Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

HAWK RESOURCES LIMITED. Capital/Financing Update 2022

Feb 24, 2022

65081_rns_2022-02-24_fcdc72fc-e114-414a-9df2-fe0db0532f05.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

ASX ANNOUNCEMENT 25 February 2022

Alderan intersects 16.2m @ 1.04g/t Au with assays up to 6.0g/t Au at Drum

HIGHLIGHTS

  • Alderan’s first drill hole 9DD22-001 at Drum gold deposit at its Detroit project in Utah, USA has intersected: o 6.3m @ 2.9g/t Au from 65.9m downhole and, o 1.5m @ 5.6g/t Au from 70.7m downhole within… …a broad gold mineralised interval of 16.2m @ 1.04g/t from 60.2m downhole.

  • 9DD22-001 gold grades over sample intervals include 6.01g/t (0.61m), 5.23g/t (0.92m) and 3.4g/t (1.13m).

  • Result verifies the presence of high-grade remnant oxide gold mineralisation approximately 20m below the bottom of the East Pit which Alderan modelled from historical drill hole data.

  • Drum Gold Mine produced 125,000oz and is geologically open along strike and down dip. It has received no modern exploration since mining ceased in 1989.

  • Examples of historical high-grade drill intercepts at Drum include: o 13.7m @ 6.4g/t Au from 13.7m downhole including 4.6m @ 18.1g/t Au (YC-58A) o 24.4m @ 2.7g/t Au from 9.1m downhole including 7.6m @ 7.6g/t Au (YC-60) o 22.9m @ 5.0g/t Au from 19.8m downhole including 9.1m @ 10.8g/t Au (YC-113A) o 35.1m @ 4.3g/t Au from 25.9m downhole including 18.3m @ 7.7g/t Au (YC-169) o 15.2m @ 4.5g/t Au from 73.2m downhole including 6.1m @ 10.3g/t Au (YC-174)

  • Modelling of historical drill data highlights Drum’s potential for extensions to remnant mineralisation and high-grade gold in structural zones.

  • Alderan’s in-pit rock samples at Drum assay up to 10.7g/t gold with 36 of 76 samples assaying +0.5g/t gold and 22 assaying +1.0g/t gold

  • Further 9DD22-001 and remaining Detroit drill hole assays are expected over coming weeks; Drum drilling is expected to recommence on 1[st] March.

Alderan Resources Limited (ASX: AL8) ( Alderan or the Company ) is pleased to provide initial assay results for drillhole 9DD22-001, the first hole completed at the historical Drum gold mine ( Drum ) in its planned 10-hole drilling programme aimed at verifying and extending remnant oxide mineralisation.[1] Drum lies within Alderan’s Detroit Project, located in the Drum Mountains region of western Utah, USA.

Hole 9DD22-001 drilled to 117.95m was designed to test for remnant gold mineralisation in the zone surrounding historical hole YC-16 on the western side of Drum’s East Pit (see Figures 1 & 2). YC-16 intersected 56.4m @ 1.8g/t Au from 44.2m downhole in the Tatow unit which hosts historical ore in the East Pit. Alderan modelling of historical drill data suggests approximately 10-20m of the YC-16 intersection is remnant gold mineralisation below Drum’s pit bottom (includes sample grades up to 7.1g/t Au).

Alderan received 9DD22-001 gold-only assays for 20 samples ranging in length from 0.5 - 2.15m between 57.0 - 78.3m down the hole. The highest grade assays are 6.01g/t Au (0.61m), 5.23g/t Au (0.92m) and 3.4g/t Au (1.13m) and the mineralized intersections include:

  • 6.3m grading 2.9g/t Au from 65.9m downhole and,

1 Refer Alderan ASX announcements dated 20 January 2022, 22 February 2022

ASX ANNOUNCEMENT 25 February 2022

  • 1.5m grading 5.6g/t Au from 70.7m downhole, within

  • 16.15m grading 1.04g/t Au from 60.04m downhole (includes internal waste intervals grading <0.15g/t Au) which lies approximately 20m below the pit wall.

Figure 3 shows a series of photographs of the mineralised drill core with interval assays.

Alderan Managing Director, Scott Caithness said: “The initial assays for hole 9DD22-001 are an excellent start to Alderan’s Drum drilling campaign. This result, along with our in-pit rock samples which grade up to 10.7g/t Au, provides confidence in our modelling of exploration potential for remnant mineralisation and also in the grade of oxide mineralisation likely to be intersected in future drilling. Particularly exciting will be upcoming drilling for mineralised extensions in previously unexplored areas to the north, south and down dip of the historically defined deposit.

“Drilling will re-commence at Drum in early March with further verification holes followed by holes to extend the historically defined deposit. We are also expecting assay results for the remainder of 9DD22-001, Mizpah hole 3DD22-001 and the Detroit holes completed in Q4, 2021 over the coming weeks.”

Hole 9DD22-001 was drilled as an angle hole to the east from the western pit wall of the East Pit rather than a twinned vertical hole next to YC-16 which was not possible due to historical mining. It is concluded from the grade of mineralisation and the length of the intersection that it represents a strong verification of the mineralisation intersected in YC-16.

==> picture [517 x 284] intentionally omitted <==

Figure 1 : Drum East Pit cross section 4377325N showing historical drill hole intersections and Alderan’s 9DD22-001 intersection.

It also provides confidence in Alderan’s modelling estimate of exploration potential for remnant oxide mineralisation based on historical drilling of approximately 1.2 - 1.5 million tonnes at a grade of approximately 1.1 - 1.4g/t gold (approximately 42,000-67,000 ounces)[2] . This estimate of exploration potential quantity and grade is conceptual in nature, there has been insufficient exploration to estimate Mineral Resources and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

2 Refer Alderan ASX releases dated 18 and 19 November 2021, 22 February 2022.

ASX ANNOUNCEMENT 25 February 2022

In addition to the exploration potential, the Drum mineralisation remains open along strike to the north and south plus down dip to the southwest where drill holes include YC-174 which intersected 15.2m grading 4.5g/t gold (including 6.1m at 10.3g/t Au) 150m from historical ore in the West Pit. Also, the ore horizon mined in the East Pit intersected by 9DD22-001 remains open down dip to the southwest and has not been drill tested below the West pit. Drum has both long and high-grade historical drill intercepts with hole DM-9 intersecting 70.1m grading 1.0g/t gold and the highest-grade individual 5ft (~1.5m) sample being 38.8g/t gold.

==> picture [517 x 407] intentionally omitted <==

Figure 2 : Aerial view of Drum showing pit outlines, significant historical drill intersections plus completed (red) and proposed Alderan drill holes . Priority 1 sites (yellow) are in the current programme while Priority 2 sites (green) are contingent.

Next Steps

Alderan awaits assays for drill hole 3DD22-001 at Mizpah and final assays for hole 9DD22-001 at Drum as well as results from holes 7DD21-003, 6DD21-004, 6DD21-005 and 6DD21-006 which were completed on its Detroit project in Q4 2021.[3] Partial assays for holes 6DD21-004 and 6DD21-005 were released in an ASX announcement on 30 December 2021. COVID-19 is impacting the turnaround time for sample analysis with the lab operating at around 80% capacity.

Additional drilling focused on Drum will commence in early March following a drill crew break and rig change currently in progress (see Table 1). Personnel shortages due to COVID are impacting Major Drilling’s ability to

3 Refer Alderan ASX announcements dated 30 December 2021, 22 February 2022

ASX ANNOUNCEMENT 25 February 2022

provide relief drillers when project dedicated drilling crews are due for breaks. This is resulting in drilling operating on a ‘20 days on - 10 days off’ roster throughout the remainder of the Detroit programme.

Table 1: Drum Planned and Completed Holes

Table 1:Drum Planned and Completed Holes
Drill Site Easting Northing Target
Depth (m)
Site Rationale and Target
Drum
9DD22-001
(Completed)
327 449 4 377 326 120 East Pit: Verify remnant mineralisation at bottom of YC-16 which
intersected 56.4m @ 1.8g/t Au.
Initial assays received. Intersection of 16.15m @ 1.04g/t Au from
60.04m downhole including 6.3m @ 2.9g/t Au from 65.9m downhole
and 1.5m @ 5.6g/t Au from 70.5m downhole. Further assays
awaited.
Site A-1 327 209 4 377 250 50 West Pit: Verify remnant mineralisation at bottom of YC-114 which
intersected 9m @ 2.0g/t Au.
Site A-2 327 209 4 377 250 110 West Pit: Verify remnant mineralisation at bottom of YC-72 which
intersected 9m @ 1.4g/t Au & Tatow test.
Site M-1 327 460 4 377 150 120 East Pit: Verify remnant mineralisation at bottom of DM-23 which
intersected 16.8m @ 1.2g/t Au.
Site M-2 327 455 4 377 150 120 East Pit: Tatow test below dropcut.
Site B 327 243 4 377 045 150 West Pit: Verify remnant mineralisation at bottom of YC-169 which
intersected 35m @ 4.3g/t Au & Tatow test.
Site G 327 409 4 377 146 140 West Pit: Tatow test in hanging wall of King Tut fault.
Site H 327 458 4 377 250 135 East Pit: Test down dip extension of YC-16 which intersected 56.4m
@ 1.8g/t Au.
Site E 327 369 4 377 104 100 West Pit: Tatow test in hanging wall of King Tut fault.
Site Ma-01 327 096 4 376 904 120 West Pit Extension: Verify YC-174 which intersected 15.2m @
4.5g/t Au; permit amendment required.

ASX ANNOUNCEMENT 25 February 2022

Figure 3 : Photograph series of mineralised drill core from the hole 9DD22-001 with gold assays from 60.04 - 76.19m down hole. The overall mineralised intercept is 16.15m @ 1.04g/t Au which includes the internal waste intervals grading <0.15g/t Au.

==> picture [325 x 486] intentionally omitted <==

----- Start of picture text -----

0.19g/t
Au
----- End of picture text -----

==> picture [248 x 486] intentionally omitted <==

----- Start of picture text -----

0.15g/t
Au
----- End of picture text -----

ASX ANNOUNCEMENT 25 February 2022

==> picture [495 x 485] intentionally omitted <==

----- Start of picture text -----

0.08g/t 1.09g/t
Au Au
0.03g/t
0.05g/t
Au
Au
0.16g/t
Au
3.4g/t
Au
----- End of picture text -----

ASX ANNOUNCEMENT 25 February 2022

==> picture [486 x 485] intentionally omitted <==

----- Start of picture text -----

2.27g/t
Au
6.01g/t
Au 0.28g/t 0.03 g/t
Au Au
5.23 g/t
Au
----- End of picture text -----

ASX ANNOUNCEMENT 25 February 2022

==> picture [234 x 485] intentionally omitted <==

----- Start of picture text -----

0.49g/t
Au
----- End of picture text -----

Drum Background

Alderan secured an option over the Drum Gold Mine, one of the most productive and economically important sediment-hosted gold deposits in Utah, in late September 2021 as part of its strategy to consolidate the Detroit mining district[4] (see Figure 5).

Drum was discovered in 1982 with a drill intercept of 15m grading 8.5g/t gold and was mined from the adjacent East and West pits between 1984-89 [5] . Over its six-year mine life, it reportedly produced 125,000oz of gold from 3.17 million tonnes of oxide ore grading 1.22g/t gold. Towards the end of its life, a small underground operation was developed in the West Pit which produced mined grades of +4g/t gold.

4 Refer Alderan ASX announcement dated 30 September 2021.

5 Krahulec, K.; Sedimentary rock-hosted gold and silver deposits in the Northeast Basin and Range, Utah; Utah Geol Survey; Jan 2011.

ASX ANNOUNCEMENT 25 February 2022

Alderan’s modelling of historical data suggests the 1980s drill defined gold deposit at Drum has exploration potential for remnant gold mineralisation totalling approximately 1.2 - 1.5 million tonnes at a grade of approximately 1.1 - 1.4g/t gold (approximately 42,000 - 67,000 ounces)[6] . This estimate of exploration potential quantity and grade is conceptual in nature, there has been insufficient exploration to estimate Mineral Resources and it is uncertain if further exploration will result in the estimation of a Mineral Resource.

The mineralisation however remains open along strike to the north, south and down dip to the southwest where drill holes include YC-174 which intersected 15.2m grading 4.5g/t gold (including 6.1m at 10.3g/t Au) 150m from historical ore in the West Pit (see Figures 6-9). The ore horizon mined in the East Pit remains open down dip to the southwest and has not been drill tested below the West pit. Drum has both long and high-grade historical drill intercepts. Hole DM-9 intersected 70.1m grading 1.0g/t gold and the highest-grade individual assay over a 5ft (~1.5m) sample interval is 38.8g/t gold.

Examples of high grade historical intersections from drilling undertaken by Western States Minerals and Nevada Resources Inc in 1982-89 include:

  • YC-58A: 13.7m @ 6.4g/t Au from 13.7m downhole including 4.6m @ 18.1g/t Au

  • YC-60: 24.4m @ 2.7g/t Au from 9.1m downhole including 7.6m @ 7.6g/t Au

  • YC-113A: 22.9m @ 5.0g/t Au from 19.8m downhole including 9.1m @ 10.8g/t Au

  • YC-169: 35.1m @ 4.3g/t Au from 25.9m downhole including 18.3m @ 7.7g/t Au

  • YC- 174: 15.2m @ 4.5g/t Au from 73.2m downhole including 6.1m @ 10.3g/t Au

  • YC-242: 38.1m @ 3.2g/t Au from 30.5m downhole including 15.2m @ 6.4g/t Au

==> picture [351 x 308] intentionally omitted <==

Figure 5 : Alderan’s Detroit tenement showing location of Drum Mine.

Alderan composite grab rock-chip sampling along the outcropping walls of the East and West pits focussed on altered target host rocks of the Tatow and Chisholm formations, the prime ore horizons during historical mining, and in visible structural zones interpreted to be potential hosts of high-grade mineralisation (see Figure 10).

This sampling verified that remnant high grade gold occurs in the pit walls with the highest gold assay being 10.65g/t over a 2.8m sampling interval[7] . Additional high-grade sample intervals include 1.7m grading 7.01g/t gold and 2.8m grading 5.86g/t gold. A total of 36 samples of the 76 collected grade +0.5g/t gold with 22 of these grading +1.0g/t gold. An additional 17 samples grade +0.15g/t gold which is above the cutoff for oxide gold leach operations in neighbouring Nevada.

6 Refer Alderan ASX releases dated 18 and 19 November 2021.

7 Alderan ASX announcement dated 16 December 2021.

ASX ANNOUNCEMENT 25 February 2022

==> picture [516 x 350] intentionally omitted <==

Figure 6: Plan showing modelled Drum gold deposit above 0.15g/t Au cut-off grade based on historical drill holes plus significant historical drill hole intersections. Potential remnant mineralisation lies outside pit boundaries to the south, north and southwest and is open.

==> picture [515 x 177] intentionally omitted <==

Figure 7: Drum long section showing gold mineralisation based on historical drill holes and interpreted geology plus significant down dip exploration potential.

ASX ANNOUNCEMENT 25 February 2022

==> picture [492 x 210] intentionally omitted <==

Figure 8: Drum East Pit north-south section showing the mineralised blocks above 0.15g/t Au cut-off based on historical drill holes – open to south.

==> picture [494 x 211] intentionally omitted <==

Figure 9: Drum West Pit north-south section showing the mineralised blocks above 0.15g/t Au cut-off based on historical drill holes – open to south.

ASX ANNOUNCEMENT 25 February 2022

==> picture [515 x 406] intentionally omitted <==

Figure 10 : Aerial view of Drum Gold Mine pits with Alderan rock sample locations and gold assay results.

Detroit Project

The Detroit Project is one of four Alderan projects (Figure 11) in Utah, USA. It lies within the Detroit Mining District, approximately 175km southwest of Salt Lake City, and contains numerous historical copper, gold and manganese mines. The district has been explored for copper and gold in the past by major mining companies such as Anaconda Copper, Kennecott, Newmont, BHP and Freeport-McMoRan but no one company was able to build a significant contiguous land position to enable district-wide modern exploration. The United States Geological Survey ( USGS ) has also explored the area, sampling extensive mineralised jasperoids.

ASX ANNOUNCEMENT 25 February 2022

==> picture [425 x 320] intentionally omitted <==

Figure 11 : Alderan Resources project locations in western Utah.

ENDS

This announcement was authorised for release by the Board of Alderan Resources Limited.

ALDERAN RESOURCES LIMITED ABN: 55 165 079 201 Suite 23, 513 Hay Street, Subiaco, 6008, WA www.alderanresources.com.au

For further information: e: [email protected]

p: +61 8 6143 6711 Scott Caithness Managing Director mailto:[email protected]

Competent Persons Statement

The information contained in this announcement that relates to both the new exploration results (assays from drill hole 9DD22-001) and the exploration potential for the Drum gold mine peripheral to the historical pits is based on, and fairly reflects, information compiled by Dr Marat Abzalov, who is a Fellow of the Australian Institute of Mining and Metallurgy. Dr Abzalov is a consultant to Alderan and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Dr Abzalov consents to the inclusion in this announcement of the matters based on his information in the form and context in which it appears. Dr Abzalov holds securities in the Company.

ASX ANNOUNCEMENT 25 February 2022

The information in this announcement that relates to historical exploration results were reported by the Company in accordance with listing rule 5.7 on 30 September 2021, 18 November 2021, 19 November 2021, 16 December 2021, 30 December 2021, 20 January 2022 and 22 February 2022. The Company confirms it is not aware of any new information or data that materially affects the information included in the previous announcement.

Appendix 1: Drill hole location details

Drill hole ID Easting* Northing* RL (m) Dip Azimuth Depth (m) Drill Type
9DD22-001 327 449 4 377 326 1826.1 -60o 98o 120 Diamond

*NAD83-z12

Appendix 2: JORC Code, 2012 Edition – Table 1 Report in relation to historical drilling

Section 1 - Sampling Techniques and Data

(Criterial in this section apply to all succeeding sections)

Criteria of
JORC Code
2012
JORC Code (2012) explanation Details of the Reported Project
Sampling
techniques
Nature and quality of sampling (e.g.
cut channels, random chips, or
specific
specialized
industry
standard
measurement
tools
appropriate to the minerals under
investigation, such as down hole
gamma sondes, or handheld XRF
instruments, etc.). These examples
should not be taken as limiting the
_broad meaning of sampling. _
Diamond drilling was used to obtain rock materials subject to pending gold and multi-element geochemical
analysis.
Sample length vary from 1 to 3 meters dependent on observed geologic characteristics.
The core was sawn by diamond saw ensuring that geologic characteristics were represented equally in both the
analytical sample and the half core remained in the core trays. Sample weights delivered to the analytical lab vary
from 3 to 7 kilograms in weight.
Include reference to measures
taken
to
ensure
sample
representativeness
and
the
appropriate
calibration
of
any
measurement tools or systems
used.
HQ diameter drill core was used for sampling. Sample length was 1 to 3 metres, that provides good representative
material.
Aspects of the determination of
mineralisation that are Material to
the Public Report. In cases where
‘industry standard’ work has been
done this would be relatively simple
(e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from
which 3 kg was pulverised to
produce a 30 g charge for fire
assay’). In other cases, more
explanation may be required, such
as where there is coarse gold that
has inherent sampling problems.
Unusual
commodities
or
mineralisation
types
(e.g.
submarine nodules) may warrant
disclosure of detailed information.
The drill core samples are analysed for gold. Individual samples were selected based on their geological
characteristics including lithology, alteration, and mineralization styles. Materials are being analysed at ALS North
American facilities.
The gold method being used is the ALS procedure that uses a 30-gram charge for fire assay (Au-AA23).
Drilling
techniques
Drill
type
(e.g.
core,
reverse
circulation,
open-hole
hammer,
rotary air blast, auger, Bangka,
sonic, etc.) and details (e.g. core
diameter, triple or standard tube,
depth
of
diamond
tails,
face-
Diamond drilling was used to obtain rock materials.
All core was of “HQ” diameter.
sampling bit or other type, whether
core is oriented and if so, by what
method, etc.).
Drill
sample
recovery
Method of recording and assessing
core and chip sample recoveries
and results assessed.
Core recoveries were measured by the geologist in charge of all logging. Core recovering for the entire program
was excellent (> 98%).
Measures
taken
to
maximize
sample
recovery
and
ensure
representative
nature
of
the
samples.
Industry standard practices, e.g. optimized drilling speed and regular changes of the drill bits, were used
throughout to ensure no recovery or sample representation issues were encountered.
Whether
a
relationship
exists
between
sample
recovery
and
grade and whether sample bias may
have occurred due to preferential
loss/gain of fine/coarse material.
Not relationships observed between the core recovery and sample grades.
Logging Whether core and chip samples
have
been
geologically
and
geotechnically logged to a level of
detail to support appropriate Mineral
Resource
estimation,
mining
studies and metallurgical studies.
Geological, geotechnical, and geophysical (magnetic susceptibility) logging was completed on all of the core
materials and is to an industry standard appropriate to the initial exploration nature of the program.
Whether logging is qualitative or
quantitative in nature. Core (or
costean,
channel,
etc.)
photography.
Geologic logging is qualitative to semi-quantitative making use of an experienced geologist and high-quality
binocular microscope. Geotechnical and geophysical logging results are quantitative.
The total length and percentage of
the relevant intersections logged.
100% of the drill core was logged applying the same logging and documentation principles.
Sub-sampling
techniques
and
sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core
taken
Drill core was sawn by a diamond saw and half core was sampled with remaining half core retained in the core
trays.
If non-core, whether riffled, tube
sampled, rotary split, etc. and
_whether sampled wet or dry. _
Not applicable, diamond drill core drilling was used.
For all sample types, the nature,
quality, and appropriateness of the
sample preparation technique.
The samples are prepared in the ALS laboratory in USA. Sample preparation follows the standard procedure of
the ALS lab, representing the industry common practice.
Each sample was weighed, fine crushed to <2mm (70% pass) and split by a riffle splitter. The sample was then
pulverized up to 250g at 85% < 75um.

==> picture [309 x 142] intentionally omitted <==

Quality control procedures adopted
for all sub-sampling stages to
maximise
representativeness
of
samples.
The logging geologist supervised sample sawing and splitting to ensure all samples were geological
representative.
Quality of comminutions is verified by a control sieving, which is a standard procedure of the ALS laboratories.
Measures taken to ensure that the
sampling is representative of the in-
situ material collected, including for
instance
results
for
field
duplicate/second-half sampling.
The diamond drill holes were oriented and drilled in such a way to attempt to cut inferred geologic controls
(bedding, faults etc.) perpendicular to their strike in order to measure true thicknesses. The logging geologist
supervised sample sawing and splitting to ensure all samples were geological representative.
Whether
sample
sizes
are
appropriate to the grain size of the
material being sampled.
Sample weight is in the range from 3 to 7 kg which is appropriate for mineralisation present in this project.
Quality
of
assay
data
and laboratory
tests
The
nature,
quality
and
appropriateness of the assaying
and laboratory procedures used and
whether the technique is considered
partial or total.
Diamond drillcore samples were assayed at the ALS laboratory. The gold method being used is the ALS procedure
that uses a 30-gram charge for fire assay, AKLS code is Au-AA23.
Multi-element geochemical analysis is planned to be used on geologic composite that vary in length from 4 to 6
meters that development from remaining gold sample pulps. That ALS procedure for this is ME-MS61m.
These are standard techniques commonly used for analysis of the gold mineralisation. 4acid digest assures a
most complete nature of the assayed results.
For
geophysical
tools,
spectrometers,
handheld
XRF
instruments, etc., the parameters
used in determining the analysis
including instrument make and
model, reading times, calibrations
factors applied and their derivation,
etc.
Not applicable. This ASX announcement reports only drilling data, portable XRF and geophysical instruments
were not used.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates,
external
laboratory
checks) and whether acceptable
levels of accuracy (i.e. lack of bias)
and
precision
have
been
established.
Certified standard reference materials have been inserted in the sample sequence at a rate of two percent. These
materials include certified gold pulps, blank pulps, and coarse blank materials. The logging geologist was
responsible for the placement of these materials. Duplicate samples will be selected and submitted for analysis
once initial gold results are received.
Verification of
sampling and
assaying
The
verification
of
significant
intersections by either independent
or alternative company personnel.
Not applicable. The current announcement is reporting essentially the initial drill holes, with initial assays still
pending.
The use of twinned holes. Not applicable – no twinned holes are planned at the current exploration program. Twin holes will be used after
economic mineralisation has been intersected.
Documentation of primary data,
data
entry
procedures,
data
verification, data storage (physical
and electronic) protocols.
Drill core was rigorously documented by Alderan geologists. All field data are collected, entered into excel
spreadsheets and validated. Assay results have been obtained electronically from the ALS laboratory.
All data are safely stored in the company office in Perth.
Discuss any adjustment to assay
data.
Not applicable – no adjustments made.
Location
of
data points
Accuracy and quality of surveys
used to locate drill holes (collar and
down-hole surveys), trenches, mine
workings and other locations used
in Mineral Resource estimation.
A handheld sub-meter GPS was used for collars and geochemical samples locating. Accuracy of the GPS based
techniques was deemed sufficient given the initial exploration nature of the drill program.
Specification of the grid system
used.
All data are recorded in a UTM zone 12 (North) NAD83 grid.
Quality
and
adequacy
of
topographic control.
RL values obtained by GPS were routinely compared with the nominal elevation values that were deduced from
the high resolution DTM system of the project area.
Data spacing
and
distribution
Data
spacing for
reporting
of
Exploration Results.
Location and spatial distribution of the drillholes are applicable for assessment of a prospectivity of the project
area but the data not suitable and was not intended to be used for quantitative assessments of the project, i.e. not
intended for estimation of the Mineral Resources.
Whether the data spacing, and
distribution is sufficient to establish
the degree of geological and grade
continuity
appropriate
for
the
Mineral Resource and Ore Reserve
estimation
procedure(s)
and
classifications applied.
Location and spatial distribution of the drillholes are applicable for assessment of a prospectivity of the project
area but the data not suitable and was not intended to be used for quantitative assessments of the project, i.e. not
intended for estimation of the Mineral Resources.
Whether sample compositing has
been applied.
Sampled material was not bulked and/or composited in any of the physical manners.
Orientation of
data
in
relation
to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of
possible structures and the extent to
which this is known, considering the
deposit type.
The diamond drill holes were oriented and drilled in such a way to attempt to cut inferred geologic controls
(bedding, faults etc.) perpendicular to their strike in order to measure true thicknesses. The logging geologist
supervised sample sawing and splitting to ensure all samples were geological representative.
If the relationship between the
drilling
orientation
and
the
orientation
of
key
mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and reported if
material.
The diamond drill holes were oriented and drilled in such a way to attempt to cut inferred geologic controls
(bedding, faults etc.) perpendicular to their strike in order to measure true thicknesses. The logging geologist
supervised sample sawing and splitting to ensure all samples were geological representative.
Sample
security
The measures taken to ensure
sample security
Chain of custody was maintained at all steps of the drill and sampling procedure. Only authorised personnel
handled or viewed the drill materials.
Audits
or
reviews
The results of any audits or reviews
of sampling techniques and data.
Drilling and sampling procedures were systematically reviewed by the company personnel and Marat Abzalov,
external consultant acting as theproject’s Competent Person.

Section 2 – Reporting of Exploration Results

(Criterial in this section apply to all succeeding sections)

Criteria of
JORC Code
2012
JORC Code (2012) explanation Details of the Reported Project
Mineral
tenement and
land
tenure
status
Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical
sites, wilderness or national park
and environmental settings.
All drill sites are located on unpatented lode claims owned by North Exploration LLC. The claims are subject to a
Mining Lease with Option to Purchase Agreement dated 27 September 2021 between North Exploration and Valyrian
Resources Corp. See ASX release dated 30 September 2021. Some of North Exploration’s mining claims have been
over-pegged by later applications. Legal due diligence however has confirmed that the North claims pre-date these
later applications. It is Alderan’s view that North Exploration’s claims are senior and valid. Any expenditure required
to prove the validity of the mining claims will be credited to required work commitment expenditures.
The security of the tenure held at
the time of reporting along with any
known impediments to obtaining a
license to operate in the area.
Title is maintained in accordance with the General Mining Act of 1872 and its associated regulations. The claims are
valid and in good standing. The claims have been properly located and monumented. The claims may be freely
transferable under the terms of the Option Agreement, subject only to the paramount title of the United States of
America.
Exploration
done by other
parties (2.2)
Acknowledgment and appraisal of
exploration by other parties.
The Drum Mountains of west central Utah have long been a subject of mining and exploration for gold, copper, and
manganese, starting from 1800’s and continued until early 1900’s. This was followed by renewed interest in
beryllium, gold, manganese, and uranium in the past 20 years.
Gold and copper were discovered in the Drum Mountains in 1872, and from 1904 to 1917, gold, silver, and copper
was produced from siliceous replacement fissure deposits in jasperoids, limestone and dolomite, for a total value of
about $46,000.
Exploration for gold and base metals intermittently continued through the entire 20th century. In particular, since early
1960’s, when jasperoids similar to that commonly found in highly productive gold mining districts have been identified
in the Drum Mountains of Utah, the specialised studies of the jasperoids have been undertaken by USGS and the
different mining companies. Sampling of these rocks commonly reveals anomalous concentrations of gold.
Geology Deposit type, geological setting,
and style of mineralisation.
The mineralisation presented at the Drum area includes different types and mineralisation styles, main of which are
Carlin-like gold, gold-bearing skarns, Cu-Mo-Au porphyries, and Marigold-type.
The focus of the Alderan’s exploration efforts at Detroit/Drum is to discover a Carlin-like gold deposit. Key feature of
Carlin-like deposits includes:
a)
Favorable permeable reactive rocks (silty limestones and limey siltstones)
b)
Favorable structures often coincident with mineral-related intrusive
c)
Gold-bearing hydrothermal solutions
d)
Micron-sized gold in fine-grained disseminated pyrite
e)
Common geochemical indicators are: As, Sb, Ba, Te, Se, Hg
f)
Common argillization, development of the jasperoids and decalcification of the host rocks.
This mineralisation was explored, and mineralised bodies delineated in the Detroit/Drum area by the drillhole, that
is presented inthis announcement.
Other types of mineralisation, representing exploration targets of Alderan in the Drum mountains area includes:
1.
Intrusion hosted/related gold mineralisation positions.
2.
Marigold style brecciated quartzites, which can spatially associate with the Carlin-like mineralisation.
3.
Magnetite copper-gold skarns that were identified through the ground magnetics.
Drill
hole
Information
A summary of all information
material to the understanding of
the exploration results including a
tabulation
of
the
following
information for all Material drill
holes:
Current announcement is focused on the new drilling results, the drillhole 9DD22-001.
Location of the drillhole collar is as follows:
-
327 449 East and 4 377 326 North’
-
1826.1m RL
-
Drilled toward 98o Azimuth at the Dip -60o
-
Drillhole is 120m deep
Easting and Northing of the drill
hole
collar.
Elevation
or
RL
(Reduced Level – elevation above
sea level in metres) of the drill hole
collar.
Dip and azimuth of the hole.
Down hole length and interception
depth_and_hole length.
If the exclusion of this information
is justified on the basis that the
information is not Material and this
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
Not applicable. Drillhole details are presented without exclusion.
Data
aggregation
methods
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (e.g. cutting of high
grades) and cut-off grades are
usually Material and should be
stated.
Length weighted average was used for estimation the grade of the intersection. The samples grade of the
mineralised interval varied from 0.03 to 6.01 g/t Au.
Where
aggregate
intercepts
incorporate short lengths of high-
grade results and longer lengths of
low-grade results, the procedure
used for such aggregation should
be
stated
and
some
typical
examples of such aggregations
should be shown in detail.
The intersections presented in this ASX announcement have been estimated using the length weighing method,
which is a standard technique broadly used at the mining industry.
The assumptions used for any
reporting
of
metal
equivalent
values should be clearly stated.
Not applicable, this ASX announcement reports the gold grade.
Relationship
between
mineralisation
widths
and
intercept
lengths
These
relationships
are
particularly
important
in
the
reporting of Exploration Results.
The drill holes were drilled vertically down that is approximately perpendicular to the gently dipping gold
mineralisation and provides intersections which lengths reasonably approximate the true thicknesses of the gold
lodes.
If
the
geometry
of
the
mineralisation with respect to the
drill hole angle is known, its nature
should be reported.
Mineralisation is gently dipping at approximately 15o degrees toward the west at the 220o Azimuth. Orientation of
the 9DD22-001 drillhole is appropriate for defining the mineralised intersections as it is shown on the cross-section.
Figure A2.1:Cross-section through the 9DD22-001 drillhole
If it is not known and only the
down hole lengths are reported,
there should be a clear statement
to this effect (e.g. ‘down hole
length, true width not known’).
Grade and length of mineralised intersections, estimated using 0.15g/t Au as lower cut-off. Because the drilling was
oriented approximately perpendicular to the strike of the gold lodes it is assumed that reported intersections (Figure
A2.1) are closely approximate their true thickness.
Diagrams Appropriate maps and sections
(with scales) and tabulations of
intercepts should be included for
any significant discovery being
reported These should include, but
not be limited to a plan view of drill
hole
collar
locations
and
appropriate sectional views.
Maps and tables are presented in the text of this ASX release and in the JORC Table 1.
Balanced
reporting
Where comprehensive reporting of
all Exploration Results is not
practicable,
representative
reporting of both low and high
grades and/or widths should be
practiced to avoid misleading
reporting of Exploration Results.
The release is focused on presenting the new drilling results verifying presence of the gold mineralisation remaining
outside of the pit shell.
Other
substantive
exploration
data
Other
exploration
data,
if
meaningful and material, should
be reported including (but not
limited
to):
geological
observations; geophysical survey
results;
geochemical
survey
results; bulk samples – size and
method of treatment; metallurgical
test
results;
bulk
density,
groundwater, geotechnical and
rock
characteristics;
potential
deleterious
or
contaminating
substances.
Alderan geologists has sampled the gold mineralisation exposed on the pit walls that also has confirmed presence
of the remnant gold mineralisation (Refer ASX announcement dated 16 December 2021).
Further work The nature and scale of planned
further work (e.g. tests for lateral
extensions or depth extensions or
large-scale
step-out
drilling).
Diagrams clearly highlighting the
areas of possible extensions,
including
the
main
geological
interpretations and future drilling
areas, provided this information is
not commercially sensitive.
The extension of the Yellow Cat gold lodes and new targets will be explored by drilling during the next phase of
exploration which is currently planned and will be announced separately. This will include detailed IP survey that
proved to be successful for generating the exploration targets in the central parts of the Drum-Detroit project of
Alderan.