ASX Release 7 April 2015

HIGHFIELD RESOURCES DELIVERS MAIDEN RESOURCE ESTIMATE FOR SECOND SPANISH POTASH PROJECT

Highlights

  •  Maiden Resource estimate for Sierra del Perdón Potash Project delivering:

  • Indicated Mineral Resource estimate of 41.8m tonnes at 10.7% K2O

  • Inferred Mineral Resource estimate at 40.3m tonnes at 10.5% K2O

  •  Exploration Target estimated at:

  • 50m to 100m tonnes of sylvinite at 10% to 14% K2O

  • 100m to 250m tonnes of carnallite at 9% to 13% K2O

  •  A Scoping Study for the Project, building on relevant work completed for the Muga Potash Project DFS, is nearing completion, with results expected to be released during the current Quarter

Spanish potash developer Highfield Resources Limited (HFR: ASX) (“Highfield” or “the Company”) is pleased to announce its JORC maiden Mineral Resource estimate for its 100%-owned Sierra del Perdón Potash Project (the “Project”). The Project is located less than 10kms from Pamplona and within 40kms of the Company´s flagship Muga Potash Project.

Sierra del Perdón is a brownfield project that was historically mined primarily for sylvinite but also for carnallite, before closing in late 1996 due to relatively low potash prices of around US$100/tonne. There is potential for potash exploitation in greenfield areas in the Sierra del Perdón Basin and for limited additional production from brownfield areas.

Highfield’s Managing Director Anthony Hall commented:

“Whilst our focus remains on our flagship Muga Potash Project, we are in a fantastic position to have a second project that we believe is also likely to be very compelling.”

The potential quantity and grade of the Exploration Target is conceptual in nature and there has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

The reader is cautioned that a Mineral Resource is an estimate only and not a precise and completely accurate calculation, being dependent on the interpretation of limited information on the location, shape, and continuity of the occurrence and on the available sampling results. Actual mineralisation can be more or less than estimated depending upon actual geological conditions.

Highfield Resources Ltd. ACN 153 918 257 ASX: HFR

Registered Office C/– HLB Mann Judd 169 Fullarton Road Dulwich, SA 5065 Australia

Head Office Directors Calle Navas de Tolosa, Derek Carter 5 - 1°B, 31002 Richard Crookes Pamplona, Anthony Hall Spain Owen Hegarty –––––––––––––––––– Pedro Rodriguez

Company Secretary Donald Stephens

Issued Capital 252.0 million shares 51.5 million performance shares 43.5 million options

–––––––––––––––––– –––––––––––––––––– Tel: +61 8 8133 5098 Tel: +34 948 050 577 Fax: +61 8 8431 3502 Fax: +34 948 050 578

The Mineral Resource statement includes Inferred Mineral Resources. There is a low level of geological confidence associated with Inferred Mineral Resources and there can be no certainty that further exploration work will result in the determination of Indicated or Measured Mineral Resources. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. No Mineral Reserves are being stated.

Sierra del Perdón Potash Project

The Company is targeting what is designated as Upper and Lower Carnallite (CU and CL) and a lower sylvinite bed (SYL) in the Sierra del Perdón (SdP) Basin area that covers an area of more than 104 km[2] ( Figure 1 ). The basin is about 10 km east to west by 6–7 km in the north-south, plunging from 100 to 1,200 m deepest part of the basin. These beds are the stratigraphic equivalent of the P0, PA, PB, and P1 potash beds, in descending order, found in the Muga-Vipasca Basin area.

==> picture [441 x 428] intentionally omitted <==

Figure 1. Sierra del Perdón Project Area Showing Mineral Resource Footprint, Historic and Current Exploration Drill Holes and Historic Exploitation Areas

Page 2 of 6

Mineralisation in the uppermost potash bed is largely carnallite transitioning to carnallite and sylvinite in the lower beds. The Company is investigating exploitation of both minerals via new access in areas not mined previously and possibly in the largely intact carnallite beds over the existing mined footprint.

The Company drilled six holes in 2013 and has worked to compile historical data including drill hole data, production reports and detailed mapped profiles of the underground workings so as to enlighten the current exploration program. Two holes were drilled in areas not mined previously, showing good intersection of carnallite and sylvinite of moderate grade. Three holes were drilled into existing workings resulting in poor recovery and no recovery within the primary mined-out seam; incomplete intercepts in these holes are excluded from the resource estimation. The drill hole which defines the western extent of the basin was barren.

Additional drilling is recommended in the Sierra del Perdón area. Historic drill holes that were instrumental in the development of the historic mines are found in Table A-1. Completed and planned drill hole locations are found in Table A-2 and shown in Figure 1.

JORC Exploration Target

The SdP Exploration Target comprises 23 exploration core holes covering an area of approximately 44 km[2] , illustrated in Figure 1. The total Exploration Target ( Table 1 ) is estimated to contain between 100 and 250m tonnes of potash in the carnallite beds (CU and CL) ranging in average grade from 9 to 13% K2O, and between 50 and 100 Mt of potash in the sylvinite bed (SYL) ranging in average grade from 10 to 14% K2O. Approximately half (50%) of the carnallite Exploration Target in the CU and CL beds is estimated to overlie old workings of the Posusa de Navarra and Posusa de Subiza mines in the SYL bed.

Of the 23 planned exploration holes, 6 were drilled or attempted in 2013. Due to the incomplete holes and the technical difficulty with core recovery, the exploration program going forward will concentrate on drilling holes in virgin ground, stepping out from the existing workings and into the deeper part of the basin. Up to five holes are proposed for 2015. Potash beds CU, CL, and SYL are targeted at depths ranging from 100 to 1,400 m.

Table 1. Sierra del Perdón JORC Exploration Target (effective date 17 March 2015)

Potash Beds Depth Range
(m)
Tonnage
(Mt)
Average K2O
(wt %)
Carnallite
100‒1,400
Sylvinite
Total
Same
100‒250
9‒13
50‒100
10‒14
150‒350

Notes:

m = meters, Mt = million tonnes. Sylvinite is a mechanical mixture of sylvite (KCl) and halite (NaCl). Carnallite refers to a mechanical mixture predominantly of carnallite (KCl·MgCl2·6H2O) and halite (NaCl).

Carnallite occurs in up to two separate beds. Sylvinite occurs in one bed. Approximately 50% of the carnallite target overlies historical mine workings in the sylvinite bed. Target cutoffs: (a) bed true thickness ≥ 1.5m: grade cutoff ≥ 8.0%K 2O, or (b) true thickness < 1.5m: grade-thickness cutoff ≥ 12.0%K2O-m.

Page 3 of 6

JORC Mineral Resource Estimate

Independent geology and mining consultants, Agapito Associates, Inc. (AAI) has issued a JORC Mineral Resource estimate, as summarised in Table 2. The Mineral Resource was estimated using a computer 3D gridded-seam geologic (block) model constructed with Mintec Inc. MineSight 3D© v9.0 software. Historical and modern data for the property were reviewed by the CPs for quality and completeness. Data utilized in the model include historic and modern drill hole logs and assays, historic and modern interpretations of 2D seismic surveys, surface topography in the form of a digital elevation model (DEM), permit boundary lines, historic resource analysis, historic geological surface mapping, and historical mining records from the Potasas de Navarra and Potasas de Subiza mines.

Table 2. Sierra del Perdón JORC Mineral Resource Estimate

(effective date 22 March 2015)

Potash Bed Average
Bed
Thickness
(m)


Tonnes
In-Place
(Mt)


K2O
(wt %)

Carnallite
(KCl·MgCl2·6H2O)
(wt %)


Sylvite
(KCl)
(wt %)


Insolubles
(wt %)

In-Place
Bulk Density
(t/m3)
INDICATED
Upper Carnallite
1.6
Lower Carnallite
2.8
Sylvinite
2.5
16.5
8.9
47.4
1.6
12.4
1.90
18.0
10.9
47.3
4.6
9.0
1.90
7.3
14.6
1.3
22.7
11.1
2.12
41.8
10.7
39.4
6.5
10.7
1.94
INFERRED
Upper Carnallite
1.6
Lower Carnallite
2.8
Sylvinite
2.2
18.6
8.9
45.7
1.9
12.4
1.91
13.2
10.7
47.6
4.2
9.0
1.90
8.5
13.7
1.3
21.4
10.6
2.12
40.3
10.5
37.0
6.7
10.9
1.95

Notes:

Potash mineralization bulk density varies by carnallite, sylvite, halite, and insolubles fractions ranging from 1.6 to 2.2 t/m[3] . The resource estimate does not include any out-of-bed dilution. Resource cut offs: (a) true thickness ≥ 1.5m: grade cutoff ≥ 8.0%K 2O, or (b) true thickness < 1.5m: grade-thickness cutoff ≥ 12.0%K2O-m. Resource reduced by 15.0% allowance for unknown geologic anomalies within resource footprint. Indicated Resource—potash meeting cut off criteria located between 0m and 1,000m of a modern exploration core hole with assays, except where otherwise limited by geologic or mining boundaries. Inferred Resource—potash meeting cut off criteria located between 1,000m and 2,000m radius of a modern exploration core hole with assays or within 2,000m of an historical exploration core hole, except where otherwise limited by geologic or mining boundaries.

The sylvinite bed (SYL) is reported as a single potash horizon, in the resource estimate. Minedout areas based on the historic workings map have been excluded from the Resource. Carnallite beds, CU and CL, are reported as one bed. A total of 41.8m tonnes of Indicated Resource is reported with an average grade of 10.7% K2O with an estimated 39.4m tonnes of that being carnallite and 6.5m tonnes being sylvite, and the remainder halite (NaCl) and insolubles. An additional 40.3m tonnes is classified as Inferred Resource of 10.5% K2O with 37.0m tonnes estimated to be carnallite and 6.7m tonnes sylvite with the remainder halite and insolubles.

Page 4 of 6

Permits

The SdP property comprises two main investigative permits (PI) and one extension permits ( Figure 1 and Table 3 ). These PIs have a surface of 14,898 hectares and cover 100% of the deposit Sierra del Perdón and any potential areas of exploration.

Table 3. Interests in Mining Permits Held by the Company

Project
Region
Permit Name **Permit Type ** Applied Granted **Ref No. ** Area Holder Structure
(km2)
Sierra del Perdón Navarra Quiñones Investigation 19/07/11 8/7/2012 35760 32.48 Geoalcali SL 100%
Sierra del Perdón Navarra Adiós Investigation 19/07/11 8/7/2012 35770 75.60 Geoalcali SL 100%
Sierra del Perdón Navarra Ampliación AdiósInvestigation 26/10/12 2/14/2014 35880 40.90 Geoalcali SL 100%
Location: All permits are located in Spain.
Holder: Geoalcali SL is a 100% owned Spanish subsidiaryof Highfield Resources.

Scoping Study

The Company is currently completing a Scoping Study for the Project. The Scoping Study builds on relevant work completed for the Muga Potash Project DFS given the similarities with respect to mining methods, processing, utilities, logistics and likely target markets. The Company expects to be in a position to release the results of the Scoping Study in the current Quarter.

For More Information

www.highfieldresources.com.au

Company

Anthony Hall Managing Director Ph: + 34 617 872 100 Hayden Locke Head of Corporate Development Ph: +34 609 811 257

Investor Relations Executives

Simon Hinsley APAC Investor Relations Ph: +61 401 809 653 Nuala Gallagher / Simon Hudson UK Investor Relations Ph: +44 207 920 3150

Competent Persons’ Statement

This ASX release was prepared by Mr. Anthony Hall, Managing Director of Highfield Resources. The information in this release that relates to Mineral Resources and Exploration Results is based on information prepared by Mr. Leo J. Gilbride, P.E. and Ms. Vanessa Santos, P.G. of Agapito Associates, Inc. (AAI) of Colorado, United States of America (USA). Mr. Gilbride is a licensed professional engineer in the State of Colorado, USA and is a registered member of the Society of Mining, Metallurgy and Exploration, Inc. (SME). Ms. Santos is a licensed professional geologist in South Carolina and Georgia, USA, and is a registered member of the SME. SME is a Joint Ore Reserves Committee (JORC) Code ‘Recognized Professional Organization’ (RPO). An RPO is an accredited organization to which the Competent Person (CP) under JORC Code Reporting

Page 5 of 6

Standards must belong in order to report Exploration Results, Mineral Resources, or Ore Reserves through the ASX. Mr. Gilbride is a Principal and Ms. Santos is the Chief Geologist with AAI and both have sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which they are undertaking to qualify as a CP as defined in the 2012 Edition of the JORC Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr. Gilbride and Ms. Santos consent to the inclusion in the release of the matters based on their information in the form and context in which it appears.

About Highfield Resources

Highfield Resources is an ASX-listed potash company with four 100%-owned projects located in Spain.

Highfield’s Muga, Vipasca, Los Pintanos, and Sierra del Perdón potash projects are located in the Ebro potash producing basin in Northern Spain covering a project area of close to 400km[2] . The Sierra del Perdón project includes two former operating mines. The Company has recently completed a definitive feasibility study for its Muga Project and is currently working towards commencing construction in the fourth quarter of 2015.

==> picture [481 x 319] intentionally omitted <==

Figure 2: Location of Highfield´s Muga-Vipasca, Pintano and Sierra del Perdón Projects in Northern Spain

Page 6 of 6

==> picture [123 x 47] intentionally omitted <==

Appendix

Explanatory Notes to the Exploration Results and Resource for the Sierra del Perdón Potash Projects

Page 1 of 50

==> picture [123 x 47] intentionally omitted <==

Property Description

The Sierra de Perdón project area is located in the northern portion of Spain within the Ebro Basin and is situated within the Navarre province of Spain. Highfield Resources (Highfield) (the “Company”) holds Exploration and Investigative Permits in three areas in Navarre and Aragon (Figure 2). The western area of Sierra del Perdón contains historic mining, operations which closed in 1997, and areas within the existing permits for brownfield and greenfield development. The eastern greenfield project area is divided into two sub-basins, Javier Basin (as defined here by the Muga and Vipasca leases) and the Pintano Basin, which are separated by an elevated saddle area.

Tenure and Surface Rights

Spanish mining permits are split into three categories: Exploration Permit (PE), Investigation Permit (PI), and Mining Concession. A PE is for desktop studies and lasts for a period of 1 year (it may be rolled over once). A PI is necessary for drilling, allows for the sinking of shafts and driving of declines and lasts for a period of 3 years (it may also be rolled over for multiple 3-year periods). For a PI to be granted, an environmental review must be completed by the relevant government. A Mining Concession is for mineral extraction and lasts for periods of 30 years (it may be rolled over twice).

In addition to the above, if a permit sits in two provinces, it must be formally issued by the Central Government in Madrid under Article 71.3 of the Spanish Mining Code.

The Sierra de Perdón property is comprised of two PIs and one extension permits converted to a PI (Table 1 and Figure 1). These PIs have a surface of 14,898 hectares and cover 100% of the deposit of Sierra del Perdón and any potential areas of exploration. The Competent Persons (CPs) have reviewed the mineral tenure from documents provided by the “Company”, including permitting requirements, but have not independently verified the permitting status, legal status, ownership of the project area, underlying property agreements or permits. The Company is relied upon by the CPs for tenure status.

Geology and Structure

The south Pyrenean Potash Basin extends from west to east from Navarre to Catalonia. The Eocene marine basin was confined by the Ebro Massif on the south and the Pyrenean Ridge on the north (Ortiz and Cabo). The Sierra del Perdón represents an asymmetrical basement-controlled sub-basin trending NE-SW and NNE-SSW. The first deposits in the region, occurring at the end of the Cretaceous period, were characterised by a regressive period with reddish continental deposits. The Eocene is marked by the beginning of tectonic compression, causing formation of subsiding basins parallel to the Pyrenees Mountains, with emersion and erosion in some parts.

The Upper Eocene potash deposits occur in the sub-basins of Navarre and Aragón provinces within the larger Ebro Basin (Figure A-1). The Navarrese sub-basins include Sierra del Perdón, Muga-Vipasca (Javier) and adjoining Pintano deposits. This potash deposit contains a 100-meter (m)-thick Upper Eocene succession of alternating claystone and evaporites (anhydrite, halite, and sylvite). The evaporites accumulated in the elongated basin at the southern foreland of the Pyrenean range (Busson and Schreiber 1997). The evaporites overlie marine deposits and conclude in a transitional marine to non-marine environment with terrigenous influence. Open marine conditions existed in the Eocene-Oligocene epochs progressing to a more restricted environment dominated by evaporation and the deposition of marl, gypsum, halite, and potassium minerals. Later, tectonism and resulting salt deformations formed broad anticlines, synclines and overturned beds, which created outcrops of the evaporite sequence. The Sierra del Perdón sub-basin is notably different from the eastern Javier Pintano basins, with predominantly carnallite mineralization overlying sylvinite, suggesting a more immature diagenesis because carnallite is considered primary and sylvinite secondary. The formation of the evaporites is further influenced by basin restriction, and paleo highs and lows which are perhaps defined by block faulting as well as the main structural basin bounds.

Page 2 of 50

==> picture [123 x 47] intentionally omitted <==

==> picture [468 x 293] intentionally omitted <==

Figure A-1. Regional Geology of the Ebro and Jaca-Pamplona Basins (from University of Michigan 2004)

The different basins are separated by orogenic events developing in the north and south as turbidite basin carbonate platforms. Towards the end of the Eocene epoch, the sedimentation axis migrated south to the Jaca-Pamplona Basin, on which the Oligocene materials were deposited. The pre-evaporitic basin sedimentation occurs in a context of continuous tectonic compression during the Eocene and Oligocene epochs, as synsedimentary tectonics of the end of the orogeny, with pronounced sediment influx. The influence of the turbidites towards the end of the Eocene epoch in the Bartoniense series from the northwest into the basin as the Belsue Formation is indicative of continued subsidence.

At the east end of the basin, the evaporite levels crop out, and the evaporites are largely dissolved, exhibiting the remnants of the upper banded clays which unconformably overlie the Pamplona Marls. In some cases they are altered to gypsum and fibrous halites. The evaporites are part of a synclinal structure with the main axis plunging to the west. The syncline is compartmented in 3 sub-blocks which are separated by faults. The northern edge of the syncline is usually affected by the erosion with an inclination towards the south. The deposit has a gentle slope of 12 degrees (º), with a depth from between 60 and 70 m (elevation +700 m to 1,100 m (elevation –400 m) in a north-south extension of 5 to 6 km. Oligio-Miocene conglomerates unconformably overlie the southern flank.

The Sierra del Perdón Basin is dominated by the SW-NE fault system named, from the south to the north, Falla (fault) de Subiza and Falla de Esparza, with several unnamed faults in between the major ones (Figure A-2). The faults are pre-evaporitic, and therefore have influenced the deposition within the basin and driven the historic mine advance. The faulted blocks are uplifted in the north (Falla Esparza) and the SE (Falla Subiza) and downdropped in the center which represents the depocenter. Displacement along Esparza is approximately 300 m and between 600 and 800 m in Subiza (Menendez 1971; del Valle 1978). The area has been separated into mining blocks, Guendulain, Beriain, Subiza and Uniano. (An additional area lies between the major fault and represents the basin’s synclinal axis that has not been mined because it plunges and deepens. No drill holes have penetrated the salts so the depth of syncline is

Page 3 of 50

==> picture [123 x 47] intentionally omitted <==

interpreted through historic seismic records. This area may also represent an offset similar to what is seen in the east, the Flexura de Ruesta that divides the Javier and Pintano sub-basins. [Empresa Nacional Adaro Investigaciones Mineras {e.n. adaro} 1988–1991]). An anticline interpreted form the historic seismic records crosses the basin NW-SE and may define an area where the upper salt has been eroded.

==> picture [448 x 344] intentionally omitted <==

Figure A-2. Sierra del Perdón Project Regional Structure and 2013 Drill Hole Locations

The depositional environment is that of a restricted marine basin, influenced by eustasy, sea floor subsidence, and/or uplift and sediment input. It is suggested that the Ebro Basin is the result of a combination of reflux and drawdown. Reflux describes a basin isolated from open marine conditions, and thereby characterised by restricted inflow, increased density, and increased salinity. Drawdown is the result of simple evaporation in an isolated basin, and brine concentration and precipitation, consistent with the classic “bulls-eye” model (Garrett 1996). In this case, the Ebro Basin is further influenced by erosion at its edges due to contemporaneous and post-depositional uplift which results in localised shallowing and sediment influx (Ortiz and Cabo 1981) transitioning from marine to continental-type deposits.

In the classic “bulls-eye” model, a basin that is cut off from open marine conditions will experience drawdown by evaporation in an arid to semi-arid environment. In the absence of sediment influx, precipitation will proceed from limestone to dolomite to gypsum, and anhydrite to halite. Depending on the composition and influences of the brine at that time, the remaining potassium, magnesium, sulfates, and chlorides will progress from potassium and magnesium

Page 4 of 50

==> picture [123 x 47] intentionally omitted <==

sulfates to sylvite and then carnallite. It is proposed herein that the formation of carnallite and sylvite be described as primary and secondary, respectively.

Potash is used to describe any number of potassium salts. By and large, the predominant economic potash is sylvite: potassium chloride (KCl) usually occurring mixed with halite to form the rock sylvinite, which may have a potassium oxide (K2O) content of up to 63%. Carnallite, a potassium magnesium chloride (KCl•MgCl2•6H2O) is also abundant, but has K2O content only as high as 17%. “Carnallite” is used to refer to the mineral and the rock interchangeably, although “carnallitite” is the more correct terminology for the carnallite and halite mixture. Besides being a source of lower grade potassium, carnallite involves a more complex production process, so it is less economically attractive than is sylvite.

The regional stratigraphy (Figure A-3) is dominated by open and restricted marine conditions. Evaporitic sedimentation (the Guendulain Formation) directly overlies the fine marine offshore sediments (Pamplona Marls) (Ortiz and Cabo 1981; Orti et al. 1984). Both drill hole data and outcrop observations assign an average thickness of about 150m to the saline formation, which displays the following sequence from bottom to top:

  1. Pamplona Marls.

  2. Marker anhydrite member (basal banded anhydrite).

  3. Lower salt member (Sal de Muro or “lower salt”), medium to very coarse recrystallised halite, medium grey to black and the lower part may be brown and sandy as described below.

  4. A carnallitic member that may be seen as an upper and lower bed and and a lower sylvinite bed. The potash is characterised as fine to coarse granularity, typically light to medium orange-red in colour, of crystalline structure with high insolubles and interbedded halite. The sylvinite exhibits brecciated structure suggesting recrystallisation after carnallite formation.

  5. Upper saline member (Sal de Techo or “upper salt”), alternating halite and clay layers, some of which exhibit deformation.

  6. Top marl member (Margas Fajeadas or “banded marls”) with intercalated anhydrite layers.

Overlying the salt is a siliciclastic detrital unit, made up of the Oligocene Galar Sandstone, Javier-Pintano hard layers, the Oligocene-Miocene Rocaforte Formation and, locally, the Igaza Conglomerates (Uncastillo Formation). This unit is capped by Quaternary and Oligocene sediments. The Quaternary is made up of alluvium, glacial till and debris (Orti et al. 1986).

These units have been simplified in the geologic modelling database as:

  • Unidad del Oligoceno (UO) for Lutitas y Limolitas

  • Unidad Detritica (UD) for Areniscas de Galar / Belsúe and (MF) as Margas Fajeadas (MF)

  • Unidad Evaporitica (UE) for Sal de Techo (ST) and Sal Muro(SM) or Sal (S)

In the Sierra del Perdón Potash Project area, the mineralogy is dominated by carnallite over sylvinite, which is medium red-orange and white, largely coarse crystalline in bands and in heavily brecciated beds containing high levels of insoluble material, largely fine-grained clays, anhydrite, and marl. The alternation from carnallite to sylvinite is not always complete and may vary from one bed to the next but it always occurs in the lower part of the sequence. The upper potash beds transition to finely banded light brown marls and clays which may exhibit salt veining and distortion as well as influx of dark grey clays and mudstones, representing the transition of the basin from marine to continental via basin-filling. The salts just below the potash tend to be dark grey to black. In some lower beds, halite

Page 5 of 50

==> picture [123 x 47] intentionally omitted <==

==> picture [468 x 572] intentionally omitted <==

Figure A-3. Regional Stratigraphy of the Ebro Basin

Page 6 of 50

==> picture [123 x 47] intentionally omitted <==

becomes brownish, sandy to coarsely granular sand and sandstone as sediment influx from the basin edges. The literature denotes this salt as “sal vieja” or “old salt” (Ortiz and Cabo 1981). The evaporite beds and bands, in general, are separated by fine to very coarse crystallised and recrystallised salts, generally grey, sometimes light-to-medium honey brown or white, with anhydrite blebs, nodules, and clasts.

Exploration and Methodology

Historic

The Sierra del Perdón Potash Project represents the westernmost potash deposit of Navarre Basin. The deposit was discovered in 1929 based on the assay of brines sourced from Guendulain springs area, 5.5 km southwest of Pamplona City. On June 23, 1929, the first drill hole completed intersected 9 m at 13.92% K2O to 78 m deep. Additional regional exploration was begun in Navarre, first by the Spanish government with five holes across the area; one each in Pamplona, Subiza, Guendulain, Javier and Tafalla. This was followed by more detailed work in the Sierra del Perdón area beginning with e.n. adaro (drill holes 1 through 21), probably conducted in the 1950s, and then by Potassa de Navarra, SA (drill holes 22 to 25) (Table A-1). Additional regional exploration by e.n. adaro and Potasas de Navarra, SA tested the outer extents from the main basin in Iborgoiti, Celigueta, Sengariz, Lecaun and into Aragon. The date and methodology of these holes is uncertain.

It is noted that some drill holes numbered 12, 4 through 10, 13, 17 through 19 and 21 were drilled under “normal conditions” to test the extension, grade and dip of the mine workings. The drill holes numbered 13, 21, 19, 9 and 4 mark the extension of the potash beds which are in “good condition of exploitability.” Drill holes 12 and 14 are in an irregular zone and did not intersect significant potash. In historic drill hole 14, in the northern part of SdP between Guendulain and Unidano shaft, there is only very weak and thin carnallite (137.91–137.93 m and 138.67–138.69 m); dips are reported at 31°. The area near drill holes 15, 16 and 10 is covered by Aquitaniense conglomerates and sands. These historic holes contribute to the knowledge of the basin mineralogy and thicknesses but do not contribute to the Resource. There are no assays associated with these holes.

The drilling campaign and study resulted in a declaration of reserves for Sierra del Perdón and other areas (Mayoral 2013). This first definition of the deposits was done in the early 1950s, a 24-drill hole campaign, an area with a surface of 5,500 hectares in the “two main levels for sylvite and upper carnallite, with a resource of 225.3 Mt at 18.0% K2O for the deposit of sylvite and 313.5 Mt at 12.6% K2O for the carnallite within the upper zone deposit.” Additional “reserve” reporting was by government entities of e. n. adaro (60.0 Mt of K2O) and Minas Potasse D´Alsace (30.0 Mt of K2O) and Potasas de Navarra SA (40 Mt of K2O). The historical resources and reserves, while technically important, are not Joint Ore Reserves Committee (JORC)-compliant. They are reported here as an indication of the historic evaluation on the property.

Production at Pamplona began in 1963 with a capacity of 250,000 tonnes per year (tpy) of K2O. A thick carnallite member overlies the sylvinite, so in 1970 a refinery with the capacity for 300,000tpy was built to accommodate for carnallite from the Esparza (Stirrett and Mayes 2013). During the early 70s, preparation and development of mining infrastructure was completed and in the mid-70s, exploitation started in Beriain Shaft and then on Subiza Ramp. Carnallite mining was ceased in 1977. Inclined ramps for the mine were located near Esparza, reaching the centre of the mine, with further shafts located at Beriain, Guendulain and Undiano. In 1982, 2.2 million tonnes of sylvinite were extracted with an average K2O grade of 11.7% (Stirrett and Mayes 2013).

By 1987, the deposit was in full production with 2 shafts and 2 extraction ramps with an annual production of 159,153 tonnes per year (tpy) of K2O, and a yearly turnover of US$ 23.95 million with an average potash price of US$ 149.6/t K2O. The operations in Navarre were closed in the late 1990s.

Page 7 of 50

==> picture [123 x 47] intentionally omitted <==

Table A-1. Sierra Del Perdón Historic Drill Holes and Locations*

Drillhole ID Easting
(m)
Northing
(m)
Elevation MSL
(m)
Total Depth
(m)
Coordinates ETRS89
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
609050
4730507
602
347
604342
4734744
527
342
611953
4732821
461
175
608447
4729635
626
292
604556
4733684
592
559
607974
4734392
508
110
609861
4732885
509
473
610343
4733387
470
107
608256
4733024
604
742
609946
4733123
496
347
609984
4731319
530
126
602791
4733946
522
582
601641
4733236
590
887
603130
4735637
472
171
601085
4731409
606
1,144
606169
4727421
544
541
600972
4734537
527
492
606157
4734202
562
387
607194
4733406
573
727
605709
4730662
723
1,320
603136
4733153
590
987
608016
4727626
600
277
607700
4728125
651
305
607289
4729788
758
597
604387
4729071
577
1,000
  • Date of drilling is unknown. Notes: ETRS89 = European Terrestrial Reference System 1989; MSL = mean sea level.

Historic production, as reported by Highfield (Geoalcali S.L. 2012) is given below.

1991 1992 1993 1994 1995
Mined ore 1,266,294 1,460,761 1,422,842 1,087,059 948,911
Potassium Chloride (t) 244,555 275,980 261,805 203,170 171,280
K2O equivalent 146,733 165,588 157,083 121,902 102,768

In 1996–97, Potasas de Navarra, main shareholder of POSUSA (operating company), decided to stop production because of a combination of factors. Presumably, the fall in potash price, combined with the need to make significant new investment in mine development. Instituto Tecnologico Geominero de España (ITGE) reported reserves of 2.0 Mt of K2O proven and 9.0 Mt of Probable (National Inventory Potash Resources 1987).

Page 8 of 50

==> picture [123 x 47] intentionally omitted <==

Modern

This maiden Mineral Resource estimate for the Sierra del Perdón Potash property was independently developed by geology and mining consultants, Agapito Associates, Inc. (AAI), USA, based on the results of documented geological studies, two-dimensional (2D) seismic analysis, exploration drilling, electric logging (elogs), and chemical analyses. The records for historic drill holes are largely drill hole logs which are used primarily for structural information. Six new drill holes from Highfield’s wholly owned Spanish subsidiary Geoalcali’s 2013 exploration campaign have been reviewed for definitive grade and thickness information. One hole (SDP-009) was barren and interpreted to be outside of the main basin. SDP-002 drilled into old workings in the Guendulain area, was incomplete, and showed poor core recovery and drilling only to what is thought to be CU carnallite. One hole (SDP-006) in the same area was incomplete, drilled to the top of the mined-out sylvinite. One hole (SDP-005) also was drilled through what is interpreted to include the mined-out portion of the sylvinite section; it exhibits poor recovery and dissolution of the core. SDP-004 and SDP013 are the only truly complete holes used in this resource.

The potash beds have been correlated using a combination of assays, core photos and inspection, and lithological and geophysical logs. The beds vary in grade and thickness and can be discontinuous. Traditionally, the lithologies have only defined the carnallite upper and lower beds, and the underlying sylvinite bed.

The main beds are CU and CL, which are generally the thickest and most continuous across the basin, and largely carnallite. The sylvinite bed (SYL) is below and generally separated from the carnallite by less than one meter of salt or very low grade sylvinite material. CU tends to be of lower grade; composited values range from 8–10% K2O. CL tends to be thinker and higher grade and separated from CU by 1–2 m of salt. The correlations are subject to revision with additional drilling. Those composited intervals are shown in Table A-2. Thicknesses in this report are generally reported as measured thickness except in the resource, where thickness is corrected to true thickness. Additional drilling will be needed in the greenfield areas, including the deeper part of the syncline. Additional drilling has been proposed and planned (Figure 1 and Table A-3) but exploration and drilling focus switched to the drilling out of JavierMuga.

SDP-013 lies in the eastern portion of the basin in an area not previously mined. It shows a similar lithologic sequence to the potash in Muga-Vipasca with the exception that the mineralogy is predominantly carnallite rather than sylvinite, over relatively thin, dark halite, and banded anhydrite at the base. The basal salt over the banded anhydrite and lower marls is medium to dark grey and only 4.8 m thick. SYL is found in a 0.9 m layer (depth 521.3 m), 1.8 m below CL. CU is of relatively low grade, with an average of 8.2% K2O and 1.3 m thick. The banded marls above the carnallite show considerable distortion which may be attributable to localized faulting or mass sediment slumping and salt veining, although they normally transition upwards and are capped by dark grey clays, likely representing sediment from the basin edge.

SDP-009 defines the eastern extent of the basin and shows a foreshortened sequence in which the salt is thin (<2 m) and dissolved, exhibiting a spongey texture of the original insolubles over a thin banded anhydrite with a bed of dark mudstone. The remnant salt is capped by alternating beds of banded and deformed, black and oxidized, light reddish brown and tan mudstones, suggesting the transition at the basin’s edge to a continental-type environment. The hole is shallow and was drilled to a depth of about 86.5 m to the top of the anhydrite. To help define the edge of evaporites, the logs for historic drill holes 8 and 10 were reviewed and both show complete sequences of carnallite and sylvinite mineralization with 8 reporting steep dips of 80°. As in SDP-013, alteration of carnallite to sylvinite is incomplete as sylvinite is found in what is interpreted to be CU, and again at the base of the potash bed.

SDP-006 is incomplete due to lost circulation in the mineralised zone below CU. The hole penetrated CU over 3.6 m carnallite at average 6.3% K2O. Below CU, core recovery was poor, hence, this hole was not be used in the resource estimation. This hole is excluded from the resource due to poor core recovery including below 205.7 m and complete loss after 213.5 m. This hole was drilled in the old workings in the Guendulain area in the northern portion

Page 9 of 50

==> picture [123 x 47] intentionally omitted <==

Table A-2. Potash Bed Resource Composites and Geologic Intervals from Exploration Drill Holes

Resource Intervals
Geologic Intervals
Resource Intervals
Geologic Intervals
Resource Intervals
Geologic Intervals
Resource Intervals
Geologic Intervals
Resource Intervals
Geologic Intervals
Resource Intervals
Geologic Intervals
Resource Intervals
Geologic Intervals
Resource Intervals
Geologic Intervals
Resource Intervals
Geologic Intervals
Resource Intervals
Geologic Intervals
Resource Intervals
Geologic Intervals
Resource Intervals
Geologic Intervals
Resource Intervals
Geologic Intervals
Resource Intervals
Geologic Intervals
Resource Intervals
Geologic Intervals
Resource Intervals
Geologic Intervals
Resource Intervals
Geologic Intervals
Potash Bed and
Drill Hole ID
Depth
from
(m)
Depth
to
(m)
Measured
Thickness
(m)

Depth
from
(m)
Depth
to
(m)
Composite
Measured
Thickness
(m)
Composite
True
Thickness
(m)
K2O
(wt %)

MgCl2
(wt %)

Insolubles
(wt %)
Upper Carnallite
SDP-002
Hole not deep enough
SDP-004 395.8
401.5
5.7 397.9
399.7
1.8 1.7 9.8 16.7 13.9
SDP-005 415.2
424.0
8. 8 Inadequate core recovery
SDP-006 201.1
204.7
3.6 203.2
204.7
1.5 1.5 8.7 14.3 12.0
SDP-009 No occurrence
SDP-013 511.7
516.5
4.8 514.1
515.6
1.5 1.5 8.2 17.7 11.3
Lower Carnallite
SDP-002
Hole not deep enough
SDP-004 402.4
406.3
3.9 402.4
406.3
3.9 3.6 12.4 15.2 9.2
SDP-005 426.2
430.4
4.2 Inadequate core recovery
SDP-006 205.6
207.5
1.9 Inadequate core recovery
SDP-009 No occurrence
SDP-013 518.3
521.0
2.7 519.5
521.0
1.5 1.5 8.4 17.9 8.8
Sylvinite
SDP-002
Hole not deep enough
SDP-004 406.6
410.2
3.6 406.6
409.9
3.3 3.0 16. 1 0.4 12.0
SDP-005 430.7
435.8
5.1 Inadequate core recovery
SDP-006 Hole not deep enough
SDP-009 No occurrence
SDP-013 521.3
522.2
0.9 521.3
522.2
0.9 0.9 10.3 0.5 8.6
Note: A blank field indicates no data.
Color
Scale
Color
Scale
10.0 10.0 10.0 20.0 10.0 100.0
0–10m 0–10m 0–10m 0–20% 0–10% 0–100%

of the deposit and even though it was planned as an unmined block, it likely drilled into an area where the lower sylvinite was mined out. The closest historical hole is 2 which only reports “normal” conditions in the deposit which might be interpreted as a complete section of carnallite over sylvinite. In this area, both carnallite and sylvinite were mined and it is interpreted in this and other holes that the targeted beds were just below CU with the lowermost beds being sylvinite in most cases.

SDP-005 was drilled within the old workings of the Subiza mine south of the main Beriain Fault and it is believed that the entire potash section was intersected. The hole lost circulation and was cored with HQ, with the core showing considerable dissolution and mechanical breakage and disking in the mineralised zone, making the assays suspect through most of the interval. Mineralisation is largely carnallite. Beds CL and SYL are separated by halite and lowgrade material. Sylvinite interpreted to be bed SYL is present from 431.3 to 434.0 m where 2.7 m of core was lost, thought to be mined out and therefore, likely to have been sylvinite of good grade. Core was recovered again from 434.0 to 435.8 m, reporting variable amounts of MgCl2. The banded marls above the salts show folding, distortion

Page 10 of 50

==> picture [123 x 47] intentionally omitted <==

Table A-3. Highfield Resources Sierra Del Perdón 2013 Drilling Campaign

Drillhole
ID
Start Date
End Date
Easting
(m)
Northing
(m)
Elevation
MSL
Investigation
Permit
Coordinates ETRS89
Total
Depth
(m)
SDP-001
ND
SDP-002
06-Jul-13
29-Jul-13
SDP-003
ND
SDP-004
18-Jun-13
24-Jul-13
SDP-005
05-Aug-13
05-Sep-13
SDP-006
05-Aug-13
12-Aug-13
SDP-007
ND
SDP-008
ND
SDP-009
22-Aug-13
03-Sep-13
SDP-010
ND
SDP-011
ND
SDP-012
ND
SDP-013
25-Oct-13
07-Nov-13
SDP-014
ND
SDP-015
ND
SDP-016
ND
SDP-017
ND
SDP-018
ND
SDP-019
ND
SDP-020
ND
SDP-021
ND
SDP-022
ND
SDP-023
ND
606021
4734589
600
604488
4735240
522
188
Adios
601229
4734257
600
609018
4733706
533
436
Quiñones
607630
4729055
654
440
Adios
604181
4735183
522
214
Adios
607439
4732968
610
609200
4731639
600
610833
4733312
468
95
Quiñones
603180
4733590
600
600929
4733415
585
600229
4734799
550
609983
4732274
532
548
Quiñones
605388
4728455
600
607256
4731626
600
604267
4730142
600
608790
4731063
600
608544
4731782
600
607984
4730995
600
607288
4730629
600
608056
4732633
600
607983
4733475
600
607408
4732931
600
Note: IP = inprogress,ND = not drilled.Coordinates in bold are final.

and salt veining but with less basin edge influence of clastics as basin fill. Logs for nearby historical hole 4 show carnallite from 235.2 to 244.9 m (11.7 m) and sylvinite directly below to a depth of 250.5 m (5.6 m).

SDP-004 was drilled near the old workings at Beriain and had a completed intersection of the mineralized zone. What is interpreted as CU is 6.6 m of carnallite with overall grades of 5.6% K2O, containing higher grade beds within that. It shows medium red orange banding directly overlying CL and SYL, the latter with the usual mixed dark and light brecciation of clay and banding in the lower part. The lower part of CL is partially sylvinite with the alteration from a depth of 405.1m, showing a marked difference in the appearance of the core. SYL is just below from 406.6 to 409.9 m (3.3 m) with an average grade of 16.1% K2O. In this hole, the upper marls show dark clays and mudstones as intermediate basin edge influences. The hole finished in the basal, banded anhydrite and marls. The lower salt (Sal Muro) is light to medium grey and tan, banded, and medium crystalline with a minor bed of clay, of 15.1 m thickness.

SDP-002 drilled into the old working in the Guendulain area and was incomplete, showing poor core recovery and drilling only to what is thought to be CU. It has no assays and is excluded from the resource. This was the first hole drilled; SDP-006 is an incomplete re-drill of SDP-002.

Seismic Surveys and Structure

Page 11 of 50

==> picture [123 x 47] intentionally omitted <==

In 1983, a 2D seismic survey was run for e.n.adaro by Compagnie Generale de Geophysique (CGG) over the Sierra del Perdón property (e.n. adaro 1985a and b). This consisted of 22 lines totalling 111 km (Figure A-4). Earlier work included a seismic campaign in 1963 and a minie-sosie (shallow seismic using a vibration-rammer source) campaign in 1979 and a vibrosesimic program by Otono in 1981. The resulting structure maps for both the top (“techo”) of salt (base of Marl) with major faults were developed by CGG in combination with the regional seismic records, field maps, satellite imagery and drill hole data. Additional surfaces identified at that time include the unconformity at the Miocene conglomerates, the base of the Galar Sandstone and the resulting isopachs. In addition, early work identified an area of possible erosion in the upper salt along the interpreted anticline.

RPS (formerly RPS Boyd Petrosearch) of Calgary, Alberta, Canada, completed a re-interpretation in 2013 of the 2D historical seismic lines and profiles on behalf of Highfield. The re-interpretation program was designed to review the overall accuracy of the historical data in terms of good correlation to drill hole data and geological intersections, as well as to identify any subsurface structures that may adversely affect the salt-bearing strata. Seismic survey lines were reviewed and were tied to wells using historical wireline data. No report was produced but structural maps for the top and base of the salt contributed to the basin interpretation in this report. The potash-bearing zones lack any velocity/density contrasts within the salt, so it is not possible to detect potash or map the structure of the zone directly.

The CPs used these structural data as generated by RPS but the structure map is modified and corrected to reflect updated drill holes.

Quality Control and Data Confirmation

The 2013 drilling program was conducted by Highfield personnel. Details of the sampling techniques and oversight of the quality control program are summarised in Table A-6.

Highfield and ALS Global (ALS), the primary contract laboratory, maintained quality control procedures of standards, duplicates, and blanks. Highfield made multiple Standard or Certified Reference Material-type (SRM or CRM) samples representing low-, medium-, and high-grade (LG, MG, HG) potassium material, but the insertion rate is insufficient to determine repeatability and calibration of the target instrumentation. SRM samples, blanks, and duplicates were inserted, both by Highfield personnel during sample preparation and by ALS as part of their own quality assurance/quality control (QA/QC) program. ALS inserted commercial standards BCR-113 and BCR-114, both potash fertilizer materials, muriate of potash (MOP) and sulfate of potash (SOP), respectively, as well as their own internal standard, SY-4, a diorite gneiss used as a blank material. The insertion rate is one blank, one SRM, and one laboratory duplicate per 20 samples or batch.

ALS assayed samples both by inductively coupled plasma (ICP) and X-ray fluorescence (XRF). In general, the ICP and XRF techniques show reasonable agreement with the XRF method exhibiting modestly elevated K2O values over the ICP method.

Highfield’s procedure designates duplicates on the quarter core at 1 in 20, blanks at 1 in 50, and standards at 1 in 20. Duplicates were submitted to ALS, and ICP results show good internal agreement. Check samples (1 in 20) were tested at Saskatchewan Research Council Laboratory (SRC). In general, SRC reports K2O values lower than reported by ALS. Because ALS and SRC show good internal agreement, the bias suggests a calibration issue.

This drilling campaign for SdP began in the summer of 2013 and procedure was not well-established to ensure good core recovery. The CPs reviewed the drilling records and concluded that core recovery was insufficient in three of the six holes drilled and therefore those assays will not be used in this resource.

Page 12 of 50

==> picture [123 x 47] intentionally omitted <==

==> picture [448 x 342] intentionally omitted <==

Figure A-4. Index of Seismic Lines and Detected Faults on Top of Salt / Base of Marls (after CGG)

Exploration Target

The SdP Exploration Target comprises 23 exploration core holes covering an area of approximately 44 km[2] , illustrated in Figure 1. The total Exploration Target (Table A-4) is estimated to contain between 100 and 250 Mt of potash in the carnallite beds (CU and CL) ranging in average grade from 9 to 13% K2O, and between 50 and 100 Mt of potash in the sylvinite bed (SYL) ranging in average grade from 10 to 14% K2O. Approximately half (50%) of the carnallite Exploration Target in the CU and CL beds is estimated to overlie old workings of the Posusa de Navarra and Posusa de Subiza mines in the SYL bed.

Of the 23 planned exploration holes, 6 were drilled or attempted in 2013. Due to the incomplete holes and the technical difficulty with core recovery, the exploration program going forward will concentrate on drilling holes in virgin ground, stepping out from the existing workings and into the deeper part of the basin. Up to five holes are proposed for 2015. Potash beds CU, CL, and SYL are targeted at depths ranging from 100 to 1,400 m.

Mineral Resource Estimate

The Mineral Resource was estimated using a computer 3D gridded-seam geologic (block) model constructed with Mintec Inc. MineSight 3D© v9.0 software. Historical and modern data for the property were reviewed by the CPs for

Page 13 of 50

==> picture [123 x 47] intentionally omitted <==

Table A-4. Sierra del Perdón JORC Exploration Target

(effective date 17 March 2015)

Potash Beds Depth Range
(m)
Tonnage
(Mt)
Average K2O
(wt %)
Carnallite
100‒1,400
Sylvinite
Total
Same
100‒250
9‒13
50‒100
10‒14
150‒350
Notes:
m = meters, Mt = million tonnes.
Sylvinite is a mechanical mixture of sylvite (KCl) and halite (NaCl).
Carnallite refers to a mechanical mixture predominantly of carnallite
(KCl·MgCl2·6H2O) and halite (NaCl).
Target cutoffs: (a) bed true thickness ≥ 1.5m: grade cutoff ≥ 8.0%K2O, or (b) true
thickness < 1.5m:grade-thickness cutoff ≥ 12.0%K2O-m.
Carnallite occurs in up to two separate beds. Sylvinite occurs in one bed.
Approximately 50% of the carnallite target overlies historical mine workings in the sylvinite
bed.

quality and completeness. Data utilized in the model include historic drill hole logs, modern drill hole logs and core assays, historic and modern interpretations of 2D seismic surveys, surface topography in the form of a digital elevation model (DEM), permit boundary lines, historic mineral inventories, historic geological surface mapping, and historical mining records from the Potasas de Navarra and Potasas de Subiza mines which include plan view maps and elevation profiles.

Figure A-5 shows the surface topography, permit boundaries, seismic lines, and locations of the historic and modern exploration core holes applied to the Mineral Resource estimate. Hole SDP-009 was drilled outside of the deposit and was used for boundary definition. Difficult drilling conditions forced Hole SDP-002 to terminate prematurely without producing potash core for assay. SDP-002 was replaced by nearby SDP-006. SDP-006 produced core through the CU bed, but no core was recovered from the lower beds. SDP-005 drilled through a 2.7-m-high opening in the Subiza mine (SYL horizon). While potash was identified in the upper beds overlying the mining horizon and below the mining horizon, core recovery was incomplete in all beds and the core could not be used for assay. Complete core was recovered in SDP-004 and SDP-013. Composites from assays were calculated and used for resource modelling in all three potash beds in SDP-004 and SDP-013, and CU in SDP-006.

No historical holes were used directly for resource modelling because assay data were not available. However, lithology logs were available for a majority of historical holes. Holes showing potash were used in the interpretation of resource continuity. Historical mining was similarly used in the interpretation of resource continuity. Detailed mine maps and geologic profiles were available in the historical records. Maps and profiles were digitized and registered in the 3D computer model. Mapped areas deemed unmineable by historic miners due to faulting or bed thinning were relied upon and excluded from the resource.

Figures A-6 and A-7 describe the general 3D geometry of the block model including the base-of-salt surface and other major structural features. Figure A-8 illustrates the subsurface block model with overburden blocks overlying the evaporite.

Page 14 of 50

==> picture [123 x 47] intentionally omitted <==

==> picture [452 x 281] intentionally omitted <==

Figure A-5. Block Model Surface Topography, Seismic Lines and Drill Holes (plan view)

==> picture [452 x 281] intentionally omitted <==

Figure A-6. Block Model Cutaway Exposing Drill Holes and Base-of-Salt Surface (view to north-northeast)

Page 15 of 50

==> picture [123 x 47] intentionally omitted <==

==> picture [452 x 281] intentionally omitted <==

Figure A-7. Block Model Cutaway Showing Major Faults and Historical Mine Workings (view to northnorthwest)

==> picture [452 x 281] intentionally omitted <==

Figure A-8. Block Model Cutaway Exposing Subsurface Blocks (view to north-northwest)

Page 16 of 50

==> picture [123 x 47] intentionally omitted <==

The Mineral Resource is bound to the north and east by the evaporite outcrop at surface and is open at depth to the west. No potash resource is claimed 200–300 m downdip of the outcrop to account for abrupt upturning of the strata near outcrop and evaporite dissolution at surface. The resource is bound to the south by the basin margin as defined by structural interpretation, seismic surveying, and limited drilling.

Resource exclusions were applied around major faults, consistent with historic mining. Potasas de Navarra mined approximately 23 Mt of sylvinite in the SYL horizon, grading 13.8% K2O on average, between 1972 and 1985, with limited potash mined prior to 1972. Potasas de Navarra mined another 5 Mt of carnallite in the overlying CL horizon, grading 11.3% K2O on average, between 1972 and 1978. Operations shifted to Subiza in 1986 where approximately 14 Mt of sylvinite was mined in the sylvinite horizon, grading 14.5% K2O on average through 1997. A minimum 50-m buffer was applied around historical workings. The mining footprints plus buffer were excluded from the bed-specific resource.

Grade parameters were composited as length-weighted averages of the individual assays over a continuous bed thickness. In most instances, top and bottom bed contacts are gradational, introducing some trade-off between grade and thickness. Contacts were selected to maximize thickness while maintaining a composite grade as close as possible to 12.0% K2O with a true thickness equal to greater than 1.5 m. Depending upon the vertical grade distribution, bed thicknesses less than 1.5 m and composite grades less than 8.0% K2O were required for geologic modelling in some instances. Composite values for the drill holes used in the resource estimate are summarized in Table A-3.

Bed thicknesses were corrected to true thicknesses for modelling according to local dip and downhole deviation survey data. Structural dip was calculated from the base-of-salt surface constructed from seismic, outcrop, historic mine survey, and historic and modern drill hole data. Dips in individual beds were adjusted locally by stacking the variable-thickness interburden and potash beds above the base-of-salt surface.

Block true thicknesses and grade parameters (K2O, MgCl2, insolubles content) were interpolated/extrapolated utilizing an inverse distance squared (ID2) model. Block estimation was limited to an isotropic search radius of 20,000 m and the 15 closest data points (drill holes). Kriging was not attempted due to the limited number of composites available. Geostatistical modelling may be justified in the future with additional drilling.

The SdP Mineral Resource estimate is summarised by resource classification, permit area, and potash bed in Table A-5. The Mineral Resource represents a subset of the original Exploration Target. The Mineral Resource has an effective date of 23 March 2015.

The resource is based upon the following cutoffs which support reasonable prospects for economic extraction by conventional mining methods:

  • Bed true thickness ≥ 1.5 m: Cutoff is grade ≥ 8.0% K2O

  • Bed true thickness < 1.5 m: Cutoff is grade x thickness ≥ 12.0 %K2O-m

The grade-thickness cutoff maintains the equivalent of an 8.0% K2O grade at 1.5 m for thin beds (<1.5 m).

The resource is reported as in-place tonnes of potash contained in the respective potash beds. The potash can occur as either sylvinite or “carnallitite.” Sylvinite is a mechanical mixture of halite and sylvite (KCl) with minor inclusions of insolubles (typically clays). Carnallitite is a mechanical mixture of halite and carnallite (KCl·MgCl2·6H2O), with minor inclusions of insolubles. Beds CU and CL are dominantly carnallitic with minor sylvite, while SYL is dominantly sylvinitic with local occurrences of carnallite. The average weight percent of sylvinite and carnallite in the resource is reported by bed in Table A-5.

Page 17 of 50

==> picture [123 x 47] intentionally omitted <==

Table A-5. Sierra del Perdón JORC Mineral Resource Estimate

(effective date 22 March 2015)

Permit Area and
Potash Bed
Average
Bed
Thickness
(m)


Tonnes
In-Place
(Mt)


K2O
(wt %)

Carnallite
(KCl·MgCl2·6H2O)
(wt %)


Sylvite
(KCl)
(wt %)


Insolubles
(wt %)

In-Place
Bulk Density
(t/m3)
INDICATED
Adiós
Upper Carnallite
1.5
Lower Carnallite
-
Sylvinite
-
Quiñones
Upper Carnallite
1.7
Lower Carnallite
2.8
Sylvinite
2.5
5.5
8.8
41.9
2.6
12.0
1.93
-
-
-
-
-
-
-
-
-
-
-
-
11.0
9.0
50.1
1.1
12.7
1.89
18.0
10.9
47.3
4.6
9.0
1.90
7.3
14.6
1.3
22.7
11.1
2.12
All Permit Areas
Upper Carnallite
1.6
Lower Carnallite
2.8
Sylvinite
2.5
16.5
8.9
47.4
1.6
12.4
1.90
18.0
10.9
47.3
4.6
9.0
1.90
7.3
14.6
1.3
22.7
11.1
2.12
41.8
10.7
39.4
6.5
10.7
1.94
INFERRED
Adiós
Upper Carnallite
1.6
Lower Carnallite
3.1
Sylvinite
2.5
Quiñones
Upper Carnallite
1.7
Lower Carnallite
2.7
Sylvinite
2.1
12.6
8.9
43.7
2.3
12.3
1.92
3.2
11.3
46.6
5.3
9.1
1.90
2.9
14.4
1.3
22.4
11.0
2.12
6.1
9.0
49.8
0.9
12.6
1.89
10.0
10.6
48.0
3.9
9.0
1.90
5.6
13.4
1.3
20.8
10.4
2.12
All Permit Areas
Upper Carnallite
1.6
Lower Carnallite
2.8
Sylvinite
2.2
18.6
8.9
45.7
1.9
12.4
1.91
13.2
10.7
47.6
4.2
9.0
1.90
8.5
13.7
1.3
21.4
10.6
2.12
40.3
10.5
37.0
6.7
10.9
1.95

Notes:

Potash mineralization bulk density varies by carnallite, sylvite, halite, and insolubles fractions ranging from 1.6 to 2.2 t/m[3] . The resource estimate does not include any out-of-bed dilution. Resource cut offs: (a) true thickness ≥ 1.5m: grade cutoff ≥ 8.0%K2O, or (b) true thickness < 1.5m: grade-thickness cutoff ≥ 12.0%K2O-m.

Resource reduced by 15.0% allowance for unknown geologic anomalies within resource footprint. Indicated Resource—potash meeting cut off criteria located between 0m and 1,000m of a modern exploration core hole with assays, except where otherwise limited by geologic or mining boundaries. Inferred Resource—potash meeting cut off criteria located between 1,000m and 2,000m radius of a modern exploration core hole with assays or within 2,000m of an historical exploration core hole, except where otherwise limited by geologic or mining boundaries.

Page 18 of 50

==> picture [123 x 47] intentionally omitted <==

Tonnages are estimated using a variable in situ bulk density calculated for each model block based on the relative modelled fractions of sylvite, carnallite, halite, and insolubles. Depending upon the mineral fractions, densities can range from a low as 1.6 tonnes per cubic meter (t/m[3] ) for pure carnallite to 2.2 t/m[3] for insolubles only. The average bulk densities for the beds mostly fall between 1.90 and 2.15 t/m[3] .

Potash bed true thicknesses from the block model are illustrated in Figures A-9 through A-11 for CU, CL, and SYL, respectively. Composite K2O grade blocks are presented in Figures A-12 through A-14 for the corresponding beds. The figures show blocks out to 2,000 m from a drill hole with assays.

Underground room-and-pillar mining is the base case mining scenario for justifying reasonable prospects for eventual economic extraction. Room-and-pillar and longwall mining were historically practiced at Navarra and Subiza for 26 years. There is a reasonable expectation that potash outside the historic mining footprint can be accessed and extracted by selective room-and-pillar mining. Potash beds overlying the historical workings also have reasonable potential for economic extraction based on evidence that those beds remain mineable above the old workings. Industry experience in potash and salt has shown that mining is often possible in undermined beds, even with high extraction and thin interburden, due to the competent and highly plastic behaviour of potash and salt. The effects of thin interburden, multi-seam mining are identified as a key risk factor with potential to affect recovery and mining economy.

Carnallite also poses a risk because carnallite creeps (plastically deforms) at a substantially faster rate than salt or sylvinite and mining must be adapted to withstand relatively high entry closure rates. While there is extensive industry experience mining in salt or sylvinite, industry experience with conventional mining experience in carnallite is limited.

The 5 Mt of carnallite mined over seven years at Navarra demonstrates that carnallite mining is locally feasible and has reasonable potential in the future.

Considering these and other mining risks, the carnallite-sylvinite Mineral Resource is considered to have reasonable prospects for eventual economic extraction. However, this is a minimum standard and does not assure that the actual economics of extraction will prove sufficiently attractive for investment in current or future markets, depending upon the economic criteria of investors. The impacts of these and other risks on extraction economy are only quantifiable for a specific mine plan at the scoping, pre-feasibility, and/or feasibility study level.

The project is at an early exploration stage. Geologic uncertainty and the impacts of historical mining are principal risks. While historical mining, and drill hole and seismic data, substantiate bed continuity across the property, variations in potash thickness, grade, and mineralogy are expected. Faults, folds, wants, and other structural disturbances can sterilise resource locally. Known sterilised areas defined by historical mining and known structure were explicitly excluded from the resource estimate. An additional 15% of the resource tonnes were factored out of the estimate as an allowance for geologic and mining uncertainty within the resource footprint.

The radii-of-influence (ROI) used for the Mineral Resource classification reflect the interpreted degree of predictability (or conversely, variability) within the deposit. Resource classifications for the deposit are stated as follows:

  • Indicated Resource —Sylvinite meeting cutoff criteria located between 0 m and 1,000 m radius of a modern exploration core hole with assays, except where otherwise limited by geologic or mining boundaries.

  • Inferred Resource —Sylvinite meeting cutoff criteria located between 1,000 m and 2,000 m radius of a modern exploration core hole with assays, except where otherwise limited by geologic or mining boundaries.

No part of the resource is classified as Measured due to the limited number of reliable modern drill holes for characterization, their wide spacing, and the uncertainty surrounding the impacts of historical mining on future

Page 19 of 50

==> picture [123 x 47] intentionally omitted <==

==> picture [452 x 283] intentionally omitted <==

Figure A-9. Block Model Bed True Thickness—Bed CU (plan view)

==> picture [452 x 283] intentionally omitted <==

Figure A-10. Block Model Bed True Thickness—Bed CL (plan view)

Page 20 of 50

==> picture [123 x 47] intentionally omitted <==

==> picture [452 x 283] intentionally omitted <==

Figure A-11. Block Model Bed True Thickness—Bed SYL (plan view)

==> picture [452 x 283] intentionally omitted <==

Figure A-12. Block Model Bed Composite K2O Grade—Bed CU (plan view)

Page 21 of 50

==> picture [123 x 47] intentionally omitted <==

recovery methods (a Modifying Factor). Mineral Resource classification areas identified in Table A-5 are shown in Figures A-15 through A-17 for the respective potash beds.

The criteria on which the mineral resource was based are summarized in Table A-6 “JORC Checklist of Assessment and Reporting Criteria.”

The reader is cautioned that a Mineral Resource is an estimate only and not a precise and completely accurate calculation, being dependent on the interpretation of limited information on the location, shape, and continuity of the occurrence and on the available sampling results. Actual mineralisation can be more or less than estimated depending upon actual geological conditions.

The Mineral Resource statement includes Inferred Mineral Resources. There is a low level of geological confidence associated with Inferred Mineral Resources and there can be no certainty that further exploration work will result in the determination of Indicated or Measured Mineral Resources. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. No Mineral Reserves are being stated.

References

Barcelona POSUSA, (1987). “Recursos Minerales Reservas ‘Javier-Los Pintano’ y ‘Monreal,’”. Internal document .

Busson, G. and B. C. Schreiber (Eds.) (1997). Sedimentary Deposition in Rift and Foreland Basins in France and Spain (Paleogene and Lower Neogene) . Columbia University Press, 480 pp.

Del Valle, J. (1978). Mapa geologico de Espana, E 1:50,000 2. Ser. 1[st] ed, Hojo norte 141, Pamplona, y Memoria Explicativa. IGME Serv. Pub. Min. Ind.

e.n. adaro (1965). Investigacion de Potasas en la zona Subpirenaica, informe para Potasas de Subiza S.A, Departamento de Yacimientos Sedimentarios (internal document).

e.n. adaro (1970). Resumen del resultado de los sondeos Perforados para Investigar Potasas. Anexo 2.

e.n. adaro (1985a). Proyecto de Investigacion del borde oeste del yacimiento del Perdon—Tomo I. Informe de resultados.

e.n. adaro (1985b). Proyecto de Investigacion del borde oeste del yacimiento del Perdon—Tomo III. Estudio petrologico, mineralogico, geoquimico.

e.n. adaro (1988–1991). Investigación y Evaluación de Mineral en el Area de Javier-Los Pintano Memoria, informe para Potasas de Subiza S.A, Departamento de Yacimientos Sedimentarios (internal document).

Garrett, D. E. (1996). Potash Deposits, Processing, Properties and Uses . London: Chapman & Hall.

Geoalcali S.L. (2012). “Navarra-Aragón Basin Potash Deposits Assessment Spain.” Internal document.

Highfield Resources (2013). “Highfield Resources Delivers Maiden Inferred JORC Resource of 163.2 Mt of Sylvinite at Javier.” ASX press release, 08 October, 6 pp.

Instituto Tecnologico Geominero de España (ITGE) (1987). National Inventory Potash Resources.

Page 22 of 50

==> picture [123 x 47] intentionally omitted <==

==> picture [452 x 283] intentionally omitted <==

Figure A-13. Block Model Bed Composite K2O Grade—Bed CL (plan view)

==> picture [452 x 283] intentionally omitted <==

Figure A-14. Block Model Bed Composite K2O Grade—Bed SYL (plan view)

Page 23 of 50

==> picture [123 x 47] intentionally omitted <==

==> picture [452 x 283] intentionally omitted <==

Figure A-15. Mineral Resource Areas—Bed CU (plan view)

==> picture [452 x 282] intentionally omitted <==

Figure A-16. Mineral Resource Areas—Bed CL (plan view)

Page 24 of 50

==> picture [123 x 47] intentionally omitted <==

==> picture [452 x 282] intentionally omitted <==

Figure A-17. Mineral Resource Areas—Bed SYL (plan view)

International Plant Nutrition Institute (2014). http://www.ipni.net/publication/nss.nsf/0/8FBD66599EAB433F85257 9AF00741710/$FILE/NSS-03%20Potassi umChloride.pdf. Website assessed by V. Santos, 5 May.

Joint Ore Reserves Committee (JORC) (2012). “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.” Effective 20 December 2012 and mandatory from 01 December 2013, 44 pp.

Mayoral, Gonzálo (2013). “Sierra del Perdón Potash Deposit.” Internal Geoalcali memo.

Menendez, N. (1971). Geologia. Complement al estudio geologico de nuetro yacimiento de diciembre de 1970. Nociones generals previas. / Geologia (II Parte). Mineralogia del yacimeinto del Perdon (supplement al estudio geologica de enero de 1971) Potasas de Navarra, SA Informe interno.

Moore, P. (2012). “Potash from Iberia.” Retrieved January 2013 from Info Mine: http://www.infomine. com/library/publications/docs/InternationalMining/Moore2012u.pdf, June, accessed by V.Santos.

Ortiz, L. R. and F. R. Cabo (1981). “The Saline (Potash) Formation of the Navarra Basin (Upper Eocene, Spain).” Petrology, Revista del Instituto de Investigaciones Geologicas Diputacion Provincial . Universiad de Barcelona, Voy 35-1981/82, pp. 72–121.

Orti Cabo, F., L. Rosell Ortiz, and J. J. L. y Pueyo Mur (1984). “Cuenca Evapor. (Potásica) Surpir. del Eoc. sup. Aportac. para una Interpr. Deposic. Libro Homenaje a L. Sánchez de la Torre.” Publicaciones de Geología , nº 20. Universitat Autónoma de Barcelona, pp. 209–231.

Page 25 of 50

==> picture [123 x 47] intentionally omitted <==

Orti, F., J. M. Salvany, L. Rosell, J. J. Pueyo, and M. Inglés (1986). “Evaporitas Antiguas (Navarra) y Actuales (Los Monegros) de la Cuenca del Ebro.” Guia de las Excursiones del XI Congreso Español de Sedimentología /

Stirrett, T. and K. Mayes (2013). “JORC Mineral Resource Estimate of the Javier-Pintano Project Area, Spain.” Internal report prepared for Highfield Resources Ltd., 25 April.

University of Michigan (2004). “Geologic Map of the Pyrenees.” From http://www-personal.umich.edu /~jmpares/ Pyrenees-Trip.html accessed by V. Santos, October 2014.

Page 26 of 50

==> picture [123 x 47] intentionally omitted <==

Table A-6. JORC Checklist of Assessment and Reporting Criteria

Section 1 Sampling Techniques and Data

Criteria **JORC Code explanation ** **JORC Code explanation ** Commentary Commentary
Sampling Nature and quality of sampling (e.g. cut The Sierra del Perdón Potash Project (the “Project”) represents the westernmost
techniques channels, random chips, or specific specialised potash deposit of the Navarre Basin. Twenty-five holes (Table A-1) were drilled
industry standard measurement tools appropriate and cored with the deposit area with additional holes drilled as part of a regional
to the minerals under investigation, such as down exploration program. The date and methodology of these holes is uncertain, most
hole gamma sondes, or handheld XRF likely they were drilled in the 1950s. In most cases, there are lithology logs for the
instruments, etc.). These examples should not be historic holes and their use in the resource is limited largely to structural
taken as limiting the broad meaning of sampling. information.
Include reference to measures taken to ensure Six new holes (see Table A-3) have been drilled and cored since 2013 by
sample representivity and the appropriate Geoalcali Sociedad Limitada (Geoalcali). One hole (SDP-009) was barren and
calibration of any measurement tools or systems interpreted to be outside of the main basin. SDP-002 drilled into old workings in
used. the Guendulain area, was incomplete, and showed poor core recovery and drilling
Aspects of the determination of mineralisation only to what is thought to be carnallite upper (CU). One hole (SDP-006) in the
that are Material to the Public Report. same area was incomplete and drilled to the top of the mined-out sylvinite. One
In cases where ‘industry standard’ work has been hole (SDP-005) also drilled through what is interpreted to include the mined-out
done this would be relatively simple (e.g. ‘reverse portion of the sylvinite section; it exhibits poor recovery and dissolution of the
circulation drilling was used to obtain 1 m core. SDP-004 and SDP-013 are the only truly complete holes used in this
samples from which 3 kg was pulverised to resource; both show core recovery at greater than 99% through the mineralized
produce a 30 g charge for fire assay’). In other zone. These holes have detailed logs and assay but not downhole geophysical
cases more explanation may be required, such records.
as where there is coarse gold that has inherent Additional drilling is recommended in the Sierra del Perdón property. Planned drill
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
hole locations are found in Table A-3 and shown in Figure 1. Geoalcali is a 100%
owned Spanish subsidiary of Highfield Resources (Highfield or the “Company”).
The historical drilling program resulted in compiled reports which are referenced in
the Appendix. In general, the historical programs were well-documented but
lacking in detailed explanation of assay work or procedure.
The new drill holes have been geologically logged, photographed, and assayed.
Some of the holes were geophysically logged through the mineralised zone.
Following logging and photographing, samples are marked and numbered for
assay.Coreis sawedwith hydraulic oilasthelubricating agent;half-coreis

Page 27 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria **JORC Code explanation ** **JORC Code explanation ** Commentary Commentary
retained and shrink-wrapped, and samples to be assayed are bagged and
secured with plastic ties and boxed for shipping to ALS Global (ALS) for crushing,
grinding and splitting. Cored samples are assayed by inductively coupled plasma-
optical emission spectrometry (ICP-OES) and X-ray fluorescence (XRF) by ALS.
Sample preparation is in Seville, Spain and assay work is completed in Loughrea,
County Galway, Ireland. ALS has a documented methodology and quality
assurance/quality control (QA/QC) protocol.
Geophysical logs are available for SDP-004, SDP-006, and SDP-009. No
geophysical logs are available for the 25 historical holes.
Drilling Drill type (e.g., core, reverse circulation, open- Drilling and coring procedures for the historical Sierra del Perdón holes are
techniques hole hammer, rotary air blast, auger, Bangka, unknown.
sonic, etc.) and details (e.g., core diameter, triple
or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
The deposit was discovered in 1929 based on the assay of brines sourced from
Guendulain springs area, 5.5 km southwest of Pamplona City. On June 23, 1929,
the first drill hole completed intersected 9 m at 13.92% K2O to 78 m deep.
Additional regional exploration was begun in Navarre, first by the Spanish
government with five holes across the area; one each in Pamplona, Subiza,
Guendulain, Javier and Tafalla. This was followed by more detailed work in the
Sierra del Perdón area beginning with e.n. adaro (drill holes 1 through 21, Table
A-1) , probably conducted in the 1950s, and then by Potassa de Navarra, SA (drill
holes 22 through 25). Additional regional exploration by e.n. adaro and Potasas
de Navarra, SA tested the outer extents from the main Basin in Iborgoiti,
Celigueta, Sengariz, Lecaun and into Aragon.
In 2013, a drilling program was initiated in Sierra del Perdón. Holes were drilled
open hole to core point for SDP-013 (151.0 m), SDP-006 (95.5 m), SDP-05
(107.0 m) and from surface for SDP-009, SDP-004 and SDP-002. The tricone bit
used for open-hole drilling was reduced through stages from 12¼-inch to 5⅞-inch
diameter. Upon completion, the hole was abandoned and cemented through the
8½-inch diameter drill hole. When the top of salt is reached, the mud is re-
formulated to a super-saturated brine to eliminate or diminish dissolution of the
highly soluble evaporite minerals. Drilling has been contracted to Geonor
Servicios Tecnicos S.L. of Galicia, Spain using a Christensen CS3000.

Page 28 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria **JORC Code explanation ** **JORC Code explanation ** Commentary Commentary
Drill sample Method of recording and assessing core and chip
Detailed information on core recovery for the historical program is not available
recovery sample recoveries and results assessed. and limited assay data is available and not used in this resource evaluation.
Measures taken to maximise sample recovery Core recovery on the 2013 drilling campaign was poor in three holes (SDP-002,
and ensure representative nature of the samples. SDP-005 and SDP-006) through the mineralized zones with intervals of lost,
Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
dissolved and mechanically disturbed intervals. The holes drilled into historic
workings and core recovery was compromised above the open workings where
circulation was initially lost and not recovered through the mined-out void or
below.
PQ core is the recommended diameter for core but in some instances, the hole is
completed with HQ if there are drilling problems such as lost circulation and there
is a need to case the hole and drop down in diameter size. SDP-005 and SDP-
013 had HQ core. The core sampling procedure is well-documented in the 2013–
2014 drilling program.
Holes were drilled with NaCl and MgCl2saturated brine or near saturated brine to
limit surficial dissolution (i.e., etching) of the core. Undersaturation could result in
preferential dissolution of NaCl, KCl, and/or MgCl2. Core was visually inspected
for etching and rejected for assay where excessive etching was observed.
Logging Whether core and chip samples have been Lithology logs were completed for the historical drilling programs and results were
geologically and geotechnically logged to a level described in the reporting for reserves at that time.
of detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.

In the modern program, cuttings were collected and core was logged,
photographed, sampled, and assayed in approximately 0.3-m lengths. The core
point, if not at the surface, was generally within the banded marls above the salt
Whether logging is qualitative or quantitative in and was completed at the base of the salt at the anhydrite marker bed to ensure
nature. Core (or costean, channel, etc.) complete coring through the salts and the mineralised zones.
photography.
The total length and percentage of the relevant
intersections logged.
Sub-sampling If core, whether cut or sawn and whether quarter,
On the 2013 drilling campaign core holes, samples were halved and quartered,
techniques half or all core taken. with a quarter sent for assay. This sampling methodology is the modern industry
and sample standard. The sample intervals of approximately 0.3-m in length were taken over
preparation thelengthof themineralisedinterval.Coreswere usuallyPQ (85millimeter

Page 29 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria **JORC Code explanation ** **JORC Code explanation ** Commentary Commentary
If non-core, whether riffled, tube sampled, rotary [mm]), but in the case of difficult drilling conditions, coring was reduced to HQ
split, etc. and whether sampled wet or dry. (63.5 mm).
This smaller core diameter is not ideal for assay as some duplicates have shown
For all sample types, the nature, quality and variability. To try to mitigate this, duplicates are selected from HQ as true
appropriateness of the sample preparation duplicates rather than on a quarter-core sample. Quarter sample duplicates are
technique. selected for PQ core. In all cases, hole size was reduced to continue drilling in
Quality control procedures adopted for all sub-
sampling stages to maximise representivity of
samples.
difficult hole conditions (lost circulation or kick-off) and is not part of normal
procedure. The program forward has made procedural changes to reduce the risk
of the need to downsize hole diameter.
Measures taken to ensure that the sampling is
representative of the in situ material collected,
including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of The nature, quality and appropriateness of the No detailed original assays are available for the historic drilling program.
assay data
and laboratory
tests


assaying and laboratory procedures used and
whether the technique is considered partial or
total.
For geophysical tools, spectrometers, handheld
XRF instruments, etc., the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external



In the 2013 sampling program, assay was by ICP-OES and XRF.
Highfield and ALS, the primary contract laboratory, maintained quality control
procedures of standards, duplicates and blanks. SRM, blanks and duplicates
were inserted, both by Highfield personnel during sample preparation and by ALS
as part of their own QA/QC program.
ALS inserted commercial standards BCR-113 and BCR-114 both potash fertilizer
materials, a Muriate of Potash (MOP) and Sulfate of Potash (SOP), respectively,
as well as their own internal standard as a blank material SY-4, a diorite gneiss.
Duplicates were submitted to ALS and show good internal agreement.
laboratory checks) and whether acceptable levels
Highfield made multiple Standard or Certified Reference Material-type (SRM or
of accuracy (i.e. lack of bias) and precision have CRM) samples representing low-, medium-, and high-grade (LG, MG, HG) potash
been established. material, but the insertion rate is insufficient and outside round-robin testing is too
limited to make reasonable conclusions as to accuracy and precision. Insertion
rate is one blank, one SRM, and one lab duplicate per 20 samples or batch.

Page 30 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary Commentary
Check samples were tested at SRC. In general, SRC reports K2O values lower
than ALS reports. Because ALS and SRC show good internal agreement, this
suggests a calibration issue.
Verification of The verification of significant intersections by ALS assayed samples both by ICP and XRF. In general, ICP analysis shows
sampling and either independent or alternative company adequate agreement with assays by XRF, which consistently report slightly higher
assaying personnel. values of K2O. Other holes showed similar bias, thereby substantiating testing
The use of twinned holes. precision. The ICP method is the base method used for resource estimation.

Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data.
Highfield receives all assay data in .xls or .csv format from the laboratories and
one person is responsible for transferring those data into a master database and
maintaining the QA/QC monitoring. AAI independently graphed the QA/QC data
and reports outliers to Geoalcali for re-assay. Detailed graphs are constructed
showing check samples, duplicated comparisons of duplicates for pulps, coarse
rejects, as well as SRM and blank insertions.
A database was built from the historical drill hole information by Highfield and
checked by AAI against the historical reporting of assays and intervals listed on
the lithologic logs.
The master database was checked against the ALS-issued Certificates of
Analysis (COA).
Location of Accuracy and quality of surveys used to locate Historical collar locations were generated from detailed comparison so the historic
data points drill holes (collar and down-hole surveys), maps. Historical data and maps are referenced to the European Datum 50
trenches, mine workings and other locations (ED50) and have been updated to the European Terrestrial Reference System
used in Mineral Resource estimation. 1989 (ETRS89) datum for compatibility with modern survey information.
Specification of the grid system used. All new locations from the 2013 drilling program are surveyed before and after
Quality and adequacy of topographic control. drilling by a licensed surveyor.
Data spacing Data spacing for reporting of Exploration Results.
Exploration drill hole spacing is illustrated on the scaled maps in Figures A-2 and
and
distribution
Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the Mineral
A-4 and samples have been composited (Table A-3) over the thickness of
identified potash beds for the reporting of exploration results. Potash bed names
are provisional pending regional correlations.
Resource and Ore Reserve estimation
procedure(s) and classifications applied.

Page 31 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria **JORC Code explanation ** **JORC Code explanation ** Commentary Commentary
Whether sample compositing has been applied. Data spacing and distribution is poor. Of six holes drilled in the modern 2013
campaign, only two holes had sufficient recovery in the mineralised zone to
contribute to this resource. One hole was barren, representing the basin edge.
Orientation of Whether the orientation of sampling achieves Deviation data were available in the 2013 drilling program. In building the new
data in unbiased sampling of possible structures and the database, apparent bed dips from the lithology logs were incorporated from
relation to extent to which this is known, considering the historical and new holes to attempt to correct to true bed thickness.
geological
structure
deposit type.
If the relationship between the drilling orientation
The regional structure is discussed in more detail in “Geology”, but the basin
structural dip is interpreted from regional maps, the Compagnie Generale de
and the orientation of key mineralised structures Geophysique (CGG) “top of salt” map, and new drill hole control. The deposit is
is considered to have introduced a sampling bias, bedded.
this should be assessed and reported if material. A historical structure map with fault offsets (Figure A-2) is used for the
interpretation of bed orientation and is modified and corrected to reflect updated
drill holes. That discussion is found in “Seismic Survey and Structure.”
Sample The measures taken to ensure sample security. In the 2013 drilling program, Highfield personnel maintained effective chain of
security custody procedures for the samples. Core was picked up at the drill site and
brought to the secured warehouse for detailed logging and sampling. Following
sampling (see sections on sampling herein), sample bags and boxes were
secured with zip ties for shipping to the laboratory.
Audits or The results of any audits or reviews of sampling ALS assayed samples both by ICP and XRF and these values were compared as
reviews techniques and data. discussed in “Verification of sampling and assaying data.”

Page 32 of 50

==> picture [123 x 47] intentionally omitted <==

Section 2 Reporting of Exploration Results

Section 2 Reporting of Exploration Results Section 2 Reporting of Exploration Results Section 2 Reporting of Exploration Results
(Criterialistedin the preceding sectionalso applytothis section.)
Criteria JORC Code explanation
Mineral Type, reference name/number, location and
tenement and ownership including agreements or material
land tenure
status
issues with third parties such as joint ventures,
partnerships, overriding royalties, native title
interests, historical sites, wilderness or national
park and environmental settings.
The security of the tenure held at the time of
reporting along with any known impediments to
obtaining a license to operate in the area.
  • Commentary  Property descriptions and land status were obtained from the list of lands as set forth in the documents provided by Highfield.

  • The Sierra de Perdón property is comprised of two Investigative Permits (PIs) and one extension permits converted to a PI (Table 3 and Figure 1). These PIs have a surface area of 14,898 hectares and cover 100% of the deposit of Sierra del Perdón and any potential areas of exploration.

  • The competent persons (CPs) have reviewed the mineral tenure from documents provided by Highfield including permitting requirements, but have not independently verified the permitting status, legal status, ownership of the project area, underlying property agreements or permits. Therefore, AAI has fully relied upon Highfield, and disclaims responsibility for that information.

  • Exploration and exploitation of mineral deposits and other geological resources in Spain are governed by the Mining Law 22/1973, which is further governed by the Royal Decree 2857/1978. All sub-surface geological structures, rocks, and minerals are considered the property of the public domain and are categorised into four sections under Spanish law (A, B, C, and D), and must have mining authority authorisation and supervision for commercial exploitation. Section C covers the minerals of interest for Highfield, and a mining concession would need to be awarded prior to exploitation which requires the accompaniment of environmental permits and municipal licenses (electrical, water etc.). Generally, exploration and investigation permits are applied for prior to applying for a mining concession (not a legal obligation), and are aimed at determining the mineral resource potential of the area through exploration practices (drilling, seismic, sampling. etc.). These are granted through the region’s government/mining authority where the exploration or investigative work will take place.

  • Exploration permits (PE) are valid for one year and can be renewed for one additional year. A PE allows only non-intrusive investigation, which is defined by the various Spanish regions and can vary.

  • A PI is good for up to three years and renewable in three-year terms or longer depending on the scope of the intended work. Investigation permits carry with

Page 33 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria
**JORC Code explanation **
Commentary
them municipal approval as they are publically released for community
discussion. To carry out work under the investigation permit, the permittee must
contract with the individual landowners to allow for access and occupation of the
land during the exploration.

In order for both types of permits to remain valid, the applicable taxes must be
paid and the permittee must comply with the applicable regulations and
exploration plan approved by the mining authority. Investigation permits require
assessment reporting which requires the permittee to submit working plans,
budgets, and initiate work within certain time allotments. Exploration and
investigation permits can be transferred in whole or in part to other third parties
with enough technical and financial backing, but must be authorised by the
proper mining authorities in Spain.
Exploration
done by other
parties

Acknowledgment and appraisal of exploration by
other parties.

Potash was first discovered in the Ebro Basin in the Catalonia area in 1912 at
Suria after the potash discoveries in Germany (Moore 2012). Salt was first
discovered through drilling, later followed by four economic potash mining zones
with a combined total thickness of 2.0 to 8.0 m (Stirrett and Mayes 2013). The
potash horizons in the area were identified to cover approximately 160 square
kilometers (km2) at depths of approximately 500 m subsurface, unless they were
brought closer to surface by anticlinal or tectonic structures (Stirrett and Mayes
2013). Several deposits were located in the Catalonia area, including Cardona,
Suria, Fodina, Balsareny, Sallent, and Manresa. Several of these areas were
developed into mines and are all flanked by anticlinal structures. The potash
deposits in the Navarre region were not located until later, in 1927, through
comparative studies to the deposits found at Catalonia (Stirrett and Mayes 2013).
The exploration efforts later led to the development of a mine near Pamplona and
Beriain.

The Sierra del Perdón Potash Project represents the westernmost potash deposit
of Navarre basin. The deposit was discovered in 1929 based on the assay of
brines sourced from Guendulain springs area, 5.5 km southwest of Pamplona
City. On June 23, 1929, the first drill hole completed intersected 9 m at 13.92%
K2O to 78-m deep. Additional regional exploration was begun in Navarre, first by
the Spanishgovernment with five holes across the area;one each in Pamplona,

Page 34 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary Commentary
Subiza, Guendulain, Javier and Tafalla. This was followed by more detailed work
in the Sierra del Perdón area beginning with e.n. adaro (drill holes 1 through 21),
probably conducted in the 1950s, and then by Potassa de Navarra, SA (drill holes
22 to 25) [Table A-1].
Production at Pamplona began in 1963 with a capacity of 250,000 tonnes per
year (tpy) of K2O. A thick carnallite member overlies the sylvinite, so in 1970 a
refinery with the capacity for 300,000 tpy was built to accommodate carnallite
from the Esparza (Stirrett and Mayes 2013). Carnallite mining was ceased in
1977. Inclined ramps for the mine were located near Esparza, reaching the
centre of the mine, with further shafts located at Beriain, Guendulain and
Undiano. In 1982, 2.2 Mt of sylvinite were extracted with an average K2O grade
of 11.7% (Stirrett and Mayes 2013). The operations in Navarre were closed in
the late 1990s.
In 1983, a 2D seismic survey was run for e.n. adaro by CGG over the Sierra del
Perdón property (e.n. adaro 1985a and b). This consisted of 22 lines totalling
111 km (Figure A-4). Earlier work included a seismic campaign in 1963 and a
minie-sosie (shallow seismic using a vibration-rammer source) campaign in 1979
and a vibrosesimic program by Otono in 1981. The resulting structure maps for
both the top (“techo”) of salt (base of Marl), with major faults, were developed by
CGG in combination with the regional seismic records, field maps, satellite
imagery and drill hole data. Additional surfaces identified at that time include the
unconformity at the Miocene conglomerates, the base of the Galar Sandstone
and the resulting isopachs. In addition, early work identified an area of possible
erosion in the upper salt along the interpreted anticline. The potash-bearing
zones lack any velocity/density contrasts within the salt; it is not possible to
detect potash or map the structure of the zone directly
Geology Deposit type, geological setting and style of The Upper Eocene potash deposits occur in the sub-basins of Navarre and
mineralisation. Aragón provinces within the larger Ebro Basin (Figure A-1). The Navarrese sub-
basins include Sierra del Perdón, Muga-Vipasca (Javier) and adjoining Pintano
deposits. This potash deposit contains a 100-m-thick Upper Eocene succession
of alternating claystone and evaporites (anhydrite, halite, and sylvite). The
evaporites accumulated in the elongated basin at the southern foreland of the

Page 35 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria
**JORC Code explanation **
Commentary
Pyrenean range (Busson and Schreiber 1997). The evaporites overlie marine
deposits and conclude in a transitional marine to non-marine environment with
terrigenous influence. Open marine conditions existed in the Eocene-Oligocene
epochs progressing to a more restricted environment dominated by evaporation
and the deposition of marl, gypsum, halite, and potassium minerals. Later,
tectonism and resulting salt deformations formed broad anticlines, synclines and
overturned beds, which created outcrops of the evaporite sequence. The Sierra
del Perdón sub-basin is notably different from the eastern Javier Pintano basins,
with predominantly carnallite mineralisation overlying sylvinite, suggesting a more
immature diagenesis because carnallite is considered primary and sylvinite
secondary. The formation of the evaporites is further influenced by the basin
restriction, and paleo highs and lows which are perhaps defined by block faulting
as well as the main structural basin bounds.

The different basins are separated by orogenic events developing in the north
and south as turbidite basin carbonate platforms. Towards the end of the Eocene
epoch, the sedimentation axis migrated south to the Jaca-Pamplona Basin, on
which the Oligocene materials were deposited. The pre-evaporitic basin
sedimentation occurs in a context of continuous tectonic compression during the
Eocene and Oligocene epochs, as synsedimentary tectonics of the end of the
orogeny, with pronounced sediment influx. The influence of the turbidites
towards the end of the Eocene epoch in the Bartoniense series from the
northwest into the basin as the Belsue Formation is indicative of continued
subsidence.

At the east end of the basin, the evaporite levels crop out, and the evaporites are
largely dissolved, exhibiting the remnants of the upper banded clays which
unconformably overlie the Pamplona Marls. In some cases they are altered to
gypsum and fibrous halites. The evaporites are part of a synclinal structure with
the main axis plunging to the west. The syncline is compartmented in 3 sub-
blocks which are separated by faults. The northern edge of the syncline is
usually affected by the erosion with an inclination towards the south. The deposit
has a gentle slope of 12 degrees (º), with a depth from between 60 and 70 m
(elevation +700m)to1,100m(elevation –400m)inanorth-southextensionof5

Page 36 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria
**JORC Code explanation **
Commentary
to 6 km. Oligio-Miocene conglomerates unconformably overlie the southern
flank.

The Sierra del Perdón basin is dominated by the SW-NE fault system named,
from the south to the north, Falla (fault) de Subiza and Falla de Esparza, with
several unnamed but numbered faults in between the major ones (Figure A-2).
The faults are pre-evaporitic and therefore have influenced deposition within the
basin and driven the historic mine advance. The faulted blocks are uplifted in the
north (Falla Esparza) and the SE (Falla Subiza) and downdropped in the center
which represents the depocenter.

Displacement along Esparza is approximately 300 m and between 600 and
800 m in Subiza (Menendez 1971; del Valle 1978). The area has been separated
into mining blocks, Guendulain, Beriain, Subiza and Uniano. (An additional area
lies between the major fault and represents the basin’s synclinal axis that has not
been mined because it plunges and deepens. No drill holes have penetrated the
salts so the depth of syncline is interpreted through historic seismic records. This
area may also represent an offset similar to what is seen in the east, the Flexura
de Ruesta that divides the Javier and Pintano sub-basin. [Empresa Nacional
Adaro Investigaciones Mineras {e.n. adaro} 1988–1991]). An anticline interpreted
from the historic seismic records crosses the basin NW-SE and may define an
area where the upper salt has been eroded.

Potash is used to describe any number of potassium salts. By and large, the
predominant economic potash is sylvite: potassium chloride (KCl) usually
occurring mixed with halite to form the rock sylvinite, which may have a
potassium oxide (K2O) content of up to 63%. Carnallite, a potassium magnesium
chloride (KCl•MgCl2•6H2O) is also abundant, but has K2O content only as high as
17%. “Carnallite” is used to refer to the mineral and the rock interchangeably,
although “carnallitite” is the more correct terminology for the carnallite and halite
mixture. Besides being a source of lower grade potassium, carnallite involves a
more complex production process, so it is less economically attractive than is
sylvite.

The depositional environment is that of a restricted marine basin, influenced by
eustasy,sea floor subsidence,and/or uplift and sediment input. It is suggested

Page 37 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria
**JORC Code explanation **
Commentary
that the Ebro Basin is the result of a combination of reflux and drawdown. Reflux
describes a basin isolated from open marine conditions, and thereby
characterised by restricted inflow, increased density, and increased salinity.
Drawdown is the result of simple evaporation in an isolated basin, and brine
concentration and precipitation, consistent with the classic “bulls-eye” model
(Garrett 1996). In this case, the Ebro Basin is further influenced by erosion at its
edges due to contemporaneous and post-depositional uplift which results in
localised shallowing and sediment influx (Ortiz and Cabo 1981) ) transitioning
from marine to continental-type deposits. In the classic “bulls-eye” model, a basin
that is cut off from open marine conditions will experience drawdown by
evaporation in an arid to semi-arid environment. In the absence of sediment
influx, precipitation will proceed from limestone to dolomite to gypsum, and
anhydrite to halite. Depending on the composition and influences of the brine at
that time, the remaining potassium, magnesium, sulfates, and chlorides will
progress from potassium and magnesium sulfates to sylvite and then carnallite.
It is proposed herein that the formation of carnallite and sylvite be described as
primary and secondary, respectively.

In the Sierra del Perdón Potash Project area, the mineralogy is dominated by
carnallite over sylvinite, which is medium red-orange and white, largely coarse
crystalline in bands and in heavily brecciated beds containing high levels of
insoluble material, largely fine-grained clays, anhydrite, and marl. The alternation
from carnallite to sylvinite is not always complete and may vary from one bed to
the next but it always occurs in the lower part of the sequence. The upper potash
beds transition to finely banded light brown marls and clays which may exhibit
salt veining and distortion as well as influx of dark grey clays and mudstones,
representing the transition of the basin from marine to continental via basin-filling.
The salts just below the potash tend to be dark grey to black. In some lower
beds, halite becomes brownish, sandy to coarsely granular sand and sandstone
as sediment influx from the Basin edges. The literature denotes this salt as “sal
vieja” or “old salt” (Ortiz and Cabo 1981). The evaporite beds and bands, in
general, are separated by fine to very coarse crystallised and recrystallised salts,
generally grey, sometimes light-to-medium honey brown or white, with anhydrite
blebs, nodules, and clasts.

Page 38 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary Commentary
Drill hole A summary of all information material to the Table A-1 shows the historical drill holes and Table A-3 shows the drill holes from
information understanding of the exploration results including the 2013 drilling program as well as wells proposed for the continued evaluation
a tabulation of the following information for all for the Project. This press release includes some picks that are preliminary.
Material drill holes: SDP-013 lies in the eastern portion of the basin in an area not previously mined.
o easting and northing of the drill hole collar It shows a similar lithologic sequence to the potash in Muga-Vipasca with the
o elevation or RL (Reduced Level— exception that the mineralogy is predominantly carnallite rather than sylvinite,
elevation above sea level in metres) of the over relatively thin, dark halite, and banded anhydrite at the base. The basal salt
drill hole collar over the banded anhydrite and lower marls is medium to dark grey and only
o dip and azimuth of the hole
o down hole length and interception depth
4.8 m thick. SYL is found in a 0.9-m layer (depth 521.3 m), 1.8 m below CL. CU
is of relatively low grade, with an average of 8.2% K2O and 1.3 m thick. The
banded marls above the carnallite show considerable distortion which may be
o hole length. attributable to localised faulting or mass sediment slumping and salt veining,
If the exclusion of this information is justified on
the basis that the information is not Material and
although they normally transition upwards and are capped by dark grey clays,
likely representing sediment from the basin edge.
this exclusion does not detract from the SDP-009 defines the eastern extent of the basin and shows a foreshortened
understanding of the report, the Competent sequence in which the salt is thin (<2 m) and dissolved, exhibiting a spongey
Person should clearly explain why this is the case. texture of the original insolubles over a thin banded anhydrite with a bed of dark
mudstone. The remnant salt is capped by alternating beds of banded and
deformed, black and oxidized, light reddish brown and tan mudstones,
suggesting the transition at the basin’s edge to a continental-type environment.
The hole is shallow and was drilled to a depth of about 86.5 m to the top of the
anhydrite. To help define the edge of evaporites, the logs for historic drill holes 8
and 10 were reviewed and both show complete sequences of carnallite and
sylvinite mineralization with 8 reporting steep dips of 80°. As in SDP-013,
alteration of carnallite to sylvinite is incomplete as sylvinite is found in what is
interpreted to be CU, and again at the base of the potash bed.
SDP-006 is incomplete due to lost circulation in the mineralised zone below CU.
The hole penetrated CU over 3.6 m carnallite at average 6.3% K2O. Below CU,
core recovery was poor, hence, this hole was not be used in the resource
estimation. This hole is excluded from the resource due to poor core recovery
including below 205.7 m and complete loss after 213.5 m. This hole was drilled
in the old workings in the Guendulain area in the northernportion of the deposit

Page 39 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria JORC Code explanation Commentary Commentary
and even though it was planned as an unmined block, it likely drilled into an area
where the lower sylvinite was mined out. The closest historical hole is 2 which
only reports “normal” conditions in the deposit which might be interpreted as a
complete section of carnallite over sylvinite. In this area, both carnallite and
sylvinite were mined and it is interpreted in this and other holes that the targeted
beds were just below CU with the lowermost beds being sylvinite in most cases.
SDP-005 was drilled within the old workings of the Subiza mine south of the main
Beriain Fault and it is believed that the entire potash section was intersected.
The hole lost circulation and was cored with HQ, with the core showing
considerable dissolution and mechanical breakage and disking in the mineralised
zone, making the assays suspect through most of the interval. Mineralisation is
largely carnallite. Beds CL and SYL are separated by halite and low-grade
material. Sylvinite interpreted to be bed SYL is present from 431.3 to 434.0 m
where 2.7 m of core was lost, thought to be mined out and therefore, likely to
have been sylvinite of good grade. Core was recovered again from 434.0 to
435.8 m, reporting variable amounts of MgCl2. The banded marls above the salts
show folding, distortion and salt veining but with less basin edge influence of
clastics as basin fill. Logs for nearby historical hole 4 show carnallite from 235.2
to 244.9 m (11.7 m) and sylvinite directly below to a depth of 250.5 m (5.6 m).
SDP-004 was drilled near the old workings at Beriain and had a complete~~d~~
intersection of the mineralised zone. What is interpreted as CU is 6.6 m of
carnallite with overall grades of 5.6% K2O, containing higher grade beds within
that. It shows medium red orange banding directly overlying CL and SYL, the
latter with the usual mixed dark and light brecciation of clay and banding in the
lower part. The lower part of CL is partially sylvinite with the alteration from a
depth of 405.1 m, showing a marked difference in the appearance of the core.
SYL is just below, from 406.6 to 409.9 m (3.3 m), with an average grade of 16.1%
K2O. In this hole, the upper marls show dark clays and mudstones as
intermediate basin edge influences. The hole finished in the basal, banded
anhydrite and marls. The lower salt (Sal Muro) is light to medium grey and tan,
banded, and medium crystalline with a minor bed of clay, of 15.1-m thickness.

Page 40 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary Commentary
SDP-002 drilled into the old working in the Guendulain area and was incomplete,
showing poor core recovery and drilling only to what is thought to be CU. It has
no assays and is excluded from the resource. This was the first hole drilled;
SDP-006 is an incomplete re-drill of SDP-002.
Data In reporting Exploration Results, weighting Composites by weighted average were made from the geochemical data to
aggregation averaging techniques, maximum and/or minimum optimise grade and thickness of the mineralised seams in both the new and
methods grade truncations (e.g. cutting of high grades) and historical data. Composites were summarised by bed and hole in Table A-2.
cut off grades are usually Material and should be
stated.
This press release includes some picks that are preliminary and further drilling
will add confidence.
Where aggregate intercepts incorporate short
lengths of high grade results and longer lengths of
low grade results, the procedure used for such
aggregation should be stated and some typical
All potassic values are in K2O percent. Most cations are reported as oxides and
water-soluble material on a percent basis. ICP and XRF testing reports are in
elemental values, but the industry standard is to report in oxides.
examples of such aggregations should be shown
in detail.
The assumptions used for any reporting of metal
equivalent values should be clearly stated.
Relationship These relationships are particularly important in Deviation data were available in the 2013 drilling program. In building the new
between the reporting of Exploration Results. database, apparent bed dips from the lithology logs were incorporated from
mineralisation
widths and
intercept
lengths


If the geometry of the mineralisation with respect
to the drill hole angle is known, its nature should
be reported.
If it is not known and only the down hole lengths
historical and new holes to attempt to correct to true vertical bed thickness
Data on bed orientation were incorporated into the database to calculate
apparent true thickness.
are reported, there should be a clear statement to
this effect (e.g. ‘down hole length, true width not
known’).
Diagrams Appropriate maps and sections (with scales) and Figure 1 illustrate Highfield’s Sierra del Perdón property showing the current
tabulations of intercepts should be included for JORC Mineral Resource footprints.
any significant discovery being reported. These
should include, but not be limited to a plan view of
Figure A-2 shows the Sierra del Perdón interpreted regional structure and
location of drill holes.

Page 41 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria
**JORC Code explanation **
Commentary
drill hole collar locations and appropriate sectional
views.
Balanced
reporting

Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting
of both low and high grades and/or widths should
be practiced to avoid misleading reporting of
Exploration Results.

Detailed exploration drilling results from individual holes appear in Highfield’s 27
November 2013 ASX release and included information on SDP-004, SDP-005,
SDP-006 and SDP-013. These releases were before the detailed QA/QC review
was conducted by AAI and before the adoption of 2012 JORC standards.
Other
substantive
exploration
data

Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey
results; geochemical survey results; bulk
samples—size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.

In 1983, a 2D seismic survey was run for e.n. adaro by CGG over the Sierra del
Perdón property (e.n. adaro 1985a and b). This consisted of 22 lines totalling
111 km (Figure A-4). Earlier work included a seismic campaign in 1963 and a
minie-sosie (shallow seismic using a vibration-rammer source) campaign in 1979
and a vibrosesimic program by Otono in 1981. The resulting structure maps for
both the top (“techo”) of salt (base of Marl) with major faults were developed by
CGG in combination with the regional seismic records, field maps, satellite
imagery and drill hole data.

RPS (formerly RPS Boyd Petrosearch) of Calgary, Alberta, Canada, completed a
re-interpretation in 2013 of the 2D historical seismic lines and profiles on behalf of
Highfield. The re-interpretation program was designed to review the overall
accuracy of the historical data in terms of good correlation to drill hole data and
geological intersections, as well as to identify any subsurface structures that may
adversely affect the salt-bearing strata. Seismic survey lines were reviewed and
were tied to wells using historical wireline data. No report was produced but
structural maps for the top and base of the salt were produced that contributed to
the interpretation of the basin in this report. The potash-bearing zones lack any
velocity/density contrasts within the salt, so it is not possible to detect potash or
map the structure of the zone directly.

The CPs used these structural data as generated by RPS but the structure map
is modified and corrected to reflect updated drill holes.
Further work

The nature and scale of planned further work (e.g.
tests for lateral extensions or depth extensions or
large-scale step-out drilling).

Additional drilling will be needed in the greenfield areas, including the deeper part
of the syncline. Additional drilling has been proposed and planned (Figure 1 and
Table A-3).

Page 42 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria JORC Code explanation JORC Code explanation Commentary
Diagrams clearly highlighting the areas of
possible extensions, including the main geological
interpretations and future drilling areas, provided
this information is not commercially sensitive.

Page 43 of 50

==> picture [123 x 47] intentionally omitted <==

Section 3 Estimation and Reporting of Mineral Resources (Criteria listed in the preceding section also apply to this section.)

Criteria
JORC Code explanation
Commentary
Database
integrity

Measures taken to ensure that data has not been
corrupted by, for example, transcription or keying
errors, between its initial collection and its use for
Mineral Resource estimation purposes.

Data validation procedures used.

Published lithologic intercepts from historical holes and associated footages and
hole coordinates were manually entered into spreadsheets for modelling. Entries
were systematically checked against the original publications to ensure accuracy.

Composite values and hole depths/coordinates in the MineSight geologic block
model were visually compared (on screen) with values in the database values for
accuracy.

In modern holes, duplicate and check assay samples were prepared for select
intervals in each potash cycle. Duplicate cores were quartered and sent to ALS
for analysis. ALS incorporated blank, repeat, and potash standard samples in the
testing protocol. Check samples were sent to a second qualified laboratory to
verify results. ALS maintains its own internal procedure and chain of custody to
high industry standards. There was good agreement in the duplicates.

ALS is a laboratory of international repute for the analysis of potash. ALS
maintains its own QC program. QC measures, and data verification procedures
applied, include the preparation and analysis of standards, duplicates, and blanks.

Check samples were sent to SRC in Saskatoon, Canada, an accredited lab, and
run with the same procedure as SRC and also showed good agreement.
Site visits

Comment on any site visits undertaken by the
Competent Person and the outcome of those visits.

If no site visits have been undertaken indicate why
this is the case.

CPs Vanessa Santos and Leo Gilbride visited the project multiple times between
2011 and 2014 and oversaw the geologic operations before, during, and after
drilling.

The CPs visited the ALS Laboratory Group assay sample preparation facility in
Seville, Spain on 30 August 2013.

The visits were conducted for the purposes of exploration planning, data
collection, site observation, core inspection, drill rig inspection, assay lab
inspection, and QA/QC confirmation.
Geological
interpretation

Confidence in (or conversely, the uncertainty of)
the geological interpretation of the mineral deposit.

The SdP Exploration Target comprises covers an area of approximately 44 km2.

Potash beds CU, CL, and SYL are targeted at depths ranging from 100 to
1,400 m.

Page 44 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria
**JORC Code explanation **
Commentary

Nature of the data used and of any assumptions
made.

The effect, if any, of alternative interpretations on
Mineral Resource estimation.

The use of geology in guiding and controlling
Mineral Resource estimation.

The factors affecting continuity both of grade and
geology.

The Exploration Target is bound to the north and east by the evaporite outcrop at
surface.

The Exploration Target is bound to the south by the basin margin as defined by
structural interpretation, seismic surveying, and limited drilling.

The Exploration Target remains open at depth to the west.

The total Exploration Target is estimated to contain between 100 and 250 Mt of
potash in the carnallite beds (CU and CL) ranging in average grade from 9 to 13%
K2O, and between 50 and 100 Mt of potash in the sylvinite bed (SYL) ranging in
average grade from 10 to 14% K2O. Approximately half (50%) of the carnallite
Exploration Target in the CU and CL beds is estimated to overlie old workings of
the Posusa de Navarra and Posusa de Subiza mines in the SYL bed.

The Mineral Resource comprises a subset of the Exploration Target.

No potash resource is claimed 200–300 m downdip of the outcrop to account for
abrupt upturning of the strata near outcrop and evaporite dissolution at surface.

Grade parameters were composited as length-weighted averages of the individual
assays over a continuous bed thickness. In most instances, top and bottom bed
contacts are gradational, introducing some trade-off between grade and
thickness. Contacts were selected to maximize thickness while maintaining a
composite grade as close as possible to 12.0% K2O with a true thickness equal to
greater than 1.5 m. Depending upon the vertical grade distribution, bed
thicknesses less than 1.5 m and composite grades less than 8.0% K2O were
required for geologic modelling in some instances.

Structural dip was calculated from the base-of-salt surface constructed from
seismic, outcrop, historical mining surveys, and drill hole data. Dips in individual
beds were adjusted locally by stacking the variable-thickness interburden and
potash beds above the base-of-salt surface.

Drill hole and seismic data indicate reasonable bed continuity across the property,
nonetheless variation in potash thickness, grade, and mineralogy are likely
between control points. Faults, folds, and other structural disturbances can
sterilise resource locally. Mineralogy can be affected by varying depositional
environments orstructure,including depositional highs, syngeneticfaulting,

Page 45 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria
**JORC Code explanation **
Commentary
basement carbonate mounds, algal reefs, post-depositional gypsum dewatering,
groundwater dissolution along fault conduits, and by other complex depositional
and structural features.

Resource exclusions were applied around major faults, consistent with historic
mining.

A minimum 50-m buffer was applied around historical workings. The mining
footprints plus buffer were excluded from the bed-specific resource.

The radii-of-influence (ROI) used for the Mineral Resource classification reflect
the interpreted degree of predictability (or conversely, variability) within the
deposit. Resource classifications for the deposit are stated as follows:
o Indicated Resource—Sylvinite meeting cutoff criteria located between 250
m and 1,000 m radius of a modern exploration core hole with assays,
except where otherwise limited by geologic or mining boundaries.
o Inferred Resource—Sylvinite meeting cutoff criteria located between
1,000 m and 2,000 m radius of a modern exploration core hole with
assays, except where otherwise limited by geologic or mining boundaries.

No part of the resource is classified as Measured due to the limited number of
reliable modern drill holes for characterization, their wide spacing, and the
uncertainty surrounding the impacts of historical mining on future recovery
methods (a Modifying Factor).

The resource is reported as in-place tonnes of potash contained in the respective
potash beds. The potash can occur as either sylvinite or “carnallitite.” Sylvinite is
a mechanical mixture of halite and sylvite (KCl) with minor inclusions of insolubles
(typically clays). Carnallitite is a mechanical mixture of halite and carnallite
(KCl·MgCl2·6H2O), with minor inclusions of insolubles.

Beds CU and CL are dominantly carnallitic.

Bed SYL is dominantly sylvinitic with local occurrences of carnallite.

Classification areas for the Mineral Resource are shown in Figures A-15 through
A-17.

Page 46 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria JORC Code explanation Commentary Commentary
Dimensions The extent and variability of the Mineral Resource The Mineral Resource occurs in potash beds CU, CL, and SYL over the footprints
expressed as length (along strike or otherwise), shown in Figures A-15 through A-17.
plan width, and depth below surface to the upper
and lower limits of the Mineral Resource.

The Mineral Resource ranges in depth between 100 m and 1,050 m deep.
Bed true thickness variability is described by the block model in Figures A-9
through A-11.
Bed composite K2O grade variability is described by Figures A-12 through A-14.
Secondary grade constituents (MgCl2and insolubles) were modelled with the
block model and show a degree of variability similar to K2O grade.
Estimation The nature and appropriateness of the estimation The Mineral Resource was quantitatively estimated using a computer 3D gridded-
and modelling technique(s) applied and key assumptions, seam geologic (block) model constructed with Mintec Inc. MineSight 3D© v9.0
techniques including treatment of extreme grade values, software.
domaining, interpolation parameters and maximum
distance of extrapolation from data points. If a
computer assisted estimation method was chosen
include a description of computer software and
parameters used.
Data utilized in the model include historic and modern drill hole logs and assays,
historic and modern interpretations of 2D seismic surveys, surface topography in
the form of a digital elevation model (DEM), permit boundary lines, historic resource
analysis, historic geological surface mapping, and historical mining records from
the Potasas de Navarra and Potasas de Subiza mines.
The availability of check estimates, previous
estimates and/or mine production records and
whether the Mineral Resource estimate takes
Grade parameters used in the block model were composited as length-weighted
averages of the individual assays over a continuous bed thickness. Composite
values are summarized in Table A-2.

appropriate account of such data.
The assumptions made regarding recovery of by-
products.
Estimation of deleterious elements or other non-
grade variables of economic significance (eg
sulphur for acid mine drainage characterisation).


Composites were only developed for beds with core recovery exceeding 85%.
No vetted drill hole data were excluded from the model. No assay or composite
outliers were identified, and none were excluded, cut, or capped in the model.
Bed thicknesses were corrected to true thicknesses for modelling according to
local dip and downhole deviation survey data.
In the case of block model interpolation, the block
size in relation to the average sample spacing and
Block true thicknesses and grade parameters (K2O, MgCl2, insoluble content)
were interpolated/extrapolated utilizing an inverse distance squared (ID2) model.
the search employed. Block estimation was limited to an isotropic search radius of 20,000 m and the 15
Any assumptions behind modelling of selective closest data points (drill holes).
mining units.

Page 47 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria
**JORC Code explanation **
Commentary

Any assumptions about correlation between
variables.

Description of how the geological interpretation
was used to control the resource estimates.

Discussion of basis for using or not using grade
cutting or capping.

The process of validation, the checking process
used, the comparison of model data to drill hole
data, and use of reconciliation data if available.

Kriging was not attempted due to the limited number of composites available.
Geostatistical modelling may be justified in the future with additional drilling.

The potash beds of interest were gridded into single layers of 50-m square blocks
of variable vertical thickness representing the local thickness of the respective
potash bed.
Moisture

Whether the tonnages are estimated on a dry basis
or with natural moisture, and the method of
determination of the moisture content.

Tonnages are estimated using a variable_in situ_bulk density calculated for each
model block based on the relative modelled fractions of sylvite, carnallite, halite,
and insolubles. Depending upon the mineral fractions, densities can range from a
low as 1.6 tonnes per cubic meter (t/m3) for pure carnallite to 2.2 t/m3for
insolubles only.

Resource densities typically fall between 1.90 and 2.15 t/m3.
Cut off
parameters

The basis of the adopted cutoff grade(s) or quality
parameters applied.

The Mineral Resource estimate is based upon the following cut offs which support
reasonable prospects for economic extraction by conventional mining methods:
o Bed true thickness ≥ 1.5 m: Cut off is grade ≥ 8.0% K2O
o Bed true thickness < 1.5 m: Cut off is grade x thickness ≥ 12.0%K2O-m

The grade-thickness cutoff maintains the equivalent of an 8.0% K2O grade at 1.5
m for thinbeds (<1.5m).
Mining factors
or
assumptions

Assumptions made regarding possible mining
methods, minimum mining dimensions and internal
(or, if applicable, external) mining dilution. It is
always necessary as part of the process of
determining reasonable prospects for eventual
economic extraction to consider potential mining
methods, but the assumptions made regarding
mining methods and parameters when estimating
Mineral Resources may not always be rigorous.
Where this is the case, this should be reported with

The Mineral Resource estimate does not include any out-of-bed dilution.

Known sterilised areas defined by historical mining and known structure were
explicitly excluded from the resource estimate.

An additional 15% of the resource tonnes were factored out of the estimate as an
allowance for geologic and mining uncertainty within the resource footprint.

Underground room-and-pillar mining is the base case mining scenario for
justifying reasonable prospects for eventual economic extraction.

Room-and-pillar and longwall mining were historically practiced at Navarra and
Subiza for 26years. There is a reasonable expectation thatpotash outside the

Page 48 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria JORC Code explanation Commentary Commentary
an explanation of the basis of the mining historic mining footprint can be accessed and extracted by selective room-and-
assumptions made. pillar mining.
Potash beds overlying the historical workings also have reasonable potential for
economic extraction based on evidence that those beds remain mineable above
the old workings.
Industry experience in potash and salt supports that mining is often possible in
undermined beds, even with high extraction and thin interburden, due to the
competent and highly plastic behaviour of potash and salt. The effects of thin
interburden, multi-seam mining are identified as a key risk factor with potential to
affect recovery and mining economy.
Carnallite poses a risk because carnallite creeps (plastically deforms) at a
substantially faster rate than salt or sylvinite and mining must be adapted to
withstand relatively high entry closure rates. While there is extensive industry
experience mining in salt or sylvinite, industry experience with conventional
mining experience in carnallite is limited.
The 5 Mt of carnallite mined over seven years at Navarra demonstrates that
carnallite mining is locally feasible and has reasonable potential in the future.
Preliminary, contemporary high-level economic modelling was conducted for the
Muga-Vipasca property which justifies reasonable prospects for eventual
economic extraction of the Highfield Muga-Vipasca Mineral Resource. The Muga-
Vipasca analysis is considered a reasonable analogue for supporting prospects
for eventual economic extraction at Sierra del Perdón. The Sierra del Perdón
carnallite is expected to result in incrementally higher mining and processing
costs compared to sylvinite mining at Muga-Vipasca.
The Sierra del Perdón Mineral Resource is considered to have reasonable
prospects for eventual economic extraction. The impacts of overmining, mining in
carnallite, and other risks on extraction economy can be quantified for a specific
mine plan at the scoping, pre-feasibility, and/or feasibility study level.
A positive return on investment is considered a minimum for justifying reasonable
prospects for eventual economic extraction and designation as a Mineral
Resource, butdoesnot necessarilyrepresentaneconomically attractivemining

Page 49 of 50

==> picture [123 x 47] intentionally omitted <==

Criteria JORC Code explanation Commentary Commentary
opportunity depending upon the desired minimum return on investment. For this
reason, not all parts of the Mineral Resource are necessarily suitable for inclusion
in a production target or are upgradeable to a Mineral Reserve. Detailed
engineering and mine planning are required to determine which parts of a Mineral
Resource are suitable for miningfor a specificproject.
Metallurgical The basis for assumptions or predictions regarding Reasonable prospects for eventual economic extraction of the Mineral Resource
factors or metallurgical amenability. It is always necessary as assume processing with conventional crushing and flotation.
assumptions part of the process of determining reasonable
prospects for eventual economic extraction to
consider potential metallurgical methods, but the
assumptions regarding metallurgical treatment
processes and parameters made when reporting
Mineral Resources may not always be rigorous.

Flotation was used successfully to process potash at Posusa de Navarra and
Posusa de Subiza from the 1970s through 1990s.
Preliminary flotation testing conducted by Geoalcali on sylvinite core from Muga-
Vipasca, a related Ebro Basin potash deposit, supports KCl recoveries in excess
of 80%. Lower recovery is anticipated in carnallite.
Where this is the case, this should be reported with
an explanation of the basis of the metallurgical
assumptions made.

Section 4 Estimation and Reporting of Ore Reserves No mineral reserves are reported.