineralisation with a more complex geometry evident in the oxidised primary mineralisation. A 3D wireframe is currently being modelled as the first step toward producing an oxide resource estimate.

Drill testing of the two interpreted higher grade shoots returned positive results. KBRC092 targeting the northern shoot intersected two zones of mineralisation – 9m @ 1.0 g/t Au from 57m and 32m @ 2.2 g/t Au from 73m including 9m @ 3.8g/t Au. KBRC093 testing the southern shoot returned 29m @ 1.9 g/t Au from 98m, including 5m @ 8.6 g/t Au . The results are significant as the shoots comprise transitional to primary material immediately down dip of the oxide zone. Preliminary leach test work on primary to transitional material has returned very good recoveries suggesting that material could potentially be used to supplement an oxide heap leach operation.

Page 17

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

==> picture [413 x 127] intentionally omitted <==

==> picture [413 x 126] intentionally omitted <==

Figure 9: Karlawinda – Location Plan Showing Tenure, Prospects and Significant Drill Intercepts

==> picture [469 x 90] intentionally omitted <==

==> picture [469 x 91] intentionally omitted <==

==> picture [469 x 90] intentionally omitted <==

Figure 10: Karlawinda – Bibra Prospect – Drill-Defined Gold Anomalies, Significant Drill Intercepts Over g/t Au x Metre Contours

Page 18

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

==> picture [469 x 106] intentionally omitted <==

==> picture [469 x 105] intentionally omitted <==

Figure 11: Karlawinda – Bibra Prospect – Cross-Section Showing Mineralised Zones

HOLLETON (IGO 90-100%)

The Holleton Project covers an area of 1,257 km[2] over the largely concealed and unexplored Holleton greenstone belt in the Southern Cross Province of the Archaean Yilgarn Craton ( Figure 12 ).

IGO is exploring the project area for Yilgarn Star, Marvel Loch and Westonia style gold deposits.

The current focus of exploration is on two narrow thinly sand-covered northsouth trending greenstone belts in the northern half of the project area.

The most significant prospect is “Syme’s Find” where surface geochemistry has defined a north-east trending gold anomaly measuring 1.5km long by 0.5km wide ( Figures 13 and 14 ) in a complex structural position on the eastern most greenstone belt. Aircore testing of the anomaly last quarter returned a number of robust oxide intercepts including:

  • 10m @ 8.3 g/t Au from 10m (including 4m @ 19.1 g/t Au from 11m)

  • 10m @ 5.5 g/t Au from 10m

  • 8m @ 5.4 g/t Au from 12m

Deeper RC drill testing of the prospect during the December quarter (15 holes for 1,656m) returned best results of 4m @ 2.9 g/t Au from 84m and 4m @ 4.5 g/t Au from 94m in SFRC002 (2m composite results) as well as numerous other narrow intercepts between 1 and 2 g/t Au throughout the prospect area. Results are currently being interpreted prior to planning the next phase of exploration.

Page 19

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

==> picture [447 x 130] intentionally omitted <==

==> picture [447 x 131] intentionally omitted <==

Figure 12: Holleton – Project Tenure Over Regional Geology Showing Major Gold Mines Proximal to the Project; and, Figure 13: Holleton – Geochemical Gold Anomalies and Significant Syme’s Find Prospect Drilling Results

==> picture [376 x 108] intentionally omitted <==

==> picture [376 x 109] intentionally omitted <==

==> picture [376 x 109] intentionally omitted <==

Figure 14: Holleton – Syme’s Find Prospect Map Showing Significant Drill Intercepts Over Auger Geochemical Results

Page 20

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

DE BEERS DATABASE

(IGO 100%)

In 2009 IGO acquired the non-diamond specific exploration database of De Beers Australia Exploration Limited (“DBAE”). This database represents the culmination of more than 30 years of exploration and the key assets of the database are the 292,000 surface geochemical samples and associated analytical results covering many mineral prospective regions throughout Australia ( Figures 4 and 15 ). As DBAE was solely focused on diamond exploration, less than half of the samples were appraised for commodities other than diamonds.

The initial focus is on analysis of samples covering under-explored Proterozoic basin margins in Western Australia and Northern Territory, prospective for polymetallic base metals and gold mineralisation.

A total of 30,306 samples have been submitted for geochemical analysis with 29,732 results having been received to date.

This work continues to generate a number of anomalies in gold, base metals and other commodities. Systematic prioritisation and field appraisal of these anomalies is progressing.

REGIONAL BASE METALS EXPLORATION

==> picture [263 x 188] intentionally omitted <==

Figure 15: IGO Base Metal Project Locations

DUKETON NICKEL JOINT VENTURE (IGO MANAGER EARNING 70% NICKEL RIGHTS)

The Duketon Nickel JV with South Boulder Mines Ltd covers ultramafic-rich stratigraphy prospective for massive and disseminated nickel sulphide mineralisation in the Duketon Greenstone Belt approximately 80km north of the Windarra nickel deposit ( Figure 16 ).

IGO is focusing on the Bulge ultramafic, a prominent thickened portion of ultramafic with a strike length of 8km situated along a more extensive ultramafic package located on the western flank of the project tenure.

Two prospects have been defined to date;

  • the high-grade Rosie Prospect, defined over a strike length of 750m and down dip extent of 400m, which includes intercepts up to 3.3m (true width) @ 9.1% Ni, 1.1% Cu, 0.2% Co and 7.1 g/t PGEs (2.2 g/t Pt, 1.7 g/t Pd, 0.8 g/t Rh, 1.8 g/t Ru) in TBDD098, and

  • the C2 Prospect which comprises three zones defined over a strike length of up to 700m and down dip extent of up to 300m which is dominated by

Page 21

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

disseminated mineralisation and includes past intercepts up to 52m @ 0.9% Ni including 37m @ 1.0% Ni.

Both prospects remain open along strike and down dip.

IGO has completed an initial three hole drilling program testing up and down dip to the north west and along strike from the high grade massive sulphide mineralisation intersected in TBDD098. All three holes intersected nickel sulphide mineralisation ( Figure 16 ). Intercepts included:

  • TBDD099: 5.6m ( 3.3m true width) @ 1.5% Ni, 0.4% Cu and 2.5g/t PGE from 470m

  • TBDD099W1: 6m ( 2.4m true width) @ 1.8% Ni, 0.5% Cu and 1.1g/t PGE from 550m

  • TBDD099W2: 4.0m ( 1.4m true width) @ 1.2% Ni, 0.5% Cu and 3.6g/t PGE from 610m

Mineralisation was predominantly disseminated and breccia style with minor massive sulphide encountered in TBDD099W1. This style of mineralisation is suggestive of remobilised sulphides possibly flanking a mineralised channel position. Down hole TEM using IGO’s proprietary high powered transmitter has been completed on all three holes. Modelled conductors from this work indicate that the strongest mineralisation is between TBDD099W1 and TBDD098 and plunges to the south-east (Figure 17).

A four hole program testing up and down dip to the south-east of TBDD098 commenced in January 2011.

==> picture [410 x 113] intentionally omitted <==

==> picture [410 x 113] intentionally omitted <==

==> picture [410 x 112] intentionally omitted <==

Figure 16: Duketon JV – Project Location in Relation to Selected Nickel Mines and Prospects Over Aeromagnetic Image

Page 22

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

==> picture [447 x 92] intentionally omitted <==

==> picture [447 x 91] intentionally omitted <==

==> picture [447 x 92] intentionally omitted <==

Figure 17: Duketon JV – Rosie Prospect Longitudinal Projection Showing Significant Drill Intercepts and Down-Hole TEM Conductors

JAGUAR NICKEL SULPHIDE JV (IGO EARNING 70% NICKEL RIGHTS)

IGO has entered into a JV with Jabiru Metals Limited (JML) whereby IGO may earn a 70% interest in the Jaguar Nickel Sulphide JV.

IGO has commenced a substantial Moving loop EM (“MLEM”) survey targeting 3 main areas. To date 336 stations for 31 line km have been completed (22% of the planned program). No significant conductors have been located so to date.

The TEM survey is scheduled to recommence in late Q1-early Q2 2011.

ORRBÄCKEN JV (IGO EARNING UP TO 73%)

The Orrbäcken Ni-Cu-Co Joint Venture with Mawson Resources is located 10km from the regional centre of Skellefteå in north eastern Sweden.

The project was generated by local prospectors who identified approximately 80 gabbroic boulders that form a 1.5km long glacial boulder train, 25 of which contain nickel sulphides and interpreted to be close to source ( Figure 18 ). Four boulder samples were taken by the Swedish Geological Survey from the Orrbäcken discovery. Nickel content ranged from 1.9% to 0.6% and averaged 1.0%, cobalt ranged from 0.21% to 0.05% and averaged 0.1% and copper ranged from 0.7% to 0.1% and averaged 0.3%. The boulder train is associated with a magnetic feature that is of a similar scale to other mafic intrusives containing economic nickel-copper deposits.

Last quarter IGO flew a combined heliborne magnetics and TEM survey which identified 13 conductors of interest including three ranked priority 1, six ranked priority 2 and four ranked priority 3 according to TEM response and spatial association with other magnetic features ( Figures 19 and 20 ).

The most significant target is a broad 1km long TEM response proximal to both the mineralised boulders and a complex magnetic feature possibly representing a prospective mafic-ultramafic intrusive body ( Figures 21 ).

Ground TEM follow-up of the three priority one targets and preparatory ground access preparation for drilling commenced in mid-January.

Page 23

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

==> picture [454 x 126] intentionally omitted <==

==> picture [454 x 125] intentionally omitted <==

Figure 18: Orrbacken JV – 1.5km Long Nickel Sulphide Glacial Boulder Trail, JV Boundary, Lakes and Prioritised TEM Anomalies Over Aeromagnetic Image

==> picture [299 x 141] intentionally omitted <==

Figure 19: Figure 20: Orrbacken JV – Priority 1 Orrbacken JV – Priority 1 Target, Nickel Sulphide Target, Nickel Sulphide Boulder Location Over Boulder Location, Figure 19 Aeromagnetic Image Magnetic Anomaly Outline Over TEM Anomaly

==> picture [143 x 149] intentionally omitted <==

Figure 21: Orrbacken JV – Gabbro Boulder containing Nickel Sulphides

Page 24

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

MT ISDELL (IGO 100%)

The Mt Isdell Project covers an area of over 400km[2] and is located 35km south of the 26M ounce Telfer gold resource and 80km south-east of the Nifty Copper Mine. The project straddles the same major north-west trending structure that is adjacent to both the Nifty and Maroochydore deposits.

Previous reconnaissance and infill lag sampling by IGO has delineated a 5km x 5km area of high order zinc, lead, copper, cobalt and gold anomalism. Preliminary aircore drill testing has confirmed geochemical anomalism, however, a more robust test using larger drilling equipment is required to fully test the targets at depth.

Last quarter a VTEM survey was flown over a portion of the project area to confirm and better define conductors identified in a 2009 Government funded TEMPEST survey. A number of conductive responses potentially representing mineralisation and/or alteration warrant follow-up.

An RC drilling program to test VTEM and geochemical targets is planned for Q2 2011 pending final access approvals.

BIRRINDUDU TIN PROJECT (IGO 100%)

The Birrindudu project is located 290km southeast of Kununurra in the Tanami Region of the Northern Territory. The project was initially identified during a review of results from the WMC Diamond division database, being used for target generation by IGO under agreement with WMC, (now BHP Billiton) which highlighted an area of strongly anomalous tin.

Analysis of samples in the IGO owned DeBeers database over the area and subsequent reconnaissance and follow-up systematic stream sediment and soil sampling by IGO has confirmed the presence of tin and tungsten spatially associated with the Palaeoproterozoic Winnecke Granophyre. The strongest results are from samples in streams draining an area containing a large aeromagnetic feature possibly representing alteration associated with the roof zone of a shallowly buried granitic pluton ( Figures 22 and 23 ).

Based on the extent of anomalism and geological setting it is believed that the project has potential to host a substantial tin, tungsten and tantalum ore body.

Preparations are being made to undertake an initial drill test of the magnetic feature to confirm that it is the source of tin and tungsten anomalism. Due to access constraints associated with the northern wet season it is anticipated that drill testing will commence in Q2 2011.

Page 25

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

==> picture [213 x 237] intentionally omitted <==

==> picture [213 x 237] intentionally omitted <==

==> picture [452 x 33] intentionally omitted <==

----- Start of picture text -----

Figure 22: Figure 23:
Birrindudu – Tin-Rich Heavy Mineral Concentrate Birrindudu – Photograph of Cassiterite-Rich
Locations Over Aerial Magnetic Image Heavy Mineral Concentrates
----- End of picture text -----

MUSGRAVE MINERALS IPO

Musgrave Minerals Ltd is on schedule to conduct an initial public offering (‘IPO’) of shares and seek admission to the official list of the Australian Securities Exchange (ASX) and quotation of its shares prior to April 30, 2011.

IGO, Mithril Resources Limited, and Goldsearch Limited have created Musgrave Minerals Ltd as a dedicated vehicle to explore the highly prospective and under-explored Musgrave Province in South Australia.

During the Quarter under review, Argonaut Resources Ltd and Integra Mining Ltd agreed to vend their respective interests in the South Australian Musgrave Province to become cornerstone investors in the new entity. This follows the decision last quarter by Barrick (PD) Australia Ltd to also vend its Musgrave exploration interests into Musgrave Minerals Ltd.

There is now participation by six mining companies as cornerstone investors in the newly formed Musgrave Minerals Ltd.

IGO, Mithril, Goldsearch and Integra have provided seed capital to the new entity and an initial phase of exploration focused on delineating new drill targets and advancing conceptual targets to a drill test decision ahead of the April 2011 IPO has been successfully completed.

The recent work included a VTEM airborne geophysical program on portions of EL’s 3942 and 3955. The VTEM survey identified more than 60 priority targets and demonstrated the effectiveness of airborne geophysics in the Musgrave environment. Further VTEM surveys are planned post IPO.

Ground EM surveys completed on seven targets on EL3942 generated from the VTEM survey, confirmed the presence of high conductance basement targets that could represent accumulations of nickel-copper sulphide mineralisation. In addition, ground EM surveys also identified two strong basement conductors over two previously identified targets outside of the VTEM coverage. All nine targets are associated with, or proximal to, outcropping and interpreted Giles Complex rock types which are considered prospective for nickel sulphide mineralisation. The Lyta target is particularly compelling as it is proximal to a gabbro dyke containing blebs of nickel-copper sulphides. These priority targets will be drill tested immediately after the completion of the IPO.

Page 26

INDEPENDENCE GROUP NL QUARTERLY REPORT: 31 DECEMBER 2010

==> picture [26 x 28] intentionally omitted <==

Surface geochemical sampling continues to identify new areas of copper-gold mineralisation at surface on EL3955. To date six of these targets have been highlighted for drill testing following IPO.

Musgrave Minerals is an exciting initiative that will ensure the unique prospectivity of the largely unexplored and highly prospective Musgrave region will have the focus and resourcing necessary to lead to explore in the most efficient and effective manner to the benefit of all stakeholders.

MARCH QUARTER EXPLORATION PROGRAM

REGIONAL NICKEL/BASE METALS Duketon: Ongoing DDH drilling testing the Rosie high grade NiS discovery Bungalbin: Surface geochemical sampling of ultramafic units. Jaguar: TEM testing main target areas. Orrbäcken: GTEM follow-up of VTEM anomalies and follow-up drill testing if warranted. Mt Isdell: Preparation for RC drill testing. Birrindudu: Preparation for RAB drill testing of magnetic feature. REGIONAL GOLD PROJECTS Tropicana: RC/DDH test underground potential down-dip of TropicanaHavana and infill drilling at Boston Shaker. Regional auger sampling and RC/aircore drill testing regional prospects. Karlawinda: Resource modelling and metallurgical test work on the Bibra oxide gold mineralisation. . Holleton: Interpretation of RC drilling results. De Beers: Continued analysis of priority geochemical samples and field follow-up of anomalies.

==> picture [107 x 43] intentionally omitted <==

INDEPENDENCE GROUP NL

CHRISTOPHER M. BONWICK MANAGING DIRECTOR

Competent Person Sign Off: The information in this report that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr Christopher M Bonwick who is a full-time employee of the Company and is a member of the Australasian Institute of Mining and Metallurgy. Christopher Bonwick has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Christopher Bonwick consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Forward-Looking Statements: This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning Independence Group NL’s planned exploration program and other statements that are not historical facts. When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may," "potential," "should," and similar expressions are forward-looking statements. Although Independence Group NL believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual results will be consistent with these forwardlooking statements.