AI assistant
HELIOS ENERGY LTD — Interim / Quarterly Report 2021
Aug 1, 2021
65047_rns_2021-08-01_d8e61485-026a-4df9-865e-047fa15e9b36.pdf
Interim / Quarterly Report
Open in viewerOpens in your device viewer
Helios Energy Ltd
30 July 2021
Quarterly Activities Report
ASX Code: HE8
Quarter Ending 30 June 2021
Directors
Helios Energy Ltd (ASX Codes: HE8, HE8OA) ( Helios or Company ) is pleased to report its activities for the quarter ended 30 June 2021.
$4.86M Placement
On 21 July 2021, Helios conducted a capital raising of $4,862,500 by way of the issue of 32,416,668 shares at a price of 15 cents per share ( Placement ). The Placement was made to sophisticated and professional investors under the provisions of section 708 of the Corporations Act 2001 (Cth). The Placement was conducted within the 15% placement capacity available to the Company in accordance with ASX Listing Rule 7.1. The Placement was jointly managed by CPS Capital Group Pty Ltd and Gleneagle Securities Pty Ltd.
Use of Placement Proceeds
The funds raised from the Placement will be used for working capital purposes and to purchase additional oil and gas leases in the Presidio Oil Project located in Presidio County, Texas, USA.
50% Increase in Play Area – Now 300,000 Acres in Total
Helios has completed 88 miles of 2D seismic which has established a thick presence of Austin Chalk age equivalent Ojinaga Formation across Helios’ entire acreage position of 85,685 gross acres. The thickness of the Ojinaga Formation ranges from 1,000 feet in the eastern section of Helios’ acreage to 2,000 feet in the western section. In addition, these 88 miles of 2D seismic has established a thick presence of Ojinaga Formation across the entire Ojinaga Shale Formation play area which has now increased by 50% from approximately 200,000 acres to approximately 300,000 acres in size.
Hui Ye Non-Executive Chairman Richard He Managing Director
Robert Bearden Non-Executive Director
Nicholas Ong Non-Executive Director John Palermo Company Secretary
Contact Details
Australian Office
Level 3, 18 Richardson Street West Perth WA 6005 Australia PO Box 1485 West Perth WA Australia 6872 Tel +61 1300 291 195 Fax +61 8 6298 6191
USA Office
3 Riverway, 17[th] Floor Suite 1750, Houston Texas USA 77056 Tel +1 713 333 3613 Fax +1 713 583 0965
Testing of Presidio 141#2 Well
Pressure build up testing of the Presidio 141#2 well continued during the quarter. After the pressure build up testing is fully completed, the Presidio 141#2 well will be returned to oil and gas production by natural unassisted flow. Production tubing will be run to the toe of the lateral portion of the well and the well will then be placed on artificial lift but only after the well
Helios Energy Ltd 30 July 2021
has ceased to flow naturally.
As the well is shallow with normal formation pressure, the well will require artificial lift for commercial oil production.
The Presidio 141#2 well is a shallow well with a total measured depth of 5,846 feet including the fracked 1,400 feet horizontal portion which was drilled into the primary target zone within the lower bench of the Ojinaga Formation.
70% in 85,685 Gross Acres
Upon the completion of the third well in the Presidio Oil Project, being the Presidio 141#2 well, Helios will have a 70%WI in a total of 85,685 gross acres (59,980 net acres) and a 70%WI in the 3 wells drilled by Helios in the Presidio Oil Project, namely, Presidio 141#2, Quinn Creek 141#1 and Quinn Mesa 113.
Gravity and Magnetic Data
Helios has acquired gravity and magnetic data over the entire Presidio Oil Project. Interpretation of that data was then compared with the entire seismic programme, along with data from the 3 new wells and the existing old well data. The data sets, when compared, evidence a high degree of ‘matching’ or ‘fit’. The presence therefore of the Ojinaga Formation across the entire Ojinaga Shale Formation play area can be easily mapped. This gravity and magnetic data analysis have played an important part in increasing the Presidio Oil Project play area to 300,000 acres.
Presidio 141#2 Well
During 2019, the 1,400 feet horizontal portion of the Presidio 141#2 well was drilled to the west towards the Quinn Creek 141#1 discovery well entirely within the zone of the best oil shows and highest natural fracturing that occurs within the 359 feet lower bench of the Ojinaga Formation present in the Presidio 141#2 well.
The 1,400 feet horizontal was drilled into rock which has uniform geological characteristics. The entire 1,400 feet is predominantly black shale with micro laminations of siltstone and fine carbonates and is highly naturally fractured. Continuous, good to excellent oil shows were observed throughout the entire 1,400 feet of horizontal drilling. Oil was present in fractures and micro-fractures and oil shows with fast fluorescence cut and bright bluish white residual ring were recorded throughout the entire 1,400 feet of horizontal drilling.
The 1,400 feet horizontal portion of the Presidio 141#2 well was fracked across 7 stages. Each stage is approximately 200 feet in length. The frack successfully injected approximately 3,313,000 pounds of proppant and approximately 64,000 barrels of completion fluid. The frack successfully injected approximately 2,366 pounds of proppant per lateral foot.
The Presidio 141#2 well is located 2,300 feet to the east of the existing Quinn Creek 141#1 discovery well. The total measured depth of the Presidio 141#2 well is 5,846 feet and this includes the 1,400 feet horizontal portion drilled into the primary target zone within the lower bench of the Ojinaga Formation. The well is located structurally updip of the existing Quinn Creek 141#1 discovery well.
Helios Energy Ltd 30 July 2021
Stratigraphy of the Presidio Oil Project located in Presidio County, Texas, USA
==> picture [481 x 393] intentionally omitted <==
Presidio Oil Project – Infrastructure
Access to the 3 wells that constitute the Presidio Oil Project (Presidio 141#2, Quinn Creek 141#1 and Quinn Mesa 113) is provided by a 25 mile unsealed, formed road constructed by Helios that branches off the sealed US-90 highway which carries heavy truck and passenger vehicle traffic. The 3 oil wells have access to ample supplies of fresh water provided by local water wells drilled into shallow water aquifers. The El Paso Oil Refinery located in El Paso, Texas has a processing capacity of 135,000 barrels of oil per day and is located 170 miles from the Presidio Oil Project. Crude oil is sold there by truck delivery.
The Presidio Oil Project is located 250 miles (or 5 hours by truck) from Midland, Texas which is the epicenter of the Permian Basin oil industry. All rigs, supplies and services required for the Presidio Oil Project are sourced from Midland, Texas. Oil production in the Permian Basin is approximately 4,600,000 bopd.
Helios Energy Ltd 30 July 2021
Easily Mapped with 2D & 3D Seismic
The lower bench of the Ojinaga Formation shows well on both 2D & 3D seismic and is easily mapped.
Porosity and Permeability in Lower Bench of the Ojinaga Shale Formation
Based on previous petrophysical analysis, the lower bench of the Ojinaga Shale Formation has porosity predominately ranging between 4% to 12.5% and permeability up to 0.75 µd (micro darcys). The porosity of sidewall cores taken from the Presidio 141#2 well is 4% to 10% therefore confirming the previous petrophysical analysis. The permeability of the sidewall cores taken from the Presidio 141#2 well is significantly higher than the previous petrophysical analysis, up to 0.06 md (60 µd). Analysis of the Quinn Creek 141#1 well and the Presidio 141#2 well as well as surrounding historical wells clearly shows that these porosity and permeability characteristics in Presidio County in the Ojinaga Shale Formation exceed the characteristics present in the Eagle Ford Shale in the Karnes Trough which is the premier sweet spot of the Eagle Ford Shale play.
Well Location Identification
Helios will continue to integrate the geological and geophysical data with the aim of high grading multiple well locations that target the Ojinaga Formation, the Eagle Ford Formation as well as the older Cretaceous units being the Buda, Georgetown and Edwards limestone formations.
Leases Acquired or Disposed of During the Quarter
No additional oil and gas leases were acquired or disposed of during the quarter. All 85,685 gross acres the subject of the Presidio Oil Project are located in the south-west portion of Presidio County, Texas and are the subject of oil and gas lease agreements entered into with private oil and gas mineral rights owners.
Related Party Payments – Item 6 of Appendix 5B
Payments to related parties listed in Item 6 of the Appendix 5B are to Executive and Non-Executive Directors for personal exertion salary and directors fees.
For further information, please contact:
Richard He
Managing Director
Helios Energy Ltd 30 July 2021
Competent Person's Statement
The information in this ASX announcement is based on information compiled or reviewed by Mr Neville Henry. Mr Henry is a qualified petroleum geologist with over 47 years of Australian, USA and other international technical, operational and executive petroleum experience in both onshore and offshore environments. He has extensive experience of petroleum exploration, appraisal, strategy development and reserve/resource estimation, as well as new oil and gas ventures identification and evaluation. Mr Henry has a BA (Honours) in geology from Macquarie University.