Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

HAWK RESOURCES LIMITED. Regulatory Filings 2021

Aug 23, 2021

65081_rns_2021-08-23_eafe03ea-155a-4223-b47a-fd70178f7181.pdf

Regulatory Filings

Open in viewer

Opens in your device viewer

ASX ANNOUNCEMENT 24 August 2021

Alderan’s drill data review highlights Mizpah’s gold potential

HIGHLIGHTS

  • Alderan’s review of historical drilling at the Mizpah prospect at Detroit has highlighted the potential for a significant distal disseminated gold deposit.

  • Mineralisation is open along strike and down dip, with 40 of 197 holes ending in highly anomalous gold.

  • Potential exists for a second gold mineralised horizon.

  • A large untested geophysical chargeability anomaly occurs below historical drilling.

  • Mizpah is one of four distal disseminated gold targets which Alderan plans to drill during its Detroit exploration programme scheduled to commence in September 2021.

Alderan Resources Limited (ASX: AL8) ( Alderan or the Company ) is pleased to announce results of a review of historical drilling on the Mizpah prospect within its Detroit Project, located in the Drum Mountains region of western Utah, USA. The 1980s drilling aimed to delineate a near-surface oxide gold deposit. Alderan’s review strongly supports the potential of Mizpah to host a distal disseminated gold deposit.

Alderan has a consolidated exploration area at Detroit covering 24.7km[2] through a series of option agreements with tenement owners[1] . This provides the Company with the opportunity to conduct the first ever modern exploration over the entire mining district.

==> picture [316 x 283] intentionally omitted <==

Figure 1: Detroit project geology showing location of Mizpah prospect.

Following consolidation, Alderan compiled past exploration data and completed stream sediment and rock sampling plus ground magnetics and induced polarization (IP) geophysical surveys. This followed its earlier drill program of seven holes at the Mizpah prospect[2,3,4,5] . Alderan’s review highlighted potential for significant copper and gold mineralisation.

Alderan Managing Director Scott Caithness said: “Alderan’s review of the historical Mizpah drilling at Detroit highlighted its potential for a distal disseminated gold deposit on the margin of the Basin Complex. It also reinforces our view that the Southern, Northern Extension and Copperhead prospects which all have prominent chargeability geophysical anomalies are excellent targets for similar gold deposits.

“We will test these targets in the drilling programme scheduled to commence in September.”

1 Alderan ASX Announcement dated 11 February 2021.

2Alderan ASX Announcement dated 30 September 2020.

3 Alderan ASX Announcement dated 15 October 2020.

4 Alderan ASX Announcement dated 19 November 2020.

5 Alderan ASX Announcement dated 22 February 2021.

ASX ANNOUNCEMENT 24 August 2021

Mizpah Historical Drilling Review

Alderan completed a review of the available historical drilling data over the Mizpah gold prospect within the Detroit project area to further assess the potential of the prospect to host a distal disseminated gold deposit.

Mizpah is located on the southeastern margin of the Basin Complex, which Alderan has highlighted as a high potential target for copper and gold mineralisation at Detroit.

Alderan reviewed data from 197 holes which were drilled over an area of approximately 400m x 250m at Mizpah in the 1980s with the objective of delineating an economic near-surface oxide gold deposit. The average depth of the drill holes was 28m, with only one hole drilled to over 100m (ended at 103.7m). The holes were terminated when they intersected fresh rock even if sulphide (pyrite) mineralisation was present.

Holes were analysed by either fire assay or AAS. However, as no quality assurance and quality control information is available, these assays are regarded by Alderan as indicative of exploration potential only. Most important however is that there were 40 holes which ended in highly anomalous grades of over 0.5g/t gold, and of these 20 ended in +1.0g/t Au (max assay 9.1g/t Au). The location of the drill holes is shown in Figure 2 and the relevant drill hole information is shown at Appendix 1.

Discussion of Results

Alderan has used this historical drill hole information and assays to develop a 3D model of the gold distribution at Mizpah. This model suggests the following:

  • The historically defined Mizpah oxide gold deposit has exploration potential for 3.0-4.0Mt at a grade of 0.4-0.8g/t gold (40,000-100,000 ounces). It should be noted that this exploration potential quantity and grade is conceptual in nature, that there has been insufficient exploration to estimate a Mineral Resource and that it is uncertain if further exploration will result in the estimation of a Mineral Resource.

  • Mizpah is open along strike to the southeast and northwest and down dip to the southwest.

  • The deposit remains open at depth with 20% of the holes drilled ending in anomalous gold mineralisation.

  • • There is potential for a second mineralised horizon at depth.

==> picture [387 x 253] intentionally omitted <==

Figure 2: Mizpah 3D block model showing historical drill holes and section lines. The block model has been built using a nominal 0.1g/t gold cutoff from the historical (1980s) drill hole data.

ASX ANNOUNCEMENT 24 August 2021

Figures 3-6 below show a long section (D-D’) and three cross sections (A-A’, B-B’ & C-C’) through the deposit model. These sections suggest that the deposit is stratigraphically controlled and broadly anticlinal, it is open to both the north-northwest and south-southeast and it is open down dip to the southwest where drilling was not deep enough to intersect the mineralized horizon. Also, a second deeper mineralized horizon may be present.

==> picture [517 x 191] intentionally omitted <==

Figure 3: Mizpah long section (D-D’) which suggests that the mineralized horizon is stratigraphically controlled and that a second deeper horizon is present (interpolated from holes drilled off the section line). It also highlights that the mineralisation is open to both the north and south.

==> picture [517 x 231] intentionally omitted <==

Figure 4 : Mizpah cross section A-A’ which suggests that the mineralisation is open down dip and conformable with stratigraphy which dips at approximately 15[o] to the west. A second deeper is horizon is present.

ASX ANNOUNCEMENT 24 August 2021

==> picture [517 x 288] intentionally omitted <==

Figure 5 : Mizpah cross section B-B’ suggests that the mineralisation is stratigraphic, dipping at approximately 20[o] to the west and open down dip to the west. A second deeper horizon is present.

==> picture [517 x 288] intentionally omitted <==

Figure 6: Mizpah cross section C-C’ suggests that the mineralisation increases in grade and is open down dip to the west.

ASX ANNOUNCEMENT 24 August 2021

Alderan’s Exploration at Mizpah

Alderan’s exploration at Mizpah has included diamond drilling, ground magnetics and induced polarization geophysical surveying plus stream, soil and rock sampling[6,7,8] .

Surface rock samples collected by Alderan at Mizpah grade up to 6.89g/t gold which is consistent with historical sample assays which grade in the 3-10g/t gold range. Alderan collected soil samples from Mizpah as part of a district-wide soil programme, with samples collected at 40m spacing along lines 200m apart (assays awaited).

Alderan’s diamond drill holes DD20M-002 and DD20M-005 were drilled into the Mizpah deposit and intersected grades and widths of mineralisation (Table 1) which are consistent with historical intersections (Figure 7).

Hole DD20M-006 suggests that the mineralisation extends to the northwest and could be much thicker than indicated in historical drill holes. It was collared 100m north-northwest of the nearest historical hole and approximately 350m northwest of the focus area of historical drilling and intersected 83m of gold mineralisation. This is significantly longer than any previous intersections.

Table 1: Alderan drill holes at Mizpah with gold intersections

Hole From
(m)
To
(m)
Interval
(m)
Au Grade
(g/t)
DD20M-002 51.2 62.4 13.3 0.42 Faulted & pyritic limestone-phyllite contact zone
DD20M-005 19.9
42.1
35.2
51.3
15.4
9.2
0.38
0.37
Faulted & quartz-sericite-pyrite altered siltstones, phyllite &
quartzite immediately below contact with limestone
Quartz-sericite-pyrite altered phyllite
DD20M-006 35.8 118.8 83.0 0.41 Brecciated meta-quartzites, quartz-monzonite porphyry, diorite
and skarn with extensive quart-sericite-pyrite alteration
Massive sulphide zone
including 84.6 91.5 6.9 1.98

Alderan’s recent exploration at Detroit included extending the May 2020 Basin Complex IP survey with two additional lines to the south and one to the north to close off responses obtained in the earlier modelling.

Using a 30 millisecond cutoff, these additional lines defined a 500m x 400m chargeability anomaly which lies largely to the southeast of the historical Mizpah drilling plus a second anomaly to the northeast of Copperhead mine (Figure 7). Alderan’s 3-D inversion modelling of the Mizpah anomaly indicates historical drilling was not deep enough to test the chargeable response which is likely to be caused by sulphide mineralisation that may contain gold (Figure 8). At a lower cutoff of 20 milliseconds, this chargeability anomaly has a strike length of 1,000m, a width of 600m and merges into the Basin Complex chargeability response (Figure 9).

Next Steps

Alderan’s review of the holes drilled at Mizpah in the 1980s indicate the deposit is near-surface, oxidized distal disseminated gold mineralisation on the margin of the Basin Complex. The review highlights that the deposit remains open at depth, along strike to the northwest and southeast and down dip to the southwest. Also, the 3- D modelled chargeability anomaly remains largely undrilled.

Mizpah is one of four distal disseminated gold targets which Alderan plans to test in its upcoming Detroit drilling programme. Permitting for 25 holes is underway and drill site prioritisation is being finalized ahead of the commencement of a 10-hole (2,500m) programme in September.

6 Alderan ASX Announcement dated 8 March 2021. 7 Alderan ASX Announcement dated 11 May 2021.

8 Alderan ASX Announcement dated 9 June 2021.

ASX ANNOUNCEMENT 24 August 2021

==> picture [335 x 364] intentionally omitted <==

Figure 7 : Basin Complex chargeability (>30 msec cutoff) overlain on reduced to pole magnetics (>0.03 SI units cutoff) showing the location of Mizpah historical (1980s) and Alderan (2020) drill holes.

==> picture [400 x 249] intentionally omitted <==

----- Start of picture text -----

2000m
----- End of picture text -----

Figure 8: Mizpah chargeability anomaly (>30 millisecond cutoff) showing the traces of historical drill holes; view looking to the northeast.

ASX ANNOUNCEMENT 24 August 2021

==> picture [455 x 541] intentionally omitted <==

Figure 9: Basin Complex 20-30 millisecond chargeability range shell showing the location of anomalies plus historical and Alderan drillholes. The Mizpah chargeability anomaly is approximately 1km long, 600m wide and merges into the Basin Complex chargeability response.

Detroit Project

The Detroit Project is one of four projects held by Alderan (Figure 9) in the state of Utah, USA. It lies within the Detroit Mining District, approximately 175km southwest of Salt Lake City, and contains numerous historical copper, gold and manganese mines. The district has been explored for copper and gold in the past by major mining companies such as Anaconda Copper, Kennecott, Newmont, BHP and Freeport-McMoRan but no one company was able to build a significant contiguous land position to enable district-wide modern exploration. The United States Geological Survey ( USGS ) has also explored the area, sampling extensive mineralised jasperoids.

ASX ANNOUNCEMENT 24 August 2021

==> picture [333 x 252] intentionally omitted <==

==> picture [256 x 10] intentionally omitted <==

----- Start of picture text -----

Figure 9 : Alderan Resources project locations in western Utah.
----- End of picture text -----

ENDS

This announcement was authorised for release by the Board of Alderan Resources Limited.

ALDERAN RESOURCES LIMITED ABN: 55 165 079 201 Suite 23, 513 Hay Street, Subiaco, 6008, WA www.alderanresources.com.au

For further information: e: [email protected]

p: +61 8 6143 6711 Scott Caithness Managing Director mailto:[email protected]

ASX ANNOUNCEMENT 24 August 2021

Competent Persons Statement

The information contained in this announcement that relates to new exploration results is based on, and fairly reflects, information compiled by Dr Marat Abzalov, who is a Fellow of the Australian Institute of Mining and Metallurgy. Dr Abzalov is a consultant to Alderan and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Dr Abzalov consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears.

The information in this announcement that relates to historical exploration results were reported by the Company in accordance with listing rule 5.7 on 30 September 2020, 15 October 2020, 19 November 2020, 22 February 2021, 8 March 2021, 11 May 2021 and 9 June 2021. The Company confirms it is not aware of any new information or data that materially affects the information included in the previous announcements.

ASX ANNOUNCEMENT 24 August 2021

Appendix 1: Drill hole details for historical drilling completed by Western States Minerals between 1986 - 1987

Hole ID Easting Northing RL (m) Depth (m) MINERALISED INTERSECTIONS (Au> 0.1 g/t) MINERALISED INTERSECTIONS (Au> 0.1 g/t) MINERALISED INTERSECTIONS (Au> 0.1 g/t) MINERALISED INTERSECTIONS (Au> 0.1 g/t)
From (m) To (m) Thickness (gold
lodes) (m)
Total
thickness
(includes
internal
waste) (m)
Au (g/t)
MZ-104 326844.9 4379490.1 1923.3 30.48 19.81 27.43 7.62 7.62 2.43
MZ-049 326787.1 4379441.3 1909.6 18.29 0.00 10.67 10.67 10.67 1.96
MZ-093 326918.7 4379295.4 1915.7 12.19 0.00 12.19 12.19 12.19 1.73
MZ-87-045 326935.7 4379266.6 1916.3 19.81 12.19 19.81 7.62 7.62 1.61
MZ-121 326911.9 4379293.6 1914.8 12.19 4.57 12.19 7.62 7.62 1.59
MZ-098 326899.8 4379459.6 1924.8 18.29 0.00 7.62 4.57 7.62 1.52
MZ-111 326861.3 4379449.5 1924.8 15.24 3.05 7.62 4.57 4.57 1.40
MZ-87-017 326832.4 4379504.7 1913.2 38.1 25.91 33.53 7.62 7.62 1.39
MZ-132 326833.1 4379459.3 1917.8 24.38 21.33 24.38 3.05 3.05 1.37
MZ-87-048 326935.9 4379306.3 1918.7 19.81 3.05 19.81 16.76 16.76 1.37
MZ-031 326960.0 4379316.4 1919.6 12.19 0.00 12.19 12.19 12.19 1.28
MZ-081 326858.1 4379318.1 1909.3 18.29 0.00 18.29 15.24 18.29 1.28
MZ-089 326896.6 4379302.6 1914.4 13.72 0.00 13.72 13.72 13.72 1.23
MZ-114 326895.1 4379468.9 1924.8 15.24 7.62 13.72 6.10 6.10 1.21
MZ-017 326870.2 4379289.0 1912.9 18.29 0.00 18.29 18.29 18.29 1.17
MZ-092 326897.9 4379285.7 1912.9 12.19 0.00 12.19 12.19 12.19 1.17
MZ-87-052 326781.7 4379235.3 1895.9 44.19 15.24 44.19 22.86 28.95 1.14
MZ-120 326905.8 4379304.3 1915.1 18.29 0.30 10.67 10.36 10.36 1.12
MZ-080 326867.1 4379330.0 1916.3 18.29 0.00 18.29 18.29 18.29 1.08
MZ-094 326932.9 4379301.9 1918.1 12.19 0.00 12.19 12.19 12.19 1.07
MZ-87-033 326868.5 4379392.5 1916.0 19.81 1.52 16.76 15.24 15.24 1.06
MZ-103 326724.3 4379439.0 1912.0 35.05 22.86 28.95 6.10 6.10 1.05
MZ-034 326964.7 4379335.6 1923.3 12.19 0.00 9.14 9.14 9.14 1.03
MZ-87-032 326877.2 4379452.5 1925.4 25.91 3.05 25.91 22.86 22.86 1.02
MZ-091 326881.9 4379282.6 1912.9 12.19 0.00 12.19 10.67 12.19 1.00
MZ-116 326885.9 4379450.0 1924.8 12.19 0.30 12.19 7.31 11.89 1.00
MZ-090 326925.0 4379314.8 1917.5 12.19 0.00 12.19 12.19 12.19 0.99
MZ-100 326797.3 4379461.0 1915.4 24.38 4.57 24.38 3.05 19.81 0.98
MZ-058 326861.3 4379437.7 1924.5 24.38 1.52 18.29 15.24 16.76 0.94
MZ-87-011 326981.4 4379320.0 1925.7 13.72 3.05 10.67 7.62 7.62 0.90
MZ-004 326879.5 4379293.8 1912.9 24.38 0.00 24.38 21.33 24.38 0.87
MZ-129 326811.0 4379276.0 1906.8 60.96 21.33 53.34 21.33 32.00 0.86
MZ-115 326890.4 4379457.4 1924.8 18.29 1.52 13.72 6.10 12.19 0.86
MZ-128 326832.7 4379346.4 1911.1 39.62 4.57 24.38 9.14 19.81 0.84
MZ-87-050 326961.4 4379280.8 1918.7 19.81 4.57 19.81 10.67 15.24 0.80
MZ-87-019 326768.3 4379344.2 1909.9 56.39 38.10 56.39 12.19 18.29 0.80
MZ-109 326791.7 4379429.8 1912.3 18.29 4.57 15.24 9.14 10.67 0.77
MZ-095 326947.2 4379307.8 1920.2 12.19 0.00 12.19 12.19 12.19 0.76
MZ-87-009 326841.7 4379278.6 1914.1 44.19 13.72 44.19 25.91 30.48 0.76
MZ-108 326758.7 4379440.7 1908.7 18.29 7.62 10.67 3.05 3.05 0.75

ASX ANNOUNCEMENT 24 August 2021

MZ-107 326749.3 4379434.1 1909.0 18.29 10.67 13.72 3.05 3.05 0.75
MZ-084 326934.2 4379332.9 1919.0 12.19 0.00 12.19 12.19 12.19 0.75
MZ-87-015 326902.8 4379206.9 1918.4 56.39 22.86 56.39 28.95 33.53 0.74
MZ-096 326905.7 4379294.1 1914.4 18.29 0.00 18.29 18.29 18.29 0.73
MZ-87-053 326805.2 4379193.8 1904.4 56.39 1.52 56.39 30.48 54.86 0.72
MZ-87-030 326859.2 4379504.9 1921.8 25.91 9.14 21.33 7.62 12.19 0.72
MZ-87-046 326942.0 4379275.8 1917.2 25.91 6.10 24.38 18.29 18.29 0.72
MZ-87-043 326879.3 4379250.2 1906.5 32 4.57 32.00 19.81 27.43 0.71
MZ-056 326847.1 4379439.8 1922.7 18.29 0.00 18.29 18.29 18.29 0.70
MZ-077 326852.3 4379332.7 1909.6 18.29 0.00 18.29 13.72 18.29 0.70
MZ-039 326874.4 4379309.6 1911.1 18.29 0.00 18.29 18.29 18.29 0.70
MZ-87-020 326780.7 4379383.6 1910.5 38.1 22.86 38.10 6.10 15.24 0.69
MZ-020 326862.0 4379275.8 1914.1 45.72 0.00 45.72 36.57 45.72 0.69
MZ-011 326856.9 4379455.6 1923.6 18.29 0.00 18.29 13.72 18.29 0.68
MZ-072 326856.8 4379368.2 1911.7 30.48 0.00 30.48 30.48 30.48 0.68
MZ-87-002 326879.5 4379284.6 1912.6 97.53 1.52 74.67 36.57 73.15 0.67
MZ-076 326846.5 4379348.1 1911.7 16.76 0.00 16.76 16.76 16.76 0.66
MZ-023 326871.7 4379320.0 1911.1 18.29 0.00 18.29 18.29 18.29 0.66
MZ-079 326882.7 4379330.3 1912.6 12.19 0.00 12.19 12.19 12.19 0.65
MZ-87-047 326941.0 4379286.4 1919.0 25.91 7.62 25.91 16.76 18.29 0.64
MZ-049N 326785.7 4379448.8 1909.6 30.48 0.00 24.38 24.38 24.38 0.62
MZ-133 326827.7 4379428.3 1922.4 18.29 6.10 18.29 12.19 12.19 0.62
MZ-047E 326780.1 4379432.4 1908.7 24.38 1.52 19.81 13.72 18.29 0.62
MZ-040 326832.6 4379364.6 1912.0 33.53 0.00 25.91 25.91 25.91 0.60
MZ-87-054 326903.6 4379280.8 1912.9 19.81 1.52 19.81 18.29 18.29 0.60
MZ-110 326797.6 4379449.0 1910.5 24.38 3.05 24.38 9.14 21.33 0.60
MZ-087 326889.1 4379315.5 1913.5 12.19 0.00 12.19 12.19 12.19 0.60
MZ-87-056 326815.0 4379460.2 1916.3 32 19.81 32.00 7.62 12.19 0.60
MZ-122 326916.5 4379284.9 1914.4 12.19 7.62 12.19 3.05 4.57 0.59
MZ-87-003 326777.7 4379486.7 1913.2 76.2 30.48 62.48 7.62 32.00 0.59
MZ-051 326801.9 4379433.9 1914.8 30.48 0.00 30.48 24.38 30.48 0.59
MZ-87-037 326846.1 4379213.4 1909.6 44.19 18.29 44.19 25.91 25.91 0.58
MZ-014 326801.6 4379361.2 1915.1 42.67 6.10 42.67 18.29 36.57 0.58
MZ-87-031 326869.6 4379464.4 1919.9 30.48 16.76 30.48 10.67 13.72 0.57
MZ-027 326910.8 4379308.7 1915.7 18.29 0.00 15.24 13.72 15.24 0.56
MZ-87-049 326963.2 4379279.3 1918.7 19.81 0.00 19.81 19.81 19.81 0.56
MZ-007 326854.8 4379421.9 1922.4 24.38 0.00 24.38 24.38 24.38 0.56
MZ-005 326863.3 4379341.8 1910.5 36.57 0.00 36.57 32.00 36.57 0.54
MZ-87-012 326973.6 4379270.1 1920.9 24.38 1.52 24.38 16.76 22.86 0.54
MZ-069 326842.5 4379380.0 1913.8 18.29 0.00 18.29 18.29 18.29 0.54
MZ-87-010 326865.4 4379263.1 1912.6 53.34 13.72 39.62 22.86 25.91 0.53
MZ-012 326828.9 4379437.7 1923.6 42.67 0.00 42.67 35.05 42.67 0.53
MZ-016 326859.9 4379356.6 1911.7 18.29 0.00 18.29 18.29 18.29 0.52
MZ-068 326856.8 4379380.6 1913.5 18.29 0.00 18.29 18.29 18.29 0.51
MZ-113 326881.1 4379459.0 1925.4 15.24 12.19 15.24 3.05 3.05 0.51
MZ-87-008 326820.4 4379241.7 1895.9 50.29 18.29 50.29 25.91 32.00 0.51

ASX ANNOUNCEMENT 24 August 2021

MZ-057 326843.4 4379430.0 1922.4 24.38 0.00 18.29 18.29 18.29 0.51
MZ-064 326841.4 4379402.0 1917.5 18.29 0.00 18.29 15.24 18.29 0.50
MZ-87-018 326839.8 4379472.4 1920.5 38.1 25.91 30.48 4.57 4.57 0.50
MZ-082 326898.1 4379347.8 1914.1 12.19 0.00 12.19 12.19 12.19 0.50
MZ-088 326863.8 4379304.6 1911.7 12.19 0.00 12.19 12.19 12.19 0.49
MZ-032 326955.2 4379297.8 1920.9 12.19 0.00 12.19 9.14 12.19 0.48
MZ-086 326906.2 4379321.0 1915.4 12.19 0.00 12.19 12.19 12.19 0.48
MZ-87-035 326828.6 4379307.2 1907.1 30.48 3.05 30.48 21.33 27.43 0.47
MZ-053 326815.6 4379437.8 1917.2 24.38 0.00 24.38 22.86 24.38 0.46
MZ-041 326809.3 4379320.3 1906.8 42.67 0.00 42.67 32.00 42.67 0.46
MZ-066 326871.2 4379414.4 1919.0 16.76 0.00 15.24 6.10 15.24 0.45
MZ-002 326860.5 4379159.3 1909.0 48.77 4.57 48.77 24.38 44.19 0.45
MZ-006 326830.7 4379409.3 1919.3 36.57 0.00 27.43 21.33 27.43 0.44
MZ-070 326827.5 4379377.3 1914.1 18.29 0.00 18.29 15.24 18.29 0.44
MZ-018 326852.7 4379300.2 1912.0 18.29 0.00 18.29 18.29 18.29 0.44
MZ-035 326985.4 4379302.4 1925.7 12.19 0.00 12.19 10.67 12.19 0.44
MZ-001 326781.6 4379146.2 1906.2 85.34 12.19 85.34 65.53 73.15 0.43
MZ-87-041 327086.1 4379165.8 1937.0 25.91 4.57 25.91 9.14 21.33 0.43
MZ-87-044 326923.1 4379280.7 1914.8 24.38 0.00 12.19 10.67 12.19 0.42
MZ-065 326855.1 4379411.1 1917.2 24.38 0.00 18.29 15.24 18.29 0.41
MZ-87-028 326874.8 4379477.8 1924.5 38.1 13.72 38.10 19.81 24.38 0.40
MZ-047 326771.1 4379420.9 1907.4 24.38 0.00 16.76 16.76 16.76 0.40
MZ-071 326847.5 4379370.6 1912.3 24.38 0.00 24.38 22.86 24.38 0.40
MZ-076N 326845.6 4379358.6 1912.3 36.57 0.00 36.57 35.05 36.57 0.39
MZ-048 326771.3 4379447.9 1908.7 30.48 0.00 18.29 15.24 18.29 0.39
MZ-052 326799.6 4379418.1 1915.4 18.29 0.00 18.29 15.24 18.29 0.39
MZ-131 326840.7 4379449.9 1920.9 18.29 9.14 13.72 4.57 4.57 0.38
MZ-87-006 326826.5 4379139.2 1908.0 103.63 6.10 92.96 60.96 86.86 0.38
MZ-059 326868.6 4379429.5 1921.5 24.38 0.00 19.81 16.76 19.81 0.38
MZ-099 326873.6 4379447.3 1925.1 24.38 0.00 21.33 10.67 21.33 0.37
MZ-106 326742.0 4379415.3 1904.4 15.24 6.10 13.72 3.05 7.62 0.37
MZ-87-051 326751.2 4379455.0 1913.2 44.19 33.53 39.62 3.05 6.10 0.37
MZ-87-007 326877.5 4379225.1 1912.6 44.19 12.19 41.15 25.91 28.95 0.37
MZ-87-042 326904.4 4379266.4 1912.9 30.48 1.52 28.95 18.29 27.43 0.37
MZ-87-038 326873.0 4379372.9 1906.8 19.81 1.52 7.62 6.10 6.10 0.37
MZ-085 326919.5 4379326.9 1916.9 12.19 0.00 12.19 12.19 12.19 0.37
MZ-026 326902.8 4379334.7 1914.8 15.24 0.00 15.24 15.24 15.24 0.36
MZ-083 326911.1 4379355.8 1915.7 12.19 0.00 12.19 12.19 12.19 0.36
MZ-073 326873.6 4379384.3 1915.7 15.24 4.57 15.24 6.10 10.67 0.36
MZ-87-023 326769.3 4379437.5 1906.8 32 1.52 25.91 10.67 24.38 0.36
MZ-87-024 326736.1 4379426.8 1913.2 32 6.10 32.00 6.10 25.91 0.34
MZ-015 326857.7 4379393.2 1914.4 24.38 0.00 22.86 22.86 22.86 0.34
MZ-044 326769.3 4379433.0 1906.5 60.96 0.00 36.57 24.38 36.57 0.34
MZ-117 326895.7 4379448.4 1923.3 12.19 4.57 12.19 7.62 7.62 0.34
MZ-063 326825.7 4379398.3 1917.8 15.24 0.00 15.24 13.72 15.24 0.34
MZ-87-013 326926.3 4379252.0 1918.7 32 3.05 32.00 24.38 28.95 0.33

ASX ANNOUNCEMENT 24 August 2021

MZ-097 326880.7 4379437.6 1922.4 12.19 7.62 12.19 4.57 4.57 0.33
MZ-101 326783.0 4379463.4 1914.1 45.72 18.29 41.15 6.10 22.86 0.33
MZ-078 326879.1 4379344.8 1912.6 12.19 0.00 9.14 7.62 9.14 0.32
MZ-87-029 326844.3 4379536.8 1919.6 25.91 18.29 25.91 7.62 7.62 0.32
MZ-062 326753.9 4379422.3 1904.7 30.48 0.00 25.91 22.86 25.91 0.32
MZ-036 326965.5 4379264.6 1920.2 9.14 0.00 9.14 9.14 9.14 0.32
MZ-010 326888.7 4379240.4 1912.9 18.29 15.24 18.29 3.05 3.05 0.31
MZ-013 326822.7 4379388.0 1916.6 24.38 0.00 18.29 16.76 18.29 0.31
MZ-118 326909.8 4379464.8 1924.8 12.19 0.30 12.19 5.79 11.89 0.30
MZ-075 326877.1 4379355.9 1913.8 24.38 0.00 22.86 22.86 22.86 0.30
MZ-87-014 326948.6 4379232.0 1926.3 44.19 6.10 44.19 10.67 38.10 0.30
MZ-87-026 326813.7 4379375.4 1916.6 38.1 12.19 35.05 12.19 22.86 0.30
MZ-061 326815.5 4379406.2 1917.8 27.43 1.52 24.38 21.33 22.86 0.29
MZ-022 326900.1 4379271.7 1911.7 12.19 0.00 12.19 12.19 12.19 0.28
MZ-045 326719.1 4379345.8 1904.7 76.2 1.52 74.67 38.10 73.15 0.28
MZ-87-055 326914.9 4379342.2 1916.6 19.81 10.67 15.24 3.05 4.57 0.28
MZ-87-036 326775.2 4379306.5 1903.5 62.48 28.95 59.43 24.38 30.48 0.27
MZ-042 326830.5 4379329.5 1909.3 30.48 6.10 27.43 18.29 21.33 0.27
MZ-067 326871.9 4379396.4 1915.4 12.19 0.00 12.19 10.67 12.19 0.25
MZ-87-027 326796.5 4379406.5 1914.1 24.38 10.67 24.38 7.62 13.72 0.25
MZ-024 326889.5 4379390.6 1916.9 15.24 1.52 15.24 12.19 13.72 0.25
MZ-021 326855.0 4379283.7 1915.1 18.29 0.00 18.29 7.62 18.29 0.24
MZ-87-034 326857.2 4379347.6 1911.1 32 25.91 32.00 6.10 6.10 0.23
MZ-030 326931.3 4379345.4 1918.4 12.19 0.00 12.19 6.10 12.19 0.23
MZ-019 326870.6 4379267.7 1912.6 12.19 0.00 12.19 12.19 12.19 0.22
MZ-009 327082.6 4379206.5 1940.1 15.24 4.57 15.24 3.05 10.67 0.22
MZ-87-021 326756.2 4379401.4 1904.4 27.43 22.86 24.38 1.52 1.52 0.22
MZ-046 326673.2 4379213.9 1895.9 80.77 6.10 79.24 32.00 73.15 0.21
MZ-87-025 326827.1 4379419.3 1919.9 25.91 6.10 21.33 12.19 15.24 0.21
MZ-025 326892.8 4379362.0 1916.0 18.29 0.00 12.19 6.10 12.19 0.21
MZ-87-016 326738.9 4379514.7 1916.0 50.29 7.62 9.14 1.52 1.52 0.19
MZ-038 326910.2 4379245.2 1917.8 12.19 7.62 10.67 3.05 3.05 0.17
MZ-029 326923.0 4379367.7 1917.2 12.19 0.00 12.19 12.19 12.19 0.16
MZ-033 326965.1 4379356.0 1923.0 12.19 0.00 9.14 3.05 9.14 0.16
MZ-130 326895.9 4379486.1 1924.8 18.29 12.19 13.72 1.52 1.52 0.16
MZ-87-022 326702.7 4379397.4 1902.9 38.1 25.91 27.43 1.52 1.52 0.16
MZ-003 326904.8 4379160.1 1913.2 42.67 Gold mineralisation was not intersected
MZ-028 326926.0 4379287.1 1916.0 9.14
MZ-037 326937.4 4379253.8 1919.0 12.19
MZ-043 326738.2 4379583.9 1524.0 19.81
MZ-050 326784.9 4379420.2 1911.7 18.29
MZ-054 326811.8 4379421.4 1917.8 21.33
MZ-055 326823.8 4379448.4 1917.5 24.38
MZ-060 326844.4 4379415.8 1917.2 24.38
MZ-102 326772.5 4379464.5 1913.2 27.43
MZ-105 326650.4 4379430.9 1909.6 60.96

ASX ANNOUNCEMENT 24 August 2021

MZ-112 326870.0 4379458.4 1924.8 12.19
MZ-126 326774.3 4379243.4 1895.9 60.96
MZ-87-004 326803.8 4379544.0 1919.6 70.1
MZ-87-005 326801.3 4379545.2 1919.6 88.39
MZ-87-040 327058.0 4379115.1 1937.0 50.29
MZ-88-002 326770.4 4379154.7 1906.2 Information for relevant drill holes not available
MZ-88-003 326732.7 4379168.7 1906.2
MZ-88-005 326756.4 4379228.7 1895.9
MZ-88-006 326858.8 4379080.6 1914.1
MZ-88-007 326974.8 4379202.5 1918.4
MZ-88-008 326989.3 4379179.3 1918.4

*All drill holes were drilled vertically down hence azimuth for all holes presented is 0.

Appendix 2: JORC Code, 2012 Edition – Table 1 Report in relation to historical drilling completed by Western States Minerals between 1986 - 1987

Section 1 - Sampling Techniques and Data

(Criterial in this section apply to all succeeding sections)

Criteria of
JORC Code
2012
JORC Code (2012) explanation Details of the Reported Project
Sampling
techniques
Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialized industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as
limiting the broad meaning of sampling.
The exploration data presented in this announcement is based on the exploration drilling,
undertaken in 1986 – 1987 by Western States Minerals when 189 RC drillholes have been drilled
at the Mizpah project area.
Total length of drilling is approximately 5,075m.
The drill holes were sampled at regular, 5ft (approximately 1 .5m) intervals (Fig. A1.1). In total, 3,351
samples were collected and assayed for Au.
.
Figure A1.1: Histogram of the drillhole sample lengths.
Include reference to measures taken to ensure
sample representativeness and the appropriate
calibration of any measurement tools or systems
_used. _
Sample length was 5ft (approximately 1.5m) that provides good representative material for the gold
assays and mineralisation grade estimation.
Aspects of the determination of mineralisation that
are Material to the Public Report. In cases where
‘industry standard’ work has been done this would
be relatively simple (e.g. ‘reverse circulation
drilling was used to obtain 1 m samples from which
3 kg was pulverised to produce a 30 g charge for
fire assay’). In other cases, more explanation may
be required, such as where there is coarse gold
that has inherent sampling problems. Unusual
commodities
or
mineralisation
types
(e.g.
submarine nodules) may warrant disclosure of
detailed information.
The drillhole samples were analysed for gold. No information is available regarding minor and trace
elements.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc.) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is oriented
and if so, by what method, etc.).
Conventional RC drilling was used for delineating the gold lodes at the Mizpah project.
Drill
sample
recovery
Method of recording and assessing core and chip
sample recoveries and results assessed.
Information not available as the exploration results in this announcement are the result of a review
of the data from historical drilling activities.
.
Measures taken to maximize sample recovery and
ensure representative nature of the samples.
Industry standard practices that were in place in Northern America in the mid-1980’s were used.
Whether a relationship exists between sample
recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of
fine/coarse material.
Not applicable as the exploration results in this announcement are the result of a review of the data
from historical drilling activities.
Logging Whether core and chip samples have been
geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource
estimation, mining studies and metallurgical
studies.
Drilling was supervised by the geologists, Jim Woods and Ken Shonk. Rock chips were geologically
logged initially in field, and then, all drill cuttings (rock chips) were placed in the boxes and later
reviewed and logging revised in the office.
Whether logging is qualitative or quantitative in
nature.
Core
(or
costean,
channel,
etc.)
photography.
Geologic logging was qualitative.
The total length and percentage of the relevant
intersections logged.
100% of the drill hole samples was logged applying the same logging and documentation principles.
Sub-sampling
techniques
and
sample
preparation
If core, whether cut or sawn and whether quarter,
half or all core taken
Not applicable, non-core drilling was used
If non-core, whether riffled, tube sampled, rotary
split, etc. and whether sampled wet or dry.
Information not available as the exploration results in this announcement are the result of a review
of the data from historical drilling activities.
For all sample types, the nature, quality, and
appropriateness
of
the
sample
preparation
technique.
The drillhole samples (RC drill cuttings) have been prepared and analysed at the Barringer Labs,
Reno. Industry standard practices that were in place in Northern America in the mid-1980s were
used.
Quality control procedures adopted for all sub-
sampling stages to maximise representativeness
of samples.
Samples were assayed using conventional fire assay method with gravity finish.
Data quality was controlled by collecting duplicates that were assayed using cyanide leach and
atomic absorption method at the Drum Mine lab.
Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including
for
instance
results
for
field
duplicate/second-half sampling.
The drill holes were oriented and drilled vertically down that is appropriate for accurate delineation
of the gently dipping gold-bearing stratigraphic units.
Whether sample sizes are appropriate to the grain
size of the material being sampled.
Initial sample, 5 ft (approximately 1.5m) of RC material, is an industry standard for gold exploration.
Sub-sampling information is not available
Quality
of
assay
data
and laboratory
tests
The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
Samples were assayed using conventional fire assay method with gravity finish, which was the
industry standard practices that were in place in Northern America in the mid-1980s were used.
For geophysical tools, spectrometers, handheld
XRF instruments, etc., the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
Not applicable. This ASX announcement reports only drilling data, portable XRF was not used.
Nature of quality control procedures adopted (e.g.
standards, blanks, duplicates, external laboratory
checks) and whether acceptable levels of
accuracy (i.e. lack of bias) and precision have
been established.
QA/QC is historic in nature, therefore the nature of QA/QC is unknown.
Verification of
sampling and
assaying
The verification of significant intersections by
either
independent
or
alternative
company
personnel.
Alderan has drilled in 2020 the 2 diamond drillholes into the gold mineralisation distributed at the
Mizpah project area. Alderan’s drilling has verified continuity and grade of the gold lodes. (Figs.
A1.2 a,b)
The use of twinned holes. Alderan has drilled 2 diamond core drillholes with an objective of twinning and verification results of
the 1986-1987 drilling. The diamond drillholes drilled by the Alderan have intersected gold
mineralisation representing the extensions of the gold lodes delineated in 1980’s by Western States
Minerals (Figs. A1.2 a, b).
(a)
(b)
Figure A1.2: Verification diamond drillholes intersecting the gold lodes at the
(a) The drillhole DD20M_002
(b) The drillhole DD20M_005
Documentation of primary data, data entry
procedures,
data
verification,
data
storage
(physical and electronic) protocols.
Hard copies of the original documentation were received from the previous owners and digitized by
AL8 team. All digital data are safely stored in the company office in Perth.
Discuss any adjustment to assay data. Not applicable – no adjustments made.
Location
of
data points
Accuracy and quality of surveys used to locate drill
holes (collar and down-hole surveys), trenches,
mine workings and other locations used in Mineral
Resource estimation.
A N30W oriented grid with 300 ft (50m) grid spacing was established and used to control drilling.
RL of the collar coordinates was deduced from the topographic map, which was revised by draping
the collars onto high resolution DTM.
Specification of the grid system used. All data are recorded in a UTM zone 12 (North) NAD83 grid.
Quality and adequacy of topographic control. RL values obtained by GPS were routinely compared with the nominal elevation values that were
deduced form the regional topographic datasets.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results. Location (Fig. A1.3) and spatial distribution of the drillholes are applicable for assessment of a
prospectivity of the project area.
Figure A1.3: map showing distribution of the collars of the drillholes drilled at the Mizpah prospect
in 1986 – 1987
Whether the data spacing, and distribution is
sufficient to establish the degree of geological and
grade continuity appropriate for the Mineral
Resource
and
Ore
Reserve
estimation
procedure(s) and classifications applied.
Exploration drillholes are distributed at the distances approximately 15x15m in the central part of
the Mizpah deposit and broader, approximately 40x40m, at the peripheral parts of the project (Fig.
A1.3). Location and spatial distribution of the drillholes are applicable for quantitative assessment
of the project area, allowing to quantify geological and grade continuities of the gold mineralisation.
This data were used for assessment of the exploration target, however, because of lacking of the
QA/QC information, estimation of the Mineral Resources were not undertaken.
Whether sample compositing has been applied. Sampled material was not bulked and/or composited in any of the physical manners.
Orientation of
data
in
relation
to
geological
structure
Whether the orientation of sampling achieves
unbiased sampling of possible structures and the
extent to which this is known, considering the
deposit type.
The drillholes were drilled vertically down that allows to cut contacts of the gold lodes and the host
stratigraphy at the high angles (quasi-perpendicular) to their strike.
If the relationship between the drilling orientation
and the orientation of key mineralised structures is
considered to have introduced a sampling bias,
this should be assessed and reported if material.
The orientation of the drilling at high angle to the contacts of the lodes is optimal for delineation of
the mineralised bodies allowing to obtain non-biased results.
Sample
security
The measures taken to ensure sample security Information regarding the field procedures is not available given the historic nature of the data. The
digital data are securely stored at the company database.
Audits
or
reviews
The results of any audits or reviews of sampling
techniques and data.
Information not available regarding any audits or reviews given the historic nature of the data.

Section 2 - Reporting of Exploration Results

(Criterial in this section apply to all succeeding sections)

Criteria of
JORC Code
2012
JORC Code (2012)
explanation
Details of the Reported Project
Mineral
tenement and
land
tenure
status
Type, reference name/number,
location and ownership including
agreements or material issues
with third parties such as joint
ventures,
partnerships,
overriding royalties, native title
interests,
historical
sites,
wilderness or national park and
environmental settings.
All drill sites are located on unpatented lode claims subject to the terms of the Option to Joint Venture Agreement
dated 10 April 2020 by and between Volantis Resources Corp. and Tamra Mining Company LLC. Locations are as
follows: Site A – DM5; Site B-DM5; Site C-DM7; Site D-DM4; Site E-DM12; Site F-DM10; Site G-DM12: Site H-
DM15; Site I-DM14.
The security of the tenure held at
the time of reporting along with
any
known
impediments
to
obtaining a license to operate in
the area.
Title is maintained in accordance with the General Mining Act of 1872 and its associated regulations. The claims
are valid and in good standing. The claims have been properly located and monumented. The claims may be freely
transferable under the terms of the Option Agreement, subject only to the paramount title of the United States of
America.
Exploration
done by other
parties (2.2)
Acknowledgment and appraisal
of exploration by other parties.
The Drum Mountains of west central Utah have long been a subject of mining and exploration for gold, copper, and
manganese, starting from 1800’s and continued until early 1900’s. This was followed by renewed interest in
beryllium, gold, manganese, and uranium in the past 20 years.
Gold and copper were discovered in the Drum Mountains in 1872, and from 1904 to 1917, gold, silver, and copper
was produced from siliceous replacement fissure deposits in jasperoids, limestone and dolomite, for a total value
of about $46,000.
Exploration for gold and base metals intermittently continued through the entire 20’s century. In particular, since
early 1960’s, when jasperoids similar to that commonly found in highly productive gold mining districts have been
identified in the Drum Mountains of Utah, the specialised studies of the jasperoids have been undertaken by USGS
and the different mining companies. Sampling of these rocks commonly reveals anomalous concentrations of gold.
Geology Deposit type, geological setting,
and style of mineralisation.
The mineralisation presented at the Drum area includes different types and mineralisation styles, main of which
are Carlin-like gold, gold-bearing skarns, Cu-Mo-Au porphyries, and Marigold-type.
The focus of the Alderan’s exploration efforts at the Mizpah prospect area of Detroit/Drum is to discover a Carlin-
like gold deposit. Key feature of Carlin-like deposits includes:
a)
Favourable permeable reactive rocks (silty limestones and limey siltstones)
b)
Favourable structures often coincident with mineral-related intrusive
c)
Gold-bearing hydrothermal solutions
d)
Micron-sized gold in fine-grained disseminated pyrite
e)
Common geochemical indicators are: As, Sb, Ba, Te, Se, Hg
  • f) Common argillization, development of the jasperoids and decalcification of the host rocks.

This mineralisation was explored and mineralised bodies delineated in the Mizpah area by the drillholes, that are presented in this announcement.

  • Other types of mineralisation, representing exploration targets of Alderan in the Drum mountains area includes: 1. Intrusion hosted/related gold mineralisation positions. 2. Marigold style brecciated quartzites, which can spatially associate with the Carlin-like mineralisation. 3. Magnetite copper-gold skarns that were identified through the ground magnetics.

Drill hole A summary of all information Information material to the understanding of In total, 189 drillholes have been drilled in 1986 – 1987 by Western States Minerals exploring for Carlin-like gold at the Mizpah area. the exploration results including a tabulation of the following Location of the drillhole collars and the depth of drilling presented in the releases is reported in the summary table information for all Material drill shown at Appendix 1. holes: Easting and Northing of the drill All holes have been drilled vertically down (i.e Dip = -90[o] ). hole collar. Elevation or RL The holes were shallow, with the length commonly in the range of 20 – 40m (Fig. A2.1) (Reduced Level – elevation above sea level in metres) of the drill hole collar. Dip and azimuth of the hole. Down hole length and interception depth and hole length. Figure A.2.1: Histogram of the drillhole lengths If the exclusion of this Drillhole information adequately presented in the Appendix 1 and on the diagrams without exclusions. information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should

clearly explain why this is the
case.
Data
aggregation
methods
In reporting Exploration Results,
weighting averaging techniques,
maximum
and/or
minimum
grade truncations (e.g. cutting of
high grades) and cut-off grades
are usually Material and should
be stated.
Length weighted average was used for estimation the grade of the intersection.
The samples grade of the mineralised interval varied from 0.01 to 9.1 g/t Au (Fig. A2.2).
Figure A2.2: Histogram of the sample grades
Where
aggregate
intercepts
incorporate short lengths of high-
grade results and longer lengths
of
low-grade
results,
the
procedure
used
for
such
aggregation should be stated
and some typical examples of
such aggregations should be
shown in detail.
Not applicable. This ASX announcement reports grade and tonnage of the exploration target that was determined
by estimated the drillhole samples into the block model. Estimation was made using Multiple Indicator Kriging.
The assumptions used for any
reporting of metal equivalent
values should be clearly stated.
Not applicable, this ASX announcement reports the gold grade.
Relationship
between
mineralisation
widths
and
intercept
lengths
These
relationships
are
particularly
important in
the
reporting of Exploration Results.
The diamond drill holes were oriented and drilled in such a way to attempt to cut inferred geologic controls (bedding,
faults etc.) perpendicular to their strike in order to measure true thicknesses.
If
the
geometry
of
the
mineralisation with respect to the
drill hole angle is known, its
nature should be reported.
Mineralisation is dipping at 12o degrees at the 225o Azi (Fig. A2.3).
Figure A2.3: Cross-section of the Mizpah project
If it is not known and only the
down hole lengths are reported,
there
should
be
a
clear
statement to this effect (e.g.
‘down hole length, true width not
known’).
Grade and length of mineralised intersections, estimated using 0.2g/t Au as lower cut-of, are presented on the
Figure A2.4. Because the drilling was oriented approximately perpendicular to the strike of the gold lodes (Fig.
A2.3) it is assumed that reported intersections (Fig. A2.4) are closely approximate their true thickness.
Figure A2.4: Grade vs. Thickness of the mineralised intersections, that were defined using 0.2g/t Au as the lower
cut-off.
Diagrams Appropriate maps and sections
(with scales) and tabulations of
intercepts should be included for
any significant discovery being
reported These should include,
but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
Maps and tables are presented in the text of the release and in the JORC Table 1.
Balanced
reporting
Where comprehensive reporting
of all Exploration Results is not
practicable,
representative
reporting of both low and high
grades and/or widths should be
practiced to avoid misleading
reporting of Exploration Results.
The release is focused on presenting the quantitative assessment results of the exploration targets based on the
1986-1987 drilling at the Mizpah gold project. This was made by estimating the sample grades in to block model
using the Multiple Indicator Kriging. Data and results of the study are summarized and reported concisely.
In particular, the high and low-grade data are presented on the diagrams (Figures. A1.2, A2.2, A2.3 and A2.4) and
downhole thicknesses of the intersections are adequately reported (Figure A2.3).
Other
substantive
exploration
data
Other
exploration
data,
if
meaningful and material, should
be reported including (but not
limited
to):
geological
observations;
geophysical
survey
results;
geochemical
survey results; bulk samples –
size and method of treatment;
metallurgical test results; bulk
density,
groundwater,
geotechnical
and
rock
characteristics;
potential
deleterious
or
contaminating
substances.
Recently completed geophysical (IP) survey have identified a chargeability anomaly in the vicinity of the Mizpah
project, suggesting possible presence of the new Carlin-like targets.
Further work The nature and scale of planned
further work (e.g. tests for lateral
extensions or depth extensions
or large-scale step-out drilling).
Diagrams clearly highlighting the
areas of possible extensions,
including the main geological
interpretations and future drilling
areas, provided this information
is not commercially sensitive.
The extension of the Mizpah gold lodes and new targets will explored by drilling during the next phase of exploration
which is currently planned and will be announced separately.