AI assistant
IGO LIMITED — Capital/Financing Update 2010
Jan 13, 2010
65111_rns_2010-01-13_62e7bbd3-be77-47d1-98b8-5997f9a34342.pdf
Capital/Financing Update
Open in viewerOpens in your device viewer
==> picture [170 x 74] intentionally omitted <==
----- Start of picture text -----
Final Logo
----- End of picture text -----
ASX Code : STB Berlin : SO3-Ber Frankfurt : SO3-Fra
Share Price: 32 cents Market Cap: $19.5M
Shares on issue: 61.278M
Cash at Bank: $3.0M ASX/TSX listed shares: $2.0M Top 20 shareholders – 48%
==> picture [153 x 32] intentionally omitted <==
Updated 1m re-sampling results for ROSIE Ni-Cu-PGE Prospect plus BULGE C2 Ni-Cu-PGE Prospect Update
South Boulder Mines Ltd (ASX: STB) is pleased to announce that additional 1m re-sampling results by JV partner Independence Group NL has demonstrated that +2% nickel with associated Cu-PGE sulphides has been intercepted over ~350m strike length at the Rosie Prospect.
A significant follow-up drill program comprising 15-20 combination RC and diamond holes is set to commence in late January. Final 1m resample results include TBRC069, drilled ~ 100m northwest of previously released massive sulphides intercept in TBDD080.
HOLE TBRC069
-
2m @ 1.65% Ni, 0.26%Cu, 0.08g/t Pt+Pd from 192m including;
-
1m @ 2.85% Ni, 0.36% Cu, 0.12g/t Pt+Pd from 193m.
Contact Details
The previously released intercepts for TBDD070 and TBDD080 are;
133-135 Edward St Perth WA 6000 PO Box 8355 Perth BC WA 6849 Telephone +61 8 9227 1144 Facsimile + 61 8 9328 8302 www.southbouldermines.com.au
HOLE TBRC070
-
20m @ 1.32 % Ni, 0.23% Cu, 1.54g/t Pt+Pd from 184m including;
-
7m @ 2.61% Ni, 0.42% Cu, 3.75g/t Pt+Pd from 190m and;
HOLE TBDD080
-
3.59m @ 2.27% Ni, 0.24% Cu, 3.10g/t Pt+Pd from 205m including;
-
0.76m @ 4.98% Ni, 0.25%Cu, 6.98g/t Pt+Pd from 207.84m
LISTED EQUITY HOLDINGS
(ASX: MZM) - 3.957m shares (ASX: MZMO) - 1.037m options (ASX: IXR) - 1.325m shares (ASX: AVZ) - 0.400m shares (ASX: BUX) - 1.000m shares (unlisted options) 0.750m options (ASX: UNX) - 0.700m shares (CDNX: CNI.V) - 130,000 shares Auvex (Pte) - 1.000m options
==> picture [153 x 53] intentionally omitted <==
Also previously released TBRC073 which was drilled ~200m east and along strike from TBRC070 and TBDD080 and ~350m east and along strike from TBRC069 intercepted;
HOLE TBRC073
-
14m @ 0.79% Ni, 0.16% Cu, 0.58g/t Pt+Pd from 146m including;
-
1m @ 1.39% Ni, 0.58% Cu, 1.18g/t Pt+Pd from 148m and;
-
2m @ 1.77% Ni, 0.09% Cu, 1.12g/t Pt+Pd from 154m and;
-
1m @ 2.24% Ni, 0.11% Cu, 1.46g/t Pt+Pd from 155m.
Six conductors are interpreted from the DHTEM surveys, and are located below the previously drilled holes.
- 1 -
DUKETON NICKEL JOINT VENTURE
ROSIE PROSPECT
One metre assay results for TBRC069 have returned 2m @ 1.65% Ni, 0.26%Cu, 0.08g/t Pt+Pd from 192m including; 1m @ 2.85% Ni, 0.36% Cu, 0.12g/t Pt+Pd from 193m.
The holes tested ~350m of strike on 100m spaced sections. The drilling programme was a success, with strong nickel, copper and PGE mineralisation intersected on all four sections.
TBRC080 intersected massive sulphides which included including a maximum grade of 4.98% Ni, 6.93 g/t Pt+Pd, 0.25% Cu, 0.21 g/t Au and 1250ppm Co over 0.76m from 207.84m . This hole intersected the nickel mineralisation 25m ‘down contact’ from TBRC070, which intersected a best interval of 20m @ 1.32 % Ni, 0.23% Cu, 1.54g/t Pt+Pd, 365ppm Co and 0.14 g/t Au from 184m including; 7m @ 2.61% Ni, 0.42% Cu, 3.75g/t Pt+Pd, 686ppm Co and 0.21 g/t Au from 190m.
==> picture [205 x 273] intentionally omitted <==
----- Start of picture text -----
Figure 1: Massive brecciated Ni-Cu-PGE sulphides
----- End of picture text -----
Figure 1: Massive brecciated Ni-Cu-PGE sulphides
| Hole ID | From | To | Interval | Ni (%) |
Cu (%) |
Co (ppm) |
Pt (ppm) |
Pd (ppm) |
As (ppm) |
S (%) |
|---|---|---|---|---|---|---|---|---|---|---|
| TBRC069 Including; |
192.00 | 194.00 | 2.00 | 1.65 | 0.26 | 180 | 0.01 | 0.07 | 8 | 8.86 |
| 193.00 | 194.00 | 1.00 | 2.85 | 0.36 | 295 | 0.02 | 0.10 | 16 | 14.60 | |
| TBRC070 | 184.00 | 204.00 | 20.00 | 1.32 | 0.23 | 365 | 0.47 | 1.07 | 944 | 6.50 |
| Including; and; |
186.00 | 188.00 | 2.00 | 1.30 | 0.26 | 305 | 0.03 | 0.04 | 2576 | 8.37 |
| 190.00 | 197.00 | 7.00 | 2.61 | 0.42 | 686 | 1.11 | 2.64 | 1305 | 11.10 | |
| TBRC073 Including; and; and; |
146.00 148.00 |
160.00 149.00 |
14.00 1.00 |
0.79 1.39 |
0.16 0.58 |
228 460 |
0.30 0.49 |
0.28 0.69 |
323 280 |
6.23 12.20 |
| 154.00 | 156.00 | 2.00 | 1.77 | 0.09 | 368 | 0.74 | 0.38 | 400 | 13.40 | |
| 155.00 | 156.00 | 1.00 | 2.24 | 0.11 | 465 | 0.94 | 0.52 | 582 | 16.50 | |
| TBRC075 | 171.00 | 176.00 | 5.00 | 0.77 | 0.14 | 266 | 0.47 | 0.83 | 86 | 5.11 |
| TBDD080 Including; |
205.54 | 209.13 | 3.59 | 2.27 | 0.24 | 596 | 1.06 | 2.04 | 1973 | 10.46 |
| 205.76 | 209.13 | 3.37 | 2.38 | 0.25 | 622 | 1.12 | 2.20 | 2085 | 10.93 | |
and; |
207.84 | 208.60 | 0.76 | 4.98 | 0.25 | 1250 | 2.27 | 4.66 | 3020 | 24.00 |
Table 1: Significant assay results from drilling at the Rosie Prospect.
Note: Samples were collected as 1m split samples for RC drill hole and half core samples for diamond drill holes. Nickel and copper values have been assayed using ICP-AES mixed acid digest. Some very high Platinum and Palladium values have been assayed using the Fire Assay Method (FA40) with ICP-AES Quantification. Significant assay results are tabulated if Ni >= 0.40%, over a minimum 2m interval and 1m if Ni >=1.0%. Maximum internal waste allowed is 2m except for hole TBRC070 which has 3m of <0.40% from 198-201m. Intersections are quoted as down-hole widths.
- 2 -
Downhole EM
Downhole EM surveys have been completed and an interpretation of the data has been received. Data quality was good with six conductors interpreted from the results. The conductors are interpreted as being coincident or proximal to the ultramafic-dolerite contact, one of the key target locations for massive sulphide mineralisation. The locations of these conductors are shown in Figure 2 and their interpreted parameters are tabulated below in Table 2.
==> picture [476 x 174] intentionally omitted <==
Figure 2: Current filament model for the Rosie prospect, viewed in plan (left) and from the south showing location of the recent drill holes (black traces) and plates as tabled above (solid shapes).
| Conductor | TBRC069_A | TBRC070-080_A | TBRC071_A | TBRC073_JC_A | TBRC073_B | TBRC075A |
|---|---|---|---|---|---|---|
| Easting (centre top edge) | 402424 | 402543 | 402579 | 402731 | 402748 | 402647 |
| Northing | 6944110 | 6944016 | 6943988 | 6943960 | 6943822 | 6943942 |
| RL (550m at surface) | 280 | 354 | 312 | 423 | 384 | 385 |
| Dip (º) | 78 | 89 | 76 | 48 | 65 | 73 |
| Dip Direction (º) | 222 | 47 | 235 | 175 | 216 | 217 |
| Plunge (º and direction) | 29.8 West | 1.2 West | 17.1 West | 12.6 West | 0 | 17.6 West |
| Strike Length (m) | 255 | 100 | 153 | 70 | 150 | 20 |
| Depth Extent (m) | 200 | 150 | 200 | 260 | 128 | 90 |
| Conductance (Siemens) | 10000 | 11000 | 5000 | 900 | 600 | 5000 |
Table 2: Rosie Prospect DHEM conductor modeled parameters
The tops of the conductors are located below or approximately coincident with the massive sulphides intersected in the recent drilling. A thin sulphiderich sediment was also intersected on the basalt-dolerite contact for the two eastern sections drilled at the Rosie prospect. The DHEM results are regarded as highly encouraging, with follow up drilling to test the geophysical anomalies as well as other geological target positions scheduled for January 2010. Independence has advised they will be expediting a follow-up 15-20 hole combination RC and diamond drilling program in late January with results available for release as they come to hand.
==> picture [286 x 214] intentionally omitted <==
Figure 3: Rosie Prospect Matrix Ni-Cu-PGE Mineralisation
- 3 -
C2 PROSPECT
In addition to the results at Rosie, drilling has also been completed at the C2 prospect. Four holes were completed on section 6945300N which included three RC/DD combination holes and one failed RC precollar. These holes were targeting potential mineralisation, down plunge and 100m along strike to the south, from the mineralisation previously intersected in drill holes TBDD071 and TBDD074 on section 6945400N, Figure 4.
A further RC/DD hole was completed on section 6945200N (a further 100m south), again to test the plunge of the system to the south. Assays have been received for the drilling and are listed in Table 3.
==> picture [417 x 188] intentionally omitted <==
==> picture [417 x 189] intentionally omitted <==
Figure 4: The Bulge C2 section 6945400N with geology and significant intersections >0.4 Ni.
Disseminated mineralisation (~0.7% Ni) was intersected in all four diamond holes over widths of 7-14m, coincident with the eastern sediment/ultramafic contact zone (Dip 65 degrees east) and within the ultramafic unit on the eastern side “Eastern Zone”. Two, minor semi-massive accumulations of pentlandite were observed in TBDD077 with a maximum grade of 7.36% Ni over 4cm at 247.38m. The true extent of the disseminated mineralisation is yet to be determined, as many of the intervals sampled to date have ended in anomalous mineralisation. It is thus planned to sample and analyse additional drill core intervals to determine their upper and lower extents of the mineralisation.
There was no obvious mineralisation within the Central zone of the ultramafic. Minor occurrences of disseminated and foliation parallel sulphides stringers were observed toward the western contact zone. These intervals were 4-6m wide up to 0.5% Ni, generally off contact approximately
- 4 -
20m, from the western sediment contact (Dip 56 degrees east). Further sampling is still required at the western contact zone in some of the holes.
TBRC076 was planned as the pre-collar for the deepest planned diamond hole on section 6945300N, however the hole lifted excessively and had to be abandoned. Hence the plunge of the system has not been adequately tested. An updated long section interpretation is currently being compiled.
DHEM was completed utilising the IGO the high-powered transmitter. This resulted in excellent quality data with multiple anomalous responses. Responses in all holes can be attributed to the known sediment distribution, however the sediments limit the distances the DHEM surveys would be able to detect any other conductors present off-hole.
This drilling has confirmed the continuity of disseminated mineralisation of the eastern zone over 600m of strike. The extra sampling needs to be completed and all relevant data compiled before the next stage of exploration at C2 can be determined.
| Hole ID | From | To | Interval | Ni (%) |
Cu (%) |
Co (ppm) |
Pt (ppm) |
Pd (ppm) |
As (ppm) |
S (%) |
|---|---|---|---|---|---|---|---|---|---|---|
| TBDD076 Including; TBDD077 Including; and; and; TBDD078* Including; and; and; TBDD079 |
65.00 106.00 |
68.00 109.00 |
3.00 3.00 |
0.66 0.70 |
0.07 0.03 |
303 198 |
0.04 0.03 |
0.04 0.05 |
56 21 |
0.01 1.20 |
| 106.00 | 107.00 | 1.00 | 1.06 | 0.05 | 310 | 0.06 | 0.10 | 30 | 2.18 | |
| 113.00 | 122.00 | 9.00 | 0.71 | 0.03 | 230 | 0.03 | 0.03 | 32 | 2.57 | |
| 126.00 190.00 259.00 189.00 197.00 |
132.00 193.00 265.00 194.00 201.00 |
6.00 3.00 6.00 5.00 4.00 |
0.45 0.40 0.53 0.55 0.49 |
0.02 0.02 0.02 0.10 0.08 |
162 162 190 273 334 |
0.02 0.03 0.01 0.16 0.42 |
0.02 0.04 0.02 0.38 0.48 |
15 8 133 2330 3048 |
1.72 1.06 1.39 7.72 6.85 |
|
| 242.00 | 255.70 | 13.70 | 0.74 | 0.03 | 222 | 0.02 | 0.03 | 18 | 2.52 | |
| 244.48 | 247.43 | 2.95 | 1.21 | 0.04 | 331 | 0.03 | 0.05 | 36 | 4.72 | |
| 247.39 | 247.43 | 0.04 | 7.36 | 0.07 | 870 | 0.16 | 0.44 | 10 | 19.2 | |
| 244.48 | 250.98 | 6.50 | 0.91 | 0.03 | 259 | 0.03 | 0.04 | 24 | 3.20 | |
| 368.58 | 373.00 | 4.42 | 0.58 | 0.03 | 192 | 0.02 | 0.02 | - | 2.32 | |
| 286.00 | 300.00 | 14.00 | 0.69 | 0.03 | 223 | 0.03 | 0.06 | 12 | 2.39 | |
| 287.63 | 289.00 | 1.37 | 1.03 | 0.04 | 320 | 0.02 | 0.02 | 22 | 3.79 | |
| 293.00 | 293.80 | 0.80 | 1.10 | 0.04 | 300 | 0.03 | 0.04 | - | 4.08 | |
| 295.00 | 296.00 | 1.00 | 1.10 | 0.04 | 305 | 0.12 | 0.14 | 30 | 4.35 | |
| 189.91 | 197.00 | 7.09 | 0.61 | 0.12 | 177 | 0.01 | 0.02 | 1069 | 7.55 | |
| Table 3: Significant assay results from drilling at the C2 Prospect. |
Note: Samples were collected as 1m split samples for RC drill hole and half core samples for diamond drill holes. Nickel and copper values have been assayed using ICP-AES mixed acid digest. Some very high Platinum and Palladium values have been assayed using the Fire Assay Method (FA40) with ICP-AES Quantification. Significant assay results are tabulated if Ni >= 0.40%, over a minimum 2m interval and 1m if Ni >=1.0%. Maximum internal waste allowed is 2m
- 5 -
| Prospect | HOLE_ID | Easting | Northing | Azimuth | Dip | Depth |
|---|---|---|---|---|---|---|
| Rosie | TBRC069 | 402450 | 6944190 | 180 | 60 | 250 |
| Rosie | TBRC070 | 402550 | 6944110 | 180 | 60 | 250 |
| Rosie | TBRC071 | 402650 | 6944085 | 180 | 60 | 300 |
| Rosie | TBRC073 | 402750 | 6943855 | 0 | 60 | 202 |
| Rosie | TBRC074 | 402560 | 6944030 | 0 | 60 | 250 |
| Rosie | TBRC075 | 402650 | 6943860 | 0 | 60 | 208 |
| Rosie | TBDD080 | 402550 | 6943888 | 0 | 62 | 234 |
| C2 | TBDD076 | 401065 | 6945300 | 270 | 60 | 351.7 |
| C2 | TBDD077 | 401180 | 6945300 | 270 | 60 | 439 |
| C2 | TBDD078 | 401238 | 6945300 | 270 | 60 | 460 |
| C2 | TBDD079 | 401252 | 6945200 | 270 | 60 | 253 |
| C2 | TBRC076 | 401295 | 6945300 | 270 | 60 | 244 |
Table 4: Drill hole locations and orientations for recently completed program.
About the Joint Venture
In early 2004, South Boulder entered a farm-out Joint Venture (JV) Agreement with Independence, whereby Independence can earn a 70% interest in the nickel rights on tenements held by South Boulder in the Duketon Project, by the completion of a Bankable Feasibility Study within 5 years of the grant of the relevant tenement. The data, interpretation and diagrams that form this ASX release have been provided courtesy of Independence.
About South Boulder Mines Ltd
Listed in 2003, South Boulder Mines (ASX: STB) is a diversified explorer primarily focused on gold, nickel, potash and phosphate.
More information:
Lorry Hughes Managing Director South Boulder Mines Ltd + 61 (8) 9227 1144
This ASX release has been compiled by Lorry Hughes using information on exploration results supplied by Independence Group who are the operator of the Duketon Nickel JV. Lorry Hughes is a member of the Australian Institute of Mining and Metallurgy. Mr Hughes is a geologist and he has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Lorry Hughes consent to the inclusion in the report of the matters based on his information in the form and context in which it appears.
- 6 -