Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

HELIX RESOURCES LIMITED Capital/Financing Update 2011

Jul 6, 2011

65059_rns_2011-07-06_d4eef22a-5025-42bb-a36c-8274fb3bac08.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX RELEASE

Helix Resources Limited

MINERALISED COPPER PORPHYRY SYSTEM CONFIRMED AT JOSHUA PROJECT - CHILE

Highlights

  • Maiden 5 hole reverse circulation drill program on Joshua Project in Chile to conclude next week;

  • Preliminary drill results provide confidence a large Cu/Au porphyry system is present and original target may be part of a much larger system than initially anticipated;

  • Drilling results include:

    • 156m @ 0.20% Cu + 0.1g/t Au from surface to EOH in ARJS11-001;

    • 147m @ 0.22% Cu + 0.1g/t Au from surface in ARJS11-002;

  • IP survey commissioned for late July 2011 to assist in defining targets for further drilling;

  • Expansion of tenement holdings in the vicinity of the Joshua Project provides Helix with another 30 km[2] of prospective ground for copper porphyry systems (Hado and Lalo Projects);

==> picture [518 x 366] intentionally omitted <==

==> picture [86 x 85] intentionally omitted <==

Figure 1: Joshua Project location and geological map

P.O. Box 825, West Perth, Western Australia 6872 Unit 7 / 29 Ord Street, West Perth, Western Australia 6005 Telephone +61 8 9321 2644, Facsimile +61 8 9321 3909, Email: [email protected], Website: helix.net.au

ASX RELEASE

Helix Resources Limited

Minerals exploration company Helix Resources (“Helix” or “the Company”) (ASX:HLX) is pleased to announce that its maiden five hole reverse circulation drill program on the Joshua Project in Chile will conclude next week with preliminary results providing confidence that a large Cu/Au porphyry system is present.

Drilling of an outcropping porphyritic intrusive has intersected broad zones of disseminated copper mineralisation. The results include 156m @ 0.20% Cu + 0.1g/t Au in ARJS11 -001, with grades increasing at depth (Note: Drill hole was suspended at 156m due to a shanked drill bit), and 147m @ 0.22% Cu + 0.1g/t Au from surface in ARJS11-002; with complete assays for all holes expected later this month. An Induced Polarisation (“IP”) survey has been commissioned for late July 2011 to assist in defining targets for further drilling.

Initial results suggest the Joshua Target No.1 porphyry appears to be part of a much larger system than initially considered. Lithological and alteration information collected from this drill program and the results of the IP Survey will assist in defining the extent of the larger system and help prioritise drill targets. The strategy is to focus on areas where multiple mineralising phases are present and/or where sulphide accumulation is present on the periphery of potassic alteration zones.

Helix has expanded its tenement holdings in the vicinity of Joshua with the Hado and Lalo tenement applications progressing, which provides Helix with another 30 km[2] of ground prospective for copper porphyry systems in this region.

Helix’s Managing Director, Greg Wheeler, commented that, “Despite the weather and drilling delays, we have managed to produce some very promising drill results. We look forward to the remaining results and commissioning an IP survey later this month which should assist in identifying the full extent of this system and prioritise the next set of drill targets.”

Table 1: Drilling information

Hole N° East North Altitude(m) Azimuth Inclination Proposeddepth(m) Completed(m) Result Comment
Hole halted due to shanked
ARJS11-001 320756 6613442 1501 55° -85° 400 156 156m @ 0.20%Cu &0.1g/t Au from surface. drill bit – Diamond tailplanned to test target depth
of 400m
ARJS11-002 320756 6613442 1501 -65° 400 182 147m @ 0.22%Cu &0.1g/t Au from surface. Hole abandoned after drillingthrough porphyritic intrusiveinto intensely silicified rock
43m @ 0.1% Cu from
330m and 16m @ Targeted core of porphyritic
ARJS11-003 320278 6613618 1575 70° -65° 400 400 0.1%Cu from 384m to intrusive
EOH (Au assays
pending)
ARJS11-004 320360 6613411 1462 70° -65° 400 234 Assays Pending
Planned to cover along strike
ARJS11-005 320703 6613247 1403 20° -65° 400 (Currently@207m) Drilling Underway –Assays Pending extension of ARJS11-001toward edge of intrusive &interaction with a regional
structural corridor
2000m est. ~1300m

Assays are 1m riffle split, multi acid digest with ICP finish. Results max 4m of internal dilution.

P.O. Box 825, West Perth, Western Australia 6872 Unit 7 / 29 Ord Street, West Perth, Western Australia 6005 Telephone +61 8 9321 2644, Facsimile +61 8 9321 3909, Email: [email protected], Website: helix.net.au

ASX RELEASE

Helix Resources Limited

For further information:

Mr Greg Wheeler Media
Managing Director Mr James Harris
Helix Resources Ltd Professional Public Relations
Tel: + 61 8 9321 2644 Tel: + 61 8 9388 0944

Competent Persons Statements

The information in this announcement that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr M Wilson who is a full time employee of Helix Resources Limited and a Member of The Australasian Institute of Mining and Metallurgy. Mr M Wilson has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr M Wilson consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

==> picture [86 x 85] intentionally omitted <==

P.O. Box 825, West Perth, Western Australia 6872 Unit 7 / 29 Ord Street, West Perth, Western Australia 6005 Telephone +61 8 9321 2644, Facsimile +61 8 9321 3909, Email: [email protected], Website: helix.net.au