AI assistant
HELIX RESOURCES LIMITED — AGM Information 2017
Nov 28, 2017
65059_rns_2017-11-28_b3370039-7ae1-4663-b5a6-2aaeeec40a6a.pdf
AGM Information
Open in viewerOpens in your device viewer
==> picture [596 x 77] intentionally omitted <==
----- Start of picture text -----
ASX ANNOUNCEMENT
29 November 2017
----- End of picture text -----
==> picture [596 x 77] intentionally omitted <==
ANNUAL GENERAL MEETING PRESENTATION
Please see attached the Company’s presentation being delivered to shareholders at today’s Annual General Meeting being held at 9:00am (WST) in the Grant Thornton boardroom, Level 2, 10 Kings Park Road, West Perth WA 6005.
- ENDS -
For further information: Mick Wilson Managing Director [email protected] Ph: +61 8 9321 2644
Dale Hanna CFO/Company Secretary [email protected] Ph: +61 8 9321 2644
Helix Resources Limited I ACN 009 138 738 I 78 Churchill Ave, Subiaco WA 6008 P: +61 8 9321 2644 F: +61 8 9321 3909 I www.helix.net.au I Email: [email protected]
AGM Presentation Targeting high value discoveries in a richly endowed province
HELIX RESOURCES – 2017 Snapshot
Geological and Structural Review Driving Exploration Strategy
-
Confirmed Helix’s copper and gold projects have provenance and potential scale
-
Review prioritised targets for advancing at Prospect and Project Scale within funding capacity
-
Regional Context – Good ground selection confirmed with new targets emerging in untested areas
Collerina Copper Project (100%)
-
Flagship Helix discovery hosted within proven copper trend
-
New geological model being tested for scale potential in 2017
-
Broader regional targets emerging (deposits form in clusters)
Regional Projects – Quanda & Fiveways (100%)
-
Continuation of the Collerina copper trend north & south
-
Opportunities arising for Latertitic Ni-Co within the 85km trend Helix controls
-
VTEM and first-pass drilling planned
Cobar Gold Project (100%)
-
High grade gold present with prospects open along strike and at depth
-
Large system potential: depth continuation, linkage and more regional prospects identified
-
New owners at Peak Gold Mine – Helix controls entire goldfield within trucking distance of Peak mine
Mundarlo Project (earning up to 80%), south-east NSW
-
Targeting VMS-style base metal systems in favourable geological setting
-
Low-cost entry with early indications of upside - EM conductor identified under historic copper-in-soils
==> picture [159 x 308] intentionally omitted <==
Helix is well-placed to deliver value from an established mining district with new discoveries and active M&A
www.helixresources.com.au I 2
CORPORATE OVERVIEW
| ASX Code HLX Issued Shares 354 million Unlisted Options (Directors, Management & Staff) 17 million Market Cap @ A$0.034ps $12m Cash at 30 Sep 2017 $1.3m Enterprise Value $10.7m Major Shareholders % Yandal Investments 8% Gee Vee Pty Ltd 7% Directors & Management 4% Top 20 52% |
|
|---|---|
| DIRECTORS & MANAGEMENT | |
| Gary Lethridge Non-Exec Chairman |
|
| Mick Wilson Managing Director |
|
| Michael Naylor Non-Exec Director |
|
| Jason Macdonald Non-Exec Director |
|
| Dale Hanna Company Sec/CFO |
*On 24[th] November 2017 Helix announced an oversubscribed placement of 40m shares at 0.03 to raise $1.2M before costs. The placement is expected to settle 30 November 2017.
www.helixresources.com.au I 3
COLLERINA AND THE COBAR DISTRICT
Large Footprint: Strong presence (1,500km²) in proven copper and gold camps that are under-explored
Actively drilling: Focussed programs delivering strong news-flow, with projects entering pivotal stages, where a market re-rating could see significant value emerge.
==> picture [469 x 335] intentionally omitted <==
----- Start of picture text -----
Aurelia
----- End of picture text -----
www.helixresources.com.au I 4
Collerina Copper Project Cracking the VMS code
==> picture [720 x 163] intentionally omitted <==
COLLERINA COPPER
-
Located in infrastructure-rich central NSW
-
150km long fertile copper belt
-
Aeris Resources’ Tritton operations – north
-
Mincor Resources’ Tottenham deposits – south
-
Typical district mining operation (eg Tritton mine)
-
High tenor mineralisation from short strike deposit
-
Substantial down-dip and down-plunge extents
-
Multiple regional targets on 85km trend held by HLX
-
First project discovery in 2015/16 - Collerina Deposit
-
Coincident geochemistry and MLEM
-
2nd hole: 14m at 4.4% Cu from 80m
-
Collerina Deposit - Exploration strategy
-
Targeting sufficient scale for potential stand-alone operation
-
New geological model established in 2017
-
Multiple new down-dip extensional and DHEM conductor targets to be drilled this quarter
==> picture [308 x 412] intentionally omitted <==
www.helixresources.com.au I 6
COLLERINA COPPER DEPOSIT
==> picture [648 x 411] intentionally omitted <==
----- Start of picture text -----
505500mE
New DHEM
Conductor
Massive Sulphide 6455000mN
Body
N
Interpreted footwall marker unit on 1vd aeromagnetics
Position of Central Zone (Massive sulphides) showing significant intersections from drilling to date
----- End of picture text -----
www.helixresources.com.au I 7
COLLERINA COPPER DEPOSIT
==> picture [609 x 383] intentionally omitted <==
www.helixresources.com.au I 8
COLLERINA COPPER DEPOSIT
| Attributes | Tritton Mine (in Production) | Collerina Deposit |
|---|---|---|
| Initial Resource | 14Mt @ 2.7% Cu, 0.3g/t Au (380,000t contained Cu) |
Yet to be determined ? |
| Mineralisation | Massive & Banded Sulphide Chalcopyrite (Primary) |
Massive & Banded Sulphide Chalcopyrite (Primary) |
| Strike Length of Main Body |
100-300m | 300m (open) |
| Depth to Mineralisation |
Begins 180m below Surface | Gossan From Surface |
| Vertical Continuity | Mineralisation defined to over 1.4km below surface |
Yet to be determined ? |
| Thickness of Massive Sulphide Mineralisation |
2- 30m (Av. Grade 2.7% Cu) | 4 - 29m (Ave. Grade 2.7%Cu) |
| Discovery Intercept |
7th hole 5m @ 1.8% Cu |
2nd Hole 14m @ 4% Cu |
| Host Rocks | Metasediments & Mafic Volcanic/Volcanoclatics |
Metasediments & Mafic Volcanic/Volcanoclatics |
| Alteration | Silica & Chlorite | www.helixresources.com.au Silica & Chlorite |
COLLERINA COPPER DEPOSIT
New DHEM conductor provides evidence for scale – drill testing planned
New DHEM Conductor RC/DDH Planned
Tritton Deposit Mineralisation Outline to Scale
www.helixresources.com.au I 10
REGIONAL OPPORTUNITIES - COLLERINA COPPER
==> picture [522 x 398] intentionally omitted <==
• Helix holds 85km of the prospective VMS Belt • To date limited exploration has been conducted on the wider Project Area • Exploration focus has been targeted towards an initial assessment of approx. 25kms of the prospective belt (i.e. the “Collerina Copper Trend”) • Multiple prospects identified across 3 regional target zones within the “Collerina Copper Trend”
www.helixresources.com.au I 11
REGIONAL OPPORTUNITIES – VMS Trend and Lateritic Ni-Co
-
Helix controls over 85km of VMS prospective trends between Aeris’ Tritton Operations and Mincor’s Tottenham Project.
-
Recent capital raising will see a portion of funds raised targeting these regionally prospective trends. Planning near-term airborne geophysics and scout drilling.
-
Helix is also reviewing regional trends for areas considered prospective for lateritic nickel-cobalt mineralisation.
==> picture [300 x 421] intentionally omitted <==
www.helixresources.com.au I 12
Mundarlo
Targeting VMS-style base metal systems
==> picture [720 x 163] intentionally omitted <==
MUNDARLO (EARNING UP TO 80%)
Project background
-
New exploration project – Helix earning in
-
Located 20km SW of Gundagai NSW
-
Targeting base metal mineralisation associated with a series of gossanous horizons within a NW trending volcano-sedimentary basin sequence
-
JV farm-in terms:
-
Helix to spend $100k by Feb 2018 to earn 60% (including a minimum 2 drill-hole program)
==> picture [291 x 196] intentionally omitted <==
- further A$150k spend by Feb 2019 to increase to 80%
ownership Recent results
-
Recently completed MLEM survey identified a discrete bedrock conductor in a favourable setting for VMS-style base metal deposits
-
Conductor sits below a zone of broad spaced historic copper-in-soil anomalism that has never been drill tested
-
Infill auger soil sampling and drill testing planned to satisfy initial earn-in commitment
==> picture [165 x 18] intentionally omitted <==
----- Start of picture text -----
www.helixresources.com.au I 14
----- End of picture text -----
Cobar Gold Project Strong indications for a potentially large scale gold system
==> picture [720 x 163] intentionally omitted <==
COBAR GOLD
==> picture [568 x 400] intentionally omitted <==
----- Start of picture text -----
Aurelia -
----- End of picture text -----
www.helixresources.com.au I 16
COBAR GOLD
Targeting sediment-hosted, structurally controlled, hydrothermal gold deposits
The Peak Trend ~4Moz (west) Mt Boppy ~0.5Moz at 10g/t (east)
A common genetic relationship between gold mineralisation in The Peak Trend
==> picture [484 x 179] intentionally omitted <==
==> picture [484 x 178] intentionally omitted <==
----- Start of picture text -----
150m
----- End of picture text -----
www.helixresources.com.au I 17
HELIX RESOURCES
-
Strong presence in proven NSW copper and gold camps in under-explored areas
-
Focussed exploration programs – dollars in the ground to create opportunities for value uplift
-
Multiple regional exploration prospects emerging within the Collerina Trend and beyond
-
Strategic ground selection providing optionality in several commodities
-
New potential VMS target identified at the Mundarlo Project – Helix farming-in
-
Expanding potential of an emerging gold system at the Cobar Gold Project
==> picture [420 x 228] intentionally omitted <==
Collerina Drilling 2016
www.helixresources.com.au I 18
IMPORTANT NOTICES
This presentation has been prepared by Helix Resources Limited (“Company”). The presentation does not contain all the information that a prospective investor may require about the companies, their business or the proposal. It is not a complete statement of material information. Except where stated, the information disclosed in this presentation (“Information”) relates to the proposed business of the Company at the date of this document. This presentation does not contain advice relating to legal, taxation or investment matters. The Company makes no representation or warranty (express or implied) as to the accuracy, reliability or completeness of the Information. The Company and its subsidiaries, directors, employees, agents and consultants shall have no liability (including liability to any person by reason of negligence or negligent misstatement) for any statements, opinions, information or matters (express or implied) arising out of, contained in or derived from, or for any omissions from this presentation, except liability under statute that cannot be excluded.
This presentation may contain reference to certain intentions, expectations and plans of a Company (“forward looking statements”). Those intentions, expectations and plans may or may not be achieved. Any forward looking statements are subject to inherent risks and uncertainties and are based on certain assumptions that may not be met or on which views may differ. The performance and operations of a Company may be influenced by a number of factors, many of which are outside the control of the Company. Actual future results may be materially different. No representation or warranty, express or implied, is made by either Company or any of its directors, officers, employees, advisers or agents that any intentions, expectations or plans will be achieved either totally or partially or that any particular rate of return will be achieved. You are cautioned against relying upon any forward looking statement in this document.
This presentation does not contain an offer of securities in a Company, nor an invitation to apply for such securities. Nothing in this document should be construed as investment advice or financial product advice, whether personal or general, for the purposes of Section 766B of the Corporations Act. The document does not involve or imply a recommendation or a statement of opinion in respect of whether to buy, sell or hold a financial product. You should obtain professional advice and carry out your own independent investigations and assessment of the Information before acting.
The Company has not verified the accuracy or completeness of the information, statements and opinions contained in this presentation. Accordingly, to the maximum extent permitted by law, the Company makes no representation and give no assurance, guarantee or warranty, express or implied, as to, and take no responsibility and assume no liability for, the authenticity, validity, accuracy, suitability or completeness of, or any errors in or omissions, from any information, statement or opinion contained in this presentation. The contents of this presentation are confidential. Information in this presentation which is attributed to a named third party source has not been checked or verified by the Company. This presentation remains the property of Helix Resources Limited and may not be reproduced, distributed, transmitted or published (in whole or in part) without the prior consent of the Company.
Competent Persons Statement
The information in this announcement that relates to Exploration Results, Mineral Resources or Ore Reserves is based on information compiled by Mr M Wilson who is a full time employee of Helix Resources Limited and a Member of The Australasian Institute of Mining and Metallurgy. Mr M Wilson has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr M Wilson consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
Details of JORC 2012 compliant information and the assumptions underlying all Resource estimations are contained in previous ASX releases or at www.helix.net.au
For full details of exploration results relating to the Cobar Gold Project refer to ASX announcements dated 7 April 2011, 17 November 2016, 3 April 2017, 26 April 2017 and 11 May 2017. Helix Resources is not aware of any new information or data that materially effects the information in this announcement.
For full details of exploration results relating to the Collerina Copper Project refer to ASX announcements dated 15 December 2014, 4 February 2015, 10 November 2015, 18 February 2016, 2 November 2016, 4 May 2017 and 8 November 2017. Helix Resources is not aware of any new information or data that materially effects the information in this announcement.
www.helixresources.com.au I 19
For further information:
Mick Wilson
Managing Director [email protected] +61 8 9321 2644
www.helixresources.com.au
==> picture [720 x 163] intentionally omitted <==