ASX

A N N O U N C E M E N T

26 September 2014

The Manager ASX Announcements Office ASX Limited Exchange Centre Level 4. 20 Bridge Street SYDNEY, NSW 2000

CAP – China Steel & Raw Material Conference, Dalian China Presentation 26 September 2014

Carpentaria Exploration Limited ( CAP ) advises that it has revised the above presentation lodged today.

Changes made:

  • Page 18 – there was a typographical error made in the Competent Person Statement with reference to 2004 JORC which should have been 2012

  • Page 19 – an additional statement in the pre-scribed format was required at the foot of the page in relation to the previously announced information.

A copy of the amended presentation follows.

For any information please contact:

==> picture [98 x 45] intentionally omitted <==

Chris J Powell

Company Secretary / CFO Carpentaria Exploration Limited +61 7 3220 2022 [email protected]

==> picture [579 x 27] intentionally omitted <==

CONNECT

==> picture [28 x 29] intentionally omitted <==

==> picture [28 x 28] intentionally omitted <==

==> picture [29 x 29] intentionally omitted <==

Level 6, 345 Ann St Brisbane Queensland 4000 PO Box 10919, Adelaide Street, Brisbane Queensland 4000 Phone: + 61 7 3220 2022 Fax: + 61 7 3220 1291 [email protected] www.capex.net.au

==> picture [51 x 50] intentionally omitted <==

We find it, We prove it, We make it possible

Carpentaria Exploration Ltd We find it. We prove it. We make it possible. New magnetite - high purity with rail and port 14[th] China International Steel and Raw Materials Conference Dalian, China 26[th] September 2014

Disclaimer

This presentation has been prepared by the management of Carpentaria Exploration Limited (CAP) for the benefit of analysts, brokers and investors and not as specific advice to any particular party or persons. The information is based on publicly available information, internally developed data and other sources. Where an opinion is expressed in this presentation, it is based on the assumptions and limitations mentioned herein and is an expression of present opinion only. No warranties or representations can be made as to origin, validity, accuracy, completeness, currency or reliability of the information. CAP disclaims and excludes all liability (to the extent permitted by law) for losses, claims, damages, demands, costs and expenses of whatever nature arising in any way out of or in connection with the information, its accuracy, completeness or by reason of reliance by any person on any of it. Where CAP expresses or implies an expectation or belief as to the success of future exploration and the economic viability of future project evaluations, such expectation or belief is expressed in good faith and is believed to have a reasonable basis. However, such expected outcomes are subject to risks, uncertainties and other factors which could cause actual results to differ materially from expected future results. Such risks include, but are not limited to, exploration success, metal price volatility, changes to current mineral resource estimates or targets, changes to assumptions for capital and operating costs as well as political and operational risks and governmental regulation outcomes. CAP does not have any obligation to advise any person if it becomes aware of any inaccuracy in or omission from any forecast or to update such forecast.

2

Hawsons Iron Project – New Magnetite

  • Different and better than other magnetite

  • Very soft siltstone – simple and low cost processing

  • Aim to deliver 10-20 Mtpa of best pellet feed for 50

years

years
Fe % SiO2% Al2O3% P% S%
>68.5 3.1-3.3 0.22-0.39 0.004 0.005

==> picture [259 x 165] intentionally omitted <==

Targeted grades based on test work and Davis Tubes

  • Technical and permitting pathway clear and achievable

  • Existing spare rail and port

  • Target production in 3.5yrs

  • Well advanced known approval process

  • Potential returns very attractive at long term price forecasts

3

Company Snapshot

  • ASX Listed : CAP

  • Major Asset : Hawsons Magnetite Iron Project NSW, Australia.

  • Discovered in 2009

  • Ownership (60% CAP, 40% Pure Metals)

CASH: AUD 4.5 million QUOTED SECURITIES: 124 m shares

==> picture [222 x 218] intentionally omitted <==

Top Shareholders: Silvergate Capital: 18.2% Conglin Group: 11.4% NEFCO: 3.2% Directors & Management: 5.3%

==> picture [275 x 180] intentionally omitted <==

4

Balanced and Experienced Board and Management

==> picture [84 x 126] intentionally omitted <==

==> picture [84 x 133] intentionally omitted <==

==> picture [85 x 127] intentionally omitted <==

Dr Neil Williams – Chairman

  • 40 years experience

  • Australia’s Chief Government Geologist 1995 - 2010

  • One of Australia's eminent geoscientists

Mr Bob Hair

  • 30yrs experience as a lawyer

  • Former General Manager Commercial MIM holdings

  • Former CEO of AIM listed Ferrum Crescent

Mr Paul Cholakos

  • 25 yrs experience in resources

  • Mining Engineer

  • Current Executive General Manager Project Development – Oil Search

==> picture [104 x 129] intentionally omitted <==

==> picture [103 x 146] intentionally omitted <==

==> picture [103 x 132] intentionally omitted <==

Mr Quentin Hill – Managing Director

  • 18 yrs experience in exploration, development and management

  • Part of Hawsons discovery team

  • Geologist

Ray Koenig - Hawsons Technical Director

  • 45 years experience

  • Chief Metallurgist Savage River Magnetite Mines

  • Business Group Leader Mining and Metals for GHD

  • Magnetite due diligence as a consultant

Mr Bin Cai

  • Conglin Australia representative

  • 18 years experience investing in emerging resource companies

5

Hawsons Iron Project Concept

  • Deliver 10 million tonnes per year of “best quality” pellet feed magnetite concentrate to end users needing high purity feed

  • Exploit very large resource with favourable mining and processing attributes and achieve very low cost production

  • Use the existing, high capacity, power, water, rail, and workforce all less than 90km from site and existing port to achieve very competitive low capital and operating costs

  • Gain requisite approvals on a timely and favourable basis as the local environment is well understood and Native Title does not apply

==> picture [78 x 126] intentionally omitted <==

==> picture [224 x 126] intentionally omitted <==

==> picture [203 x 126] intentionally omitted <==

==> picture [160 x 126] intentionally omitted <==

6

Project Concept –Transport logistics

  • Mine to rail head via new slurry – 50km

  • Existing open access rail to new stockpile at Port Pirie – 360km

  • New stockpile to existing port berths via new conveyor

  • Barge transport to 180,000t vessels – 15-30km

==> picture [107 x 161] intentionally omitted <==

==> picture [158 x 115] intentionally omitted <==

==> picture [160 x 127] intentionally omitted <==

==> picture [183 x 127] intentionally omitted <==

==> picture [224 x 381] intentionally omitted <==

7

Targeted CFR China Costs

Position on the cost curve

  • Carpentaria is targeting the second quartile of the all in CFR China cost curve indexed to 62% Fe

  • Approx. US$56

  • Approx. US$64 (69% basis)

  • Withstand price fluctuations

==> picture [432 x 364] intentionally omitted <==

Source - After Credit Suisse 21 August 2013 1 Reported cash costs are C1 costs

2 all-in cash costs include royalties, sustaining capital, corporates costs but not finance costs 3 includes a freight adjustment to CFR China and indexed to a 62% product 4 exchange rate 0.85USD = 1.00AUD

8

Capital Intensity – benefits of existing infrastructure

Low capital intensity

10Mtpa start up case utilising existing infrastructure targets:

  • Low capital cost per tonne of capacity (capital intensity ~$140150USD)

  • Capital intensity similar to hematite projects

  • Lower than comparable magnetite projects

  • Low capital service costs

==> picture [447 x 349] intentionally omitted <==

----- Start of picture text -----

350
Magnetite Projects (grey)
Range 67-69%Fe
Minas Rio 68% Fe
300
Karara
250
Southdown
Fusion
200 Some typical
Central Eyre
hematite projects (red)
150
Hawsons Mblam 63%Fe
Hawsons
Roy Hill 58-61%Fe
100 10 Mtpa aim 20 Mtpa aim
Pilbara 333 62%Fe
50
Roper Bar 60%fe RIO TINTO
0
0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000
Total Capital Cost estimate USD M
----- End of picture text -----

Source - refer Appendix 4

9

Its about low costs and high quality !

Resource

==> picture [295 x 173] intentionally omitted <==

----- Start of picture text -----

Resource outline
----- End of picture text -----

  • JORC* resource 1.8 Billion tonnes at 15% mass recovery for 263Mt of 69.7% Fe, 2.9% SiO2 (mine 100t to produce 15t concentrate)

Mining

  • 3000m x 600m ore body – low mining cost

  • bulk mining methods

  • waste : ore 0.3 : 1

  • material movement and mining costs comparable to higher grade projects

==> picture [254 x 168] intentionally omitted <==

----- Start of picture text -----

600m
----- End of picture text -----

  • Potential for large resource extensions and long life

  • Siltstone rock very soft - easy on mining equipment

==> picture [164 x 132] intentionally omitted <==

==> picture [163 x 122] intentionally omitted <==

  • Refer Appendix 1

10

Siltstone ore is different to typical iron formations

==> picture [432 x 266] intentionally omitted <==

----- Start of picture text -----

Grind size and energy intensity (after Credit Suisse Dec 2011)
25.8
Well known deposits, from company data
21.5 5 x
17.2 4 x
12.9 3 x
8.6 2 x
4.3
Hawsons
0
20 60 100 140 180 220 260 300
Grind Size (P80 microns)
Processing circuit capacity required per tonne of concentrate (MW)
----- End of picture text -----

==> picture [264 x 148] intentionally omitted <==

  • very different ore - soft

  • natural grain size 10-50 microns, don’t break the crystals

  • ~ one quarter energy use of typical magnetite ores per tonne of concentrate (BWI 6-7)

  • produces high purity concentrate

  • large processing cost savings up to $5-15/t concentrate

  • Comparatively low technical risk

  • Its about costs and quality not head grade

11

Concentrate product - high purity

Concentrate product likely specifications*

  • High purity concentrate – very low impurities
Fe >68.5%
SiO2 3.1-3.3%
Al2O3 0.22-0.39%
P 0.004%
S 0.005%
Size 100% passing 38 microns
  • Good pelletising properties

  • Good blending product to reduce impurities

  • Increase blast furnace feed grade

  • 10Mt of Hawsons 69% to upgrade 35Mt of 58%Fe to 45Mt of 62%Fe

==> picture [123 x 121] intentionally omitted <==

  - Increase efficiency,

  - Control pollutent emissions,

  - Better quality steel
  • Alternative long term, high grade supply source, diversify high grade supply

  • Based on Davis tube results and other test work

12

Project pathway clear and achievable

  • Grid power with spare capacity (220Kv line)

  • High yield water source with allocation available

  • Existing rail 360km to existing port

  • 13Mtpa spare capacity on rail

  • 3 spare berths for 10-20Mtpa capacity

  • Require conveyors, stockpiles and ship loaders

  • Port access secured under a right of first refusal

  • Permitting

  • no Native Title

  • Mining lease application lodged

  • Seasonal environmental surveys at mine site completed

==> picture [223 x 380] intentionally omitted <==

13

How does Hawsons compare others?

Hawsons Others
resource >250Mt concentrate most
mining standard and inpit crush and convey most
water does not use sea water few
processing one stage ofgrinding,no regrinding few
two stages magnetic separation few
No floatation few
power low costgridpower available few
transport existingopen access rail line few
existing port access secured few
permitting No Native Title few
EIS seasonal surveys complete on mine site few
MiningLease Application lodged some
Government support-State Significant
Development
most
Stable low risk country some

14

Current and future work

Current program designed to align all project elements Complete in 2-3 months

Build a platform for further investment

  • Additional process test work

  • Port - rail - marine prefeasibility study to ± 30

  • Power network capability study ± 15%

  • Environmental work progressing

Future test work subject to additional funding

  • Resource drilling

  • Pilot plant test work

  • Geotechnical test work

  • Significant infrastructure negotiation

Targeted production and approval time frames

  • Approval less than two years

  • Completion of bankable feasibility study

  • Production targeted in 3.5-4yrs

==> picture [325 x 415] intentionally omitted <==

15

Summary

==> picture [217 x 102] intentionally omitted <==

----- Start of picture text -----

Long life and scaleable
----- End of picture text -----

High grade product consistently delivered Targeted low operating and capital costs

==> picture [275 x 172] intentionally omitted <==

==> picture [264 x 168] intentionally omitted <==

16

Summary

  • High purity concentrate , blending

Key is low costs and product quality

  • Good pelletising

  • Competitive costs, potential good returns

  • Favourable ore attributes

Technical and permitting pathway clear and achievable

  • Favourable environmental attributes

  • Existing rail, port, power and water infrastructure

==> picture [78 x 126] intentionally omitted <==

==> picture [224 x 126] intentionally omitted <==

==> picture [203 x 126] intentionally omitted <==

==> picture [160 x 126] intentionally omitted <==

17

Carpentaria Exploration

We find it. We prove it. We make it possible.

Phone: +61 7 3220 2022 To find out more, visit us at www.capex.net.au

==> picture [366 x 50] intentionally omitted <==

The information in this presentation that relates to Exploration Results, Exploration Targets and Resources is based on information compiled by Q.S. Hill, who is a member of the Australian Institute of Geoscientists and has had sufficient experience which is relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Q.S.Hill is an employee of Carpentaria and consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

18

CARPENTARIA

APPENDIX 1 – Resources

Concentrate Grades Concentrate Grades Concentrate Grades
Category Billion
Tonnes
Magnetite
DTR%
Fe% Al2O3% P%1 SiO2% LOI% Contained
Concentrate
Million Tonnes
Inferred 1.554 14.7 69.6 0.20 0.004 2.9 -3.0 228
Indicated 0.215 16.2 69.8 0.20 0.005 2.8 -3.0 35
Total 1.769 14.9 69.7 0.20 0.004 2.9 -3.0 263
Indicated and Exploration
Inferred potential
Resource area

Reported under JORC 2012 – no material change since first published ASX announcement 26 March 2014

The Company is not aware of any new information or data that materially affects the information included in the relevant market announcement and, in the case of estimates of +mineral resources or +ore reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed.

19

CARPENTARIA APPENDIX 2

Mining

  • low strip ratio 0.3:1 waste to ore falling to 0.1:1 by year 4

  • Low cost bulk mining methodsin pit crush and convey

  • 600m mining widths

  • UCS 50-90Mpa cf 350Mpa

Processing

  • simple flow sheet

  • very low energy

  • Don’t break the magnetite

  • very high grade product

  • Bond Work Index 6-7Kwhr/t (cf 18-40)

==> picture [316 x 168] intentionally omitted <==

==> picture [415 x 195] intentionally omitted <==

----- Start of picture text -----

magnetite quartz
5o micron
----- End of picture text -----

==> picture [212 x 28] intentionally omitted <==

----- Start of picture text -----

Image of concentrate
----- End of picture text -----

Photomicrograph of rock

20

CARPENTARIA EXPLORATION APPENDIX 3 – Processing Flow Sheet

==> picture [564 x 394] intentionally omitted <==

----- Start of picture text -----

ROM Hydroseparator
Rougher Mag Sep
Impact Crushing
50%
+10 mm 50% Cleaner Mag Sep
Ball
Mill
-10 mm
Fines -1mm
Barmac
Crusher
Stockpile
Cyclone
Concentrate
despatching
Fines -1mm Tailings
Tailings disposal
----- End of picture text -----

21

CARPENTARIA EXPLORATION APPENDIX 4 – Capital Intensity Chart

Project Operator Capex A$M Annual M
Tonnes
Capex/Tonne
A$M
Product
%Fe
Roy Hill₁ Hancock [10,000] 55 [180] [55]
Karara₂ Karara JV 3000 10 300 68
Central Eyre₃ Iron Road 2590 12.4 210 67
Fusion₄ Eyre Iron 2600 10 260 67
Mbalam₅ Sundance 4700-7830 35 134-224 63
Southdown₆ Grange 2885 10 289 69
Minas Rio₈ Anglo 9300 26.5-30 350-310 68
Pilbara 333₉ Rio 15740 113 139 62
Roper Bar₁₁ West Desert 180 3 60 60
  • ₁ http://www.royhill.com.au/sites/default/files/Tim%20Treadgold%27s%20article.pdf

  • ₂ http://gindpublic.powercreations.com.au/images/gind---iebohvaiti.pdf

  • ₃ http://www.ironroadlimited.com.au/images/files/projects/20110614%20Iron%20Road%20-%20CEIP%20Prefeasibility%20.pdf

  • ₄ http://centrexmetals.com.au/wp-content/sharelink/20120503-mine-and-port-scoping-study-completed-and-dfs-commenced87554443598698511.pdf

₅ http://www.sundanceresources.com.au/IRM/Company/ShowPage.aspx/PDFs/2675-51552764/PresentationResourcesRisingStars

  • ₆http://www.grangeresources.com.au/clients/grange/downloads/item150/southdown_dfs_presentation_-_albany_16_may_2012.pdf

₈ http://www.angloamerican.com/business/ironore/projects.aspx , http://www.mining-technology.com/projects/minas-rio-iron-ore-brazil/ ₉http://www.riotinto.com/documents/110324_New_opportunities_for_industry_growth_Sam_Walsh.pdf

₁₁ ASX550 : Investor Notice of Presentation 20 Sep 2013.pdf USD/AUD conversion at 0.94

22