Skip to main content

AI assistant

Sign in to chat with this filing

The assistant answers questions, extracts KPIs, and summarises risk factors directly from the filing text.

GREAT BOULDER RESOURCES LIMITED Capital/Financing Update 2023

Jul 23, 2023

64967_rns_2023-07-23_4dc07389-a5f6-44d1-9eff-1a013e6c2663.pdf

Capital/Financing Update

Open in viewer

Opens in your device viewer

==> picture [595 x 129] intentionally omitted <==

----- Start of picture text -----

ASX Announcement
24 JULY 2023
----- End of picture text -----

HIGH GRADE GOLD IN DIAMOND DRILLING AT IRONBARK & MULGA BILL

HIGHLIGHTS

  • A 5-hole diamond drilling program designed to provide geological structural information has intersected a number of high-grade gold lodes at Side Well. Highlights include:

  • 7.02m @ 10.50g/t Au from 122m, including 0.45m @ 102.5g/t Au from 122.8m in 23IBDD001 at Ironbark

  • 19.25m @ 5.22g/t Au from 121m, including 2.2m @ 10.64g/t Au from 126m and 2.25m @ 19.69g/t Au from 138m in 23IBRCD021 at Ironbark

  • 0.3m @ 41.30g/t Au from 195.95m, and 1.38m @ 8.92g/t from 246.7m including 0.36m @ 28.9g/t Au from 246.7m in 23MBRCD039 at Mulga Bill

  • 1m @ 45.60g/t Au from 142m in 23MBRCD040 at Mulga Bill

  • AC drilling around Ironbark and at Mulga Bill North designed to generate new and refine existing targets for follow up RC drill testing is now complete with receipt of assays expected in August

  • 4,000m RC drill program scheduled to commence next week targeting Cervelo and Malvern lodes, including the “gap” area between the Central and HGV zones at Mulga Bill

Great Boulder Resources (“ Great Boulder ” or the “ Company ”) (ASX: GBR ) is pleased to provide an update on recent exploration activity at the Company’s flagship Side Well Gold Project (“ Side Well ”) near Meekatharra in Western Australia.

Great Boulder’s Managing Director, Andrew Paterson commented:

“These five diamond holes were designed to provide structural information at Ironbark and Mulga Bill so it’s great to see high-grade gold intersections in all five holes, particularly the two wide zones at Ironbark.”

“The structural orientations and new assay data will feed back into our resource model at both deposits. We are hoping to have a resource update completed during the fourth quarter of this year.”

“Meanwhile we will have the RC rig back on site for the start of August, and we’re finalising heritage survey plans for the Ironbark corridor so we can start drilling those new targets as quickly as possible.”

ASX Code: GBR Contact: Andrew Paterson, Managing Director E: [email protected] GREATBOULDER.COM.AU P: +61 8 9321 6037 Level 1, 51 Colin St West Perth WA 6005 ABN 70 611 695 955

ASX Announcement 24 JULY 2023

2

==> picture [48 x 57] intentionally omitted <==

==> picture [48 x 57] intentionally omitted <==

Three diamond holes were drilled at Ironbark and two at Mulga Bill for a total of 1,157.96m: 516m of RC pre-collars and the remainder diamond core. The holes were primarily designed to provide structural information to allow GBR’s geologists to correlate and confirm orientations of mineralised structures and vein sets.

All holes were logged on site for structure, lithology, alteration and mineralisation before being transported to Perth for cutting, sampling and assaying.

There were intervals of core loss during drilling, some of which are within the significant intersections noted here and in Table 3 below. Any core loss intervals are assigned a default grade of 0g/t Au when calculating the average grade of each interval.

==> picture [402 x 479] intentionally omitted <==

FIGURE 1: SPECKS OF VISIBLE GOLD IN 23IBRCD020 AT IRONBARK, 110.44M TO 111.16M DOWN HOLE.

E: [email protected] GREATBOULDER.COM.AU ABN 70 611 695 955

ASX Code: GBR Contact: Andrew Paterson, Managing Director P: +61 8 9321 6037 Level 1, 51 Colin St West Perth WA 6005

ASX Announcement

3

24 JULY 2023

==> picture [48 x 57] intentionally omitted <==

==> picture [48 x 57] intentionally omitted <==

Next Steps

AC drilling around Ironbark and at Mulga Bill North designed to generate new and refine existing targets for follow up RC drill testing is now complete with receipt of assays expected in August.

The Challenge Drilling RC rig is scheduled to return to site at the end of July to commence a 4,000m program at Mulga Bill concentrating on the Cervelo and Malvern lodes, including the “gap” area between the Central and HGV zones.

GBR is working with the Yugunga Nya Heritage Officer to finalise costs and timing for heritage surveys to commence over the Ironbark corridor. This program is the next step in the process of opening up the new high priority targets on the eastern side of Side Well for initial exploration.

==> picture [469 x 468] intentionally omitted <==

==> picture [202 x 9] intentionally omitted <==

----- Start of picture text -----

FIGURE 2: IRONBARK SECTION 7058825N.
----- End of picture text -----

E: [email protected] GREATBOULDER.COM.AU ABN 70 611 695 955

ASX Code: GBR Contact: Andrew Paterson, Managing Director P: +61 8 9321 6037 Level 1, 51 Colin St West Perth WA 6005

ASX Announcement

4

24 JULY 2023

==> picture [48 x 57] intentionally omitted <==

==> picture [48 x 57] intentionally omitted <==

==> picture [469 x 469] intentionally omitted <==

FIGURE 3: IRONBARK SECTION 7058875N.

Ironbark hole 23IBRCD021 (Figure 3) is slightly offset from previous RC hole 23IBRC007. Both holes were drilled after the resource wireframes were interpreted based on drilling up to the end of 2022. Pleasingly, both new holes on this section intersected thicker high-grade mineralisation than the February resource model.

E: [email protected] GREATBOULDER.COM.AU ABN 70 611 695 955

ASX Code: GBR Contact: Andrew Paterson, Managing Director P: +61 8 9321 6037 Level 1, 51 Colin St West Perth WA 6005

ASX Announcement

5

24 JULY 2023

==> picture [48 x 57] intentionally omitted <==

==> picture [48 x 57] intentionally omitted <==

==> picture [452 x 452] intentionally omitted <==

FIGURE 4: IRONBARK SECTION 7059085N.

The intersection in hole 23IBRCD020 (Figure 4) included a vein with visible gold shown in figure 1, however this section assayed 42.40g/t Au.

This announcement has been approved by the Great Boulder Board.

==> picture [233 x 39] intentionally omitted <==

For further information contact:

Andrew Paterson

Media

Managing Director Great Boulder Resources Limited [email protected] www.greatboulder.com.au

Lucas Robinson Corporate Storytime +61 408 228 889 [email protected]

==> picture [15 x 15] intentionally omitted <==

Follow GBR on LinkedIn

==> picture [18 x 15] intentionally omitted <==

Follow GBR on Twitter

E: [email protected] GREATBOULDER.COM.AU ABN 70 611 695 955

ASX Code: GBR Contact: Andrew Paterson, Managing Director P: +61 8 9321 6037 Level 1, 51 Colin St West Perth WA 6005

ASX Announcement

6

24 JULY 2023

==> picture [48 x 57] intentionally omitted <==

==> picture [48 x 57] intentionally omitted <==

==> picture [410 x 497] intentionally omitted <==

FIGURE 5: PLAN VIEW OF THE RECENT COLLAR POSITIONS AT IRONBARK.

TABLE 1: SIDE WELL INFERRED MINERAL RESOURCE (ASX 1 FEB 2023)

Deposit Category Tonnes Grade (g/t Au) Au (Koz)
Mulga Bill Inferred 5,258,000 2.5 431,000
Ironbark Inferred 934,000 2.9 87,000
Global Resource Total 6,192,000 2.6 518,000
Resources reported at a cut-off grade of 0.5g/tgoldfor openpit and 1.0g/tfor underground

E: [email protected] ABN 70 611 695 955

ASX Code: GBR Contact: Andrew Paterson, Managing Director P: +61 8 9321 6037 Level 1, 51 Colin St West Perth WA 6005

GREATBOULDER.COM.AU

ASX Announcement 24 JULY 2023

7

==> picture [48 x 57] intentionally omitted <==

==> picture [48 x 57] intentionally omitted <==

==> picture [410 x 497] intentionally omitted <==

FIGURE 6: PLAN VIEW OF RECENT COLLAR POSITIONS AT MULGA BILL.

The next phase of RC drilling at Mulga Bill will continue defining lode positions at Cervelo and also the Malvern lodes (shown in red on Figure 6) linking the Central and HGV zones.

E: [email protected] GREATBOULDER.COM.AU ABN 70 611 695 955

ASX Code: GBR Contact: Andrew Paterson, Managing Director P: +61 8 9321 6037 Level 1, 51 Colin St West Perth WA 6005

ASX Announcement

8

24 JULY 2023

==> picture [48 x 57] intentionally omitted <==

==> picture [48 x 57] intentionally omitted <==

==> picture [359 x 358] intentionally omitted <==

FIGURE 7: SIDE WELL IS STRATEGICALLY LOCATED CLOSE TO EXISTING MINES AND INFRASTRUCTURE

COMPETENT PERSON’S STATEMENT

Exploration information in this Announcement is based upon work undertaken by Mr Andrew Paterson who is a Member of the Australasian Institute of Geoscientists (AIG). Mr Paterson has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (JORC Code). Mr Paterson is an employee of Great Boulder Resources and consents to the inclusion in the report of the matters based on their information in the form and context in which it appears.

The information that relates to Mineral Resources was first reported by the Company in its announcement to the ASX on 1 February 2023. The Company is not aware of any new information or data that materially affects the information included in this announcement and that all material assumptions and technical parameters underpinning the estimates continue to apply and have not material changed. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.

E: [email protected] GREATBOULDER.COM.AU ABN 70 611 695 955

ASX Code: GBR Contact: Andrew Paterson, Managing Director P: +61 8 9321 6037 Level 1, 51 Colin St West Perth WA 6005

ASX Announcement

9

24 JULY 2023

==> picture [48 x 57] intentionally omitted <==

==> picture [48 x 57] intentionally omitted <==

ABOUT GREAT BOULDER RESOURCES

Great Boulder is a mineral exploration company with a portfolio of highly prospective gold and base metals assets in Western Australia ranging from greenfields through to advanced exploration. The Company’s core focus is the Side Well Gold Project at Meekatharra in the Murchison gold field, where the Company has an Inferred Mineral Resource of 6.192Mt @ 2.6g/t Au for 518,000oz Au. The Company is also progressing early-stage exploration at Wellington Base Metal Project located in an emerging MVT province. With a portfolio of highly prospective assets plus the backing of a strong technical team, the Company is well positioned for future success.

==> picture [269 x 326] intentionally omitted <==

CAPITAL STRUCTURE

504.3M $6.5M

SHARES ON ISSUE ASX: GBR

CASH Post Entitlement Issue April 2023

$40.3M

Nil

MARKET CAP At $0.080/sh

DEBT As at 31 Mar 2023

$2.3M

LISTED INVESTMENT Cosmo Metals (ASX:CMO)

30.1M UNLISTED OPTIONS

$50k

DAILY LIQUIDITY Average 30-day value traded

30.1%

TOP 20 OWNERSHIP

==> picture [75 x 75] intentionally omitted <==

Exploring WA Gold & Base Metal assets, located in proximity to operating mines & infrastructure

==> picture [75 x 75] intentionally omitted <==

Developing a significant high grade, large scale gold system at Side Well

==> picture [74 x 75] intentionally omitted <==

Technically focused exploration team with a strong track record of discovery

==> picture [74 x 75] intentionally omitted <==

Undertaking smart, innovative & systematic exploration

==> picture [75 x 75] intentionally omitted <==

Ongoing drilling at multiple projects providing consistent, material newsflow

E: [email protected] GREATBOULDER.COM.AU ABN 70 611 695 955

ASX Code: GBR Contact: Andrew Paterson, Managing Director P: +61 8 9321 6037 Level 1, 51 Colin St West Perth WA 6005

ASX Announcement

10

24 JULY 2023

==> picture [48 x 57] intentionally omitted <==

==> picture [48 x 57] intentionally omitted <==

TABLE 2: DRILL HOLE COLLAR DETAILS. COORDINATES ARE IN GDA94, ZONE 50.

Prospect Hole ID Easting Northing RL Depth Pre-
collar
Dip Azi
Ironbark 23IBDD001 660008 7058826 517 186.2 101 -55 90
Ironbark 23IBRCD020 660057 7059085 517 150 78 -55 90
Ironbark 23IBRCD021 660029 7058885 517 156.26 102 -55 90
Mulga Bill 23MBRCD039 658261 7061000 510 379.3 186 -60 87
Mulga Bill 23MBRCD040 658331 7060375 511 286.2 150 -55 87

TABLE 3: SIGNIFICANT INTERSECTIONS.

Prospect Hole ID From To Width Grade g/t Au Comments
Ironbark 23IBRCD020
(RC to 78m)
Including
4
110
110.44
127.45
131.9
8
111.16
111.16
128
133.75
4
1.16
0.72
0.55
1.85
0.12
26.53
42.40
0.82
1.92
4m composite

Includes 0.3m core loss
23IBDD001
Including
122
122.8
152
129.02
123.25
152.84
7.02
0.45
0.84
10.50
102.5
1.33
No RC pre-collar
23IBRCD021
Including
Including
121
126
138
140.25
128.2
140.25
19.25
2.2
2.25
5.22
10.64
19.69
Includes 1.7m core loss
Includes 0.4m core loss
(RC to 102m)
Mulga Bill 23MBRCD039
(RC to 186m)
Including
60
160
195.95
222.72
246.7
246.7
250.35
257.52
308.6
319
333.9
358.85
359.93
64
164
196.25
223.5
248.08
247.06
250.65
258
309
319.5
334.48
359.15
360.29
4
4
0.3
0.78
1.38
0.36
0.3
0.48
0.4
0.5
0.58
0.3
0.36
1.43
0.96
41.3
1.38
8.92
28.9
1.01
5.01
1.71
1.63
8.61
6.48
3.44
4m composite
4m composite







23MBRCD040
(RC to 150m)
88
97
125
142
148
177.07
219.6
224.43
92
99
126
143
149
177.84
219.9
224.84
4
2
1
1
1
0.77
0.3
0.41
0.10
0.58
1.18
45.6
8.65
1.04
4.07
1.71
4m composite




E: [email protected] GREATBOULDER.COM.AU ABN 70 611 695 955

ASX Code: GBR Contact: Andrew Paterson, Managing Director P: +61 8 9321 6037 Level 1, 51 Colin St West Perth WA 6005

ASX Announcement

11

24 JULY 2023

==> picture [48 x 57] intentionally omitted <==

==> picture [48 x 57] intentionally omitted <==

Appendix 1 - JORC Code, 2012 Edition Table 1 (Side Well Project)

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria Commentary
Sampling techniques RC samples were collected into calico bags over 1m intervals using a cyclone splitter. The residual
bulk samples are placed in lines of piles on the ground. 2 cone splits are taken off the rig splitter for
RC drilling. Visually prospective zones were sampled over 1m intervals and sent for analysis while the
rest of the hole was composited over 4m intervals by taking a scoop sample from each 1m bag.
Core samples are selected visually based on observations of alteration and mineralisation and
sampled to contacts or metre intervals as appropriate. Once samples are marked the core is cut in
half longitudinally with one half taken for assay and the other half returned to the core tray.
AC samples were placed in piles on the ground with 4m composite samples taken using a scoop.
Auger samples are recovered from the auger at blade refusal depth. Auger drilling is an open-hole
technique.
Drilling techniques Industry standard drilling methods and equipment were utilised.
Auger drilling was completed using a petrol-powered hand-held auger.
Drill sample recovery Sample recovery data is noted in geological comments as part of the logging process. Sample
condition has been logged for every geological interval as part of the logging process. Water was
encountered during drilling resulting in minor wet and moist samples with the majority being dry.
No quantitative twinned drilling analysis has been undertaken.
Logging Geological logging of drilling followed established company procedures. Qualitative logging of
samples includes lithology, mineralogy, alteration, veining and weathering. Abundant geological
comments supplement logged intervals.
Sub-sampling techniques
and sample preparation
1m cyclone splits and 4m speared composite samples were taken in the field. Samples were
prepared and analysed at ALS Laboratories Perth for the RC drilling and Intertek Laboratories for
the AC drilling. Samples were pulverized so that each samples had a nominal 85% passing 75
microns. Au analysis was undertaken using Au-AA26 involving 50g lead collection fire assay and
Atomic Adsorption Spectrometry (AAS) finish. For AC drilling, Au analysis was undertaken using a
50g lead collection fire assay with ICP-OES finish.
Multi-element analysis was completed at both ALS and Intertek Laboratories. Digestion was
completed using both 4 Acid and Aqua-regia and analysed by ICP-AES and ICP-MS (Intertek code
4A/MS48, ALS codes ME-MS61, ME-ICP41-ABC).
Quality of assay data
and laboratory tests
All samples were assayed by industry standard techniques.
Verification of sampling
and assaying
The standard GBR protocol was followed for insertion of standards and blanks with a blank and
standard inserted per 25 for RC drilling and 40 samples for AC drilling. Analysis of ME was typically
done on master pulps after standard gold analysis with a company multi-element standard inserted
every 50 samples. No QAQC problems were identified in the results. No twinned drilling has been
undertaken.
Data spacing and
distribution
The spacing and location of the majority of drilling in the projects is, by the nature of early
exploration, variable.
The spacing and location of data is currently only being considered for exploration purposes.
Orientation of data in
relation to geological
structure
Drilling is dominantly perpendicular to regional geological trends where interpreted and practical.
True width and orientation of intersected mineralisation is currently unknown or not clear.
The spacing and location of the data is currently only being considered for exploration purposes.

E: [email protected] ABN 70 611 695 955

ASX Code: GBR Contact: Andrew Paterson, Managing Director P: +61 8 9321 6037 Level 1, 51 Colin St West Perth WA 6005

GREATBOULDER.COM.AU

ASX Announcement

12

24 JULY 2023

==> picture [48 x 57] intentionally omitted <==

==> picture [48 x 57] intentionally omitted <==

Sample security GBR personnel were responsible for delivery of samples from the drill site to the courier companies
dispatch center in Meekatharra. Samples were transported by Toll Ipec from Meekatharra to the
laboratories in Perth.
Audits or reviews Data review and interpretation by independent consultants on a regular basis. Group technical
meetings are usually held monthly.

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria Commentary
Mineral tenement and
land tenure status
Side Well tenement E51/1905 is a 48-block exploration license covering an area of 131.8km2
immediately east and northeast of Meekatharra in the Murchison province. The tenement is a 75:25
joint venture between Great Boulder and Zebina Minerals Pty Ltd.
Exploration done by
other parties
Tenement E51/1905 has a protracted exploration history but is relatively unexplored compared to
other regions surrounding Meekathara.
Geology The Side Well tenement group covers a portion of the Meekatharra-Wydgee Greenstone Belt north
of Meekatharra, WA. The north-northeasterly-trending Archaean Meekatharra-Wydgee Greenstone
Belt, comprises a succession of metamorphosed mafic to ultramafic and felsic and sedimentary rocks
belonging to the Luke Creek and Mount Farmer Groups.
Over the northern extensions of the belt, sediments belonging to the Proterozoic Yerrida Basin
unconformably overlie Archaean granite-greenstone terrain. Structurally, the belt takes the form of
a syncline known as the Polelle syncline. Younger Archaean granitoids have intrusive contacts with
the greenstone succession and have intersected several zones particularly in the Side Well area.
Within the Side Well tenement group, a largely concealed portion of the north-north-easterly
trending Greenstone Belt is defined, on the basis of drilling and airborne magnetic data, to underlie
the area. The greenstone succession is interpreted to be tightly folded into a south plunging syncline
and is cut by easterly trending Proterozoic dolerite dykes.
There is little to no rock exposure at the Side Well prospect. This area is covered by alluvium and
lacustrine clays, commonly up to 60 metres thick.
Drill hole Information A list of the drill hole coordinates, orientations and intersections reported in this announcement are
provided as an appended table.
Data aggregation
methods
Results were reported using cut-off levels relevant to the sample type. For composited samples
significant intercepts were reported for grades greater than 0.1g/t Au with a maximum dilution of
4m. For single metre splits, significant intercepts were reported for grades greater than 0.5g/t Au
with a maximum dilution of 3m.
A weighted average calculation was used to allow for bottom of hole composites that were less than
the standard 4m and when intervals contain composited samples plus 1m split samples.
No metal equivalents are used.
Relationship between
mineralisation widths
and intercept lengths
The orientation of structures and mineralisation is not known with certainty, but majority of the
drilling drilling was conducted using appropriate perpendicular orientations for interpreted
mineralisation. Stratigraphy appears to be steeply dipping to the west however mineralisation may
have a different orientation.
Diagrams Refer to figures in announcement.
Balanced reporting It is not practical to report all historical exploration results from the Side Well project. Selected
historical intercepts have been re-reported by GBR to highlight the prospectivity of the region. Full
drillhole details can be found in publicly available historical annual reports.
Other substantive
exploration data
Subsequent to Doray Minerals Limited exiting the project in 2015, private companies have held the
ground with no significant work being undertaken.
Further work Further work is discussed in the document.

ASX Code: GBR Contact: Andrew Paterson, Managing Director E: [email protected] P: +61 8 9321 6037 Level 1, 51 Colin St West Perth WA 6005 ABN 70 611 695 955

GREATBOULDER.COM.AU