Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

Hummingbird Resources PLC Share Issue/Capital Change 2021

Dec 20, 2021

7696_sha_2021-12-20_8c94735d-1841-46be-8e7d-0d7e3310cf10.html

Share Issue/Capital Change

Open in viewer

Opens in your device viewer

National Storage Mechanism | Additional information

RNS Number : 1203W

Hummingbird Resources PLC

20 December 2021

Hummingbird Resources plc / Ticker: HUM / Index: AIM / Sector: Mining

20 December 2021

Hummingbird Resources plc

("Hummingbird" or the "Company") 

Yanfolila Drilling Update

Drilling Results Show Life of Mine Extension Potential Continues   

Hummingbird Resources plc (AIM:HUM) provides an update on its extensive 2021 exploration drilling programme at the Sanioumale West ("SW") and greenfield deposits, Kama and Diaban, at the Yanfolila gold mine ("Yanfolila") in Mali. For the full release, including graphics, please follow the link here http://www.rns-pdf.londonstockexchange.com/rns/1203W_1-2021-12-19.pdf

The Company notes further assays have recently been received from the Sanioumale East deposit drilling campaign at Yanfolila which, once fully reviewed, are expected to be reported in Q1 2022.

Highlights

§ The Company has received and analysed c.12,800 meters ("m") of multiple assays from the SW deposit and assays from the initial drilling completed at greenfield deposits Kama and Diaban at Yanfolila

§ Results show significant grade and depth, such as 8 metres ("m") at 20.82 grams a ton ("g/t") at the SW deposit, highlighting upside potential to the deposits' current Resources and Reserves profile (164,200 ounces ("oz") and 50,400 oz respectively)

§ Kama and Diaban are two new greenfield targets receiving their first round of drill testing, showing the potential to establish new resources at these deposits

§ Notable drill results from the SW deposit include: 

§ 8m at 20.28 g/t from 61m (SNWRC0482)

§ 7m at 12.18 g/t from 14m (SNWRC0506)

§ 6m at 5.53 g/t from 76m (SNWRC0514)

§ 7m at 4.98 g/t from 40m (SNWRC0507)

§ 5m at 3.72 g/t from 40m (SNWRC0482)

§ 6m at 3.67 g/t from 72m (SNWRC0490)

§ 31m at 3.32 g/t from 55m (SNWRC0500)

§ 20m at 2.96 g/t from 23m (SNWRC0501)

§ 7m at 2.91 g/t from 165m (SNWRC0494)

§ 5m at 2.57 g/t from 78m (SNWRC0491)

§ 15m at 2.59 g/t from 97m (SNWRC0506)

§ 5m at 2.02 g/t from 13m (SNWRC0483)

§ Notable initial drill results from the Kama and Diaban deposits include:

§ 4m at 4.47 g/t from 59m (KARC0020)

§ 3m at 3.87 g/t from 35m (KARC0019)

§ 1m at 4.0 g/t from 23m (DBRC0049)

§ 1m at 2.11 g/t from 16m (KARC0002)

§ The 2021 SW drilling has been focussed on extending the Inferred Mineral Resources and testing for additional and new Mineral Resources extensions. To date, the SW drill results show high-grade mineralisation exists and remains open at depth

§ Greenfield drilling is at the reconnaissance stage at the Kama and Diaban deposits where the focus has been on testing for mineral resource potential and testing of gold mineralisation along a prospective regional structure respectively. The Greenfield drilling results show:

o  Gold mineralisation exists at Kama and is open to the north

o  Successfully intersected new zones of gold mineralisation at the Diaban deposit, proof that the regional structure is gold bearing

§ The Company is analysing future exploration potential in these areas, in particular at Kama, to further prove up their resource potential    

§ The Company has now completed its extensive ~44,000m 2021 exploration drilling programme at Yanfolila. This year's drilling programme will feed into the Company's updated 2022 Resources and Reserves statements, scheduled for release in Q2 2022

Dan Betts, CEO of Hummingbird Resources, commented:

"Yanfolila currently hosts a sizable Resources and Reserves profile of 1.93 million oz and 705,800 oz respectfully.  With today's positive drilling results from SW, in addition to the greenfield drilling results, we see potential for additional Resources and Reserves growth, taking us one step closer to the Company's strategic goal of achieving a +10-year Reserve mine life at Yanfolila."

Noris Del Bel Belluz, Group Technical Services Manager of Hummingbird Resources, commented:

"These results continue to show the potential for ongoing increases in Resources and Reserves at Yanfolila. Now that this year's extensive drilling campaign at Yanfolila has concluded, our geology team is interpreting these assay results, and those to come, to delineate additional Reserve and Resource ounces for the exploration drilling campaign in 2022, all of which will be included in our updated 2022 Company Resources and Reserves statement, scheduled for release in Q2 2022."

2021 SW drill programme summary

Following on from the successful 2020 mineral resource infill drill programme at SW, the focus for the 2021 drilling has been to follow up on the open-ended mineralisation that could lead to further open pit extensions, and which would increase the mineable reserves available to add to the operation's life of mine ("LOM") plan. 44 holes were drilled and as per the included sections, these were targeting down dip or along strike extensions below the current pit design or below the base of the modelled inferred mineral resources.

Due to the targeted nature of the drilling, many good intersections were recorded. Only the higher-grade southern portion of the 2.5-kilometre-long SW structure was drilled tested, with further drilling required to infill the northern portions of the structure and continue drill testing at depth of the higher-grade zones along the southern end of the SW structure.

The current Mineral Resources at SW are made up of a significant portion of lower grade material ideally suited to heap leaching, as shown in recent bottle roll metallurgical test work. By including and targeting these lower grade resources in addition to the high grade CIL feed material, there exist many targets to continue growing the mineral resource and its mineable reserves.  Drill testing at SW is still relatively shallow. An increased understanding of the mineralisation controls and gold distribution at deposit will assist in its growth as an important ore source for the operation, which has recently started to be mined.

2021 Greenfield drill programme summary - Kama & Diaban

As part of the LOM extension strategy, two new targets, Kama and Diaban, were drill tested to evaluate their Mineral Resource potential.

At Kama, where historical shallow artisanal workings existed along the same structure hosting the Soloba mineralisation and the Komana West deposit, 21 RC holes on a line spacing of 80m were drilled for 1,800m. In each drill section, narrow zones of mineralisation were intersected, confirming the existence of a mineralised system underlying the area. The third and northern most drill section intersected two shallow and separate mineralised intervals that remain open to the north and not drill tested to date.

The Diaban drilling was testing a conceptual target over a 1.5-km-long portion of the regional Siekorole Shear Zone (near its intersection with the Sankarani Shear Zone upon which Gonka, Komana East and Sanioumale East deposits are located).  This drilling intersected gold mineralisation, a highly positive sign that the structure is connected to a mineralised system. Further study and analysis of the drill results, the RC chips and exploration data sets is required before further follow up drilling can be planned in 2022.

SW selected drill results

Hole ID Depth from (m) Depth to (m) Intercept description
SNWRC0482 10 12 2m @ 4.30 g/t
SNWRC0482 40 45 5m @ 3.72 g/t
SNWRC0482 61 69 8m @ 20.28 g/t
SNWRC0483 13 18 5m @ 2.02 g/t
SNWRC0484 51 60 9m @ 1.77 g/t
SNWRC0485 41 61 20m @ 1.76 g/t
SNWRC0485 77 85 8m @ 2.37 g/t
SNWRC0486 176 177 1m @ 9.04 g/t
SNWRC0489 30 50 20m @ 0.89 g/t
SNWRC0490 72 78 6m @ 3.67 g/t
SNWRC0491 39 53 14m @ 0.76 g/t
SNWRC0491 78 83 5m @ 2.57 g/t
SNWRC0491 93 97 4m @ 2.22 g/t
SNWRC0493 95 116 21m @ 0.78 g/t
SNWRC0494 54 79 25m @ 1.08 g/t
SNWRC0494 165 172 7m @ 2.91 g/t
SNWRC0495 94 108 14m @ 0.68 g/t
SNWRC0495 132 150 18m @ 1.97 g/t
SNWRC0499 12 19 7m @ 1.59 g/t
SNWRC0500 55 86 31m @ 3.32 g/t
SNWRC0501 23 43 20m @ 2.96 g/t
SNWRC0502 72 83 11m @ 1.57 g/t
SNWRC0506 14 21 7m @ 12.18 g/t
SNWRC0506 97 112 15m @ 2.59 g/t
SNWRC0507 40 47 7m @ 4.98 g/t
SNWRC0508 31 36 5m @ 2.35 g/t
SNWRC0509 100 108 8m @ 1.89 g/t
SNWRC0512 16 29 13m @ 0.76 g/t
SNWRC0514 76 82 6m @ 5.53 g/t
SNWRC0515 26 36 10m @ 2.20 g/t

Minimum Interval 1 m Trigger 0.5 g/t (Max 5 m Int Waste)

Greenfield selected drill results

Kama

Hole Number Depth from (m) Depth to (m) Intercept description
KARC0002 16 17 1m @ 2.11 g/t
KARC0008 45 46 1m @ 1.51 g/t
KARC0008 53 56 3m @ 0.60 g/t
KARC0019 35 38 3m @ 3.87 g/t
KARC0020 59 63 4m @ 4.47 g/t

Minimum Interval 1 m Trigger 0.5 g/t (Max 5 m Int Waste)

Diaban

Hole Number Depth from (m) Depth to (m) Intercept description
DBRC0019 10 12 2m @ 0.85 g/t
DBRC0023 4 5 1m @ 0.92 g/t
DBRC0029 107 110 3m @ 1.53 g/t
DBRC0040 18 19 1m @ 0.75 g/t
DBRC0049 23 24 1m @ 4.00 g/t

Minimum Interval 1 m Trigger 0.5 g/t (Max 5 m Int Waste)

Qualified Person Review:

David Muir, has reviewed and approved the technical information contained within this announcement in his capacity as a Qualified Person, as required under the AIM Rules for Companies. David is the Group Database Manager for Hummingbird, and is a "Competent Person", according to the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves ("JORC Code, 2012 Edition") and is a member of good standing with the Australian Institute of Geoscientists (AIG). 

**ENDS**

Notes to Editors:

Hummingbird Resources (AIM: HUM) is a multi-asset, multi-jurisdiction gold production, development and exploration Company, member of the World Gold Council and founding member of Single Mine Origin (www.singlemineorigin.com). The Company currently has two core gold projects, the operational Yanfolila Gold Mine in Mali, and the Kouroussa Gold Mine in Guinea, which will more than double current gold production when in production, scheduled for first gold pour end of Q2 2023. Further, the Company has a controlling interest in the Dugbe Gold Project in Liberia that is being developed by Pasofino Gold Limited through an earn-in agreement. Our vision is to continue to grow our asset base, producing profitable ounces, while placing our Environmental, Social & Governance ('ESG') policies and practices at the heart of all we do

For further information please visit https://www.hummingbirdresources.co.uk/ or contact:

Daniel Betts, CEO

Thomas Hill, FD

Anthony Köcken, COO

Edward Montgomery, CSO & ESG
Hummingbird Resources plc Tel: +44 (0) 20 7409 6660
James Spinney

Ritchie Balmer
Strand Hanson Limited

Nominated Adviser
Tel: +44 (0) 20 7409 3494
James Asensio

Thomas Diehl
Canaccord Genuity Limited

Broker
Tel: +44 (0) 20 7523 8000
Bobby Morse

Ariadna Peretz

James Husband
Buchanan

Financial PR/IR
Tel:  +44 (0) 20 7466 5000

Email: [email protected]

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact [email protected] or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

DRLDKCBBDBDBCBD